-
1
-
-
77955716145
-
The impact of emerging information technology on project management for construction
-
T. Froese The impact of emerging information technology on project management for construction Automation in Construction 19 5 2010 531 538
-
(2010)
Automation in Construction
, vol.19
, Issue.5
, pp. 531-538
-
-
Froese, T.1
-
2
-
-
80054926367
-
Design error reduction: Toward the effective utilization of Building Information Modelling
-
P.E.D. Love, D.J. Edwards, S. Han, and Y.M. Goh Design error reduction: toward the effective utilization of Building Information Modelling Research in Engineering Design 22 3 2011 173 187
-
(2011)
Research in Engineering Design
, vol.22
, Issue.3
, pp. 173-187
-
-
Love, P.E.D.1
Edwards, D.J.2
Han, S.3
Goh, Y.M.4
-
5
-
-
33745017628
-
Describing the changes in architectural information technology to understand design complexity and free-form architectural expression
-
H. Penttilä Describing the changes in architectural information technology to design complexity and free form expression Journal of Information Technology in Construction 11 2006 395 408 (Pubitemid 43877593)
-
(2006)
Electronic Journal of Information Technology in Construction
, vol.11
, pp. 395-408
-
-
Penttila, H.1
-
7
-
-
84860427258
-
-
Institute Of Building Sciences (nibs) Available at (Accessed 23rd May, 2010)
-
National Institute of Building Sciences (NIBS) United States National Building Information Modeling Standard, Version 1, Part 1, Overview, Principles, and Methodologies Available at www.Nibs.org 2007 (Accessed 23rd May, 2010)
-
(2007)
United States National Building Information Modeling Standard, Version 1, Part 1, Overview, Principles, and Methodologies
-
-
-
8
-
-
62549091452
-
Paradigm trajectories of building information modeling practice in project networks
-
J.E. Taylor, and P.G. Bernstein Paradigm trajectories of building information modeling practice in project networks ASCE Journal of Management in Engineering 25 2 2009 69 76
-
(2009)
ASCE Journal of Management in Engineering
, vol.25
, Issue.2
, pp. 69-76
-
-
Taylor, J.E.1
Bernstein, P.G.2
-
10
-
-
0011713414
-
A taxonomy of real and virtual world display integration
-
Y. Ohta H. Tamura, Springer Verlag Berlin
-
P. Milgram, and H. Colquhoun A taxonomy of real and virtual world display integration Y. Ohta H. Tamura, Mixed Reality - Merging Real and Virtual Worlds 1999 Springer Verlag Berlin 1 16
-
(1999)
Mixed Reality - Merging Real and Virtual Worlds
, pp. 1-16
-
-
Milgram, P.1
Colquhoun, H.2
-
13
-
-
79551689722
-
A theoretical framework of a BIM-based multi-disciplinary collaboration platform
-
V. Singh, N. Gu, and X. Wang A theoretical framework of a BIM-based multi-disciplinary collaboration platform Automation in Construction 20 2 2011 134 144
-
(2011)
Automation in Construction
, vol.20
, Issue.2
, pp. 134-144
-
-
Singh, V.1
Gu, N.2
Wang, X.3
-
14
-
-
84864251021
-
Functional requirement of an AR System for supervision, commenting, and strategizing in construction
-
S. Lee, and D.H. Shin Functional requirement of an AR System for supervision, commenting, and strategizing in construction Proceedings of International Conference on Construction Applications of Virtual Reality, Sendai, Japan 2010
-
(2010)
Proceedings of International Conference on Construction Applications of Virtual Reality, Sendai, Japan
-
-
Lee, S.1
Shin, D.H.2
-
17
-
-
33644674627
-
Compatibility issues in Augmented Reality systems for AEC: An experimental prototype study
-
DOI 10.1016/j.autcon.2005.06.002, PII S0926580505000671
-
X. Wang, and P.S. Dunston Compatibility issues in Augmented Reality systems for AEC: an experimental prototype study Automation in Construction 15 3 2006 314 326 (Pubitemid 43332715)
-
(2006)
Automation in Construction
, vol.15
, Issue.3
, pp. 314-326
-
-
Wang, X.1
Dunston, P.S.2
-
18
-
-
36949038465
-
Using augmented reality to plan virtual construction worksite
-
X. Wang Using augmented reality to plan virtual construction worksite International Journal of Advanced Robotic Systems 4 4 2007 501 512 (Pubitemid 350239767)
-
(2007)
International Journal of Advanced Robotic Systems
, vol.4
, Issue.4
, pp. 501-512
-
-
Wang, X.1
-
19
-
-
79955676092
-
An iterative methodology for mapping mixed reality technologies to AEC operations
-
P.S. Dunston, and X. Wang An iterative methodology for mapping mixed reality technologies to AEC operations Journal of Information Technology in Construction 16 2011 509 528
-
(2011)
Journal of Information Technology in Construction
, vol.16
, pp. 509-528
-
-
Dunston, P.S.1
Wang, X.2
-
20
-
-
34547518881
-
Design, strategies, and issues towards an Augmented Reality-based construction training platform
-
X. Wang, and P.S. Dunston Design, strategies, and issues towards an augmented reality-based construction training platform Journal of Information Technology in Construction 12 2007 363 380 (Pubitemid 47187047)
-
(2007)
Electronic Journal of Information Technology in Construction
, vol.12
, pp. 363-380
-
-
Wang, X.1
Dunston, P.S.2
-
22
-
-
84863734598
-
Mobile computing platform for construction site management
-
C. Kim, H. Lim, and H. Kim Mobile computing platform for construction site management Proceedings of 28th International Symposium on Automation and Robotics in Construction, Seoul, Korea 2011 1164 1169
-
(2011)
Proceedings of 28th International Symposium on Automation and Robotics in Construction, Seoul, Korea
, pp. 1164-1169
-
-
Kim, C.1
Lim, H.2
Kim, H.3
-
23
-
-
84863757276
-
A generation step for force reflecting control of a pneumatic excavator based on augmented reality environment
-
N.T. Trung, D.Q. Truong, and K.K. Ahn A generation step for force reflecting control of a pneumatic excavator based on augmented reality environment Proceedings of 28th International Symposium on Automation and Robotics in Construction, Seoul, Korea 2011 637 642
-
(2011)
Proceedings of 28th International Symposium on Automation and Robotics in Construction, Seoul, Korea
, pp. 637-642
-
-
Trung, N.T.1
Truong, D.Q.2
Ahn, K.K.3
-
24
-
-
84863765437
-
A smart crane operations assistance system using augmented reality technology
-
Y.C. Chen, H.L.S. Kang, and S. Hsieh A smart crane operations assistance system using augmented reality technology Proceedings of 28th International Symposium on Automation and Robotics in Construction, Seoul, Korea 2011 643 649
-
(2011)
Proceedings of 28th International Symposium on Automation and Robotics in Construction, Seoul, Korea
, pp. 643-649
-
-
Chen, Y.C.1
Kang, H.L.S.2
Hsieh, S.3
-
25
-
-
77957836985
-
Augmented reality in architecture and design: Potentials and challenges for application
-
X. Wang Augmented reality in architecture and design: potentials and challenges for application International Journal of Architectural Computing 7 2 2009 309 326
-
(2009)
International Journal of Architectural Computing
, vol.7
, Issue.2
, pp. 309-326
-
-
Wang, X.1
-
30
-
-
68349117209
-
Project pathogens: The anatomy of omission errors in construction and resource engineering projects
-
P.E.D. Love, D.J. Edwards, Z. Irani, and D.H.T. Walker Project pathogens: the anatomy of omission errors in construction and resource engineering projects IEEE Transactions on Engineering Management 56 3 2009 425 435
-
(2009)
IEEE Transactions on Engineering Management
, vol.56
, Issue.3
, pp. 425-435
-
-
Love, P.E.D.1
Edwards, D.J.2
Irani, Z.3
Walker, D.H.T.4
-
31
-
-
0000356975
-
Object versus space-based models of visual attention: Implications for the design of head-up displays
-
C.D. Wickens, and J. Long Object versus space-based models of visual attention: implications for the design of head-up displays Journal of Experimental Psychology. Applied 1 1995 179 193
-
(1995)
Journal of Experimental Psychology. Applied
, vol.1
, pp. 179-193
-
-
Wickens, C.D.1
Long, J.2
-
35
-
-
79551686205
-
Technology adoption in the BIM implementation for lean architectural practice
-
Y. Arayici, P. Coates, L. Koskela, M. Kagioglou, C. Usher, and K. O'Reilly Technology adoption in the BIM implementation for lean architectural practice Automation in Construction 20 2 2011 189 195
-
(2011)
Automation in Construction
, vol.20
, Issue.2
, pp. 189-195
-
-
Arayici, Y.1
Coates, P.2
Koskela, L.3
Kagioglou, M.4
Usher, C.5
O'Reilly, K.6
-
38
-
-
84867839822
-
Moving beyond optimism bias and strategic misrepresentation: An explanation for social infrastructure project cost overruns
-
P.E.D. Love, D.J. Edwards, and Z. Irani Moving beyond optimism bias and strategic misrepresentation: an explanation for social infrastructure project cost overruns IEEE Transactions on Engineering Management 99 2012 1 12
-
(2012)
IEEE Transactions on Engineering Management
, vol.99
, pp. 1-12
-
-
Love, P.E.D.1
Edwards, D.J.2
Irani, Z.3
-
39
-
-
78149283543
-
Understanding and facilitating BIM adoption in the AEC industry
-
N. Gu, and K. London Understanding and facilitating BIM adoption in the AEC industry Automation in Construction 19 8 2010 988 999
-
(2010)
Automation in Construction
, vol.19
, Issue.8
, pp. 988-999
-
-
Gu, N.1
London, K.2
-
40
-
-
35649013247
-
Leveraging global markets: Lessons from Alcoa Alumina
-
DOI 10.1016/j.ijinfomgt.2007.08.005, PII S0268401207001089
-
C. Standing, R. Stockdale, and P.E.D. Love Leveraging global markets: lessons from Alcoa Alumina International Journal of Information Management 27 6 2007 432 437 (Pubitemid 350026144)
-
(2007)
International Journal of Information Management
, vol.27
, Issue.6
, pp. 432-437
-
-
Standing, C.1
Stockdale, R.2
Love, P.E.D.3
-
41
-
-
77955715786
-
Design team stories: Exploring interdisciplinary use of 3D object models in practice
-
Moum Design team stories: exploring interdisciplinary use of 3D object models in practice Automation in Construction 19 5 2010 554 569
-
(2010)
Automation in Construction
, vol.19
, Issue.5
, pp. 554-569
-
-
|