메뉴 건너뛰기




Volumn 32, Issue 1-2, 2008, Pages 275-291

Scheduling of multi-product batch plants based upon timed automata models

Author keywords

Multi product batch plants; Reachability analysis; Scheduling; Timed automata

Indexed keywords

AUTOMATA THEORY; INDUSTRIAL PLANTS; MATHEMATICAL MODELS; SYNCHRONIZATION;

EID: 35548941233     PISSN: 00981354     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.compchemeng.2007.07.009     Document Type: Article
Times cited : (35)

References (38)
  • 1
    • 35548945418 scopus 로고    scopus 로고
    • Abdeddaim, Y. (November 2002). Scheduling with Timed Automata. PhD thesis, Institut National Polytechnique de Grenoble.
  • 3
    • 84958770488 scopus 로고    scopus 로고
    • Job-shop scheduling using timed automata
    • Berry G., and Comon H. (Eds), Springer
    • Abdeddaim Y., and Maler O. Job-shop scheduling using timed automata. In: Berry G., and Comon H. (Eds). Computer aided verification (CAV), LNCS 2102 (2001), Springer 478-492
    • (2001) Computer aided verification (CAV), LNCS 2102 , pp. 478-492
    • Abdeddaim, Y.1    Maler, O.2
  • 9
    • 33646184816 scopus 로고    scopus 로고
    • Optimal scheduling using priced timed automata
    • Behrmann G., Larsen K.G., and Rasmussen J.I. Optimal scheduling using priced timed automata. ACM Sigmetrics 32 4 (2005) 34-40
    • (2005) ACM Sigmetrics , vol.32 , Issue.4 , pp. 34-40
    • Behrmann, G.1    Larsen, K.G.2    Rasmussen, J.I.3
  • 14
    • 35548937890 scopus 로고    scopus 로고
    • Fehnker, A. (1999). Scheduling a steel plant with timed automata. Technical report csi-r9910, Computing Science Institute Nijmegen.
  • 15
    • 84957667493 scopus 로고    scopus 로고
    • Godefroid, P. (June 1991). Using partial orders to improve automatic verification methods. In Proceedings of the 2nd Workshop on Computer Aided Verification, volume 531 of LNCS (pp. 176-185). Springer.
  • 16
    • 0032216021 scopus 로고    scopus 로고
    • Effective continuous-time formulation for short-term scheduling. 1. Multipurpose batch processes
    • Ierapetritou M.G., and Floudas C.A. Effective continuous-time formulation for short-term scheduling. 1. Multipurpose batch processes. Industrial & Engineering Chemistry Research 37 (1998) 4341-4359
    • (1998) Industrial & Engineering Chemistry Research , vol.37 , pp. 4341-4359
    • Ierapetritou, M.G.1    Floudas, C.A.2
  • 17
    • 0032216046 scopus 로고    scopus 로고
    • Effective continuous-time formulation for short-term scheduling. 2. Continuous and semi-continuous processes
    • Ierapetritou M.G., and Floudas C.A. Effective continuous-time formulation for short-term scheduling. 2. Continuous and semi-continuous processes. Industrial & Engineering Chemistry Research 37 (1998) 4360
    • (1998) Industrial & Engineering Chemistry Research , vol.37 , pp. 4360
    • Ierapetritou, M.G.1    Floudas, C.A.2
  • 18
    • 0032877613 scopus 로고    scopus 로고
    • Effective continuous-time formulation for short-term scheduling. 3. Multiple intermediate due dates
    • Ierapetritou M.G., Hene T.S., and Floudas C.A. Effective continuous-time formulation for short-term scheduling. 3. Multiple intermediate due dates. Industrial & Engineering Chemistry Research 38 (1999) 3446
    • (1999) Industrial & Engineering Chemistry Research , vol.38 , pp. 3446
    • Ierapetritou, M.G.1    Hene, T.S.2    Floudas, C.A.3
  • 20
    • 2442436591 scopus 로고    scopus 로고
    • Enhanced continuous-time unit-specific-event based formulation for short-term scheduling of multipurpose batch processes: Resource constraints and mixed storage policies
    • Janak S.L., Lin X., and Floudas C.A. Enhanced continuous-time unit-specific-event based formulation for short-term scheduling of multipurpose batch processes: Resource constraints and mixed storage policies. Industrial & Engineering Chemistry Research 42 (2004) 2516
    • (2004) Industrial & Engineering Chemistry Research , vol.42 , pp. 2516
    • Janak, S.L.1    Lin, X.2    Floudas, C.A.3
  • 21
    • 0442265758 scopus 로고    scopus 로고
    • Combined strategic and operational planning-an MILP success story in chem. ind
    • Kallrath J. Combined strategic and operational planning-an MILP success story in chem. ind. OR Spectrum 24 (2002) 315-341
    • (2002) OR Spectrum , vol.24 , pp. 315-341
    • Kallrath, J.1
  • 22
    • 0442264226 scopus 로고    scopus 로고
    • Planning and scheduling in the process industry
    • Kallrath J. Planning and scheduling in the process industry. OR Spectrum 24 (2002) 219-250
    • (2002) OR Spectrum , vol.24 , pp. 219-250
    • Kallrath, J.1
  • 24
    • 0037635200 scopus 로고    scopus 로고
    • New general continuous-time state-task network formulation for short-term scheduling of multipurpose batch plants
    • Maravelias C.T., and Grossmann I.E. New general continuous-time state-task network formulation for short-term scheduling of multipurpose batch plants. Industrial & Engineering Chemistry Research 42 (2003) 3056
    • (2003) Industrial & Engineering Chemistry Research , vol.42 , pp. 3056
    • Maravelias, C.T.1    Grossmann, I.E.2
  • 25
    • 0343627890 scopus 로고    scopus 로고
    • Optimal scheduling of a resource-constrained multiproduct batch plant supplying intermediates to nearby end-product facilities
    • Mendez C.A., and Cerda J. Optimal scheduling of a resource-constrained multiproduct batch plant supplying intermediates to nearby end-product facilities. Computers and Chemical Engineering 24 (2000) 369
    • (2000) Computers and Chemical Engineering , vol.24 , pp. 369
    • Mendez, C.A.1    Cerda, J.2
  • 26
    • 72249103605 scopus 로고    scopus 로고
    • If-2.0: A validation environment for component-based real-time systems
    • Springer
    • Mounier L., Graf S., and Bozga M. If-2.0: A validation environment for component-based real-time systems. Proceedings of CAV'02, volume 2404 of LNCS (2002), Springer 343-348
    • (2002) Proceedings of CAV'02, volume 2404 of LNCS , pp. 343-348
    • Mounier, L.1    Graf, S.2    Bozga, M.3
  • 27
    • 35548989749 scopus 로고    scopus 로고
    • Panek, S. (2007). Produktionsplanung mit Echtzeitautomaten. PhD thesis, Universität Dortmund, Fachbereich Bio- und Chemieingenieurwesen.
  • 28
    • 62549150590 scopus 로고    scopus 로고
    • Panek, S., Stursberg, O., & Engell, S. (September 2004). Job shop scheduling by combining reachability analysis with linear programming. In Proceedings of IFAC Workshop on Discrete Event Systems (pp. 199-204).
  • 29
    • 33744944065 scopus 로고    scopus 로고
    • Efficient synthesis of production schedules by optimization of timed automata
    • Panek S., Stursberg O., and Engell S. Efficient synthesis of production schedules by optimization of timed automata. Control Engineering Practice 14 (2006) 1183-1197
    • (2006) Control Engineering Practice , vol.14 , pp. 1183-1197
    • Panek, S.1    Stursberg, O.2    Engell, S.3
  • 32
    • 0027545175 scopus 로고
    • A general algorithm for short-term scheduling of batch operations. ii. Computational issues. i. MILP formulation
    • Shah N., Pantelides C.C., and Sargent R.W.H. A general algorithm for short-term scheduling of batch operations. ii. Computational issues. i. MILP formulation. Computers and Chemical Engineering 17 2 (1993) 229-244
    • (1993) Computers and Chemical Engineering , vol.17 , Issue.2 , pp. 229-244
    • Shah, N.1    Pantelides, C.C.2    Sargent, R.W.H.3
  • 33
    • 33748760882 scopus 로고    scopus 로고
    • Continuous-time models for short-term scheduling of multipurpose batch plants: A comparative study
    • Shaik M.A., Janak S.L., and Floudas C.A. Continuous-time models for short-term scheduling of multipurpose batch plants: A comparative study. Industrial & Engineering Chemistry Research 45 (2006) 6190
    • (2006) Industrial & Engineering Chemistry Research , vol.45 , pp. 6190
    • Shaik, M.A.1    Janak, S.L.2    Floudas, C.A.3
  • 34
    • 15344346066 scopus 로고    scopus 로고
    • A simpler better slot-based continuous-time formulation for short-term scheduling in multipurpose batch plants
    • Sundaramoorthy A., and Karimi I.A. A simpler better slot-based continuous-time formulation for short-term scheduling in multipurpose batch plants. Chemical Engineering Science 60 (2005) 2697-2702
    • (2005) Chemical Engineering Science , vol.60 , pp. 2697-2702
    • Sundaramoorthy, A.1    Karimi, I.A.2
  • 36
    • 0036453772 scopus 로고    scopus 로고
    • Redefining event variables for efficient modeling of continuous-time batch processing
    • Wang S., and Guignard M. Redefining event variables for efficient modeling of continuous-time batch processing. Annals of Operations Research 116 (2002) 113
    • (2002) Annals of Operations Research , vol.116 , pp. 113
    • Wang, S.1    Guignard, M.2
  • 37
    • 35549010253 scopus 로고    scopus 로고
    • Westenberger, H., & Kallrath, J. (1995). Formulation of a job shop problem in process industry. Technical report, Bayer AG, Leverkusen, BASF AG, Ludwigshafen.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.