-
1
-
-
33847099674
-
A model-based rescheduling framework for managing abnormal supply chain events
-
Adhitya, A., Srinivasan, R., Karimi, I.A., A model-based rescheduling framework for managing abnormal supply chain events. Comput. Chem. Eng. 31:5–6 (2007), 496–518.
-
(2007)
Comput. Chem. Eng.
, vol.31
, Issue.5-6
, pp. 496-518
-
-
Adhitya, A.1
Srinivasan, R.2
Karimi, I.A.3
-
2
-
-
84989493292
-
An experimental study of the effectiveness of rolling schedules in production planning
-
Baker, K.R., An experimental study of the effectiveness of rolling schedules in production planning. Decis. Sci. 8:1 (1977), 19–27.
-
(1977)
Decis. Sci.
, vol.8
, Issue.1
, pp. 19-27
-
-
Baker, K.R.1
-
3
-
-
0037081993
-
A novel branch and bound algorithm for scheduling flowshop plants with uncertain processing times
-
Balasubramanian, J., Grossmann, I.E., A novel branch and bound algorithm for scheduling flowshop plants with uncertain processing times. Comput. Chem. Eng. 26:1 (2002), 41–57.
-
(2002)
Comput. Chem. Eng.
, vol.26
, Issue.1
, pp. 41-57
-
-
Balasubramanian, J.1
Grossmann, I.E.2
-
4
-
-
0037445865
-
Scheduling optimization under uncertainty-an alternative approach
-
Balasubramanian, J., Grossmann, I.E., Scheduling optimization under uncertainty-an alternative approach. Comput. Chem. Eng. 27 (2003), 469–490.
-
(2003)
Comput. Chem. Eng.
, vol.27
, pp. 469-490
-
-
Balasubramanian, J.1
Grossmann, I.E.2
-
5
-
-
3042702298
-
Approximation to multistage stochastic optimization in multiperiod batch plant scheduling under demand uncertainty
-
Balasubramanian, J., Grossmann, I.E., Approximation to multistage stochastic optimization in multiperiod batch plant scheduling under demand uncertainty. Ind. Eng. Chem. Res. 43 (2004), 3695–3713.
-
(2004)
Ind. Eng. Chem. Res.
, vol.43
, pp. 3695-3713
-
-
Balasubramanian, J.1
Grossmann, I.E.2
-
6
-
-
14844327381
-
Adjustable robust solutions of uncertain linear programs
-
Ben-Tal, A., Goryashko, A., Guslitzer, E., Nemirovski, A., Adjustable robust solutions of uncertain linear programs. Math. Program. 99:2 (2004), 351–376.
-
(2004)
Math. Program.
, vol.99
, Issue.2
, pp. 351-376
-
-
Ben-Tal, A.1
Goryashko, A.2
Guslitzer, E.3
Nemirovski, A.4
-
7
-
-
0442266090
-
Robust solutions of Linear Programming problems contaminated with uncertain data
-
Ben-Tal, A., Nemirovski, A., Robust solutions of Linear Programming problems contaminated with uncertain data. Math. Program. 88:3 (2000), 411–424.
-
(2000)
Math. Program.
, vol.88
, Issue.3
, pp. 411-424
-
-
Ben-Tal, A.1
Nemirovski, A.2
-
8
-
-
9644308639
-
Partitioning procedures for solving mixed-variables programming problems
-
Benders, J.F., Partitioning procedures for solving mixed-variables programming problems. Numer. Math. 4 (1962), 238–252.
-
(1962)
Numer. Math.
, vol.4
, pp. 238-252
-
-
Benders, J.F.1
-
9
-
-
84870613023
-
Robust discrete optimization and network flows
-
Bertsimas, D., Sim, M., Robust discrete optimization and network flows. Math. Program., Ser. B 98 (2003), 49–71.
-
(2003)
Math. Program., Ser. B
, vol.98
, pp. 49-71
-
-
Bertsimas, D.1
Sim, M.2
-
10
-
-
0003939480
-
Introduction to Stochastic Programming
-
Springer
-
Birge, J.R., Louveaux, F., Introduction to Stochastic Programming. 1997, Springer.
-
(1997)
-
-
Birge, J.R.1
Louveaux, F.2
-
11
-
-
0022693736
-
A comparison of strategies to dampen nervousness in MRP systems
-
Blackburn, J.D., Kropp, D.H., Millen, R.A., A comparison of strategies to dampen nervousness in MRP systems. INFORMS Manag. Sci. 32:4 (1986), 413–429.
-
(1986)
INFORMS Manag. Sci.
, vol.32
, Issue.4
, pp. 413-429
-
-
Blackburn, J.D.1
Kropp, D.H.2
Millen, R.A.3
-
12
-
-
1642498232
-
Risk management in the scheduling of batch plants under uncertain market demand
-
Bonfill, A., Bagajewicz, M., Espuña, A., Puigjaner, L., Risk management in the scheduling of batch plants under uncertain market demand. Ind. Eng. Chem. Res. 43 (2004), 741–750.
-
(2004)
Ind. Eng. Chem. Res.
, vol.43
, pp. 741-750
-
-
Bonfill, A.1
Bagajewicz, M.2
Espuña, A.3
Puigjaner, L.4
-
13
-
-
14344251891
-
Addressing robustness in scheduling batch processes with uncertain operation times
-
Bonfill, A., Espuña, A., Puigjaner, L., Addressing robustness in scheduling batch processes with uncertain operation times. Ind. Eng. Chem. Res., 44(5), 2005, 1524.
-
(2005)
Ind. Eng. Chem. Res.
, vol.44
, Issue.5
, pp. 1524
-
-
Bonfill, A.1
Espuña, A.2
Puigjaner, L.3
-
14
-
-
44349131406
-
Proactive approach to address the uncertainty in short-term scheduling
-
Bonfill, A., Espuña, A., Puigjaner, L., Proactive approach to address the uncertainty in short-term scheduling. Comput. Chem. Eng. 32:8 (2008), 1689–1706.
-
(2008)
Comput. Chem. Eng.
, vol.32
, Issue.8
, pp. 1689-1706
-
-
Bonfill, A.1
Espuña, A.2
Puigjaner, L.3
-
15
-
-
1642557090
-
A model predictive control framework for robust management of multi-product, multi-echelon demand networks
-
Braun, M., Rivera, D., Flores, M., Carlyle, W., Kempf, K., A model predictive control framework for robust management of multi-product, multi-echelon demand networks. Annu. Rev. Control 27:2 (2003), 229–245.
-
(2003)
Annu. Rev. Control
, vol.27
, Issue.2
, pp. 229-245
-
-
Braun, M.1
Rivera, D.2
Flores, M.3
Carlyle, W.4
Kempf, K.5
-
16
-
-
0001499525
-
Minimizing the effects of batch process variability using online schedule modification
-
Cott, B.J., Macchietto, S., Minimizing the effects of batch process variability using online schedule modification. Comput. Chem. Eng. 13:1–2 (1989), 105–113.
-
(1989)
Comput. Chem. Eng.
, vol.13
, Issue.1-2
, pp. 105-113
-
-
Cott, B.J.1
Macchietto, S.2
-
17
-
-
77950368077
-
Medium-term planning of a multiproduct batch plant under evolving multi-period multi-uncertainty by means of a moving horizon strategy
-
Cui, J., Engell, S., Medium-term planning of a multiproduct batch plant under evolving multi-period multi-uncertainty by means of a moving horizon strategy. Comput. Chem. Eng. 34:5 (2010), 598–619.
-
(2010)
Comput. Chem. Eng.
, vol.34
, Issue.5
, pp. 598-619
-
-
Cui, J.1
Engell, S.2
-
18
-
-
0000685021
-
RTN-based rolling horizon algorithms for medium term scheduling of multipurpose plants
-
Dimitriadis, A., Shah, N., Pantelides, C.C., RTN-based rolling horizon algorithms for medium term scheduling of multipurpose plants. Comput. Chem. Eng. 21:97 (1997), S1061–S1066.
-
(1997)
Comput. Chem. Eng.
, vol.21
, Issue.97
, pp. S1061-S1066
-
-
Dimitriadis, A.1
Shah, N.2
Pantelides, C.C.3
-
19
-
-
84929409676
-
A time scale-bridging approach for integrating production scheduling and process control
-
Du, J., Park, J., Harjunkoski, I., Baldea, M., A time scale-bridging approach for integrating production scheduling and process control. Comput. Chem. Eng. 79 (2015), 59–69.
-
(2015)
Comput. Chem. Eng.
, vol.79
, pp. 59-69
-
-
Du, J.1
Park, J.2
Harjunkoski, I.3
Baldea, M.4
-
20
-
-
36049002767
-
Distributed MPC for dynamic supply chain management
-
Springer Berlin Heidelberg Berlin, Heidelberg
-
Dunbar, W.B., Desa, S., Distributed MPC for dynamic supply chain management. Assessment and Future Directions of Nonlinear Model Predictive Control, 2007, Springer Berlin Heidelberg, Berlin, Heidelberg, 607–615.
-
(2007)
Assessment and Future Directions of Nonlinear Model Predictive Control
, pp. 607-615
-
-
Dunbar, W.B.1
Desa, S.2
-
21
-
-
0033327116
-
A rolling horizon heuristic for reactive scheduling of batch process operations
-
Elkamel, A., Mohindra, A., A rolling horizon heuristic for reactive scheduling of batch process operations. Eng. Optim. 31:6 (1999), 763–792.
-
(1999)
Eng. Optim.
, vol.31
, Issue.6
, pp. 763-792
-
-
Elkamel, A.1
Mohindra, A.2
-
23
-
-
34748843403
-
Optimal reactive scheduling of manufacturing plants with flexible batch recipes
-
Ferrer-Nadal, S., Méndez, C.A., Graells, M., Puigjaner, L., Optimal reactive scheduling of manufacturing plants with flexible batch recipes. Ind. Eng. Chem. Res. 46:19 (2007), 6273–6283.
-
(2007)
Ind. Eng. Chem. Res.
, vol.46
, Issue.19
, pp. 6273-6283
-
-
Ferrer-Nadal, S.1
Méndez, C.A.2
Graells, M.3
Puigjaner, L.4
-
24
-
-
84984982147
-
On deterministic online scheduling: major considerations, paradoxes and remedies
-
Gupta, D., Maravelias, C.T., On deterministic online scheduling: major considerations, paradoxes and remedies. Comput. Chem. Eng. 94 (2016), 312–330.
-
(2016)
Comput. Chem. Eng.
, vol.94
, pp. 312-330
-
-
Gupta, D.1
Maravelias, C.T.2
-
25
-
-
84894902084
-
Scope for industrial applications of production scheduling models and solution methods
-
Harjunkoski, I., Maravelias, C.T., Bongers, P., Castro, P.M., Engell, S., Grossmann, I.E., Hooker, J., Méndez, C.A., Sand, G., Wassick, J.M., Scope for industrial applications of production scheduling models and solution methods. Comput. Chem. Eng. 62 (2014), 161–193.
-
(2014)
Comput. Chem. Eng.
, vol.62
, pp. 161-193
-
-
Harjunkoski, I.1
Maravelias, C.T.2
Bongers, P.3
Castro, P.M.4
Engell, S.5
Grossmann, I.E.6
Hooker, J.7
Méndez, C.A.8
Sand, G.9
Wassick, J.M.10
-
26
-
-
0026206925
-
General reordering algorithm for scheduling of batch processes
-
Hasebe, S., Hashimoto, I., Ishikawa, A., General reordering algorithm for scheduling of batch processes. J. Chem. Eng. Jpn. 24:4 (1991), 483–489.
-
(1991)
J. Chem. Eng. Jpn.
, vol.24
, Issue.4
, pp. 483-489
-
-
Hasebe, S.1
Hashimoto, I.2
Ishikawa, A.3
-
27
-
-
0034306985
-
Knowledge-based predictive and reactive scheduling in industrial environments
-
Henning, G.P., Cerdá, J., Knowledge-based predictive and reactive scheduling in industrial environments. Comput. Chem. Eng. 24:9 (2000), 2315–2338.
-
(2000)
Comput. Chem. Eng.
, vol.24
, Issue.9
, pp. 2315-2338
-
-
Henning, G.P.1
Cerdá, J.2
-
28
-
-
0033135294
-
A framework for schedule evaluation with processing uncertainty
-
Honkomp, S., Mockus, L., Reklaitis, G.V., A framework for schedule evaluation with processing uncertainty. Comput. Chem. Eng. 23:4–5 (1999), 595–609.
-
(1999)
Comput. Chem. Eng.
, vol.23
, Issue.4-5
, pp. 595-609
-
-
Honkomp, S.1
Mockus, L.2
Reklaitis, G.V.3
-
29
-
-
77956768604
-
A constraint approach for rescheduling batch processing plants including pipeless plants
-
Huang, W., Chung, P.W.H., A constraint approach for rescheduling batch processing plants including pipeless plants. Comput. Aided Chem. Eng. 14:C (2003), 161–166.
-
(2003)
Comput. Aided Chem. Eng.
, vol.14
, Issue.100
, pp. 161-166
-
-
Huang, W.1
Chung, P.W.H.2
-
30
-
-
0029224646
-
Incorporating on-line scheduling strategies in integrated batch production control
-
Huercio, A., Espuña, A., Puigjaner, L., Incorporating on-line scheduling strategies in integrated batch production control. Comput. Chem. Eng. 19:95 (1995), 609–614.
-
(1995)
Comput. Chem. Eng.
, vol.19
, Issue.95
, pp. 609-614
-
-
Huercio, A.1
Espuña, A.2
Puigjaner, L.3
-
31
-
-
33846071077
-
Production scheduling of a large-scale industrial batch plant. II. Reactive scheduling
-
Janak, S.L., Floudas, C.A., Kallrath, J., Vormbrock, N., Production scheduling of a large-scale industrial batch plant. II. Reactive scheduling. Ind. Eng. Chem. Res. 45:25 (2006), 8253–8269.
-
(2006)
Ind. Eng. Chem. Res.
, vol.45
, Issue.25
, pp. 8253-8269
-
-
Janak, S.L.1
Floudas, C.A.2
Kallrath, J.3
Vormbrock, N.4
-
32
-
-
33845624253
-
A new robust optimization approach for scheduling under uncertainty. II. Uncertainty with known probability distribution
-
Janak, S.L., Lin, X., Floudas, C.A., A new robust optimization approach for scheduling under uncertainty. II. Uncertainty with known probability distribution. Comput. Chem. Eng. 31:3 (2007), 171–195.
-
(2007)
Comput. Chem. Eng.
, vol.31
, Issue.3
, pp. 171-195
-
-
Janak, S.L.1
Lin, X.2
Floudas, C.A.3
-
33
-
-
3042696417
-
Scheduling under uncertainty using MILP sensitivity analysis
-
Jia, Z., Ierapetritou, M.G., Scheduling under uncertainty using MILP sensitivity analysis. Ind. Eng. Chem. Res. 43 (2004), 3782–3791.
-
(2004)
Ind. Eng. Chem. Res.
, vol.43
, pp. 3782-3791
-
-
Jia, Z.1
Ierapetritou, M.G.2
-
34
-
-
33846267725
-
Generate Pareto optimal solutions of scheduling problems using normal boundary intersection technique
-
Jia, Z., Ierapetritou, M.G., Generate Pareto optimal solutions of scheduling problems using normal boundary intersection technique. Comput. Chem. Eng. 31:4 (2007), 268–280.
-
(2007)
Comput. Chem. Eng.
, vol.31
, Issue.4
, pp. 268-280
-
-
Jia, Z.1
Ierapetritou, M.G.2
-
35
-
-
0003410673
-
Stochastic Programming
-
Wiley New York
-
Kall, P., Wallace, S., Stochastic Programming. 1994, Wiley, New York.
-
(1994)
-
-
Kall, P.1
Wallace, S.2
-
36
-
-
0028173941
-
Reactive schedule modification in multipurpose batch chemical plants
-
Kanakamedala, K.B., Reklaitis, G.V., Venkatasubramanian, V., Reactive schedule modification in multipurpose batch chemical plants. Ind. Eng. Chem. Res. 33 (1994), 77–90.
-
(1994)
Ind. Eng. Chem. Res.
, vol.33
, pp. 77-90
-
-
Kanakamedala, K.B.1
Reklaitis, G.V.2
Venkatasubramanian, V.3
-
37
-
-
0022129820
-
Deterministic variability analysis for intermediate storage in noncontinuous processes. Part I: Allowability conditions
-
sep
-
Karimi, I.A., Reklaitis, G.V., Deterministic variability analysis for intermediate storage in noncontinuous processes. Part I: Allowability conditions. AIChE J. 31:9 (sep 1985), 1516–1527.
-
(1985)
AIChE J.
, vol.31
, Issue.9
, pp. 1516-1527
-
-
Karimi, I.A.1
Reklaitis, G.V.2
-
38
-
-
0034333693
-
New lot-sizing formulations for less nervous production schedules
-
Kazan, O., Nagi, R., Rump, C.M., New lot-sizing formulations for less nervous production schedules. Comput. Oper. Res. 27:13 (2000), 1325–1345.
-
(2000)
Comput. Oper. Res.
, vol.27
, Issue.13
, pp. 1325-1345
-
-
Kazan, O.1
Nagi, R.2
Rump, C.M.3
-
39
-
-
0042734250
-
Rule-based reactive rescheduling system for multi-purpose batch processes
-
Kim, M., Lee, I.-B., Rule-based reactive rescheduling system for multi-purpose batch processes. Comput. Chem. Eng. 21 (1997), S1197–S1202.
-
(1997)
Comput. Chem. Eng.
, vol.21
, pp. S1197-S1202
-
-
Kim, M.1
Lee, I.-B.2
-
40
-
-
0043235502
-
Rescheduling algorithms in case of unit failure for batch process management
-
Ko, D., Moon, I., Rescheduling algorithms in case of unit failure for batch process management. Comput. Chem. Eng. 21:97 (1997), 1067–1072.
-
(1997)
Comput. Chem. Eng.
, vol.21
, Issue.97
, pp. 1067-1072
-
-
Ko, D.1
Moon, I.2
-
41
-
-
0038063333
-
Development of a rescheduling system for the optimal operation of pipeless plants
-
Ko, D., Na, S., Moon, I., Oh, M., Dong-Gu Samsung, T.-S., Development of a rescheduling system for the optimal operation of pipeless plants. Comput. Chem. Eng. 23 (1999), S523–S526.
-
(1999)
Comput. Chem. Eng.
, vol.23
, pp. S523-S526
-
-
Ko, D.1
Na, S.2
Moon, I.3
Oh, M.4
Dong-Gu Samsung, T.-S.5
-
42
-
-
0027545176
-
A general algorithm for short-term scheduling of batch operations-I. MILP formulation
-
Kondili, E., Pantelides, C.C., Sargent, R.W.H., A general algorithm for short-term scheduling of batch operations-I. MILP formulation. Comput. Chem. Eng. 17:2 (1993), 211–227.
-
(1993)
Comput. Chem. Eng.
, vol.17
, Issue.2
, pp. 211-227
-
-
Kondili, E.1
Pantelides, C.C.2
Sargent, R.W.H.3
-
43
-
-
57249089354
-
Costs for rescheduling actions: a critical issue for reducing the gap between scheduling theory and practice
-
Kopanos, G.M., Capón-García, E., Espuña, A., Puigjaner, L., Costs for rescheduling actions: a critical issue for reducing the gap between scheduling theory and practice. Ind. Eng. Chem. Res. 47:22 (2008), 8785–8795.
-
(2008)
Ind. Eng. Chem. Res.
, vol.47
, Issue.22
, pp. 8785-8795
-
-
Kopanos, G.M.1
Capón-García, E.2
Espuña, A.3
Puigjaner, L.4
-
44
-
-
84896531795
-
Reactive scheduling by a multiparametric programming rolling horizon framework: a case of a network of combined heat and power units
-
Kopanos, G.M., Pistikopoulos, E.N., Reactive scheduling by a multiparametric programming rolling horizon framework: a case of a network of combined heat and power units. Ind. Eng. Chem. Res. 53:11 (2014), 4366–4386.
-
(2014)
Ind. Eng. Chem. Res.
, vol.53
, Issue.11
, pp. 4366-4386
-
-
Kopanos, G.M.1
Pistikopoulos, E.N.2
-
45
-
-
84977900509
-
Multi-stage adjustable robust optimization for process scheduling under uncertainty
-
Lappas, N.H., Gounaris, C.E., Multi-stage adjustable robust optimization for process scheduling under uncertainty. AIChE J. 62:5 (2016), 1646–1667.
-
(2016)
AIChE J.
, vol.62
, Issue.5
, pp. 1646-1667
-
-
Lappas, N.H.1
Gounaris, C.E.2
-
46
-
-
0035836308
-
Batch process schedule optimization under parameter volatility
-
Lee, Y.G., Malone, M.F., Batch process schedule optimization under parameter volatility. Int. J. Prod. Res. 39:4 (2001), 603–623.
-
(2001)
Int. J. Prod. Res.
, vol.39
, Issue.4
, pp. 603-623
-
-
Lee, Y.G.1
Malone, M.F.2
-
47
-
-
80052829888
-
A comparative theoretical and computational study on robust counterpart optimization: I. Robust linear optimization and robust mixed integer linear optimization
-
Li, Z., Ding, R., Floudas, C.A., A comparative theoretical and computational study on robust counterpart optimization: I. Robust linear optimization and robust mixed integer linear optimization. Ind. Eng. Chem. Res. 50:18 (2011), 10567–10603.
-
(2011)
Ind. Eng. Chem. Res.
, vol.50
, Issue.18
, pp. 10567-10603
-
-
Li, Z.1
Ding, R.2
Floudas, C.A.3
-
48
-
-
84906346550
-
A comparative theoretical and computational study on robust counterpart optimization: III. Improving the quality of robust solutions
-
Li, Z., Floudas, C.A., A comparative theoretical and computational study on robust counterpart optimization: III. Improving the quality of robust solutions. Ind. Eng. Chem. Res. 53:33 (2014), 13112–13124.
-
(2014)
Ind. Eng. Chem. Res.
, vol.53
, Issue.33
, pp. 13112-13124
-
-
Li, Z.1
Floudas, C.A.2
-
49
-
-
37749011834
-
Process scheduling under uncertainty using multiparametric programming
-
Li, Z., Ierapetritou, M.G., Process scheduling under uncertainty using multiparametric programming. AIChE J. 53:12 (2007), 3183–3203.
-
(2007)
AIChE J.
, vol.53
, Issue.12
, pp. 3183-3203
-
-
Li, Z.1
Ierapetritou, M.G.2
-
50
-
-
38849148294
-
Process scheduling under uncertainty: review and challenges
-
Li, Z., Ierapetritou, M.G., Process scheduling under uncertainty: review and challenges. Comput. Chem. Eng. 32:4–5 (2008), 715–727.
-
(2008)
Comput. Chem. Eng.
, vol.32
, Issue.4-5
, pp. 715-727
-
-
Li, Z.1
Ierapetritou, M.G.2
-
51
-
-
54949139556
-
Reactive scheduling using parametric programming
-
Li, Z., Ierapetritou, M.G., Reactive scheduling using parametric programming. AIChE J. 54:10 (2008), 2610–2623.
-
(2008)
AIChE J.
, vol.54
, Issue.10
, pp. 2610-2623
-
-
Li, Z.1
Ierapetritou, M.G.2
-
52
-
-
47249135022
-
Robust optimization for process scheduling under uncertainty
-
Li, Z., Ierapetritou, M.G., Robust optimization for process scheduling under uncertainty. Ind. Eng. Chem. Res. 47 (2008), 4148–4157.
-
(2008)
Ind. Eng. Chem. Res.
, vol.47
, pp. 4148-4157
-
-
Li, Z.1
Ierapetritou, M.G.2
-
53
-
-
77957358328
-
Rolling horizon based planning and scheduling integration with production capacity consideration
-
Li, Z., Ierapetritou, M.G., Rolling horizon based planning and scheduling integration with production capacity consideration. Chem. Eng. Sci. 65:22 (2010), 5887–5900.
-
(2010)
Chem. Eng. Sci.
, vol.65
, Issue.22
, pp. 5887-5900
-
-
Li, Z.1
Ierapetritou, M.G.2
-
54
-
-
84861168114
-
A comparative theoretical and computational study on robust counterpart optimization: II. Probabilistic guarantees on constraint satisfaction
-
may
-
Li, Z., Tang, Q., Floudas, C.A., A comparative theoretical and computational study on robust counterpart optimization: II. Probabilistic guarantees on constraint satisfaction. Ind. Eng. Chem. Res. 51:19 (may 2012), 6769–6788.
-
(2012)
Ind. Eng. Chem. Res.
, vol.51
, Issue.19
, pp. 6769-6788
-
-
Li, Z.1
Tang, Q.2
Floudas, C.A.3
-
55
-
-
1942532282
-
A new robust optimization approach for scheduling under uncertainty: I. Bounded uncertainty
-
Lin, X., Janak, S.L., Floudas, C.A., A new robust optimization approach for scheduling under uncertainty: I. Bounded uncertainty. Comput. Chem. Eng. 28:6–7 (2004), 1069–1085.
-
(2004)
Comput. Chem. Eng.
, vol.28
, Issue.6-7
, pp. 1069-1085
-
-
Lin, X.1
Janak, S.L.2
Floudas, C.A.3
-
56
-
-
84929379376
-
Production scheduling in the process industry.
-
Lindholm, A., Giselsson, P., Quttineh, N.-H., Lidestam, H., Johnsson, C., Forsman, K., Production scheduling in the process industry. 22nd International Conference on Production Research, 2013.
-
(2013)
22nd International Conference on Production Research
-
-
Lindholm, A.1
Giselsson, P.2
Quttineh, N.-H.3
Lidestam, H.4
Johnsson, C.5
Forsman, K.6
-
57
-
-
84908263973
-
Hierarchical scheduling and disturbance management in the process industry
-
Lindholm, A., Nytzén, N.-P., Hierarchical scheduling and disturbance management in the process industry. Comput. Chem. Eng. 71 (2014), 489–500.
-
(2014)
Comput. Chem. Eng.
, vol.71
, pp. 489-500
-
-
Lindholm, A.1
Nytzén, N.-P.2
-
58
-
-
84860610233
-
General framework and modeling approach classification for chemical production scheduling
-
Maravelias, C.T., General framework and modeling approach classification for chemical production scheduling. AIChE J. 58:6 (2012), 1812–1828.
-
(2012)
AIChE J.
, vol.58
, Issue.6
, pp. 1812-1828
-
-
Maravelias, C.T.1
-
59
-
-
84890960177
-
Robust decision making for hybrid process supply chain systems via model predictive control
-
Mastragostino, R., Patel, S., Swartz, C.L., Robust decision making for hybrid process supply chain systems via model predictive control. Comput. Chem. Eng. 62 (2014), 37–55.
-
(2014)
Comput. Chem. Eng.
, vol.62
, pp. 37-55
-
-
Mastragostino, R.1
Patel, S.2
Swartz, C.L.3
-
60
-
-
0042807254
-
Dynamic scheduling in multiproduct batch plants
-
Méndez, C.A., Cerdá, J., Dynamic scheduling in multiproduct batch plants. Comput. Chem. Eng. 27:8–9 (2003), 1247–1259.
-
(2003)
Comput. Chem. Eng.
, vol.27
, Issue.8-9
, pp. 1247-1259
-
-
Méndez, C.A.1
Cerdá, J.2
-
61
-
-
1942500440
-
An MILP framework for batch reactive scheduling with limited discrete resources
-
Méndez, C.A., Cerdá, J., An MILP framework for batch reactive scheduling with limited discrete resources. Comput. Chem. Eng. 28:6 (2004), 1059–1068.
-
(2004)
Comput. Chem. Eng.
, vol.28
, Issue.6
, pp. 1059-1068
-
-
Méndez, C.A.1
Cerdá, J.2
-
62
-
-
33748102266
-
State-of-the-art review of optimization methods for short-term scheduling of batch processes
-
Méndez, C.A., Cerdá, J., Grossmann, I.E., Harjunkoski, I., Fahl, M., State-of-the-art review of optimization methods for short-term scheduling of batch processes. Comput. Chem. Eng. 30:6–7 (2006), 913–946.
-
(2006)
Comput. Chem. Eng.
, vol.30
, Issue.6-7
, pp. 913-946
-
-
Méndez, C.A.1
Cerdá, J.2
Grossmann, I.E.3
Harjunkoski, I.4
Fahl, M.5
-
63
-
-
33749166362
-
Optimization of operations in supply chain systems using hybrid systems approach and model predictive control
-
Mestan, E., Turkay, M., Arkun, Y., Optimization of operations in supply chain systems using hybrid systems approach and model predictive control. Process Des. Control 45 (2006), 6493–6503.
-
(2006)
Process Des. Control
, vol.45
, pp. 6493-6503
-
-
Mestan, E.1
Turkay, M.2
Arkun, Y.3
-
64
-
-
0029236537
-
A framework for investigating schedule robustness under uncertainty
-
jun
-
Mignon, D., Honkomp, S., Reklaitis, G., A framework for investigating schedule robustness under uncertainty. Comput. Chem. Eng. 19 (jun 1995), 615–620.
-
(1995)
Comput. Chem. Eng.
, vol.19
, pp. 615-620
-
-
Mignon, D.1
Honkomp, S.2
Reklaitis, G.3
-
65
-
-
20344400593
-
A multilevel, control-theoretic framework for integration of planning, scheduling, and rescheduling
-
Munawar, S.A., Gudi, R.D., A multilevel, control-theoretic framework for integration of planning, scheduling, and rescheduling. Ind. Eng. Chem. Res. 44:11 (2005), 4001–4021.
-
(2005)
Ind. Eng. Chem. Res.
, vol.44
, Issue.11
, pp. 4001-4021
-
-
Munawar, S.A.1
Gudi, R.D.2
-
66
-
-
84910071771
-
Extended discrete-time resource task network formulation for the reactive scheduling of a mixed batch/continuous process
-
Nie, Y., Biegler, L.T., Wassick, J.M., Villa, C.M., Extended discrete-time resource task network formulation for the reactive scheduling of a mixed batch/continuous process. Ind. Eng. Chem. Res. 53:44 (2014), 17112–17123.
-
(2014)
Ind. Eng. Chem. Res.
, vol.53
, Issue.44
, pp. 17112-17123
-
-
Nie, Y.1
Biegler, L.T.2
Wassick, J.M.3
Villa, C.M.4
-
67
-
-
77957922318
-
Reactive scheduling framework based on domain knowledge and constraint programming
-
Novas, J.M., Henning, G.P., Reactive scheduling framework based on domain knowledge and constraint programming. Comput. Chem. Eng. 34:12 (2010), 2129–2148.
-
(2010)
Comput. Chem. Eng.
, vol.34
, Issue.12
, pp. 2129-2148
-
-
Novas, J.M.1
Henning, G.P.2
-
68
-
-
84861578980
-
A comprehensive constraint programming approach for the rolling horizon-based scheduling of automated wet-etch stations
-
Novas, J.M., Henning, G.P., A comprehensive constraint programming approach for the rolling horizon-based scheduling of automated wet-etch stations. Comput. Chem. Eng. 42 (2012), 189–205.
-
(2012)
Comput. Chem. Eng.
, vol.42
, pp. 189-205
-
-
Novas, J.M.1
Henning, G.P.2
-
69
-
-
0029713693
-
Scheduling of batch processes with operational uncertainties
-
Orcun, S., Altinal, K., Hortacsu, O., Scheduling of batch processes with operational uncertainties. Comput. Chem. Eng. 20 (1996), 1191–1196.
-
(1996)
Comput. Chem. Eng.
, vol.20
, pp. 1191-1196
-
-
Orcun, S.1
Altinal, K.2
Hortacsu, O.3
-
70
-
-
68249099005
-
A survey of dynamic scheduling in manufacturing systems
-
Ouelhadj, D., Petrovic, S., Ouelhadj, D., Petrovic, S., A survey of dynamic scheduling in manufacturing systems. J. Sched. 12 (2009), 417–431.
-
(2009)
J. Sched.
, vol.12
, pp. 417-431
-
-
Ouelhadj, D.1
Petrovic, S.2
Ouelhadj, D.3
Petrovic, S.4
-
71
-
-
84869501412
-
SmartGantt – an interactive system for generating and updating rescheduling knowledge using relational abstractions
-
Palombarini, J., Martínez, E., SmartGantt – an interactive system for generating and updating rescheduling knowledge using relational abstractions. Comput. Chem. Eng. 47 (2012), 202–216.
-
(2012)
Comput. Chem. Eng.
, vol.47
, pp. 202-216
-
-
Palombarini, J.1
Martínez, E.2
-
72
-
-
35548941233
-
Scheduling of multi-product batch plants based upon timed automata models
-
Panek, S., Engell, S., Subbiah, S., Stursberg, O., Scheduling of multi-product batch plants based upon timed automata models. Comput. Chem. Eng. 32:1 (2008), 275–291.
-
(2008)
Comput. Chem. Eng.
, vol.32
, Issue.1
, pp. 275-291
-
-
Panek, S.1
Engell, S.2
Subbiah, S.3
Stursberg, O.4
-
73
-
-
85062407858
-
Moving horizon closed-loop production scheduling using dynamic process models
-
Pattison, R.C., Touretzky, C.R., Harjunkoski, I., Baldea, M., Moving horizon closed-loop production scheduling using dynamic process models. AIChE J., 2016.
-
(2016)
AIChE J.
-
-
Pattison, R.C.1
Touretzky, C.R.2
Harjunkoski, I.3
Baldea, M.4
-
74
-
-
0042306179
-
A model predictive control strategy for supply chain optimization
-
Perea-López, E., Ydstie, B.E., Grossmann, I.E., A model predictive control strategy for supply chain optimization. Comput. Chem. Eng. 27:8–9 (2003), 1201–1218.
-
(2003)
Comput. Chem. Eng.
, vol.27
, Issue.8-9
, pp. 1201-1218
-
-
Perea-López, E.1
Ydstie, B.E.2
Grossmann, I.E.3
-
75
-
-
0031271861
-
Multiperiod planning and scheduling of multiproduct batch plants under demand uncertainty
-
Petkov, S.B., Maranas, C.D., Multiperiod planning and scheduling of multiproduct batch plants under demand uncertainty. Ind. Eng. Chem. Res. 36:11 (1997), 4864–4881.
-
(1997)
Ind. Eng. Chem. Res.
, vol.36
, Issue.11
, pp. 4864-4881
-
-
Petkov, S.B.1
Maranas, C.D.2
-
76
-
-
33746054949
-
A fuzzy logic based production scheduling/rescheduling in the presence of uncertain disruptions
-
Petrovic, D., Duenas, A., A fuzzy logic based production scheduling/rescheduling in the presence of uncertain disruptions. Fuzzy Sets Syst. 157:16 (2006), 2273–2285.
-
(2006)
Fuzzy Sets Syst.
, vol.157
, Issue.16
, pp. 2273-2285
-
-
Petrovic, D.1
Duenas, A.2
-
77
-
-
77949487107
-
Model Predictive Control: Theory and Design
-
Nob Hill Pub
-
Rawlings, J.B., Mayne, D., Model Predictive Control: Theory and Design. 2009, Nob Hill Pub.
-
(2009)
-
-
Rawlings, J.B.1
Mayne, D.2
-
78
-
-
34548247313
-
Reactive scheduling framework for a multiproduct pipeline with inventory management
-
Relvas, S., Matos, H.A., Paula, A., Barbosa-Póvoa, F.D., Fialho, J., Reactive scheduling framework for a multiproduct pipeline with inventory management. Ind. Eng. Chem. Res. 46:17 (2007), 5659–5672.
-
(2007)
Ind. Eng. Chem. Res.
, vol.46
, Issue.17
, pp. 5659-5672
-
-
Relvas, S.1
Matos, H.A.2
Paula, A.3
Barbosa-Póvoa, F.D.4
Fialho, J.5
-
79
-
-
0029723234
-
Reactive scheduling approach for multipurpose chemical batch plants
-
Rodrigues, M.T.M., Gimeno, L., Passos, C.A.S., Campos, M.D., Reactive scheduling approach for multipurpose chemical batch plants. Comput. Chem. Eng. 20:96 (1996), 1215–1220.
-
(1996)
Comput. Chem. Eng.
, vol.20
, Issue.96
, pp. 1215-1220
-
-
Rodrigues, M.T.M.1
Gimeno, L.2
Passos, C.A.S.3
Campos, M.D.4
-
80
-
-
0035339890
-
An MILP-based reordering algorithm for complex industrial scheduling and rescheduling
-
Roslöf, J., Harjunkoski, I., Björkqvist, J., Karlsson, S., Westerlund, T., An MILP-based reordering algorithm for complex industrial scheduling and rescheduling. Comput. Chem. Eng. 25:4 (2001), 821–828.
-
(2001)
Comput. Chem. Eng.
, vol.25
, Issue.4
, pp. 821-828
-
-
Roslöf, J.1
Harjunkoski, I.2
Björkqvist, J.3
Karlsson, S.4
Westerlund, T.5
-
81
-
-
0035339891
-
On- line fault diagnosis system support for reactive scheduling in multi- purpose batch chemical plants
-
Ruiz, D., Cantó, J., Nougués, J.M., Espuña, A., Puigjaner, L., On- line fault diagnosis system support for reactive scheduling in multi- purpose batch chemical plants. Comput. Chem. Eng. 25 (2001), 829–837.
-
(2001)
Comput. Chem. Eng.
, vol.25
, pp. 829-837
-
-
Ruiz, D.1
Cantó, J.2
Nougués, J.M.3
Espuña, A.4
Puigjaner, L.5
-
82
-
-
36749101348
-
Proactive scheduling under uncertainty: a parametric optimization approach
-
Ryu, J.H., Dua, V., Pistikopoulos, E.N., Proactive scheduling under uncertainty: a parametric optimization approach. Ind. Eng. Chem. Res. 46:24 (2007), 8044–8049.
-
(2007)
Ind. Eng. Chem. Res.
, vol.46
, Issue.24
, pp. 8044-8049
-
-
Ryu, J.H.1
Dua, V.2
Pistikopoulos, E.N.3
-
83
-
-
33845605931
-
A novel approach to scheduling of zero-wait batch processes under processing time variations
-
Ryu, J.-H., Pistikopoulos, E.N., A novel approach to scheduling of zero-wait batch processes under processing time variations. Comput. Chem. Eng. 31:3 (2007), 101–106.
-
(2007)
Comput. Chem. Eng.
, vol.31
, Issue.3
, pp. 101-106
-
-
Ryu, J.-H.1
Pistikopoulos, E.N.2
-
84
-
-
0000179190
-
Rescheduling frequency in an fms with uncertain processing times and unreliable machines
-
Sabuncuoglu, I., Karabuk, S., Rescheduling frequency in an fms with uncertain processing times and unreliable machines. J. Manuf. Syst. 18:4 (1999), 268–283.
-
(1999)
J. Manuf. Syst.
, vol.18
, Issue.4
, pp. 268-283
-
-
Sabuncuoglu, I.1
Karabuk, S.2
-
85
-
-
1942500445
-
Optimization under uncertainty: state-of-the-art and opportunities
-
Sahinidis, N.V., Optimization under uncertainty: state-of-the-art and opportunities. Comput. Chem. Eng. 28:6 (2004), 971–983.
-
(2004)
Comput. Chem. Eng.
, vol.28
, Issue.6
, pp. 971-983
-
-
Sahinidis, N.V.1
-
86
-
-
11544276901
-
Sensitivity analysis for project planning and scheduling under uncertain completions
-
Samikoglu, Ö., Honkomp, S., Pekny, J., Reklaitis, G.V., Sensitivity analysis for project planning and scheduling under uncertain completions. Comput. Chem. Eng. 22:98 (1998), S871–S874.
-
(1998)
Comput. Chem. Eng.
, vol.22
, Issue.98
, pp. S871-S874
-
-
Samikoglu, Ö.1
Honkomp, S.2
Pekny, J.3
Reklaitis, G.V.4
-
87
-
-
1942500439
-
Modeling and solving real-time scheduling problems by stochastic integer programming
-
Sand, G., Engell, S., Modeling and solving real-time scheduling problems by stochastic integer programming. Comput. Chem. Eng. 28:6–7 (2004), 1087–1103.
-
(2004)
Comput. Chem. Eng.
, vol.28
, Issue.6-7
, pp. 1087-1103
-
-
Sand, G.1
Engell, S.2
-
88
-
-
0034661258
-
Approximation of an ideal online scheduler for a multiproduct batch plant
-
Sand, G., Engell, S., Märkert, A., Schultz, R., Schulz, C., Approximation of an ideal online scheduler for a multiproduct batch plant. Comput. Chem. Eng. 24:2–7 (2000), 361–367.
-
(2000)
Comput. Chem. Eng.
, vol.24
, Issue.2-7
, pp. 361-367
-
-
Sand, G.1
Engell, S.2
Märkert, A.3
Schultz, R.4
Schulz, C.5
-
89
-
-
0029216440
-
Effects of equipment failure uncertainty in batch production scheduling
-
Sanmartí, E., Espuña, A., Puigjaner, L., Effects of equipment failure uncertainty in batch production scheduling. Comput. Chem. Eng. 19:Suppl. 1 (1995), 565–570.
-
(1995)
Comput. Chem. Eng.
, vol.19
, pp. 565-570
-
-
Sanmartí, E.1
Espuña, A.2
Puigjaner, L.3
-
90
-
-
0031193217
-
Batch production and preventive maintenance scheduling under equipment failure uncertainty
-
Sanmartí, E., Espuña, A., Puigjaner, L., Batch production and preventive maintenance scheduling under equipment failure uncertainty. Comput. Chem. Eng. 21:10 (1997), 157–1168.
-
(1997)
Comput. Chem. Eng.
, vol.21
, Issue.10
, pp. 157-1168
-
-
Sanmartí, E.1
Espuña, A.2
Puigjaner, L.3
-
91
-
-
0029723654
-
A combined scheduling/reactive scheduling strategy to minimize the effect of process operations uncertainty in batch plants
-
Sanmartí, E., Huercio, A., Espuña, A., Puigjaner, L., A combined scheduling/reactive scheduling strategy to minimize the effect of process operations uncertainty in batch plants. Comput. Chem. Eng. 20:2 (1996), 1263–1268.
-
(1996)
Comput. Chem. Eng.
, vol.20
, Issue.2
, pp. 1263-1268
-
-
Sanmartí, E.1
Huercio, A.2
Espuña, A.3
Puigjaner, L.4
-
92
-
-
41149165852
-
Dynamic modeling and control of supply chain systems: a review
-
Sarimveis, H., Patrinos, P., Tarantilis, C.D., Kiranoudis, C.T., Dynamic modeling and control of supply chain systems: a review. Comput. Oper. Res. 35:11 (2008), 3530–3561.
-
(2008)
Comput. Oper. Res.
, vol.35
, Issue.11
, pp. 3530-3561
-
-
Sarimveis, H.1
Patrinos, P.2
Tarantilis, C.D.3
Kiranoudis, C.T.4
-
93
-
-
1842850954
-
A two-layered optimisation-based control strategy for multi-echelon supply chain networks
-
Seferlis, P., Giannelos, N.F., A two-layered optimisation-based control strategy for multi-echelon supply chain networks. Comput. Chem. Eng. 28:5 (2004), 799–809.
-
(2004)
Comput. Chem. Eng.
, vol.28
, Issue.5
, pp. 799-809
-
-
Seferlis, P.1
Giannelos, N.F.2
-
94
-
-
84959465283
-
A computational framework and solution algorithms for two-stage adaptive robust scheduling of batch manufacturing processes under uncertainty
-
Shi, H., You, F., A computational framework and solution algorithms for two-stage adaptive robust scheduling of batch manufacturing processes under uncertainty. AIChE J. 62:3 (2016), 687–703.
-
(2016)
AIChE J.
, vol.62
, Issue.3
, pp. 687-703
-
-
Shi, H.1
You, F.2
-
95
-
-
0010680207
-
Technical note-convex programming with set- inclusive constraints and applications to inexact linear programming
-
Soyster, A.L., Technical note-convex programming with set- inclusive constraints and applications to inexact linear programming. Oper. Res. 21:5 (1973), 1154–1157.
-
(1973)
Oper. Res.
, vol.21
, Issue.5
, pp. 1154-1157
-
-
Soyster, A.L.1
-
96
-
-
84985759548
-
Freezing the master production schedule under demand uncertainty
-
Sridharan, V., Berry, W.L., Freezing the master production schedule under demand uncertainty. Decis. Sci. 21:1 (1990), 97–120.
-
(1990)
Decis. Sci.
, vol.21
, Issue.1
, pp. 97-120
-
-
Sridharan, V.1
Berry, W.L.2
-
97
-
-
84869496558
-
A state-space model for chemical production scheduling
-
Subramanian, K., Maravelias, C.T., Rawlings, J.B., A state-space model for chemical production scheduling. Comput. Chem. Eng. 47 (2012), 97–110.
-
(2012)
Comput. Chem. Eng.
, vol.47
, pp. 97-110
-
-
Subramanian, K.1
Maravelias, C.T.2
Rawlings, J.B.3
-
98
-
-
84894262785
-
Economic model predictive control for inventory management in supply chains
-
Subramanian, K., Rawlings, J.B., Maravelias, C.T., Economic model predictive control for inventory management in supply chains. Comput. Chem. Eng. 64 (2014), 71–80.
-
(2014)
Comput. Chem. Eng.
, vol.64
, pp. 71-80
-
-
Subramanian, K.1
Rawlings, J.B.2
Maravelias, C.T.3
-
99
-
-
84874021009
-
Integration of control theory and scheduling methods for supply chain management
-
Subramanian, K., Rawlings, J.B., Maravelias, C.T., Flores-Cerrillo, J., Megan, L., Integration of control theory and scheduling methods for supply chain management. Comput. Chem. Eng. 51 (2013), 4–20.
-
(2013)
Comput. Chem. Eng.
, vol.51
, pp. 4-20
-
-
Subramanian, K.1
Rawlings, J.B.2
Maravelias, C.T.3
Flores-Cerrillo, J.4
Megan, L.5
-
100
-
-
74249122263
-
Rolling horizon approach for dynamic parallel machine scheduling problem with release times
-
Tang, L., Jiang, S., Liu, J., Rolling horizon approach for dynamic parallel machine scheduling problem with release times. Ind. Eng. Chem. Res. 49:1 (2010), 381–389.
-
(2010)
Ind. Eng. Chem. Res.
, vol.49
, Issue.1
, pp. 381-389
-
-
Tang, L.1
Jiang, S.2
Liu, J.3
-
101
-
-
84902470295
-
Advances in mixed-integer programming methods for chemical production scheduling
-
Velez, S., Maravelias, C.T., Advances in mixed-integer programming methods for chemical production scheduling. Annu. Rev. Chem. Biomol. Eng. 5 (2014), 97–121.
-
(2014)
Annu. Rev. Chem. Biomol. Eng.
, vol.5
, pp. 97-121
-
-
Velez, S.1
Maravelias, C.T.2
-
102
-
-
84930335068
-
On the solution of large-scale mixed integer programming scheduling models
-
Velez, S., Merchan, A.F., Maravelias, C.T., On the solution of large-scale mixed integer programming scheduling models. Chem. Eng. Sci. 136 (2015), 139–157.
-
(2015)
Chem. Eng. Sci.
, vol.136
, pp. 139-157
-
-
Velez, S.1
Merchan, A.F.2
Maravelias, C.T.3
-
103
-
-
0242703954
-
Rescheduling manufacturing systems: a framework of strategies, policies, and methods
-
Vieira, G.E., Herrmann, J.W., Lin, E., Rescheduling manufacturing systems: a framework of strategies, policies, and methods. J. Scheduling 6 (2003), 39–62.
-
(2003)
J. Scheduling
, vol.6
, pp. 39-62
-
-
Vieira, G.E.1
Herrmann, J.W.2
Lin, E.3
-
104
-
-
0034332903
-
A new approach for efficient rescheduling of multiproduct batch plants
-
Vin, J., Ierapetritou, M.G., A new approach for efficient rescheduling of multiproduct batch plants. Ind. Eng. Chem. Res. 39:11 (2000), 4228–4238.
-
(2000)
Ind. Eng. Chem. Res.
, vol.39
, Issue.11
, pp. 4228-4238
-
-
Vin, J.1
Ierapetritou, M.G.2
-
105
-
-
0035904351
-
Robust short-term scheduling of multiproduct batch plants under demand uncertainty
-
Vin, J.P., Ierapetritou, M.G., Robust short-term scheduling of multiproduct batch plants under demand uncertainty. Ind. Eng. Chem. Res. 40 (2001), 4543–4554.
-
(2001)
Ind. Eng. Chem. Res.
, vol.40
, pp. 4543-4554
-
-
Vin, J.P.1
Ierapetritou, M.G.2
-
106
-
-
0141859879
-
A fuzzy robust scheduling approach for product development projects
-
Wang, J., A fuzzy robust scheduling approach for product development projects. Eur. J. Oper. Res. 152:1 (2004), 180–194.
-
(2004)
Eur. J. Oper. Res.
, vol.152
, Issue.1
, pp. 180-194
-
-
Wang, J.1
-
107
-
-
0027224847
-
One-machine rescheduling heuristics with efficiency and stability as criteria
-
Wu, S.D., Storer, R.H., Chang, P.C., One-machine rescheduling heuristics with efficiency and stability as criteria. Comput. Oper. Res. 20:1 (1993), 1–14.
-
(1993)
Comput. Oper. Res.
, vol.20
, Issue.1
, pp. 1-14
-
-
Wu, S.D.1
Storer, R.H.2
Chang, P.C.3
-
108
-
-
84879491651
-
Solving two-stage robust optimization problems using a column-and-constraint generation method
-
Zeng, B., Zhao, L., Solving two-stage robust optimization problems using a column-and-constraint generation method. Oper. Res. Lett. 41:5 (2013), 457–461.
-
(2013)
Oper. Res. Lett.
, vol.41
, Issue.5
, pp. 457-461
-
-
Zeng, B.1
Zhao, L.2
-
109
-
-
84863191392
-
Integration of scheduling and control with closed loop implementation
-
Zhuge, J., Ierapetritou, M.G., Integration of scheduling and control with closed loop implementation. Ind. Eng. Chem. Res. 51:25 (2012), 8550–8565.
-
(2012)
Ind. Eng. Chem. Res.
, vol.51
, Issue.25
, pp. 8550-8565
-
-
Zhuge, J.1
Ierapetritou, M.G.2
|