메뉴 건너뛰기




Volumn 49, Issue 1, 2010, Pages 381-389

Rolling horizon approach for dynamic parallel machine scheduling problem with release times

Author keywords

[No Author keywords available]

Indexed keywords

ADJUSTMENT METHOD; COMPUTATIONAL EXPERIMENT; DYNAMIC CHANGES; DYNAMIC SCHEDULING PROBLEMS; ENERGY CONSUMPTION; JOB COMPLETION; LAGRANGIAN RELAXATIONS; OPTIMIZATION METHOD; PARALLEL MACHINE-SCHEDULING PROBLEMS; PROCESSING TIME; PRODUCTION PROCESS; RELEASE TIME; ROLLING HORIZON; SCHEDULING PROBLEM; TOTAL DEVIATIONS; WEIGHTED COMPLETION;

EID: 74249122263     PISSN: 08885885     EISSN: None     Source Type: Journal    
DOI: 10.1021/ie900206m     Document Type: Article
Times cited : (10)

References (14)
  • 1
    • 0016080006 scopus 로고
    • Scheduling independent tasks to reduce mean finishing time
    • Bruno, J.; Coffman, E.; Sethi, R. Scheduling independent tasks to reduce mean finishing time. Commun. A.C.M. 1974, 17 (7), 382-387.
    • (1974) Commun. A.C.M. , vol.17 , Issue.7 , pp. 382-387
    • Bruno, J.1    Coffman, E.2    Sethi, R.3
  • 3
    • 33847129277 scopus 로고    scopus 로고
    • Dynamic predictive scheduling of operational strategies for continuous processes using mixed-logic dynamic optimization
    • Busch, J.; Oldenburg, J.; Santos, M.; Cruse, A.; Marquardt, W. Dynamic predictive scheduling of operational strategies for continuous processes using mixed-logic dynamic optimization. Comput. Chem. Eng. 2007, 33, 574-587.
    • (2007) Comput. Chem. Eng. , vol.33 , pp. 574-587
    • Busch, J.1    Oldenburg, J.2    Santos, M.3    Cruse, A.4    Marquardt, W.5
  • 4
    • 0042306179 scopus 로고    scopus 로고
    • A model prodective control strategy for supply chain optimization
    • Perea-López, E.; Ydstie, B. E.; Grossmann, I. E. A model prodective control strategy for supply chain optimization. Comput. Chem. Eng. 2003, 27, 1201-1218.
    • (2003) Comput. Chem. Eng. , vol.27 , pp. 1201-1218
    • Perea-López, E.1    Ydstie, B.E.2    Grossmann, I.E.3
  • 5
    • 0031275461 scopus 로고    scopus 로고
    • Model-based predictive control for generalized production planning problems
    • Tzafestas, S.; Kapsiotis, G.; Kyriannakis, E. Model-based predictive control for generalized production planning problems. Comput. Ind. 1997, 34, 201-210.
    • (1997) Comput. Ind. , vol.34 , pp. 201-210
    • Tzafestas, S.1    Kapsiotis, G.2    Kyriannakis, E.3
  • 6
    • 0242642748 scopus 로고    scopus 로고
    • A strategy for the integration of production planning and reactive scheduling in the optimization of a hydrogen supply network
    • Heever, S. A.; Grossmann, I. E. A strategy for the integration of production planning and reactive scheduling in the optimization of a hydrogen supply network. Comput. Chem. Eng. 2003, 27, 1813-1839.
    • (2003) Comput. Chem. Eng. , vol.27 , pp. 1813-1839
    • Heever, S.A.1    Grossmann, I.E.2
  • 7
    • 0030676526 scopus 로고    scopus 로고
    • A rolling horizon job shop rescheduling strategy in the dynamic environment
    • Fang, J.; Xi, Y. G. A rolling horizon job shop rescheduling strategy in the dynamic environment. Int. J. Adv. Manuf. Tech. 1997, 13, 227-232.
    • (1997) Int. J. Adv. Manuf. Tech. , vol.13 , pp. 227-232
    • Fang, J.1    Xi, Y.G.2
  • 8
    • 0031506199 scopus 로고    scopus 로고
    • Rolling horizon procedures for the single machine deterministic total completion time scheduling problem with release dates
    • Chand, S.; Traub, R.; Uzsoy, R. Rolling horizon procedures for the single machine deterministic total completion time scheduling problem with release dates. Ann. Oper. Res. 1997, 70, 115-125. (Pubitemid 127429152)
    • (1997) Annals of Operations Research , vol.70 , pp. 115-125
    • Chand, S.1    Traub, R.2    Uzsoy, R.3
  • 9
    • 20344400593 scopus 로고    scopus 로고
    • A multilevel, control-theoretic framework for integration of planning, scheduling, and rescheduling
    • Munawar, S. A.; Gudi, R. D. A multilevel, control-theoretic framework for integration of planning, scheduling, and rescheduling. Ind. Eng. Chem. Res. 2005, 44, 4001-4021.
    • (2005) Ind. Eng. Chem. Res. , vol.44 , pp. 4001-4021
    • Munawar, S.A.1    Gudi, R.D.2
  • 10
    • 49249099572 scopus 로고    scopus 로고
    • Integrated operational planning and medium-term scheduling for large-scale industrial batch plants
    • Verderame, P. M.; Floudas, C. A. Integrated operational planning and medium-term scheduling for large-scale industrial batch plants. Ind. Eng. Chem. Res. 2008, 47, 4845-4860.
    • (2008) Ind. Eng. Chem. Res. , vol.47 , pp. 4845-4860
    • Verderame, P.M.1    Floudas, C.A.2
  • 11
    • 0019477279 scopus 로고
    • The lagrangian relaxation method for solving integer programming problems
    • Fisher, M. The Lagrangian Relaxation Method for solving integer programming problems. Manag. Sci. 1981, 27 (1), 1-18.
    • (1981) Manag. Sci. , vol.27 , Issue.1 , pp. 1-18
    • Fisher, M.1
  • 12


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.