메뉴 건너뛰기




Volumn 65, Issue 22, 2010, Pages 5887-5900

Rolling horizon based planning and scheduling integration with production capacity consideration

Author keywords

Economics; Mathematical modeling; Optimization; Planning and scheduling integration; Rolling horizon method; Systems engineering

Indexed keywords

COMPLEX PROCESSES; COMPUTATIONAL EFFORT; FAST SOLUTIONS; INDUSTRIAL PLANNING; INTEGRATED PLANNING; INTEGRATED PRODUCTION; MATHEMATICAL MODELING; NOVEL METHODS; OPTIMIZATION MODELS; PARAMETRIC PROGRAMMING; PLANNING AND SCHEDULING; PLANNING AND SCHEDULING INTEGRATION; PLANNING MODELS; PROCESS NETWORKS; PRODUCTION CAPACITY; ROLLING HORIZON; ROLLING HORIZON METHOD; SCHEDULING MODELS; SOLUTION QUALITY;

EID: 77957358328     PISSN: 00092509     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ces.2010.08.010     Document Type: Article
Times cited : (79)

References (28)
  • 2
    • 0038337833 scopus 로고    scopus 로고
    • Optimal periodic scheduling of batch plants using RTN-based discrete and continuous-time formulations: a case study approach
    • Castro P., Barbosa-Povoa A., Matos H. Optimal periodic scheduling of batch plants using RTN-based discrete and continuous-time formulations: a case study approach. Industrial and Engineering Chemistry Research 2003, 42:3346-3360.
    • (2003) Industrial and Engineering Chemistry Research , vol.42 , pp. 3346-3360
    • Castro, P.1    Barbosa-Povoa, A.2    Matos, H.3
  • 3
    • 0000685021 scopus 로고    scopus 로고
    • RTN-based rolling horizon algorithms for medium term scheduling of multipurpose plants
    • Dimitriadis A.D., Shah N., Pantelides C.C. RTN-based rolling horizon algorithms for medium term scheduling of multipurpose plants. Computers and Chemical Engineering 1997, 21:S1061-S1066.
    • (1997) Computers and Chemical Engineering , vol.21
    • Dimitriadis, A.D.1    Shah, N.2    Pantelides, C.C.3
  • 4
    • 30444434197 scopus 로고    scopus 로고
    • A decomposition method for the simultaneous planning and scheduling of single-stage continuous multiproduct plants
    • Erdirik-Dogan M., Grossmann I.E. A decomposition method for the simultaneous planning and scheduling of single-stage continuous multiproduct plants. Industrial and Engineering Chemistry Research 2006, 45:299-315.
    • (2006) Industrial and Engineering Chemistry Research , vol.45 , pp. 299-315
    • Erdirik-Dogan, M.1    Grossmann, I.E.2
  • 5
    • 0242718574 scopus 로고    scopus 로고
    • Discrete optimization methods and their role in the integration of planning and scheduling. AIChE Symp. Ser.
    • Grossmann, I.E., Van den Heever, S.A., Harjunkoski, I., 2002. Discrete optimization methods and their role in the integration of planning and scheduling. AIChE Symp. Ser. 98, 150.
    • (2002) , vol.98 , pp. 150
    • Grossmann, I.E.1    Van den Heever, S.A.2    Harjunkoski, I.3
  • 6
    • 0032216021 scopus 로고    scopus 로고
    • Effective continuous-time formulation for short-term scheduling. 1. Multipurpose batch processes
    • Ierapetritou M.G., Floudas C.A. Effective continuous-time formulation for short-term scheduling. 1. Multipurpose batch processes. Industrial and Engineering Chemistry Research 1998, 37:4341-4359.
    • (1998) Industrial and Engineering Chemistry Research , vol.37 , pp. 4341-4359
    • Ierapetritou, M.G.1    Floudas, C.A.2
  • 8
    • 0442264226 scopus 로고    scopus 로고
    • Planning and scheduling in the process industry
    • Kallrath J. Planning and scheduling in the process industry. OR Spectrum 2002, 24:219-250.
    • (2002) OR Spectrum , vol.24 , pp. 219-250
    • Kallrath, J.1
  • 10
    • 5644303213 scopus 로고    scopus 로고
    • Planning and scheduling in supply chains: an overview of issues in practice
    • Kreipl S., Pinedo M. Planning and scheduling in supply chains: an overview of issues in practice. Production and Operations Management 2004, 13:77-92.
    • (2004) Production and Operations Management , vol.13 , pp. 77-92
    • Kreipl, S.1    Pinedo, M.2
  • 11
    • 37749011834 scopus 로고    scopus 로고
    • Process scheduling under uncertainty using multiparametric programming
    • Li Z., Ierapetritou M.G. Process scheduling under uncertainty using multiparametric programming. AICHE Journal 2007, 53:3183-3203.
    • (2007) AICHE Journal , vol.53 , pp. 3183-3203
    • Li, Z.1    Ierapetritou, M.G.2
  • 12
    • 67649756833 scopus 로고    scopus 로고
    • Integrated production planning and scheduling using a decomposition framework
    • Li Z., Ierapetritou M.G. Integrated production planning and scheduling using a decomposition framework. Chemical Engineering Science 2009, 64:3585-3597.
    • (2009) Chemical Engineering Science , vol.64 , pp. 3585-3597
    • Li, Z.1    Ierapetritou, M.G.2
  • 13
    • 0037036735 scopus 로고    scopus 로고
    • Continuous-time optimization approach for medium-range production scheduling of a multiproduct batch plant
    • Lin X., Floudas C.A., Modi S., Juhasz N.M. Continuous-time optimization approach for medium-range production scheduling of a multiproduct batch plant. Industrial and Engineering Chemistry Research 2002, 41:3884-3906.
    • (2002) Industrial and Engineering Chemistry Research , vol.41 , pp. 3884-3906
    • Lin, X.1    Floudas, C.A.2    Modi, S.3    Juhasz, N.M.4
  • 14
    • 70249093672 scopus 로고    scopus 로고
    • Integration of production planning and scheduling: overview, challenges and opportunities
    • Maravelias C.T., Sung C. Integration of production planning and scheduling: overview, challenges and opportunities. Computers and Chemical Engineering 2009, 33:1919-1930.
    • (2009) Computers and Chemical Engineering , vol.33 , pp. 1919-1930
    • Maravelias, C.T.1    Sung, C.2
  • 15
    • 20344400593 scopus 로고    scopus 로고
    • A multilevel, control-theoretic framework for integration of planning, scheduling, and rescheduling
    • Munawar S.A., Gudi R.D. A multilevel, control-theoretic framework for integration of planning, scheduling, and rescheduling. Ind. Eng. Chem. Res. 2005, 44:4001-4021.
    • (2005) Ind. Eng. Chem. Res. , vol.44 , pp. 4001-4021
    • Munawar, S.A.1    Gudi, R.D.2
  • 18
    • 1942500439 scopus 로고    scopus 로고
    • Modeling and solving real-time scheduling problems by stochastic integer programming
    • Sand G., Engell S. Modeling and solving real-time scheduling problems by stochastic integer programming. Computers and Chemical Engineering 2004, 28:1087-1103.
    • (2004) Computers and Chemical Engineering , vol.28 , pp. 1087-1103
    • Sand, G.1    Engell, S.2
  • 21
    • 59249096047 scopus 로고    scopus 로고
    • Production scheduling of a large-scale industrial continuous plant: short-term and medium-term scheduling
    • Shaik M.A., Floudas C.A., Kallrath J., Pitz H.-J. Production scheduling of a large-scale industrial continuous plant: short-term and medium-term scheduling. Computers and Chemical Engineering 2009, 33:670-686.
    • (2009) Computers and Chemical Engineering , vol.33 , pp. 670-686
    • Shaik, M.A.1    Floudas, C.A.2    Kallrath, J.3    Pitz, H.-J.4
  • 22
    • 34248578445 scopus 로고    scopus 로고
    • An attainable region approach for effective production planning of multi-product processes
    • Sung C., Maravelias C.T. An attainable region approach for effective production planning of multi-product processes. AICHE Journal 2007, 53:1298-1315.
    • (2007) AICHE Journal , vol.53 , pp. 1298-1315
    • Sung, C.1    Maravelias, C.T.2
  • 23
    • 49249099572 scopus 로고    scopus 로고
    • Integrated operational planning and medium-term scheduling of a large-scale industrial batch plants
    • Verderame P.M., Floudas C.A. Integrated operational planning and medium-term scheduling of a large-scale industrial batch plants. Industrial and Engineering Chemistry Research 2008, 47:4845-4860.
    • (2008) Industrial and Engineering Chemistry Research , vol.47 , pp. 4845-4860
    • Verderame, P.M.1    Floudas, C.A.2
  • 25
    • 4143112202 scopus 로고    scopus 로고
    • Cyclic short-term scheduling of multiproduct batch plants using continuous-time representation
    • Wu D., Ierapetritou M. Cyclic short-term scheduling of multiproduct batch plants using continuous-time representation. Computers and Chemical Engineering 2004, 28:2271-2286.
    • (2004) Computers and Chemical Engineering , vol.28 , pp. 2271-2286
    • Wu, D.1    Ierapetritou, M.2
  • 26
    • 0041805288 scopus 로고    scopus 로고
    • Decomposition approaches for the efficient solution of short-term scheduling problems
    • Wu D., Ierapetritou M.G. Decomposition approaches for the efficient solution of short-term scheduling problems. Computers and Chemical Engineering 2003, 27:1261-1276.
    • (2003) Computers and Chemical Engineering , vol.27 , pp. 1261-1276
    • Wu, D.1    Ierapetritou, M.G.2
  • 27
    • 34548447064 scopus 로고    scopus 로고
    • Hierarchical approach for production planning and scheduling under uncertainty
    • Wu D., Ierapetritou M.G. Hierarchical approach for production planning and scheduling under uncertainty. Chemical Engineering and Processing 2007, 46:1129-1140.
    • (2007) Chemical Engineering and Processing , vol.46 , pp. 1129-1140
    • Wu, D.1    Ierapetritou, M.G.2
  • 28
    • 0035205124 scopus 로고    scopus 로고
    • Novel continuous-time MILP formulation for multipurpose batch plants. 2. Integrated planning and scheduling
    • Zhu X.X., Majozi T. Novel continuous-time MILP formulation for multipurpose batch plants. 2. Integrated planning and scheduling. Industrial and Engineering Chemistry Research 2001, 40:5621-5634.
    • (2001) Industrial and Engineering Chemistry Research , vol.40 , pp. 5621-5634
    • Zhu, X.X.1    Majozi, T.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.