-
2
-
-
0035339834
-
Advanced enterprise resource management systems for the batch industry. The TicTacToe algorithm
-
Badell M., and Puigjaner L.A. Advanced enterprise resource management systems for the batch industry. The TicTacToe algorithm. Computers and Chemical Engineering 25 (2001) 517-538
-
(2001)
Computers and Chemical Engineering
, vol.25
, pp. 517-538
-
-
Badell, M.1
Puigjaner, L.A.2
-
3
-
-
0000185277
-
A lift-and-project cutting plane algorithm for mixed 0-1 programs
-
Balas E., Ceria S., and Cornuejols G. A lift-and-project cutting plane algorithm for mixed 0-1 programs. Mathematical Programming 58 (1993) 295-324
-
(1993)
Mathematical Programming
, vol.58
, pp. 295-324
-
-
Balas, E.1
Ceria, S.2
Cornuejols, G.3
-
4
-
-
0037081993
-
A novel branch and bound algorithm for scheduling flowshop plants with uncertain processing times
-
Balasubramanian J., and Grossmann I.E. A novel branch and bound algorithm for scheduling flowshop plants with uncertain processing times. Computers and Chemical Engineering 26 (2002) 41-57
-
(2002)
Computers and Chemical Engineering
, vol.26
, pp. 41-57
-
-
Balasubramanian, J.1
Grossmann, I.E.2
-
7
-
-
0031146289
-
Using detailed scheduling to obtain realistic operating policies for a batch processing facility
-
Bassett M.H., Pekny J.F., and Reklaitis G.V. Using detailed scheduling to obtain realistic operating policies for a batch processing facility. Industrial and Engineering Chemistry Research 36 (1997) 1717-1726
-
(1997)
Industrial and Engineering Chemistry Research
, vol.36
, pp. 1717-1726
-
-
Bassett, M.H.1
Pekny, J.F.2
Reklaitis, G.V.3
-
9
-
-
9644308639
-
Partitioning procedures for solving mixed-variables programming problems
-
Benders J.F. Partitioning procedures for solving mixed-variables programming problems. Numerische Mathematik 4 (1962) 238-252
-
(1962)
Numerische Mathematik
, vol.4
, pp. 238-252
-
-
Benders, J.F.1
-
11
-
-
33748106905
-
-
Bixby, R. E., Fenelon, M., Gu Z., Rothberg E., & Wunderling R. (2002). MIP: Theory and practice: Closing the gap. http://www.ilog.com/products/optimization/tech/research/mip.pdf.
-
-
-
-
12
-
-
0036239414
-
Solving real-world linear programs: A decade and more of progress
-
Bixby R.E. Solving real-world linear programs: A decade and more of progress. Operations Research 50 (2002) 3-15
-
(2002)
Operations Research
, vol.50
, pp. 3-15
-
-
Bixby, R.E.1
-
15
-
-
33748104622
-
-
Braun, H., & Kasper, T. (2004). Optimization in SAP supply chain management. Presented at CPAIOR04, Nice. http://www-sop.inria.fr/coprin/cpaior04/files/CPAIOR2004SAP.PDF.
-
-
-
-
16
-
-
22944446817
-
Review, extensions and computational comparison of MILP formulations for scheduling of batch processes
-
Burkard R., and Hatzl J. Review, extensions and computational comparison of MILP formulations for scheduling of batch processes. Computers and Chemical Engineering 29 (2005) 2823-2835
-
(2005)
Computers and Chemical Engineering
, vol.29
, pp. 2823-2835
-
-
Burkard, R.1
Hatzl, J.2
-
17
-
-
0010476425
-
A process scheduling problem arising from chemical production planning
-
Burkard R., Hujter M., Klinz R., Rudolf R., and Wennink M. A process scheduling problem arising from chemical production planning. Optimization Methods and Software 10 (1998) 175-196
-
(1998)
Optimization Methods and Software
, vol.10
, pp. 175-196
-
-
Burkard, R.1
Hujter, M.2
Klinz, R.3
Rudolf, R.4
Wennink, M.5
-
18
-
-
0035795519
-
An improved RTN continuous-time formulation for the short-term scheduling of multipurpose batch plants
-
Castro P., Barbosa-Póvoa A.P.F.D., and Matos H. An improved RTN continuous-time formulation for the short-term scheduling of multipurpose batch plants. Industrial and Engineering Chemistry Research 40 (2001) 2059-2068
-
(2001)
Industrial and Engineering Chemistry Research
, vol.40
, pp. 2059-2068
-
-
Castro, P.1
Barbosa-Póvoa, A.P.F.D.2
Matos, H.3
-
20
-
-
1042286434
-
Multi-objective process design in multi-purpose batch plants using a tabu search optimization algorithm
-
Cavin L., Fischer U., Glover F., and Hungerbühler K. Multi-objective process design in multi-purpose batch plants using a tabu search optimization algorithm. Computers and Chemical Engineering 28 (2004) 459-478
-
(2004)
Computers and Chemical Engineering
, vol.28
, pp. 459-478
-
-
Cavin, L.1
Fischer, U.2
Glover, F.3
Hungerbühler, K.4
-
21
-
-
0031140322
-
A mixed-integer linear programming model for short-term scheduling of single-stage multiproduct batch plants with parallel lines
-
Cerdá J., Henning G.P., and Grossmann I.E. A mixed-integer linear programming model for short-term scheduling of single-stage multiproduct batch plants with parallel lines. Industrial and Engineering Chemistry Research 36 (1997) 1695-1707
-
(1997)
Industrial and Engineering Chemistry Research
, vol.36
, pp. 1695-1707
-
-
Cerdá, J.1
Henning, G.P.2
Grossmann, I.E.3
-
22
-
-
0037028817
-
Optimal short-term scheduling of multiproduct single-stage batch plants with parallel lines
-
Chen C., Liu C., Feng X., and Shao H. Optimal short-term scheduling of multiproduct single-stage batch plants with parallel lines. Industrial and Engineering Chemistry Research 41 (2002) 1249-1260
-
(2002)
Industrial and Engineering Chemistry Research
, vol.41
, pp. 1249-1260
-
-
Chen, C.1
Liu, C.2
Feng, X.3
Shao, H.4
-
24
-
-
0000000310
-
A tree search algorithm for mixed integer programming problems.
-
Dakin R.J. A tree search algorithm for mixed integer programming problems. Computer Journal 8 (1965) 250-255
-
(1965)
Computer Journal
, vol.8
, pp. 250-255
-
-
Dakin, R.J.1
-
25
-
-
33748096163
-
-
Dash Optimization (2003). http://www.dashoptimization.com/products_version2003.html.
-
-
-
-
26
-
-
0002883087
-
The constraint logic programming language CHIP
-
Tokyo
-
Dincbas M., Van Hentenryck P., Simonis H., Aggoun A., Graf T., and Berthier F. The constraint logic programming language CHIP. FGCS-88: Proceedings of International Conference on Fifth Generation Computer Systems. Tokyo (1988) 693-702
-
(1988)
FGCS-88: Proceedings of International Conference on Fifth Generation Computer Systems
, pp. 693-702
-
-
Dincbas, M.1
Van Hentenryck, P.2
Simonis, H.3
Aggoun, A.4
Graf, T.5
Berthier, F.6
-
27
-
-
18844388780
-
Aggregated scheduling of a multiproduct batch plant by two-stage stochastic integer programming
-
Engell S., Märkert A., Sand G., and Schultz R. Aggregated scheduling of a multiproduct batch plant by two-stage stochastic integer programming. Optimization and Engineering 5 (2004) 335-359
-
(2004)
Optimization and Engineering
, vol.5
, pp. 335-359
-
-
Engell, S.1
Märkert, A.2
Sand, G.3
Schultz, R.4
-
29
-
-
33749833429
-
-
Flores-Tlacuahuac, A., & Grossmann, I. E. (2006). Simultaneous cyclic scheduling and control of a multiproduct CSTR reactor. Industrial and Engineering Chemistry Research, in press.
-
-
-
-
30
-
-
2442583184
-
Continuous-time versus discrete-time approaches for scheduling of chemical processes: A review
-
Floudas C.A., and Lin X. Continuous-time versus discrete-time approaches for scheduling of chemical processes: A review. Computers and Chemical Engineering 28 (2004) 2109-2129
-
(2004)
Computers and Chemical Engineering
, vol.28
, pp. 2109-2129
-
-
Floudas, C.A.1
Lin, X.2
-
31
-
-
0036568989
-
A simple new continuous-time formulation for short-term scheduling of multipurpose batch processes
-
Giannelos N.F., and Georgiadis M.C. A simple new continuous-time formulation for short-term scheduling of multipurpose batch processes. Industrial and Engineering Chemistry Research 41 (2002) 2178-2184
-
(2002)
Industrial and Engineering Chemistry Research
, vol.41
, pp. 2178-2184
-
-
Giannelos, N.F.1
Georgiadis, M.C.2
-
32
-
-
0002703574
-
Tabu search: A tutorial
-
Glover F. Tabu search: A tutorial. Interfaces 20 (1990) 74
-
(1990)
Interfaces
, vol.20
, pp. 74
-
-
Glover, F.1
-
33
-
-
0003269032
-
Genetic algorithms in search
-
Addison-Wesley, Reading Mass
-
Goldberg D.E. Genetic algorithms in search. Optimisation and machine learning (1989), Addison-Wesley, Reading Mass
-
(1989)
Optimisation and machine learning
-
-
Goldberg, D.E.1
-
34
-
-
84958977914
-
Outline of an algorithm for integer solutions to linear programs
-
Gomory R.E. Outline of an algorithm for integer solutions to linear programs. Bulletin of the American Mathematics Society 64 (1958) 275-278
-
(1958)
Bulletin of the American Mathematics Society
, vol.64
, pp. 275-278
-
-
Gomory, R.E.1
-
36
-
-
0020100192
-
Using lagrangean techniques to solve hierarchical production planning problems.
-
Graves S.C. Using lagrangean techniques to solve hierarchical production planning problems. Management Science 28 (1982) 260-275
-
(1982)
Management Science
, vol.28
, pp. 260-275
-
-
Graves, S.C.1
-
37
-
-
0141664156
-
Review of non-linear mixed-integer and disjunctive programming techniques for process systems engineering
-
Grossmann I.E. Review of non-linear mixed-integer and disjunctive programming techniques for process systems engineering. Journal of Optimization and Engineering 3 (2002) 227-252
-
(2002)
Journal of Optimization and Engineering
, vol.3
, pp. 227-252
-
-
Grossmann, I.E.1
-
38
-
-
25144478491
-
Enterprise-wide Optimization: A New Frontier in Process Systems Engineering
-
Grossmann I.E. Enterprise-wide Optimization: A New Frontier in Process Systems Engineering. AIChE Journal 51 (2005) 1846-1857
-
(2005)
AIChE Journal
, vol.51
, pp. 1846-1857
-
-
Grossmann, I.E.1
-
39
-
-
0037503184
-
An improved MILP formulation for scheduling multiproduct, multistage batch plants
-
Gupta S., and Karimi I.A. An improved MILP formulation for scheduling multiproduct, multistage batch plants. Industrial and Engineering Chemistry Research 42 (2003) 2365-2380
-
(2003)
Industrial and Engineering Chemistry Research
, vol.42
, pp. 2365-2380
-
-
Gupta, S.1
Karimi, I.A.2
-
40
-
-
0032960899
-
A hierarchical lagrangean relaxation procedure for solving midterm planning problems
-
Gupta A., and Maranas C.D. A hierarchical lagrangean relaxation procedure for solving midterm planning problems. Industrial and Engineering Chemistry Research 38 (1999) 1937-1947
-
(1999)
Industrial and Engineering Chemistry Research
, vol.38
, pp. 1937-1947
-
-
Gupta, A.1
Maranas, C.D.2
-
41
-
-
0035890549
-
A decomposition approach for the scheduling of a steel plant production
-
Harjunkoski I., and Grossmann I.E. A decomposition approach for the scheduling of a steel plant production. Computers and Chemical Engineering 55 11 (2001) 1647-1660
-
(2001)
Computers and Chemical Engineering
, vol.55
, Issue.11
, pp. 1647-1660
-
-
Harjunkoski, I.1
Grossmann, I.E.2
-
42
-
-
0037111002
-
Decomposition techniques for multistage scheduling problems using mixed-integer and constraint programming methods
-
Harjunkoski I., and Grossmann I.E. Decomposition techniques for multistage scheduling problems using mixed-integer and constraint programming methods. Computers and Chemical Engineering 26 (2002) 1533-1552
-
(2002)
Computers and Chemical Engineering
, vol.26
, pp. 1533-1552
-
-
Harjunkoski, I.1
Grossmann, I.E.2
-
44
-
-
0034306985
-
Knowledge-based predictive and reactive scheduling in industrial environments
-
Henning G.P., and Cerdá J. Knowledge-based predictive and reactive scheduling in industrial environments. Computers and Chemical Engineering 24 9 (2000) 2315-2338
-
(2000)
Computers and Chemical Engineering
, vol.24
, Issue.9
, pp. 2315-2338
-
-
Henning, G.P.1
Cerdá, J.2
-
46
-
-
0032216021
-
Effective continuous-time formulation for short-term scheduling. 1. Multipurpose batch processes
-
Ierapetritou M.G., and Floudas C.A. Effective continuous-time formulation for short-term scheduling. 1. Multipurpose batch processes. Industrial and Engineering Chemistry Research 37 (1998) 4341-4359
-
(1998)
Industrial and Engineering Chemistry Research
, vol.37
, pp. 4341-4359
-
-
Ierapetritou, M.G.1
Floudas, C.A.2
-
47
-
-
33748097201
-
-
ILOG (1999). ILOG OPL Studio 2.1., User's Manual. ILOG Inc.
-
-
-
-
48
-
-
0038649803
-
A temporal decomposition scheme for non-linear multisite production planning and distribution models
-
Jackson J., and Grossmann I.E. A temporal decomposition scheme for non-linear multisite production planning and distribution models. Industrial and Engineering Chemistry Research 42 (2003) 3045-3055
-
(2003)
Industrial and Engineering Chemistry Research
, vol.42
, pp. 3045-3055
-
-
Jackson, J.1
Grossmann, I.E.2
-
49
-
-
0010986664
-
Algorithms for hybrid MILP/CP model for a class of optimization problems
-
Jain V., and Grossmann I.E. Algorithms for hybrid MILP/CP model for a class of optimization problems. INFORMS Journal in Computing 13 (2001) 258-276
-
(2001)
INFORMS Journal in Computing
, vol.13
, pp. 258-276
-
-
Jain, V.1
Grossmann, I.E.2
-
50
-
-
2442436591
-
Enhanced continuous-time unit-specific event-based formulation for short-term scheduling of multipurpose batch processes: Resource constraints and mixed storage policies
-
Janak S.L., Lin X., and Floudas C.A. Enhanced continuous-time unit-specific event-based formulation for short-term scheduling of multipurpose batch processes: Resource constraints and mixed storage policies. Industrial and Engineering Chemistry Research 43 (2004) 2516-2533
-
(2004)
Industrial and Engineering Chemistry Research
, vol.43
, pp. 2516-2533
-
-
Janak, S.L.1
Lin, X.2
Floudas, C.A.3
-
51
-
-
11844290763
-
Enhanced continuous-time unit-specific event-based formulation for short-term scheduling of multipurpose batch processes: Resource constraints and mixed storage policies
-
Janak S.L., Lin X., and Floudas C.A. Enhanced continuous-time unit-specific event-based formulation for short-term scheduling of multipurpose batch processes: Resource constraints and mixed storage policies. Addition/Correction. Industrial and Engineering Chemistry Research 44 (2005) 426
-
(2005)
Addition/Correction. Industrial and Engineering Chemistry Research
, vol.44
, pp. 426
-
-
Janak, S.L.1
Lin, X.2
Floudas, C.A.3
-
54
-
-
0039930054
-
MIMI/G: A graphical environment for mathematical programming and modeling
-
Jones C.V., and Baker T.E. MIMI/G: A graphical environment for mathematical programming and modeling. Interfaces 26 3 (1996) 90ff
-
(1996)
Interfaces
, vol.26
, Issue.3
-
-
Jones, C.V.1
Baker, T.E.2
-
55
-
-
0034257999
-
Mixed integer optimization in the chemical process industry: Experience, potential and future
-
Kallrath J. Mixed integer optimization in the chemical process industry: Experience, potential and future. Transactions I. Chemical E. 78 Part A (2000) 809-822
-
(2000)
Transactions I. Chemical E.
, vol.78
, Issue.PART A
, pp. 809-822
-
-
Kallrath, J.1
-
56
-
-
0442264226
-
Planning and scheduling in the process industry
-
Kallrath J. Planning and scheduling in the process industry. OR Spectrum 24 (2002) 219-250
-
(2002)
OR Spectrum
, vol.24
, pp. 219-250
-
-
Kallrath, J.1
-
58
-
-
0027545176
-
A general algorithm for short-term scheduling of batch operations-I. MILP formulation
-
Kondili E., Pantelides C.C., and Sargent W.H. A general algorithm for short-term scheduling of batch operations-I. MILP formulation. Computers and Chemical Engineering 2 (1993) 211-227
-
(1993)
Computers and Chemical Engineering
, vol.2
, pp. 211-227
-
-
Kondili, E.1
Pantelides, C.C.2
Sargent, W.H.3
-
59
-
-
0028442512
-
Implementation of resource constraints in ILOG schedule: A library for the development of constrained-based scheduling systems
-
Le Pape C. Implementation of resource constraints in ILOG schedule: A library for the development of constrained-based scheduling systems. Intelligent Systems Engineering 3 2 (1998) 55-66
-
(1998)
Intelligent Systems Engineering
, vol.3
, Issue.2
, pp. 55-66
-
-
Le Pape, C.1
-
60
-
-
0035980317
-
A novel non-uniform discrete time formulation for short-term scheduling of batch and continuous processes
-
Lee K., Park H.I., and Lee I. A novel non-uniform discrete time formulation for short-term scheduling of batch and continuous processes. Industrial and Engineering Chemistry Research 40 (2001) 4902-4911
-
(2001)
Industrial and Engineering Chemistry Research
, vol.40
, pp. 4902-4911
-
-
Lee, K.1
Park, H.I.2
Lee, I.3
-
62
-
-
0346734333
-
Resource-constrained scheduling of parallel production lines using asynchronous slots
-
Lim M., and Karimi I.A. Resource-constrained scheduling of parallel production lines using asynchronous slots. Industrial and Engineering Chemistry Research 42 (2003) 6832-6842
-
(2003)
Industrial and Engineering Chemistry Research
, vol.42
, pp. 6832-6842
-
-
Lim, M.1
Karimi, I.A.2
-
63
-
-
0035340986
-
Design, synthesis and scheduling of multipurpose batch plants via an effective continuous-time formulation
-
Lin X., and Floudas C.F. Design, synthesis and scheduling of multipurpose batch plants via an effective continuous-time formulation. Computers and Chemical Engineering 25 (2001) 665-674
-
(2001)
Computers and Chemical Engineering
, vol.25
, pp. 665-674
-
-
Lin, X.1
Floudas, C.F.2
-
64
-
-
0037036735
-
Continuous-time optimization approach for medium-range production scheduling of a multiproduct batch plant
-
Lin X., Floudas C.A., Modi S., and Juhasz N.M. Continuous-time optimization approach for medium-range production scheduling of a multiproduct batch plant. Industrial and Engineering Chemistry Research 41 (2002) 3884-3906
-
(2002)
Industrial and Engineering Chemistry Research
, vol.41
, pp. 3884-3906
-
-
Lin, X.1
Floudas, C.A.2
Modi, S.3
Juhasz, N.M.4
-
65
-
-
0031845056
-
Sequencing of batch operations for a highly coupled production process: Genetic algorithms versus mathematical programming
-
Löhl T., Schulz C., and Engell S. Sequencing of batch operations for a highly coupled production process: Genetic algorithms versus mathematical programming. Computers and Chemical Engineering 22 1 (1988) S579-S585
-
(1988)
Computers and Chemical Engineering
, vol.22
, Issue.1
-
-
Löhl, T.1
Schulz, C.2
Engell, S.3
-
66
-
-
0037635200
-
New general continuous-time state-task network formulation for short-term scheduling of multipurpose batch plants
-
Maravelias C.T., and Grossmann I.E. New general continuous-time state-task network formulation for short-term scheduling of multipurpose batch plants. Industrial and Engineering Chemistry Research 42 (2003) 3056-3074
-
(2003)
Industrial and Engineering Chemistry Research
, vol.42
, pp. 3056-3074
-
-
Maravelias, C.T.1
Grossmann, I.E.2
-
67
-
-
4143136582
-
A hybrid MILP/CP decomposition approach for the continuous time scheduling of multipurpose batch plants
-
Maravelias C.T., and Grossmann I.E. A hybrid MILP/CP decomposition approach for the continuous time scheduling of multipurpose batch plants. Computers and Chemical Engineering 28 (2004) 1921-1949
-
(2004)
Computers and Chemical Engineering
, vol.28
, pp. 1921-1949
-
-
Maravelias, C.T.1
Grossmann, I.E.2
-
68
-
-
0034307307
-
Optimal scheduling of batch plants satisfying multiple product orders with different due-dates
-
Méndez C.A., Henning G.P., and Cerdá J. Optimal scheduling of batch plants satisfying multiple product orders with different due-dates. Computers and Chemical Engineering 24 (2000) 2223-2245
-
(2000)
Computers and Chemical Engineering
, vol.24
, pp. 2223-2245
-
-
Méndez, C.A.1
Henning, G.P.2
Cerdá, J.3
-
69
-
-
0035339828
-
An MILP continuous-time approach to short-term scheduling of resource-constrained multistage flowshop batch facilities
-
Méndez C.A., Henning G.P., and Cerdá J. An MILP continuous-time approach to short-term scheduling of resource-constrained multistage flowshop batch facilities. Computers and Chemical Engineering 25 (2001) 701-711
-
(2001)
Computers and Chemical Engineering
, vol.25
, pp. 701-711
-
-
Méndez, C.A.1
Henning, G.P.2
Cerdá, J.3
-
70
-
-
33748102518
-
An MILP framework for short-term scheduling of single-stage batch plants with limited discrete resources
-
Elsevier Science Ltd., ISBN 0-444-51109-1
-
Méndez C.A., and Cerdá J. An MILP framework for short-term scheduling of single-stage batch plants with limited discrete resources. Computer-aided Chemical Engineering 12 (2002) 721-726 Elsevier Science Ltd., ISBN 0-444-51109-1
-
(2002)
Computer-aided Chemical Engineering
, vol.12
, pp. 721-726
-
-
Méndez, C.A.1
Cerdá, J.2
-
71
-
-
2442495043
-
An MILP continuous-time framework for short-term scheduling of multipurpose batch processes under different operation strategies
-
Méndez C.A., and Cerdá J. An MILP continuous-time framework for short-term scheduling of multipurpose batch processes under different operation strategies. Optimization and Engineering 4 (2003) 7-22
-
(2003)
Optimization and Engineering
, vol.4
, pp. 7-22
-
-
Méndez, C.A.1
Cerdá, J.2
-
73
-
-
1942500440
-
An MILP framework for batch reactive scheduling with limited discrete resources
-
Méndez C.A., and Cerdá J. An MILP framework for batch reactive scheduling with limited discrete resources. Computers and Chemical Engineering 28 (2004) 1059-1068
-
(2004)
Computers and Chemical Engineering
, vol.28
, pp. 1059-1068
-
-
Méndez, C.A.1
Cerdá, J.2
-
74
-
-
33748120584
-
Short-term scheduling of multistage batch processes subject to limited finite resources.
-
Méndez C.A., and Cerdá J. Short-term scheduling of multistage batch processes subject to limited finite resources. Computer-aided Chemical Engineering 15B (2004) 984-989
-
(2004)
Computer-aided Chemical Engineering
, vol.15 B
, pp. 984-989
-
-
Méndez, C.A.1
Cerdá, J.2
-
75
-
-
20344400107
-
Short-term scheduling of batch processes. A comparative study of different approaches
-
pp. 4022, 4034
-
Mishra B.V., Mayer E., Raisch J., and Kienle A. Short-term scheduling of batch processes. A comparative study of different approaches. Industrial and Engineering Chemistry Research 44 (2005) pp. 4022, 4034
-
(2005)
Industrial and Engineering Chemistry Research
, vol.44
-
-
Mishra, B.V.1
Mayer, E.2
Raisch, J.3
Kienle, A.4
-
76
-
-
0032997426
-
Continuous time representation approach to batch and continuous process scheduling. 1. MINLP formulation
-
Mockus L., and Reklaitis G.V. Continuous time representation approach to batch and continuous process scheduling. 1. MINLP formulation. Industrial and Engineering Chemistry Research 38 (1999) 197-203
-
(1999)
Industrial and Engineering Chemistry Research
, vol.38
, pp. 197-203
-
-
Mockus, L.1
Reklaitis, G.V.2
-
77
-
-
0033037070
-
Continuous time representation approach to batch and continuous process scheduling. 2. Computational issues
-
Mockus L., and Reklaitis G.V. Continuous time representation approach to batch and continuous process scheduling. 2. Computational issues. Industrial and Engineering Chemistry Research 38 (1999) 204-210
-
(1999)
Industrial and Engineering Chemistry Research
, vol.38
, pp. 204-210
-
-
Mockus, L.1
Reklaitis, G.V.2
-
78
-
-
33748095049
-
-
Nuijten, W. P. M. (1994). Time and resource constrained scheduling: A constraint satisfaction approach. PhD Thesis, Eindhoven University of Technology.
-
-
-
-
79
-
-
25844475256
-
Production campaign planning including grade transition sequencing and dynamic optimization
-
Nyström R.H., Franke R., Harjunkoski I., and Kroll A. Production campaign planning including grade transition sequencing and dynamic optimization. Computers and Chemical Engineering 29 (2005) 2163-2179
-
(2005)
Computers and Chemical Engineering
, vol.29
, pp. 2163-2179
-
-
Nyström, R.H.1
Franke, R.2
Harjunkoski, I.3
Kroll, A.4
-
80
-
-
9644281095
-
Production scheduling in a steelmaking-continuous casting plant
-
Pacciarelli D., and Pranzo M. Production scheduling in a steelmaking-continuous casting plant. Computers and Chemical Engineering 28 (2004) 2823-2835
-
(2004)
Computers and Chemical Engineering
, vol.28
, pp. 2823-2835
-
-
Pacciarelli, D.1
Pranzo, M.2
-
81
-
-
0000763707
-
Unified frameworks for optimal process planning and scheduling
-
Cache publications, New York pp. 253-274
-
Pantelides C.C. Unified frameworks for optimal process planning and scheduling. Foundations of computer-aided process operations (1994), Cache publications, New York pp. 253-274
-
(1994)
Foundations of computer-aided process operations
-
-
Pantelides, C.C.1
-
85
-
-
0001690679
-
A continuous time mixed integer linear programming model for short-term scheduling of multistage batch plants
-
Pinto J.M., and Grossmann I.E. A continuous time mixed integer linear programming model for short-term scheduling of multistage batch plants. Industrial and Engineering Chemistry Research 34 (1995) 3037-3051
-
(1995)
Industrial and Engineering Chemistry Research
, vol.34
, pp. 3037-3051
-
-
Pinto, J.M.1
Grossmann, I.E.2
-
86
-
-
0002584921
-
An alternate MILP model for short-term scheduling of batch plants with preordering constraints
-
Pinto J.M., and Grossmann I.E. An alternate MILP model for short-term scheduling of batch plants with preordering constraints. Industrial and Engineering Chemistry Research 35 (1996) 338-342
-
(1996)
Industrial and Engineering Chemistry Research
, vol.35
, pp. 338-342
-
-
Pinto, J.M.1
Grossmann, I.E.2
-
87
-
-
0030713544
-
A logic-based approach to scheduling problems with resource constraints
-
Pinto J.M., and Grossmann I.E. A logic-based approach to scheduling problems with resource constraints. Computers and Chemical Engineering 21 (1997) 801-818
-
(1997)
Computers and Chemical Engineering
, vol.21
, pp. 801-818
-
-
Pinto, J.M.1
Grossmann, I.E.2
-
88
-
-
0032386621
-
Assignments and sequencing models of the scheduling of process systems
-
Pinto J.M., and Grossmann I.E. Assignments and sequencing models of the scheduling of process systems. Annals of Operations Research 81 (1998) 433-466
-
(1998)
Annals of Operations Research
, vol.81
, pp. 433-466
-
-
Pinto, J.M.1
Grossmann, I.E.2
-
91
-
-
0034307311
-
Short-term planning and scheduling in multipurpose batch chemical plants: A multi-level approach
-
Rodrigues M.T.M., Latre L.G., and Rodrigues L.C.A. Short-term planning and scheduling in multipurpose batch chemical plants: A multi-level approach. Computers and Chemical Engineering 24 (2000) 2247-2258
-
(2000)
Computers and Chemical Engineering
, vol.24
, pp. 2247-2258
-
-
Rodrigues, M.T.M.1
Latre, L.G.2
Rodrigues, L.C.A.3
-
93
-
-
0035339890
-
An MILP-based reordering algorithm for complex industrial scheduling and rescheduling
-
Roslöf J., Harjunkoski I., Björkqvist J., Karlsson S., and Westerlund T. An MILP-based reordering algorithm for complex industrial scheduling and rescheduling. Computers and Chemical Engineering 25 (2001) 821-828
-
(2001)
Computers and Chemical Engineering
, vol.25
, pp. 821-828
-
-
Roslöf, J.1
Harjunkoski, I.2
Björkqvist, J.3
Karlsson, S.4
Westerlund, T.5
-
94
-
-
0035162838
-
Optimal scheduling for a multiproduct batch process with minimization of penalty on due date period
-
Ryu J.H., Lee H.K., and Lee I.B. Optimal scheduling for a multiproduct batch process with minimization of penalty on due date period. Industrial and Engineering Chemistry Research 40 1 (2001) 228-233
-
(2001)
Industrial and Engineering Chemistry Research
, vol.40
, Issue.1
, pp. 228-233
-
-
Ryu, J.H.1
Lee, H.K.2
Lee, I.B.3
-
95
-
-
0030737170
-
Knowledge-based scheduling in industry and medicine
-
Sauer J., and Bruns R. Knowledge-based scheduling in industry and medicine. IEEE Expert 12 (1997) 24-31
-
(1997)
IEEE Expert
, vol.12
, pp. 24-31
-
-
Sauer, J.1
Bruns, R.2
-
96
-
-
0029717404
-
A simple continuous-time process scheduling formulation and a novel solution algorithm
-
Schilling G., and Pantelides C.C. A simple continuous-time process scheduling formulation and a novel solution algorithm. Computers and Chemical Engineering 20 (1996) S1221-S1226
-
(1996)
Computers and Chemical Engineering
, vol.20
-
-
Schilling, G.1
Pantelides, C.C.2
-
97
-
-
33847551675
-
Scheduling of a multiproduct polymer batch plant
-
Pekny J.F., Blau G.E., and Carnahan B. (Eds), CACHE Publications, Snowbird
-
Schulz C., Engell S., and Rudolf R. Scheduling of a multiproduct polymer batch plant. In: Pekny J.F., Blau G.E., and Carnahan B. (Eds). Proceeding for foundations of computer-aided process operations (FOCAPO' 98) (1998), CACHE Publications, Snowbird
-
(1998)
Proceeding for foundations of computer-aided process operations (FOCAPO' 98)
-
-
Schulz, C.1
Engell, S.2
Rudolf, R.3
-
98
-
-
0027545175
-
A general algorithm for short-term scheduling of batch operations-II. Computational issues
-
Shah N., Pantelides C.C., and Sargent W.H. A general algorithm for short-term scheduling of batch operations-II. Computational issues. Computers and Chemical Engineering 2 (1993) 229-244
-
(1993)
Computers and Chemical Engineering
, vol.2
, pp. 229-244
-
-
Shah, N.1
Pantelides, C.C.2
Sargent, W.H.3
-
100
-
-
85133749042
-
Agent-based systems for intelligent manufacturing: A state of the art survey
-
Shen W., and Norrie D.H. Agent-based systems for intelligent manufacturing: A state of the art survey. Knowledge and Information Systems 1 2 (1999) 129-156
-
(1999)
Knowledge and Information Systems
, vol.1
, Issue.2
, pp. 129-156
-
-
Shen, W.1
Norrie, D.H.2
-
101
-
-
0029215490
-
Issues in solving large scale planning, design and scheduling problems in batch chemical plants
-
Subrahmanyam S., Bassett M.H., Pekny J.F., and Reklaitis G.V. Issues in solving large scale planning, design and scheduling problems in batch chemical plants. Computers and Chemical Engineering 19 (1995) 577-582
-
(1995)
Computers and Chemical Engineering
, vol.19
, pp. 577-582
-
-
Subrahmanyam, S.1
Bassett, M.H.2
Pekny, J.F.3
Reklaitis, G.V.4
-
102
-
-
15344346066
-
A simpler better slot-based continuous-time formulation for short-term scheduling in multiproduct batch plants
-
Sundaramoorthy A., and Karimi I.A. A simpler better slot-based continuous-time formulation for short-term scheduling in multiproduct batch plants. Chemical and Engineering Science 60 (2005) 2679-2702
-
(2005)
Chemical and Engineering Science
, vol.60
, pp. 2679-2702
-
-
Sundaramoorthy, A.1
Karimi, I.A.2
-
103
-
-
0033892353
-
A mathematical programming model for scheduling steelmaking continuous casting production
-
Tang L., Liu J., Rong A., and Yang Z. A mathematical programming model for scheduling steelmaking continuous casting production. European Journal of Operational Research 120 2 (2000) 423-435
-
(2000)
European Journal of Operational Research
, vol.120
, Issue.2
, pp. 423-435
-
-
Tang, L.1
Liu, J.2
Rong, A.3
Yang, Z.4
-
105
-
-
4143132806
-
Constraint and integer programming in OPL
-
Van Hentenryck P. Constraint and integer programming in OPL. INFORMS Journal on Computing 14 4 (2002) 345-372
-
(2002)
INFORMS Journal on Computing
, vol.14
, Issue.4
, pp. 345-372
-
-
Van Hentenryck, P.1
-
108
-
-
0001314330
-
ECLiPSe: A platform for constraint logic programming
-
Wallace M., Novello S., and Schimpf J. ECLiPSe: A platform for constraint logic programming. ICL Systems Journal 12 1 (1997) 159-200
-
(1997)
ICL Systems Journal
, vol.12
, Issue.1
, pp. 159-200
-
-
Wallace, M.1
Novello, S.2
Schimpf, J.3
-
109
-
-
0342757703
-
A genetic algorithm for online-scheduling of a multiproduct polymer batch plant
-
Wang K., Löhl T., Stobbe M., and Engell S. A genetic algorithm for online-scheduling of a multiproduct polymer batch plant. Computers and Chemical Engineering 24 (2000) 393-400
-
(2000)
Computers and Chemical Engineering
, vol.24
, pp. 393-400
-
-
Wang, K.1
Löhl, T.2
Stobbe, M.3
Engell, S.4
-
110
-
-
33748110165
-
-
Westenberger, H. & Kallrath, J. (1995). Formulation of a job shop problem in process industry. Internal report, Bayer AG, Leverkusen, and BASF AG, Ludwigshafen.
-
-
-
-
111
-
-
33748102883
-
-
Wilkinson, S. J. (1996) Aggregate formulations for large-scale process scheduling problems, Thesis dissertation, Department of Chemical Engineering and Chemical Technology, Imperial College, London.
-
-
-
-
114
-
-
0030174820
-
The optimal operation of mixed production facilities-a general formulation and some approaches for the solution
-
Zhang X., and Sargent W.H. The optimal operation of mixed production facilities-a general formulation and some approaches for the solution. Computers and Chemical Engineering 20 (1996) 897-904
-
(1996)
Computers and Chemical Engineering
, vol.20
, pp. 897-904
-
-
Zhang, X.1
Sargent, W.H.2
-
115
-
-
0035205124
-
Novel continuous time MILP formulation for multipurpose batch plants. 2. Integrated planning and scheduling
-
Zhu X.X., and Majozi T. Novel continuous time MILP formulation for multipurpose batch plants. 2. Integrated planning and scheduling. Industrial and Engineering Chemistry Research 40 (2001) 5621-5634
-
(2001)
Industrial and Engineering Chemistry Research
, vol.40
, pp. 5621-5634
-
-
Zhu, X.X.1
Majozi, T.2
|