메뉴 건너뛰기




Volumn 53, Issue 11, 2014, Pages 4366-4386

Reactive scheduling by a multiparametric programming rolling horizon framework: A case of a network of combined heat and power units

Author keywords

[No Author keywords available]

Indexed keywords

ELECTRIC NETWORK PARAMETERS; SCHEDULING;

EID: 84896531795     PISSN: 08885885     EISSN: 15205045     Source Type: Journal    
DOI: 10.1021/ie402393s     Document Type: Article
Times cited : (100)

References (62)
  • 1
    • 0000179190 scopus 로고    scopus 로고
    • Rescheduling frequency in an FMS with uncertain processing times and unreliable machines
    • Sabuncuoglu, I.; Karabuk, S. Rescheduling frequency in an FMS with uncertain processing times and unreliable machines J. Manuf. Syst. 1999, 18, 268-283
    • (1999) J. Manuf. Syst. , vol.18 , pp. 268-283
    • Sabuncuoglu, I.1    Karabuk, S.2
  • 2
    • 0029229437 scopus 로고
    • Uncertainty in process design and operations
    • Pistikopoulos, E. N. Uncertainty in process design and operations Comput. Chem. Eng. 1995, 19, 553-563
    • (1995) Comput. Chem. Eng. , vol.19 , pp. 553-563
    • Pistikopoulos, E.N.1
  • 3
    • 38849148294 scopus 로고    scopus 로고
    • Process scheduling under uncertainty: Review and challenges
    • Li, Z.; Ierapetritou, M. G. Process scheduling under uncertainty: Review and challenges Comput. Chem. Eng. 2008, 32, 715-727
    • (2008) Comput. Chem. Eng. , vol.32 , pp. 715-727
    • Li, Z.1    Ierapetritou, M.G.2
  • 4
    • 5144232431 scopus 로고    scopus 로고
    • Executing production schedules in the face of uncertainties: A review and some future directions
    • Aytug, H.; Lawley, M. A.; McKay, K.; Mohan, S.; Uzsoy, R. Executing production schedules in the face of uncertainties: a review and some future directions Eur. J. Oper. Res. 2005, 161, 86-110
    • (2005) Eur. J. Oper. Res. , vol.161 , pp. 86-110
    • Aytug, H.1    Lawley, M.A.2    McKay, K.3    Mohan, S.4    Uzsoy, R.5
  • 5
    • 77951681272 scopus 로고    scopus 로고
    • Planning and scheduling under uncertainty: A review across multiple sectors
    • Verderame, P. M.; Elia, J. A.; Li, J.; Floudas, C. A. Planning and scheduling under uncertainty: a review across multiple sectors Ind. Eng. Chem. Res. 2010, 49, 3993-4017
    • (2010) Ind. Eng. Chem. Res. , vol.49 , pp. 3993-4017
    • Verderame, P.M.1    Elia, J.A.2    Li, J.3    Floudas, C.A.4
  • 6
    • 1942500445 scopus 로고    scopus 로고
    • Optimization under uncertainty: State-of-the-art and opportunities
    • Sahinidis, N. V. Optimization under uncertainty: State-of-the-art and opportunities Comput. Chem. Eng. 2004, 28, 971-983
    • (2004) Comput. Chem. Eng. , vol.28 , pp. 971-983
    • Sahinidis, N.V.1
  • 8
    • 84863191392 scopus 로고    scopus 로고
    • Integration of scheduling and control with closed loop implementation
    • Zhuge, J.; Ierapetritou, M. G. Integration of scheduling and control with closed loop implementation Ind. Eng. Chem. Res. 2012, 51, 8550-8565
    • (2012) Ind. Eng. Chem. Res. , vol.51 , pp. 8550-8565
    • Zhuge, J.1    Ierapetritou, M.G.2
  • 10
    • 0030676526 scopus 로고    scopus 로고
    • A rolling horizon job shop rescheduling strategy in the dynamic environment
    • Fang, J.; Xi, Y. G. A rolling horizon job shop rescheduling strategy in the dynamic environment Int. J. Adv. Manuf. Technol. 1997, 13, 227-232
    • (1997) Int. J. Adv. Manuf. Technol. , vol.13 , pp. 227-232
    • Fang, J.1    Xi, Y.G.2
  • 11
    • 1942500439 scopus 로고    scopus 로고
    • Modeling and solving real-time scheduling problems by stochastic integer programming
    • Sand, G.; Engell, S. Modeling and solving real-time scheduling problems by stochastic integer programming Comput. Chem. Eng. 2004, 28, 1087-1103
    • (2004) Comput. Chem. Eng. , vol.28 , pp. 1087-1103
    • Sand, G.1    Engell, S.2
  • 12
    • 77956079451 scopus 로고    scopus 로고
    • Simultaneous scheduling and control of multiproduct continuous parallel lines
    • Flores-Tlacuahuac, A.; Grossmann, I. E. Simultaneous scheduling and control of multiproduct continuous parallel lines Ind. Eng. Chem. Res. 2010, 49, 7909-7921
    • (2010) Ind. Eng. Chem. Res. , vol.49 , pp. 7909-7921
    • Flores-Tlacuahuac, A.1    Grossmann, I.E.2
  • 13
    • 79959828153 scopus 로고    scopus 로고
    • Simultaneous cyclic scheduling and control of tubular reactors: Parallel production lines
    • Flores-Tlacuahuac, A.; Grossmann, I. E. Simultaneous cyclic scheduling and control of tubular reactors: Parallel production lines Ind. Eng. Chem. Res. 2011, 50, 8086-8096
    • (2011) Ind. Eng. Chem. Res. , vol.50 , pp. 8086-8096
    • Flores-Tlacuahuac, A.1    Grossmann, I.E.2
  • 14
    • 84861578980 scopus 로고    scopus 로고
    • A comprehensive constraint programming approach for the rolling horizon-based scheduling of automated wet-etch stations
    • Novas, J. M.; Henning, G. P. A comprehensive constraint programming approach for the rolling horizon-based scheduling of automated wet-etch stations Comput. Chem. Eng. 2012, 42, 189-205
    • (2012) Comput. Chem. Eng. , vol.42 , pp. 189-205
    • Novas, J.M.1    Henning, G.P.2
  • 15
    • 0034661258 scopus 로고    scopus 로고
    • Approximation of an ideal online scheduler for a multiproduct batch plant
    • Sand, G.; Engell, S.; Märkert, A.; Schultz, R.; Schulz, C. Approximation of an ideal online scheduler for a multiproduct batch plant Comput. Chem. Eng. 2000, 24, 361-367
    • (2000) Comput. Chem. Eng. , vol.24 , pp. 361-367
    • Sand, G.1    Engell, S.2    Märkert, A.3    Schultz, R.4    Schulz, C.5
  • 16
    • 0242642748 scopus 로고    scopus 로고
    • A strategy for the integration of production planning and reactive scheduling in the optimization of a hydrogen supply network
    • van den Heever, S. A.; Grossmann, I. E. A strategy for the integration of production planning and reactive scheduling in the optimization of a hydrogen supply network Comput. Chem. Eng. 2003, 27, 1813-1839
    • (2003) Comput. Chem. Eng. , vol.27 , pp. 1813-1839
    • Van Den Heever, S.A.1    Grossmann, I.E.2
  • 17
    • 34548447064 scopus 로고    scopus 로고
    • Hierarchical approach for production planning and scheduling under uncertainty
    • Wu, D.; Ierapetritou, M. G. Hierarchical approach for production planning and scheduling under uncertainty Chem. Eng. Process. 2007, 46, 1129-1140
    • (2007) Chem. Eng. Process. , vol.46 , pp. 1129-1140
    • Wu, D.1    Ierapetritou, M.G.2
  • 18
    • 34248578445 scopus 로고    scopus 로고
    • An attainable region approach for production planning of multiproduct processes
    • Sung, C.; Maravelias, C. T. An attainable region approach for production planning of multiproduct processes AIChE J. 2007, 53, 1298-1315
    • (2007) AIChE J. , vol.53 , pp. 1298-1315
    • Sung, C.1    Maravelias, C.T.2
  • 19
    • 49249099572 scopus 로고    scopus 로고
    • Integrated operational planning and medium-term scheduling for large-scale industrial batch plants
    • Verderame, P. A.; Floudas, C. A. Integrated operational planning and medium-term scheduling for large-scale industrial batch plants Ind. Eng. Chem. Res. 2008, 47, 4845-4860
    • (2008) Ind. Eng. Chem. Res. , vol.47 , pp. 4845-4860
    • Verderame, P.A.1    Floudas, C.A.2
  • 20
    • 77957358328 scopus 로고    scopus 로고
    • Rolling horizon based planning and scheduling integration with production capacity consideration
    • Li, Z.; Ierapetritou, M. G. Rolling horizon based planning and scheduling integration with production capacity consideration Chem. Eng. Sci. 2010, 65, 5887-5900
    • (2010) Chem. Eng. Sci. , vol.65 , pp. 5887-5900
    • Li, Z.1    Ierapetritou, M.G.2
  • 21
    • 0034661653 scopus 로고    scopus 로고
    • Dynamic modeling and classical control theory for supply chain management
    • Perea, E.; Grossmann, I.; Ydstie, E.; Tahmassebi, T. Dynamic modeling and classical control theory for supply chain management Comput. Chem. Eng. 2000, 24, 1143-1149
    • (2000) Comput. Chem. Eng. , vol.24 , pp. 1143-1149
    • Perea, E.1    Grossmann, I.2    Ydstie, E.3    Tahmassebi, T.4
  • 22
    • 0042306179 scopus 로고    scopus 로고
    • A model predictive control strategy for supply chain optimization
    • Perea-López, E.; Ydstie, B. E.; Grossmann, I. E. A model predictive control strategy for supply chain optimization Comput. Chem. Eng. 2003, 27, 1201-1218
    • (2003) Comput. Chem. Eng. , vol.27 , pp. 1201-1218
    • Perea-López, E.1    Ydstie, B.E.2    Grossmann, I.E.3
  • 23
    • 65349128854 scopus 로고    scopus 로고
    • Risk management for a global supply chain planning under uncertainty: Models and algorithms
    • You, F. Q.; Wassick, J. M.; Grossmann, I. E. Risk management for a global supply chain planning under uncertainty: Models and algorithms AIChE J. 2009, 55, 931-946
    • (2009) AIChE J. , vol.55 , pp. 931-946
    • You, F.Q.1    Wassick, J.M.2    Grossmann, I.E.3
  • 24
    • 84867231027 scopus 로고    scopus 로고
    • Multiechelon supply chain planning with sequence-dependent changeovers and price elasticity of demand under uncertainty
    • Liu, S.; Shah, N.; Papageorgiou, L. G. Multiechelon supply chain planning with sequence-dependent changeovers and price elasticity of demand under uncertainty AIChE J. 2012, 58, 3390-3403
    • (2012) AIChE J. , vol.58 , pp. 3390-3403
    • Liu, S.1    Shah, N.2    Papageorgiou, L.G.3
  • 26
    • 0029404198 scopus 로고
    • Rolling horizon procedures for dynamic parallel machine scheduling with sequence-dependent setup times
    • Ovacik, I. M.; Uzsoy, R. Rolling horizon procedures for dynamic parallel machine scheduling with sequence-dependent setup times Int. J. Prod. Res. 1995, 33, 3173-3192
    • (1995) Int. J. Prod. Res. , vol.33 , pp. 3173-3192
    • Ovacik, I.M.1    Uzsoy, R.2
  • 27
    • 0031506199 scopus 로고    scopus 로고
    • Rolling horizon procedures for the single machine deterministic total completion time scheduling problem with release dates
    • Chand, S.; Traub, R.; Uzsoy, R. Rolling horizon procedures for the single machine deterministic total completion time scheduling problem with release dates Ann. Oper. Res. 1997, 70, 115-125
    • (1997) Ann. Oper. Res. , vol.70 , pp. 115-125
    • Chand, S.1    Traub, R.2    Uzsoy, R.3
  • 28
    • 0030417871 scopus 로고    scopus 로고
    • Decomposition techniques for the solution of large-scale scheduling problems
    • Bassett, M. H.; Pekny, J. F.; Reklaitis, G. V. Decomposition techniques for the solution of large-scale scheduling problems AIChE J. 1996, 42, 3373-3387
    • (1996) AIChE J. , vol.42 , pp. 3373-3387
    • Bassett, M.H.1    Pekny, J.F.2    Reklaitis, G.V.3
  • 29
    • 0000685021 scopus 로고    scopus 로고
    • RTN-based rolling horizon algorithms for medium term scheduling of multipurpose plants
    • Dimitriadis, A. D.; Shah, N.; Pantelides, C. C. RTN-based rolling horizon algorithms for medium term scheduling of multipurpose plants Comput. Chem. Eng. 1997, 21, S1061-S1066
    • (1997) Comput. Chem. Eng. , vol.21
    • Dimitriadis, A.D.1    Shah, N.2    Pantelides, C.C.3
  • 30
    • 33846049584 scopus 로고    scopus 로고
    • Production scheduling of a large-Scale industrial batch plant. I. Short-term and medium-term scheduling
    • Janak, S. L.; Floudas, C. A.; Kallrath, J.; Vormbrock, N. Production scheduling of a large-Scale industrial batch plant. I. short-term and medium-term scheduling Ind. Eng. Chem. Res. 2006, 45, 8234-8252
    • (2006) Ind. Eng. Chem. Res. , vol.45 , pp. 8234-8252
    • Janak, S.L.1    Floudas, C.A.2    Kallrath, J.3    Vormbrock, N.4
  • 31
    • 34548563859 scopus 로고    scopus 로고
    • Planning models for parallel batch reactors with sequence-dependent changeovers
    • Erdirik-Dogan, M.; Grossmann, I. E. Planning models for parallel batch reactors with sequence-dependent changeovers AIChE J. 2007, 53, 2284-2300
    • (2007) AIChE J. , vol.53 , pp. 2284-2300
    • Erdirik-Dogan, M.1    Grossmann, I.E.2
  • 32
    • 59249096047 scopus 로고    scopus 로고
    • Production scheduling of a large-scale industrial continuous plant: Short-term and medium-term scheduling
    • Shaik, M. A.; Floudas, C. A.; Kallrath, J.; Pitz, H.-J. Production scheduling of a large-scale industrial continuous plant: Short-term and medium-term scheduling Comput. Chem. Eng. 2009, 33, 670-686
    • (2009) Comput. Chem. Eng. , vol.33 , pp. 670-686
    • Shaik, M.A.1    Floudas, C.A.2    Kallrath, J.3    Pitz, H.-J.4
  • 33
    • 79851508341 scopus 로고    scopus 로고
    • Long-term scheduling of a single-unit multi-product continuous process to manufacture high performance glass
    • Lima, R. M.; Grossmann, I. E.; Jiao, Y. Long-term scheduling of a single-unit multi-product continuous process to manufacture high performance glass Comput. Chem. Eng. 2011, 35, 554-574
    • (2011) Comput. Chem. Eng. , vol.35 , pp. 554-574
    • Lima, R.M.1    Grossmann, I.E.2    Jiao, Y.3
  • 34
    • 84866929231 scopus 로고    scopus 로고
    • Production scheduling of a large-scale steelmaking continuous casting process via unit-specific event-based continuous-time models: Short-term and medium-term scheduling
    • Li, J.; Xiao, X.; Tang, Q.; Floudas, C. A. Production scheduling of a large-scale steelmaking continuous casting process via unit-specific event-based continuous-time models: short-term and medium-term scheduling Ind. Eng. Chem. Res. 2012, 51, 7300-7319
    • (2012) Ind. Eng. Chem. Res. , vol.51 , pp. 7300-7319
    • Li, J.1    Xiao, X.2    Tang, Q.3    Floudas, C.A.4
  • 37
    • 0033684759 scopus 로고    scopus 로고
    • Decision making under uncertainty: Is sensitivity analysis of any use?
    • Wallace, S. W. Decision making under uncertainty: Is sensitivity analysis of any use? Oper. Res. 2000, 48, 20-25
    • (2000) Oper. Res. , vol.48 , pp. 20-25
    • Wallace, S.W.1
  • 38
    • 0000627541 scopus 로고
    • Multiparametric linear programming
    • Gal, T.; Nedoma, J. Multiparametric linear programming Manage. Sci. 1972, 18, 406-422
    • (1972) Manage. Sci. , vol.18 , pp. 406-422
    • Gal, T.1    Nedoma, J.2
  • 39
    • 33744976026 scopus 로고
    • RIM multiparametric linear programming
    • Gal, T. RIM multiparametric linear programming Manage. Sci. 1975, 21, 567-575
    • (1975) Manage. Sci. , vol.21 , pp. 567-575
    • Gal, T.1
  • 41
    • 0001052070 scopus 로고    scopus 로고
    • Parametric optimization of MILP programs and a framework for the parametric optimization of MINLPs
    • Pertsinidis, A.; Grossmann, I. E.; McRae, G. J. Parametric optimization of MILP programs and a framework for the parametric optimization of MINLPs Comput. Chem. Eng. 1998, 22, S205-S212
    • (1998) Comput. Chem. Eng. , vol.22
    • Pertsinidis, A.1    Grossmann, I.E.2    McRae, G.J.3
  • 42
    • 0031100306 scopus 로고    scopus 로고
    • A multiparametric programming approach for linear process engineering problems under uncertainty
    • Acevedo, J.; Pistikopoulos, E. N. A multiparametric programming approach for linear process engineering problems under uncertainty Ind. Eng. Chem. Res. 1997, 36, 717-728
    • (1997) Ind. Eng. Chem. Res. , vol.36 , pp. 717-728
    • Acevedo, J.1    Pistikopoulos, E.N.2
  • 43
    • 0042188408 scopus 로고    scopus 로고
    • An algorithm for the solution of multiparametric mixed integer linear programming problems
    • Dua, V.; Pistikopoulos, E. N. An algorithm for the solution of multiparametric mixed integer linear programming problems Ann. Oper. Res. 2000, 99, 123-139
    • (2000) Ann. Oper. Res. , vol.99 , pp. 123-139
    • Dua, V.1    Pistikopoulos, E.N.2
  • 44
    • 34547471469 scopus 로고    scopus 로고
    • A new methodology for the general multiparametric mixed-integer linear programming (MILP) problems
    • Li, Z.; Ierapetritou, M. G. A new methodology for the general multiparametric mixed-integer linear programming (MILP) problems Ind. Eng. Chem. Res. 2007, 46, 5141-5151
    • (2007) Ind. Eng. Chem. Res. , vol.46 , pp. 5141-5151
    • Li, Z.1    Ierapetritou, M.G.2
  • 46
    • 84862206281 scopus 로고    scopus 로고
    • A two-stage method for the approximate solution of general multiparametric mixed-integer linear programming problems
    • Wittmann-Holbein, M.; Pistikopoulos, E. N. A two-stage method for the approximate solution of general multiparametric mixed-integer linear programming problems Ind. Eng. Chem. Res. 2012, 51, 8095-8107
    • (2012) Ind. Eng. Chem. Res. , vol.51 , pp. 8095-8107
    • Wittmann-Holbein, M.1    Pistikopoulos, E.N.2
  • 48
    • 33845605931 scopus 로고    scopus 로고
    • A novel approach to scheduling of zero-wait batch processes under processing time variations
    • Ryu, J.-H.; Pistikopoulos, E. N. A novel approach to scheduling of zero-wait batch processes under processing time variations Comput. Chem. Eng. 2007, 31, 101-106
    • (2007) Comput. Chem. Eng. , vol.31 , pp. 101-106
    • Ryu, J.-H.1    Pistikopoulos, E.N.2
  • 49
    • 36749101348 scopus 로고    scopus 로고
    • Proactive scheduling under uncertainty: A parametric optimization approach
    • Ryu, J.-H.; Dua, V.; Pistikopoulos, E. N. Proactive scheduling under uncertainty: a parametric optimization approach Ind. Eng. Chem. Res. 2007, 46, 8044-8049
    • (2007) Ind. Eng. Chem. Res. , vol.46 , pp. 8044-8049
    • Ryu, J.-H.1    Dua, V.2    Pistikopoulos, E.N.3
  • 50
    • 37749011834 scopus 로고    scopus 로고
    • Process scheduling under uncertainty using multiparametric programming
    • Li, Z.; Ierapetritou, M. G. Process scheduling under uncertainty using multiparametric programming AIChE J. 2008, 53, 3183-3203
    • (2008) AIChE J. , vol.53 , pp. 3183-3203
    • Li, Z.1    Ierapetritou, M.G.2
  • 51
    • 54949139556 scopus 로고    scopus 로고
    • Reactive scheduling using parametric programming
    • Li, Z.; Ierapetritou, M. G. Reactive scheduling using parametric programming AIChE J. 2008, 54, 2610-2623
    • (2008) AIChE J. , vol.54 , pp. 2610-2623
    • Li, Z.1    Ierapetritou, M.G.2
  • 52
    • 84885869425 scopus 로고    scopus 로고
    • Proactive scheduling of batch processes by a combined robust optimization and multi-parametric programming approach
    • Wittmann-Holbein, M.; Pistikopoulos, E. N. Proactive scheduling of batch processes by a combined robust optimization and multi-parametric programming approach AIChE J. 2013, 59, 4184-4211
    • (2013) AIChE J. , vol.59 , pp. 4184-4211
    • Wittmann-Holbein, M.1    Pistikopoulos, E.N.2
  • 53
    • 0033876326 scopus 로고    scopus 로고
    • Constrained model predictive control: Stability and optimality
    • Mayne, D. Q.; Rawlings, J. B.; Rao, C. V.; Scokaert, P. O. M. Constrained model predictive control: Stability and optimality Automatica 2000, 36, 789-814
    • (2000) Automatica , vol.36 , pp. 789-814
    • Mayne, D.Q.1    Rawlings, J.B.2    Rao, C.V.3    Scokaert, P.O.M.4
  • 54
    • 57249089354 scopus 로고    scopus 로고
    • Costs for rescheduling actions: A critical issue for reducing the gap between scheduling theory and practice
    • Kopanos, G. M.; Capón-García, E.; Espuna, A.; Puigjaner, L. Costs for rescheduling actions: A critical issue for reducing the gap between scheduling theory and practice Ind. Eng. Chem. Res. 2008, 47, 8785-8795
    • (2008) Ind. Eng. Chem. Res. , vol.47 , pp. 8785-8795
    • Kopanos, G.M.1    Capón-García, E.2    Espuna, A.3    Puigjaner, L.4
  • 55
    • 68549086891 scopus 로고    scopus 로고
    • Predictive optimal management method for the control of polygeneration systems
    • Collazos, A.; Maréchal, F.; Gähler, C. Predictive optimal management method for the control of polygeneration systems Comput. Chem. Eng. 2009, 33, 1584-1592
    • (2009) Comput. Chem. Eng. , vol.33 , pp. 1584-1592
    • Collazos, A.1    Maréchal, F.2    Gähler, C.3
  • 56
    • 77957328482 scopus 로고    scopus 로고
    • Short term scheduling of multiple grid-parallel PEM fuel cells for microgrid applications
    • El-Sharkh, M. Y.; Rahman, A.; Alam, M. S. Short term scheduling of multiple grid-parallel PEM fuel cells for microgrid applications Int. J. Hydrogen Energy 2010, 35, 11099-11106
    • (2010) Int. J. Hydrogen Energy , vol.35 , pp. 11099-11106
    • El-Sharkh, M.Y.1    Rahman, A.2    Alam, M.S.3
  • 57
    • 81855197034 scopus 로고    scopus 로고
    • Optimal online operation of residential ìCHP systems using linear programming
    • Shaneb, O. A.; Taylor, P. C.; Coates, G. Optimal online operation of residential ìCHP systems using linear programming Energy Buildings 2012, 44, 17-25
    • (2012) Energy Buildings , vol.44 , pp. 17-25
    • Shaneb, O.A.1    Taylor, P.C.2    Coates, G.3
  • 58
    • 76449110174 scopus 로고    scopus 로고
    • Suitable operational strategy for power interchange operation using multiple residential SOFC (solid oxide fuel cell) cogeneration systems
    • Wakui, T.; Yokoyama, R.; Shimizu, K. Suitable operational strategy for power interchange operation using multiple residential SOFC (solid oxide fuel cell) cogeneration systems Energy 2010, 35, 740-750
    • (2010) Energy , vol.35 , pp. 740-750
    • Wakui, T.1    Yokoyama, R.2    Shimizu, K.3
  • 59
    • 84870762866 scopus 로고    scopus 로고
    • Energy production planning of a network of micro combined heat and power generators
    • Kopanos, G. M.; Georgiadis, M. C.; Pistikopoulos, E. N. Energy production planning of a network of micro combined heat and power generators Appl. Energy 2013, 102, 1522-1534
    • (2013) Appl. Energy , vol.102 , pp. 1522-1534
    • Kopanos, G.M.1    Georgiadis, M.C.2    Pistikopoulos, E.N.3
  • 60
    • 77953719536 scopus 로고    scopus 로고
    • An energy systems engineering approach to the optimal design of energy systems in commercial buildings
    • Liu, P.; Pistikopoulos, E. N.; Li, Z. An energy systems engineering approach to the optimal design of energy systems in commercial buildings Energy Policy 2010, 38, 4224-4231
    • (2010) Energy Policy , vol.38 , pp. 4224-4231
    • Liu, P.1    Pistikopoulos, E.N.2    Li, Z.3
  • 61
    • 79551531006 scopus 로고    scopus 로고
    • Optimisation based design of a district energy system for an eco-town in the United Kingdom
    • Weber, C.; Shah, N. Optimisation based design of a district energy system for an eco-town in the United Kingdom Energy 2011, 36, 1292-1308
    • (2011) Energy , vol.36 , pp. 1292-1308
    • Weber, C.1    Shah, N.2
  • 62
    • 84867897195 scopus 로고    scopus 로고
    • Optimal design and operation of distributed energy systems: Application to Greek residential sector
    • Mehleri, E. D.; Sarimveis, H.; Markatos, N. C.; Papageorgiou, L. G. Optimal design and operation of distributed energy systems: Application to Greek residential sector Renew. Energy 2013, 51, 331-342
    • (2013) Renew. Energy , vol.51 , pp. 331-342
    • Mehleri, E.D.1    Sarimveis, H.2    Markatos, N.C.3    Papageorgiou, L.G.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.