-
1
-
-
84897386909
-
AEC (UK) BIM protocol
-
UK
-
(UK) A (2012) AEC (UK) BIM protocol. UK
-
(2012)
-
-
-
2
-
-
84865595461
-
Real-time resource location tracking in building information Models (BIM). In Cooperative Design
-
Costin A, Pradhananga N, Teizer J, Marks E (2012) Real-time resource location tracking in building information Models (BIM). In Cooperative Design, Visualization, and Engineering, pp 41–48
-
(2012)
Visualization, and Engineering
, pp. 41-48
-
-
Costin, A.1
Pradhananga, N.2
Teizer, J.3
Marks, E.4
-
3
-
-
84926278602
-
-
United States Air Force Center for Engineering and the Environment Capital Investment Management, USA:
-
Afceecim (2012) “ATTACHMENT F”—BIM requirement. United States Air Force Center for Engineering and the Environment Capital Investment Management, USA
-
(2012)
“ATTACHMENT F”—BIM requirement
-
-
-
4
-
-
84926279201
-
The contractor’s guide to BIM. Associated General Contractors of America
-
Agc (2009) The contractor’s guide to BIM. Associated General Contractors of America, USA
-
(2009)
USA
-
-
-
5
-
-
77957283609
-
Multi-dimensional building performance data management for continuous commissioning
-
Ahmed A, Ploennigs J, Menzel K et al (2010) Multi-dimensional building performance data management for continuous commissioning. Adv Eng Inform 24:466–475
-
(2010)
Adv Eng Inform
, vol.24
, pp. 466-475
-
-
Ahmed, A.1
Ploennigs, J.2
Menzel, K.3
-
6
-
-
84926279200
-
E202–2008 BIM protocol. American Institute of Architects
-
Aia (2008) E202–2008 BIM protocol. American Institute of Architects, USA
-
(2008)
USA
-
-
-
8
-
-
84888344631
-
BIM approach for automated drafting and design for modular construction manufacturing
-
Alwisy A, Al-Hussein M, Al-Jibouri S (2012) BIM approach for automated drafting and design for modular construction manufacturing. In: Computing in civil engineering (2012), pp 221– 228
-
(2012)
Computing in civil engineering
, vol.2012
, pp. 221-228
-
-
Alwisy, A.1
Al-Hussein, M.2
Al-Jibouri, S.3
-
9
-
-
84926277979
-
-
Mechanical Contractors’ Association, Australia:
-
Amca (2011) BIM-MEPAUS practice. Mechanical Contractors’ Association, Australia
-
(2011)
BIM-MEPAUS practice
-
-
-
10
-
-
84865041022
-
The contractors guide to BIM
-
America A (2005) The contractors guide to BIM. http://iweb.agc.org/iweb/Purchase/ProductDetail.aspx
-
(2005)
-
-
America, A.1
-
11
-
-
84884502984
-
Deviation analysis method for the assessment of the quality of the as-is building information models generated from point cloud data
-
Anil EB, Tang P, Akinci B et al (2013) Deviation analysis method for the assessment of the quality of the as-is building information models generated from point cloud data. Autom Constr 35:507–516
-
(2013)
Autom Constr
, vol.35
, pp. 507-516
-
-
Anil, E.B.1
Tang, P.2
Akinci, B.3
-
12
-
-
84926277978
-
Australian and New Zealand revit standard. Australian and New Zealand Revit Standard Commitee
-
Anzrs (2012) Australian and New Zealand revit standard. Australian and New Zealand Revit Standard Commitee, Australia
-
(2012)
Australia
-
-
-
13
-
-
84934270900
-
BIM guidelines and standards for architects, engineers, and contractors
-
Indiana University Architect’s Office and Engineering Services, USA
-
Aoes (2012) BIM guidelines and standards for architects, engineers, and contractors. Indiana University Architect’s Office and Engineering Services, USA
-
(2012)
-
-
-
14
-
-
84926278600
-
Autodesk I Autodesk Case Studies
-
Autodesk I Autodesk Case Studies. http://usa.autodesk.com/autodesk-inventor/customers/
-
-
-
-
15
-
-
79960269657
-
Building information modeling (BIM): trends, benefits, risks, and challenges for the AEC industry
-
Azhar S (2011) Building information modeling (BIM): trends, benefits, risks, and challenges for the AEC industry. Leadersh Manag Eng 11:241–252
-
(2011)
Leadersh Manag Eng
, vol.11
, pp. 241-252
-
-
Azhar, S.1
-
17
-
-
79551681843
-
Building information modeling for sustainable design and (Formula presented.) rating analysis
-
Azhar S, Carlton WA, Olsen D et al (2011) Building information modeling for sustainable design and $$\text{ LEED }^{\textregistered }$$LEED® rating analysis. Autom Constr 20:217–224
-
(2011)
Autom Constr
, vol.20
, pp. 217-224
-
-
Azhar, S.1
Carlton, W.A.2
Olsen, D.3
-
18
-
-
84887336071
-
-
Building and Construction Authority, Singapore:
-
Bca (2012) Singapore BIM guide. Building and Construction Authority, Singapore
-
(2012)
Singapore BIM guide
-
-
-
19
-
-
84926279199
-
-
Bentley Bentley Software User Case Studies, p 11
-
Bentley Bentley Software User Case Studies, p 11. http://www.bentley.com/enAU/Engineering+Architecture+Construction+Software+Resources/User+Stories/Bentley+Software+User+Case+Studies/
-
-
-
-
20
-
-
84926277354
-
BIM guide. College of the Desert
-
Cd (2011) BIM guide. College of the Desert, USA
-
(2011)
USA
-
-
-
21
-
-
79954424532
-
A review and outlook for a ‘building information model’ (BIM): a multi-standpoint framework for technological development
-
Cerovsek T (2011) A review and outlook for a ‘building information model’ (BIM): a multi-standpoint framework for technological development. Adv Eng Inform 25:224–244
-
(2011)
Adv Eng Inform
, vol.25
, pp. 224-244
-
-
Cerovsek, T.1
-
22
-
-
80053141965
-
Benefits of implementing building information modeling for healthcare facility commissioning
-
Chen C, Dib HY, Lasker GC (2011) Benefits of implementing building information modeling for healthcare facility commissioning. In: Computing in Civil Engineering (2011), pp 578–585
-
(2011)
Computing in Civil Engineering
, vol.2011
, pp. 578-585
-
-
Chen, C.1
Dib, H.Y.2
Lasker, G.C.3
-
23
-
-
84883209973
-
Application of BIM on quantity estimate for reinforced concrete
-
Cheng YM, Chen JY (2013) Application of BIM on quantity estimate for reinforced concrete. Appl Mech Mater 357:2402–2405
-
(2013)
Appl Mech Mater
, vol.357
, pp. 2402-2405
-
-
Cheng, Y.M.1
Chen, J.Y.2
-
24
-
-
84863746764
-
-
Seoul, Korea:
-
Chiu C-T, Hsu T-H, Wang M-T et al (2011) Simulation for steel bridge erection by using BIM tools. In: Proceedings of the 28th ISARC, Seoul, Korea, pp 560–563
-
(2011)
Simulation for steel bridge erection by using BIM tools. In: Proceedings of the 28th ISARC
, pp. 560-563
-
-
Chiu, C.-T.1
Hsu, T.-H.2
Wang, M.-T.3
-
25
-
-
84857373326
-
A parametric approach to the bioclimatic design of large scale projects: the case of a student housing complex
-
Chronis A, Liapi KA, Sibetheros I (2012) A parametric approach to the bioclimatic design of large scale projects: the case of a student housing complex. Autom Constr 22:24–35
-
(2012)
Autom Constr
, vol.22
, pp. 24-35
-
-
Chronis, A.1
Liapi, K.A.2
Sibetheros, I.3
-
26
-
-
84926278599
-
Best Practice guide for professional indemnity insurance when using BIM and, outline scope of services. Construction Industry Council
-
Cic (2013) Best Practice guide for professional indemnity insurance when using BIM and, outline scope of services. Construction Industry Council, UK
-
(2013)
UK
-
-
-
27
-
-
84926277353
-
BIM development criteria and standards for design and construction projects. Capital Improvements Management Services San Antonio
-
Cims (2011) BIM development criteria and standards for design and construction projects. Capital Improvements Management Services San Antonio, USA
-
(2011)
USA
-
-
-
28
-
-
84892713194
-
Impact of BIM-enabled design-to-fabrication on building delivery
-
Clevenger CM, Khan R (2013) Impact of BIM-enabled design-to-fabrication on building delivery. Pract Period Struct Des Constr 19(1),122–128
-
(2013)
Pract Period Struct Des Constr
, vol.19
, Issue.1
, pp. 122-128
-
-
Clevenger, C.M.1
Khan, R.2
-
29
-
-
84926278598
-
BIM standard for AEC industry in UK. AEC (UK) Committee
-
Committee AU (2011) BIM standard for AEC industry in UK. AEC (UK) Committee, UK
-
(2011)
UK
-
-
-
30
-
-
84926278597
-
Smart Market Report
-
New York: USA
-
The Business Value of BIM for Infrastructure (2012) Smart Market Report, McGraw-Hill Construction, New York, USA
-
(2012)
McGraw-Hill Construction
-
-
-
31
-
-
84926278596
-
-
Construction and Real Estate NETwork, Singapore:
-
Corenet (2011) CORENET e-submission system. Construction and Real Estate NETwork, Singapore
-
(2011)
CORENET e-submission system
-
-
-
32
-
-
84926277352
-
MIT CAD and BIM guidelines
-
Engineering, and Construction, USA:
-
Cpec (2011) MIT CAD and BIM guidelines. MIT Campus Planning, Engineering, and Construction, USA
-
(2011)
MIT Campus Planning
-
-
-
33
-
-
84926279198
-
Attachment G - University of Washington CAD and BIM standards. University of Washington Capital Projects Office
-
Cpo (2012) Attachment G - University of Washington CAD and BIM standards. University of Washington Capital Projects Office, USA
-
(2012)
USA
-
-
-
35
-
-
84870822070
-
Implementing ‘Site BIM’: a case study of ICT innovation on a large hospital project
-
Davies R, Harty C (2013) Implementing ‘Site BIM’: a case study of ICT innovation on a large hospital project. Autom Constr 30:15–24
-
(2013)
Autom Constr
, vol.30
, pp. 15-24
-
-
Davies, R.1
Harty, C.2
-
37
-
-
84884559870
-
Real-time safety early warning system for cross passage construction in Yangtze Riverbed Metro Tunnel based on the internet of things
-
Ding LY, Zhou C, Deng QX et al (2013) Real-time safety early warning system for cross passage construction in Yangtze Riverbed Metro Tunnel based on the internet of things. Autom Constr 36:25–37
-
(2013)
Autom Constr
, vol.36
, pp. 25-37
-
-
Ding, L.Y.1
Zhou, C.2
Deng, Q.X.3
-
38
-
-
84926278595
-
BIM guidelines and standards for ARCHITECTS and ENGINEERS. Department of Administration
-
Wisconsin, USA:
-
Doa/Dsf (2009) BIM guidelines and standards for ARCHITECTS and ENGINEERS. Department of Administration, Division of State Facilities, Wisconsin, USA
-
(2009)
Division of State Facilities
-
-
-
39
-
-
38649094993
-
BIM handbook: a guide to building information modeling for owners, managers, designers, engineers and contractors
-
2nd edn, Wiley, New York
-
Eastman C, Teicholz P, Sacks R et al (2011) BIM handbook: a guide to building information modeling for owners, managers, designers, engineers and contractors 2nd edn, Wiley, New York
-
(2011)
-
-
Eastman, C.1
Teicholz, P.2
Sacks, R.3
-
40
-
-
77949484698
-
Using the MD CAD model to develop the time–cost integrated schedule for construction projects
-
Feng C-W, Chen Y-J, Huang J-R (2010) Using the MD CAD model to develop the time–cost integrated schedule for construction projects. Autom Constr 19:347–356
-
(2010)
Autom Constr
, vol.19
, pp. 347-356
-
-
Feng, C.-W.1
Chen, Y.-J.2
Huang, J.-R.3
-
42
-
-
84926278594
-
BIM guidelines. University of Southern California Facilities Management Services
-
Fms (2012) BIM guidelines. University of Southern California Facilities Management Services, USA
-
(2012)
USA
-
-
-
43
-
-
84865594260
-
Cooperative information sharing between a 3D model and structural analysis software for railway viaducts
-
Luo Y, (ed), Springer, Berlin:
-
Fujisawa Y, Yabuki N (2012) Cooperative information sharing between a 3D model and structural analysis software for railway viaducts. In: Luo Y (ed) Cooperative design, visualization, and engineering. Springer, Berlin, pp 203–206
-
(2012)
Cooperative design, visualization, and engineering
, pp. 203-206
-
-
Fujisawa, Y.1
Yabuki, N.2
-
44
-
-
84926277351
-
Kopitnari International Airport—Structure of terminal building–design, fabrication, erection
-
Springer, Berlin:
-
Gazdus H, Futó T (2013) Kopitnari International Airport—Structure of terminal building–design, fabrication, erection. In: Jármai K, Farkas J (eds) Design, fabrication and economy of metal structures. Springer, Berlin, pp 519–524
-
(2013)
Design, fabrication and economy of metal structures
, pp. 519-524
-
-
Gazdus, H.1
Futó, T.2
Jármai, K.3
Farkas, J.4
-
45
-
-
79551684312
-
Challenging electronic procurement in the AEC sector: a BIM-based integrated perspective
-
Grilo A, Jardim-Goncalves R (2011) Challenging electronic procurement in the AEC sector: a BIM-based integrated perspective. Autom Constr 20:107–114
-
(2011)
Autom Constr
, vol.20
, pp. 107-114
-
-
Grilo, A.1
Jardim-Goncalves, R.2
-
46
-
-
84904669736
-
BIM project execution planning guide
-
Group CICR (2010) BIM project execution planning guide. Pennsylvania State University
-
(2010)
Pennsylvania State University
-
-
-
49
-
-
85000904146
-
Georgia Tech BIM requirements and guidelines for architects, engineers and contractors
-
Georgia Tech Facilities Management, USA:
-
Gtfm (2011) Georgia Tech BIM requirements and guidelines for architects, engineers and contractors. Georgia Tech Facilities Management, USA
-
(2011)
-
-
-
50
-
-
84878575659
-
VP-based safety management in large-scale construction projects, a conceptual framework
-
Guo HL, Li H, Li V (2013) VP-based safety management in large-scale construction projects, a conceptual framework. Autom Constr 34,16–24
-
(2013)
Autom Constr
, vol.34
, pp. 16-24
-
-
Guo, H.L.1
Li, H.2
Li, V.3
-
52
-
-
84897371476
-
-
The Hong Kong Institute of Building Information Modeling, Hong Kong:
-
Hkibim (2011) BIM project specification. The Hong Kong Institute of Building Information Modeling, Hong Kong
-
(2011)
BIM project specification
-
-
-
53
-
-
84878364002
-
A study on the benefits of augmented reality in retaining working memory in assembly tasks: a focus on differences in gender
-
Hou L, Wang X (2013) A study on the benefits of augmented reality in retaining working memory in assembly tasks: a focus on differences in gender. Autom Constr 32:38–45
-
(2013)
Autom Constr
, vol.32
, pp. 38-45
-
-
Hou, L.1
Wang, X.2
-
54
-
-
84882317682
-
Using animated augmented reality to cognitively guide assembly
-
Hou L, Wang X, Bernold L et al (2013) Using animated augmented reality to cognitively guide assembly. J Comput Civ Eng 27:439–451
-
(2013)
J Comput Civ Eng
, vol.27
, pp. 439-451
-
-
Hou, L.1
Wang, X.2
Bernold, L.3
-
55
-
-
79551684087
-
BIM-and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 2. Development and site trials
-
Hu Z, Zhang J (2011) BIM-and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 2. Development and site trials. Autom Constr 20:167–180
-
(2011)
Autom Constr
, vol.20
, pp. 167-180
-
-
Hu, Z.1
Zhang, J.2
-
56
-
-
84872313658
-
Integrating BIM and GIS to improve the visual monitoring of construction supply chain management
-
Irizarry J, Karan EP, Jalaei F (2013) Integrating BIM and GIS to improve the visual monitoring of construction supply chain management. Autom Constr 31:241–254
-
(2013)
Autom Constr
, vol.31
, pp. 241-254
-
-
Irizarry, J.1
Karan, E.P.2
Jalaei, F.3
-
57
-
-
84869184207
-
Roadmap for implementation of BIM in the UK construction industry
-
Khosrowshahi F, Arayici Y (2012) Roadmap for implementation of BIM in the UK construction industry. Eng Constr Archit Manag 19:610–635
-
(2012)
Eng Constr Archit Manag
, vol.19
, pp. 610-635
-
-
Khosrowshahi, F.1
Arayici, Y.2
-
58
-
-
78649318463
-
Analysis of an energy efficient building design through data mining approach
-
Kim H, Stumpf A, Kim W (2011) Analysis of an energy efficient building design through data mining approach. Autom Constr 20:37–43
-
(2011)
Autom Constr
, vol.20
, pp. 37-43
-
-
Kim, H.1
Stumpf, A.2
Kim, W.3
-
59
-
-
0032207592
-
Comparison of U.S. project delivery systems
-
Konchar M, Sanvido V (1998) Comparison of U.S. project delivery systems. J Constr Eng Manag 124:435–444
-
(1998)
J Constr Eng Manag
, vol.124
, pp. 435-444
-
-
Konchar, M.1
Sanvido, V.2
-
60
-
-
84926278592
-
BIM standard. Los Angeles Community College District
-
Laccd (2011) BIM standard. Los Angeles Community College District, USA
-
(2011)
USA
-
-
-
61
-
-
84860313079
-
Development of space database for automated building design review systems
-
Lee J-K, Lee J, Jeong Y-S et al (2012) Development of space database for automated building design review systems. Autom Constr 24:203–212
-
(2012)
Autom Constr
, vol.24
, pp. 203-212
-
-
Lee, J.-K.1
Lee, J.2
Jeong, Y.-S.3
-
62
-
-
84863293193
-
Efficiency analysis of set-based design with structural building information modeling (S-BIM) on high-rise building structures
-
Lee S-I, Bae J-S, Cho YS (2012) Efficiency analysis of set-based design with structural building information modeling (S-BIM) on high-rise building structures. Autom Constr 23:20–32
-
(2012)
Autom Constr
, vol.23
, pp. 20-32
-
-
Lee, S.-I.1
Bae, J.-S.2
Cho, Y.S.3
-
63
-
-
45949103855
-
Integrating design and construction through virtual prototyping
-
Li H, Huang T, Kong C et al (2008) Integrating design and construction through virtual prototyping. Autom Constr 17:915– 922
-
(2008)
Autom Constr
, vol.17
, pp. 915-922
-
-
Li, H.1
Huang, T.2
Kong, C.3
-
65
-
-
84870848003
-
Semi-automatic and specification–compliant cost estimation for tendering of building projects based on IFC data of design model
-
Ma Z, Wei Z, Zhang X (2013) Semi-automatic and specification–compliant cost estimation for tendering of building projects based on IFC data of design model. Autom Constr 30:126–135
-
(2013)
Autom Constr
, vol.30
, pp. 126-135
-
-
Ma, Z.1
Wei, Z.2
Zhang, X.3
-
66
-
-
84897380121
-
Beyond the BIM utopia: approaches to the development and implementation of building information modeling
-
Miettinen R, Paavola S (2014) Beyond the BIM utopia: approaches to the development and implementation of building information modeling. Autom Constr 43:84–91
-
(2014)
Autom Constr
, vol.43
, pp. 84-91
-
-
Miettinen, R.1
Paavola, S.2
-
67
-
-
84926279196
-
Rgd BIM standard
-
Ministry of the Interior and Kingdom Relations, The Netherlands:
-
Mikr (2012) Rgd BIM standard. Rijksgebouwendienst (Ministry of the Interior and Kingdom Relations), The Netherlands
-
(2012)
Rijksgebouwendienst
-
-
-
69
-
-
84889073277
-
Improving the design and production data flow of a complex curvilinear geometric glass reinforced concrete façade
-
Moya Q, Pons O (2014) Improving the design and production data flow of a complex curvilinear geometric glass reinforced concrete façade. Autom Constr 38:46–58
-
(2014)
Autom Constr
, vol.38
, pp. 46-58
-
-
Moya, Q.1
Pons, O.2
-
70
-
-
84926279195
-
Det Digitale Byggeri (Digital Construction)
-
National Agency for Enterprise and Construction, Denmark:
-
Naec (2007) Det Digitale Byggeri (Digital Construction). Erhvervsstyrelsen (National Agency for Enterprise and Construction), Denmark
-
(2007)
Erhvervsstyrelsen
-
-
-
71
-
-
84926277348
-
NATSPEC National BIM guide. Construction Information Systems Limited ABN 20 117 574 606
-
Natspec (2011) NATSPEC National BIM guide. Construction Information Systems Limited ABN 20 117 574 606, Australia
-
(2011)
Australia
-
-
-
72
-
-
84926278590
-
BoligBIM (BIM manual)
-
Norwegian Home Builders Association, Norway:
-
Nhba (2011) BoligBIM (BIM manual). Boligprodusentene (Norwegian Home Builders Association), Norway
-
(2011)
Boligprodusentene
-
-
-
73
-
-
84926277977
-
National BIM standard. National Institute of Building Science
-
Nibs (2012) National BIM standard. National Institute of Building Science, USA
-
(2012)
USA
-
-
-
74
-
-
84926277347
-
BIM guidelines and standards for architects and engineers. New York City School Construction Authority
-
Nycsca (2012) BIM guidelines and standards for architects and engineers. New York City School Construction Authority, USA
-
(2012)
USA
-
-
-
76
-
-
84926279193
-
EAD (E/A Design Division) BIM standard manual
-
NJ Engineering Department, USA:
-
Pany&Njed (2012) EAD (E/A Design Division) BIM standard manual. The Port Authority of NY & NJ Engineering Department, USA
-
(2012)
The Port Authority of NY &
-
-
-
77
-
-
84878412814
-
A framework for construction safety management and visualization system
-
Park C-S, Kim H-J (2013) A framework for construction safety management and visualization system. Autom Constr 33,95–103
-
(2013)
Autom Constr
, vol.33
, pp. 95-103
-
-
Park, C.-S.1
Kim, H.-J.2
-
78
-
-
84878418504
-
A framework for proactive construction defect management using BIM, augmented reality and ontology-based data collection template
-
Park C-S, Lee D-Y, Kwon O-S et al (2013) A framework for proactive construction defect management using BIM, augmented reality and ontology-based data collection template. Autom Constr 33:61–71
-
(2013)
Autom Constr
, vol.33
, pp. 61-71
-
-
Park, C.-S.1
Lee, D.-Y.2
Kwon, O.-S.3
-
79
-
-
80053586673
-
Virtual sensors for estimation of energy consumption and thermal comfort in buildings with underfloor heating
-
Ploennigs J, Ahmed A, Hensel B et al (2011) Virtual sensors for estimation of energy consumption and thermal comfort in buildings with underfloor heating. Adv Eng Inform 25:688–698
-
(2011)
Adv Eng Inform
, vol.25
, pp. 688-698
-
-
Ploennigs, J.1
Ahmed, A.2
Hensel, B.3
-
80
-
-
84926277346
-
BIM planning guide for facility owners. The Pennsylvania State University
-
Psu (2012) BIM planning guide for facility owners. The Pennsylvania State University, USA
-
(2012)
USA
-
-
-
81
-
-
53149123235
-
Automated construction activity monitoring system
-
Rebolj D, Babič NČ, Magdič A et al (2008) Automated construction activity monitoring system. Adv Eng Inform 22:493– 503
-
(2008)
Adv Eng Inform
, vol.22
, pp. 493-503
-
-
Rebolj, D.1
Babič, NČ.2
Magdič, A.3
-
82
-
-
84878950855
-
Building information modeling as a tool for the design of airports
-
Sobh T, Elleithy K, (eds), Springer, Netherlands:
-
Ribeiro J, Silva N, Lima E (2010) Building information modeling as a tool for the design of airports. In: Sobh T, Elleithy K (eds) Innovations in computing sciences and software engineering. Springer, Netherlands, pp 611–614
-
(2010)
Innovations in computing sciences and software engineering
, pp. 611-614
-
-
Ribeiro, J.1
Silva, N.2
Lima, E.3
-
83
-
-
80053608291
-
Designing a BIM-based serious game for fire safety evacuation simulations
-
Rüppel U, Schatz K (2011) Designing a BIM-based serious game for fire safety evacuation simulations. Adv Eng Inform 25:600–611
-
(2011)
Adv Eng Inform
, vol.25
, pp. 600-611
-
-
Rüppel, U.1
Schatz, K.2
-
84
-
-
84926277345
-
The use of the building information model in construction logistics and progress tracking in the Worcester trail courthouse. In: Joint international conference on computing and decision making in civil and building engineering
-
Salazar G, Mokbel H, Aboulezz M et al (2006) The use of the building information model in construction logistics and progress tracking in the Worcester trail courthouse. In: Joint international conference on computing and decision making in civil and building engineering, pp 986–995
-
(2006)
pp 986–995
-
-
Salazar, G.1
Mokbel, H.2
Aboulezz, M.3
-
85
-
-
84926277344
-
BIM standards for architects, engineers and contractors. San Diego Community College District
-
Sdccd (2012) BIM standards for architects, engineers and contractors. San Diego Community College District, USA
-
(2012)
USA
-
-
-
86
-
-
84926279192
-
First Steps to BIM competence: a guide for specialist contractors. Specialist Engineering Contractors’ Group and BIM Academy at the University of Northumbria
-
Sec (2013) First Steps to BIM competence: a guide for specialist contractors. Specialist Engineering Contractors’ Group and BIM Academy at the University of Northumbria, UK
-
(2013)
UK
-
-
-
87
-
-
84926277976
-
Senate Properties: BIM requirements
-
Senate Properties, Finland:
-
Sk (2007) Senate Properties: BIM requirements. Senaatti Kiinteistot (Senate Properties), Finland
-
(2007)
Senaatti Kiinteistot
-
-
-
88
-
-
84990309972
-
-
Statsbygg, Norway:
-
Statsbygg (2012) Statsbygg BIM manual. Statsbygg, Norway
-
(2012)
Statsbygg BIM manual
-
-
-
90
-
-
77149152512
-
Automated code compliance checking for building envelope design
-
Tan X, Hammad A, Fazio P (2010) Automated code compliance checking for building envelope design. J Comput Civ Eng 24:203–211
-
(2010)
J Comput Civ Eng
, vol.24
, pp. 203-211
-
-
Tan, X.1
Hammad, A.2
Fazio, P.3
-
91
-
-
80053148707
-
Efficient and effective quality assessment of as-is building information models and 3D laser-scanned data. In: Computing in civil engineering. American Society of Civil Engineers
-
Tang P, Anil E, Akinci B et al (2011) Efficient and effective quality assessment of as-is building information models and 3D laser-scanned data. In: Computing in civil engineering. American Society of Civil Engineers, pp 486–493
-
(2011)
pp 486–493
-
-
Tang, P.1
Anil, E.2
Akinci, B.3
-
92
-
-
62549091452
-
Paradigm trajectories of building information modeling practice in project networks
-
Taylor J, Bernstein P (2009) Paradigm trajectories of building information modeling practice in project networks. J Manag Eng 25:69–76
-
(2009)
J Manag Eng
, vol.25
, pp. 69-76
-
-
Taylor, J.1
Bernstein, P.2
-
93
-
-
70249138274
-
Personnel tracking on construction sites using video cameras
-
Teizer J, Vela PA (2009) Personnel tracking on construction sites using video cameras. Adv Eng Inform 23:452–462
-
(2009)
Adv Eng Inform
, vol.23
, pp. 452-462
-
-
Teizer, J.1
Vela, P.A.2
-
94
-
-
84926278588
-
Professional service provider guidelines and standards
-
Texas, USA:
-
Tfc (2010) Professional service provider guidelines and standards. Texas Facilities Commission, Texas, USA
-
(2010)
Texas Facilities Commission
-
-
-
96
-
-
84926277974
-
BIM guide. Veterans Affairs
-
Va (2010) BIM guide. Veterans Affairs, USA
-
(2010)
USA
-
-
-
97
-
-
84890525940
-
Building information modeling (BIM) for existing buildings—literature review and future needs
-
Volk R, Stengel J, Schultmann F (2014) Building information modeling (BIM) for existing buildings—literature review and future needs. Autom Constr 38:109–127
-
(2014)
Autom Constr
, vol.38
, pp. 109-127
-
-
Volk, R.1
Stengel, J.2
Schultmann, F.3
-
98
-
-
84926277973
-
Vrg Formato Intercambio Datos Edificación (Building Data Exchange Format)
-
Generalitat Valenciana (Valencia Regional Government), Spain
-
Vrg Formato Intercambio Datos Edificación (Building Data Exchange Format). In: Generalitat Valenciana (Valencia Regional Government), Spain
-
-
-
-
99
-
-
84887850438
-
Integrating building information models with construction process simulations for project scheduling support
-
Wang W-C, Weng S-W, Wang S-H et al (2014) Integrating building information models with construction process simulations for project scheduling support. Autom Constr 37:68–80
-
(2014)
Autom Constr
, vol.37
, pp. 68-80
-
-
Wang, W.-C.1
Weng, S.-W.2
Wang, S.-H.3
-
100
-
-
33644674627
-
Compatibility issues in augmented reality systems for AEC: an experimental prototype study
-
Wang X, Dunston PS (2006) Compatibility issues in augmented reality systems for AEC: an experimental prototype study. Autom Constr 15:314–326
-
(2006)
Autom Constr
, vol.15
, pp. 314-326
-
-
Wang, X.1
Dunston, P.S.2
-
101
-
-
84878373156
-
Augmented reality in built environment: classification and implications for future research
-
Wang X, Kim MJ, Love PED et al (2013) Augmented reality in built environment: classification and implications for future research. Autom Constr 32:1–13
-
(2013)
Autom Constr
, vol.32
, pp. 1-13
-
-
Wang, X.1
Kim, M.J.2
Love, P.E.D.3
-
102
-
-
84878587673
-
A conceptual framework for integrating building information modeling with augmented reality
-
Wang X, Love PED, Kim MJ et al (2012) A conceptual framework for integrating building information modeling with augmented reality. Autom Constr 34:37–44
-
(2012)
Autom Constr
, vol.34
, pp. 37-44
-
-
Wang, X.1
Love, P.E.D.2
Kim, M.J.3
-
103
-
-
84858031678
-
A framework for facilitating multi-dimensional information integration, management and visualization in engineering projects
-
Wu I, Hsieh S-H (2012) A framework for facilitating multi-dimensional information integration, management and visualization in engineering projects. Autom Constr 23:71–86
-
(2012)
Autom Constr
, vol.23
, pp. 71-86
-
-
Wu, I.1
Hsieh, S.-H.2
-
104
-
-
84888347782
-
BIM-enabled building commissioning and handover. In: Computing in civil engineering
-
Wu W, Issa RRA (2012) BIM-enabled building commissioning and handover. In: Computing in civil engineering, pp 237–244
-
(2012)
pp 237–244
-
-
Wu, W.1
Issa, R.R.A.2
-
105
-
-
79954557707
-
Using rfid and real-time virtual reality simulation for optimization in steel construction
-
Xie H, Shi W, Issa RR (2011) Using rfid and real-time virtual reality simulation for optimization in steel construction. J Inf Technol Constr 16,291–308
-
(2011)
J Inf Technol Constr
, vol.16
, pp. 291-308
-
-
Xie, H.1
Shi, W.2
Issa, R.R.3
-
106
-
-
84905253349
-
The study of BIM-based MRT structural inspection system
-
Yen C-I, Chen J-H, Huang P-F (2012) The study of BIM-based MRT structural inspection system. J Mech Eng Autom 2:96–101
-
(2012)
J Mech Eng Autom
, vol.2
, pp. 96-101
-
-
Yen, C.-I.1
Chen, J.-H.2
Huang, P.-F.3
-
107
-
-
83755178369
-
Improving construction supply network visibility by using automated materials locating and tracking technology
-
Young DA, Haas CT, Goodrum P et al (2011) Improving construction supply network visibility by using automated materials locating and tracking technology. J Constr Eng Manag 137:976–984
-
(2011)
J Constr Eng Manag
, vol.137
, pp. 976-984
-
-
Young, D.A.1
Haas, C.T.2
Goodrum, P.3
-
108
-
-
79551684087
-
BIM-and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 1. Principles and methodologies
-
Zhang J, Hu Z (2011) BIM-and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 1. Principles and methodologies. Autom Constr 20:155–166
-
(2011)
Autom Constr
, vol.20
, pp. 155-166
-
-
Zhang, J.1
Hu, Z.2
-
109
-
-
84869092675
-
Building information modeling (BIM) and safety: automatic safety checking of construction models and schedules
-
Zhang S, Teizer J, Lee J-K et al (2013) Building information modeling (BIM) and safety: automatic safety checking of construction models and schedules. Autom Constr 29:183–195
-
(2013)
Autom Constr
, vol.29
, pp. 183-195
-
-
Zhang, S.1
Teizer, J.2
Lee, J.-K.3
-
110
-
-
84926279190
-
Automated safety-in-design rule-checking for capital facility projects. In: 13th international conference on construction applications of virtual reality
-
Zhang S, Teizer J, Perez E et al (2013) Automated safety-in-design rule-checking for capital facility projects. In: 13th international conference on construction applications of virtual reality, London
-
(2013)
London
-
-
Zhang, S.1
Teizer, J.2
Perez, E.3
-
111
-
-
84884499651
-
Intelligent generation of bill of quantity from IFC data subject to chinese standard
-
Department of Civil Engineering, Tsinghua University, Glodon Co. Ltd., Beijing, China
-
Zhiliang M, Zhenhua W, Xiude Z et al (2011) Intelligent generation of bill of quantity from IFC data subject to chinese standard. Department of Civil Engineering, Tsinghua University, Glodon Co. Ltd., Beijing, China
-
(2011)
-
-
Zhiliang, M.1
Zhenhua, W.2
Xiude, Z.3
|