메뉴 건너뛰기




Volumn 62, Issue 5, 2016, Pages 1646-1667

Multi-stage adjustable robust optimization for process scheduling under uncertainty

Author keywords

Process scheduling; Robust optimization; Uncertainty

Indexed keywords

OPTIMIZATION; PRODUCTION CONTROL;

EID: 84977900509     PISSN: 00011541     EISSN: 15475905     Source Type: Journal    
DOI: 10.1002/aic.15183     Document Type: Article
Times cited : (119)

References (77)
  • 1
    • 0034257999 scopus 로고    scopus 로고
    • Mixed integer optimization in the chemical process industry
    • Kallrath J. Mixed integer optimization in the chemical process industry. Chem Eng Res Des. 2000;78(6):809-822.
    • (2000) Chem Eng Res Des. , vol.78 , Issue.6 , pp. 809-822
    • Kallrath, J.1
  • 2
    • 71749086095 scopus 로고    scopus 로고
    • Enterprise-wide optimization in an integrated chemical complex
    • Wassick J. Enterprise-wide optimization in an integrated chemical complex. Comp Chem Eng. 2009;33(12):1950-1963.
    • (2009) Comp Chem Eng. , vol.33 , Issue.12 , pp. 1950-1963
    • Wassick, J.1
  • 3
    • 0035890549 scopus 로고    scopus 로고
    • A decomposition approach for the scheduling of a steel plant production
    • Harjunkoski I, Grossmann I. A decomposition approach for the scheduling of a steel plant production. Comp Chem Eng. 2001;25(11-12):1647-1660.
    • (2001) Comp Chem Eng. , vol.25 , Issue.11-12 , pp. 1647-1660
    • Harjunkoski, I.1    Grossmann, I.2
  • 4
    • 33751273486 scopus 로고    scopus 로고
    • Optimization of aluminum smelter casthouse operations
    • Prasad P, Maravelias C, Kelly J. Optimization of aluminum smelter casthouse operations. Ind Eng Chem Res. 2006;45(22):7603-7617.
    • (2006) Ind Eng Chem Res. , vol.45 , Issue.22 , pp. 7603-7617
    • Prasad, P.1    Maravelias, C.2    Kelly, J.3
  • 5
    • 80052845471 scopus 로고    scopus 로고
    • A novel optimization method to automated wet-etch station scheduling in semiconductor manufacturing systems
    • Aguirre AM, Méndez C, Castro P. A novel optimization method to automated wet-etch station scheduling in semiconductor manufacturing systems. Comp Chem Eng. 2011;35(12):2960-2972.
    • (2011) Comp Chem Eng. , vol.35 , Issue.12 , pp. 2960-2972
    • Aguirre, A.M.1    Méndez, C.2    Castro, P.3
  • 7
    • 75249086191 scopus 로고    scopus 로고
    • Optimal production scheduling and lot-sizing in dairy plants: the yogurt production line
    • Kopanos G, Puigjaner L, Georgiadis M. Optimal production scheduling and lot-sizing in dairy plants: the yogurt production line. Ind Eng Chem Res. 2010;49(2):701-718.
    • (2010) Ind Eng Chem Res. , vol.49 , Issue.2 , pp. 701-718
    • Kopanos, G.1    Puigjaner, L.2    Georgiadis, M.3
  • 8
    • 84861576506 scopus 로고    scopus 로고
    • Efficient mathematical frameworks for detailed production scheduling in food processing industries
    • Kopanos G, Puigjaner L, Georgiadis M. Efficient mathematical frameworks for detailed production scheduling in food processing industries. Comp Chem Eng. 2012;42:206-216.
    • (2012) Comp Chem Eng. , vol.42 , pp. 206-216
    • Kopanos, G.1    Puigjaner, L.2    Georgiadis, M.3
  • 9
    • 0035166107 scopus 로고    scopus 로고
    • Strategic supply chain optimization for the pharmaceutical industries
    • Papageorgiou L, Rotstein G, Shah N. Strategic supply chain optimization for the pharmaceutical industries. Ind Eng Chem Res. 2001;40(1):275-286.
    • (2001) Ind Eng Chem Res. , vol.40 , Issue.1 , pp. 275-286
    • Papageorgiou, L.1    Rotstein, G.2    Shah, N.3
  • 10
    • 84883457529 scopus 로고    scopus 로고
    • Multi-period scheduling of a multi-stage multi-product bio-pharmaceutical process
    • Kabra S, Shaik M, Rathore A. Multi-period scheduling of a multi-stage multi-product bio-pharmaceutical process. Comp Chem Eng. 2013;57:95-103.
    • (2013) Comp Chem Eng. , vol.57 , pp. 95-103
    • Kabra, S.1    Shaik, M.2    Rathore, A.3
  • 11
    • 25144491255 scopus 로고    scopus 로고
    • Mixed integer linear programming in process scheduling: modeling, algorithms, and applications
    • Floudas C, Lin X. Mixed integer linear programming in process scheduling: modeling, algorithms, and applications. Annal Operat Res. 2005;139(1):131-162.
    • (2005) Annal Operat Res. , vol.139 , Issue.1 , pp. 131-162
    • Floudas, C.1    Lin, X.2
  • 12
    • 33748102266 scopus 로고    scopus 로고
    • State-of-the-art review of optimization methods for short-term scheduling of batch processes
    • Méndez C, Cerdá J, Grossmann I, Harjunkoski I, Fahl M. State-of-the-art review of optimization methods for short-term scheduling of batch processes. Comp Chem Eng. 2006;30(6-7):913-946.
    • (2006) Comp Chem Eng. , vol.30 , Issue.6-7 , pp. 913-946
    • Méndez, C.1    Cerdá, J.2    Grossmann, I.3    Harjunkoski, I.4    Fahl, M.5
  • 14
    • 5144232431 scopus 로고    scopus 로고
    • Executing production schedules in the face of uncertainties: a review and some future directions
    • Aytug H, Lawley M, McKay K, Mohan S, Uzsoy R. Executing production schedules in the face of uncertainties: a review and some future directions. European J Operat Res. 2005;161(1):86-110.
    • (2005) European J Operat Res. , vol.161 , Issue.1 , pp. 86-110
    • Aytug, H.1    Lawley, M.2    McKay, K.3    Mohan, S.4    Uzsoy, R.5
  • 15
    • 38849148294 scopus 로고    scopus 로고
    • Process scheduling under uncertainty: review and challenges
    • Li Z, Ierapetritou M. Process scheduling under uncertainty: review and challenges. Comp Chem Eng. 2008;32(4-5):715-727.
    • (2008) Comp Chem Eng. , vol.32 , Issue.4-5 , pp. 715-727
    • Li, Z.1    Ierapetritou, M.2
  • 17
    • 84863393058 scopus 로고    scopus 로고
    • Theory and applications of robust optimization
    • Bertsimas D, Brown D, Caramanis C. Theory and applications of robust optimization. SIAM Rev. 2011;53(3):464-501.
    • (2011) SIAM Rev. , vol.53 , Issue.3 , pp. 464-501
    • Bertsimas, D.1    Brown, D.2    Caramanis, C.3
  • 18
    • 84922433461 scopus 로고    scopus 로고
    • A practical guide to robust optimization
    • Gorissen B, Yankolu, den Hertog D. A practical guide to robust optimization. Omega. 2015;53:124-137.
    • (2015) Omega. , vol.53 , pp. 124-137
    • Gorissen, B.1    Yankolu2    den Hertog, D.3
  • 19
    • 0010680207 scopus 로고
    • Technical noteconvex programming with set-inclusive constraints and applications to inexact linear programming
    • Soyster A. Technical noteconvex programming with set-inclusive constraints and applications to inexact linear programming. Operat Res. 1973;21(5):1154-1157.
    • (1973) Operat Res. , vol.21 , Issue.5 , pp. 1154-1157
    • Soyster, A.1
  • 20
    • 3042762207 scopus 로고    scopus 로고
    • The price of robustness
    • Bertsimas D, Sim M. The price of robustness. Operat Res. 2004;52(1):35-53.
    • (2004) Operat Res. , vol.52 , Issue.1 , pp. 35-53
    • Bertsimas, D.1    Sim, M.2
  • 21
    • 34248632661 scopus 로고    scopus 로고
    • Incorporating estimation errors into portfolio selection: robust portfolio construction
    • Ceria S, Stubbs R. Incorporating estimation errors into portfolio selection: robust portfolio construction. J Asset Manag. 2006;7(2):109-127.
    • (2006) J Asset Manag. , vol.7 , Issue.2 , pp. 109-127
    • Ceria, S.1    Stubbs, R.2
  • 22
    • 0032664938 scopus 로고    scopus 로고
    • Robust solutions of uncertain linear programs
    • Ben-Tal A, Nemirovski A. Robust solutions of uncertain linear programs. Operat Res Lett. 1999;25(1):1-13.
    • (1999) Operat Res Lett. , vol.25 , Issue.1 , pp. 1-13
    • Ben-Tal, A.1    Nemirovski, A.2
  • 23
    • 80052829888 scopus 로고    scopus 로고
    • A comparative theoretical and computational study on robust counterpart optimization: I. Robust linear optimization and robust mixed integer linear optimization
    • Li Z, Ding R, Floudas C. A comparative theoretical and computational study on robust counterpart optimization: I. Robust linear optimization and robust mixed integer linear optimization. Ind Eng Chem Res. 2011;50(18):10567-10603.
    • (2011) Ind Eng Chem Res. , vol.50 , Issue.18 , pp. 10567-10603
    • Li, Z.1    Ding, R.2    Floudas, C.3
  • 25
    • 84861168114 scopus 로고    scopus 로고
    • A comparative theoretical and computational study on robust counterpart optimization: II. Probabilistic guarantees on constraint satisfaction
    • Li Z, Tang Q, Floudas C. A comparative theoretical and computational study on robust counterpart optimization: II. Probabilistic guarantees on constraint satisfaction. Ind Eng Chem Res. 2012;51(19):6769-6788.
    • (2012) Ind Eng Chem Res. , vol.51 , Issue.19 , pp. 6769-6788
    • Li, Z.1    Tang, Q.2    Floudas, C.3
  • 26
    • 1942532282 scopus 로고    scopus 로고
    • A new robust optimization approach for scheduling under uncertainty: I. Bounded uncertainty
    • Lin X, Janak S, Floudas C. A new robust optimization approach for scheduling under uncertainty: I. Bounded uncertainty. Comp Chem Eng. 2004;28(6-7):1069-1085.
    • (2004) Comp Chem Eng. , vol.28 , Issue.6-7 , pp. 1069-1085
    • Lin, X.1    Janak, S.2    Floudas, C.3
  • 27
    • 47249135022 scopus 로고    scopus 로고
    • Robust optimization for process scheduling under uncertainty
    • Li Z, Ierapetritou M. Robust optimization for process scheduling under uncertainty. Ind Eng Chem Res. 2008;47(12):4148-4157.
    • (2008) Ind Eng Chem Res. , vol.47 , Issue.12 , pp. 4148-4157
    • Li, Z.1    Ierapetritou, M.2
  • 28
    • 84906346550 scopus 로고    scopus 로고
    • A comparative theoretical and computational study on robust counterpart optimization: III. Improving the quality of robust solutions
    • Li Z, Floudas C. A comparative theoretical and computational study on robust counterpart optimization: III. Improving the quality of robust solutions. Ind Eng Chem Res. 2014;53(33):13112-13124.
    • (2014) Ind Eng Chem Res. , vol.53 , Issue.33 , pp. 13112-13124
    • Li, Z.1    Floudas, C.2
  • 29
    • 84863571593 scopus 로고    scopus 로고
    • Scheduling of crude oil operations under demand uncertainty: A robust optimization framework coupled with global optimization
    • Li J, Misener R, Floudas C. Scheduling of crude oil operations under demand uncertainty: A robust optimization framework coupled with global optimization. AIChE Journal. 2012;58(8):2373-2396.
    • (2012) AIChE Journal. , vol.58 , Issue.8 , pp. 2373-2396
    • Li, J.1    Misener, R.2    Floudas, C.3
  • 30
    • 84901242416 scopus 로고    scopus 로고
    • Robust optimization and stochastic programming approaches for medium-term production scheduling of a large-scale steelmaking continuous casting process under demand uncertainty
    • Ye Y, Li J, Li Z, Tang Q, Xiao X, Floudas C. Robust optimization and stochastic programming approaches for medium-term production scheduling of a large-scale steelmaking continuous casting process under demand uncertainty. Comp Chem Eng. 2014;66:165-185.
    • (2014) Comp Chem Eng. , vol.66 , pp. 165-185
    • Ye, Y.1    Li, J.2    Li, Z.3    Tang, Q.4    Xiao, X.5    Floudas, C.6
  • 31
    • 14844327381 scopus 로고    scopus 로고
    • Adjustable robust solutions of uncertain linear programs
    • Ben-Tal A, Goryashko A, Guslitzer E, Nemirovski A. Adjustable robust solutions of uncertain linear programs. Math Prog. 2004;99(2):351-376.
    • (2004) Math Prog. , vol.99 , Issue.2 , pp. 351-376
    • Ben-Tal, A.1    Goryashko, A.2    Guslitzer, E.3    Nemirovski, A.4
  • 32
    • 73649088639 scopus 로고    scopus 로고
    • Uncertain linear programs: extended affinely adjustable robust counterparts
    • Chen X, Zhang Y. Uncertain linear programs: extended affinely adjustable robust counterparts. Operat Res. 2009;57(6):1469-1482.
    • (2009) Operat Res. , vol.57 , Issue.6 , pp. 1469-1482
    • Chen, X.1    Zhang, Y.2
  • 33
    • 81255179653 scopus 로고    scopus 로고
    • Primal and dual linear decision rules in stochastic and robust optimization
    • Kuhn D, Wiesemann W, Georghiou A. Primal and dual linear decision rules in stochastic and robust optimization. Math Prog. 2011;130(1):177-209.
    • (2011) Math Prog. , vol.130 , Issue.1 , pp. 177-209
    • Kuhn, D.1    Wiesemann, W.2    Georghiou, A.3
  • 34
    • 84930795404 scopus 로고    scopus 로고
    • Design of near optimal decision rules in multistage adaptive mixed-integer optimization
    • Bertsimas D, Georghiou A. Design of near optimal decision rules in multistage adaptive mixed-integer optimization. Operat Res. 2015;63(3):610-627.
    • (2015) Operat Res. , vol.63 , Issue.3 , pp. 610-627
    • Bertsimas, D.1    Georghiou, A.2
  • 35
    • 84991872512 scopus 로고    scopus 로고
    • A computational framework and solution algorithms for two-stage adaptive robust scheduling of batch manufacturing processes under uncertainty
    • Shi H, You F. A computational framework and solution algorithms for two-stage adaptive robust scheduling of batch manufacturing processes under uncertainty. AIChE J. 2015.
    • (2015) AIChE J.
    • Shi, H.1    You, F.2
  • 36
    • 84991892868 scopus 로고    scopus 로고
    • Robust linear optimization with recourse.
    • Thiele A, Terry T, M. E. Robust linear optimization with recourse. www.optimization-online.org, 2010.
    • (2010)
    • Thiele, A.1    Terry, T.M.E.2
  • 37
    • 84879491651 scopus 로고    scopus 로고
    • Solving two-stage robust optimization problems using a column-and-constraint generation method
    • Zeng B, Zhao L. Solving two-stage robust optimization problems using a column-and-constraint generation method. Operat Res Lett. 2013;41(5):457-461. ISSN 0167-6377. doi:10.1016/j.orl.2013.05.003.
    • (2013) Operat Res Lett. , vol.41 , Issue.5 , pp. 457-461
    • Zeng, B.1    Zhao, L.2
  • 38
    • 0000133803 scopus 로고    scopus 로고
    • Batch plant design and operations under uncertainty
    • Ierapetritou M, Pistikopoulos E. Batch plant design and operations under uncertainty. Ind Eng Chem Res. 1996;35(3):772-787.
    • (1996) Ind Eng Chem Res. , vol.35 , Issue.3 , pp. 772-787
    • Ierapetritou, M.1    Pistikopoulos, E.2
  • 39
    • 3042702298 scopus 로고    scopus 로고
    • Approximation to multistage stochastic optimization in multiperiod batch plant scheduling under demand uncertainty
    • Grossmann I, Balasubramanian J. Approximation to multistage stochastic optimization in multiperiod batch plant scheduling under demand uncertainty. Ind Eng Chem Res. 2004;43(14):3695-3713.
    • (2004) Ind Eng Chem Res. , vol.43 , Issue.14 , pp. 3695-3713
    • Grossmann, I.1    Balasubramanian, J.2
  • 40
    • 1642498232 scopus 로고    scopus 로고
    • Risk management in the scheduling of batch plants under uncertain market demand
    • Bonfill A, Bagajewicz M, Espuña A, Puigjaner L. Risk management in the scheduling of batch plants under uncertain market demand. Ind Eng Chem Res. 2004;43(3):741-750.
    • (2004) Ind Eng Chem Res. , vol.43 , Issue.3 , pp. 741-750
    • Bonfill, A.1    Bagajewicz, M.2    Espuña, A.3    Puigjaner, L.4
  • 41
    • 14344251891 scopus 로고    scopus 로고
    • Addressing robustness in scheduling batch processes with uncertain operation times
    • Bonfill A, Espuña A, Puigjaner L. Addressing robustness in scheduling batch processes with uncertain operation times. Ind Eng Chem Res. 2005;44(5):1524-1534.
    • (2005) Ind Eng Chem Res. , vol.44 , Issue.5 , pp. 1524-1534
    • Bonfill, A.1    Espuña, A.2    Puigjaner, L.3
  • 42
    • 84857444291 scopus 로고    scopus 로고
    • On the combinatorial structure of discrete-time MIP formulations for chemical production scheduling
    • Maravelias C. On the combinatorial structure of discrete-time MIP formulations for chemical production scheduling. Comp Chem Eng. 2012;38:204-212.
    • (2012) Comp Chem Eng. , vol.38 , pp. 204-212
    • Maravelias, C.1
  • 43
    • 84875778960 scopus 로고    scopus 로고
    • Multiple and nonuniform time grids in discrete-time MIP models for chemical production scheduling
    • Velez S, Maravelias C. Multiple and nonuniform time grids in discrete-time MIP models for chemical production scheduling. Comp Chem Eng. 2013;53:70-85.
    • (2013) Comp Chem Eng. , vol.53 , pp. 70-85
    • Velez, S.1    Maravelias, C.2
  • 44
    • 0035795519 scopus 로고    scopus 로고
    • An improved RTN continuous-time formulation for the short-term scheduling of multipurpose batch plants
    • Castro P, Barbosa-po A, Matos H. An improved RTN continuous-time formulation for the short-term scheduling of multipurpose batch plants. Ind Eng Chem Res. 2001;40(9):2059-2068.
    • (2001) Ind Eng Chem Res. , vol.40 , Issue.9 , pp. 2059-2068
    • Castro, P.1    Barbosa-po, A.2    Matos, H.3
  • 45
    • 0037635200 scopus 로고    scopus 로고
    • New general continuous-time state-task network formulation for short-term scheduling of multipurpose batch plants
    • Maravelias C, Grossmann I. New general continuous-time state-task network formulation for short-term scheduling of multipurpose batch plants. Ind Eng Chem Res. 2003;42(13):3056-3074.
    • (2003) Ind Eng Chem Res. , vol.42 , Issue.13 , pp. 3056-3074
    • Maravelias, C.1    Grossmann, I.2
  • 46
    • 0037503184 scopus 로고    scopus 로고
    • An improved MILP formulation for scheduling multiproduct, multistage batch plants
    • Gupta S, Karimi I. An improved MILP formulation for scheduling multiproduct, multistage batch plants. Ind Eng Chem Res. 2003;42(11):2365-2380.
    • (2003) Ind Eng Chem Res. , vol.42 , Issue.11 , pp. 2365-2380
    • Gupta, S.1    Karimi, I.2
  • 47
    • 0346101524 scopus 로고    scopus 로고
    • Simple continuous-time formulation for short-term scheduling of batch and continuous processes
    • Castro P, Barbosa-po A, Matos H, Novais A. Simple continuous-time formulation for short-term scheduling of batch and continuous processes. Ind Eng Chem Res. 2004;43(1):105-118.
    • (2004) Ind Eng Chem Res. , vol.43 , Issue.1 , pp. 105-118
    • Castro, P.1    Barbosa-po, A.2    Matos, H.3    Novais, A.4
  • 48
    • 15344346066 scopus 로고    scopus 로고
    • A simpler better slot-based continuous-time formulation for short-term scheduling in multipurpose batch plants
    • Sundaramoorthy A, Karimi I. A simpler better slot-based continuous-time formulation for short-term scheduling in multipurpose batch plants. Chem Eng Sci. 2005;60(10):2679-2702.
    • (2005) Chem Eng Sci. , vol.60 , Issue.10 , pp. 2679-2702
    • Sundaramoorthy, A.1    Karimi, I.2
  • 49
    • 38849188495 scopus 로고    scopus 로고
    • Scheduling multistage batch plants with parallel units and no interstage storage
    • Liu Y, Karimi I. Scheduling multistage batch plants with parallel units and no interstage storage. Comp Chem Eng. 2008;32(4-5):671-693.
    • (2008) Comp Chem Eng. , vol.32 , Issue.4-5 , pp. 671-693
    • Liu, Y.1    Karimi, I.2
  • 50
    • 67651092136 scopus 로고    scopus 로고
    • A novel network-based continuous-time representation for process scheduling: Part I. Main concepts and mathematical formulation
    • Giménez D, Henning G, Maravelias C. A novel network-based continuous-time representation for process scheduling: Part I. Main concepts and mathematical formulation. Comp Chem Eng. 2009;33(9):1511-1528.
    • (2009) Comp Chem Eng. , vol.33 , Issue.9 , pp. 1511-1528
    • Giménez, D.1    Henning, G.2    Maravelias, C.3
  • 51
    • 68549088725 scopus 로고    scopus 로고
    • A novel network-based continuous-time representation for process scheduling: Part II. General framework
    • Giménez D, Henning G, Maravelias C. A novel network-based continuous-time representation for process scheduling: Part II. General framework. Comp Chem Eng. 2009;33(10):1644-1660.
    • (2009) Comp Chem Eng. , vol.33 , Issue.10 , pp. 1644-1660
    • Giménez, D.1    Henning, G.2    Maravelias, C.3
  • 52
    • 0032216021 scopus 로고    scopus 로고
    • Effective continuous-time formulation for short-term scheduling. 1. Multipurpose batch processes
    • Ierapetritou M, Floudas C. Effective continuous-time formulation for short-term scheduling. 1. Multipurpose batch processes. Ind Eng Chem Res. 1998;37(11):4341-4359.
    • (1998) Ind Eng Chem Res. , vol.37 , Issue.11 , pp. 4341-4359
    • Ierapetritou, M.1    Floudas, C.2
  • 53
    • 0036568989 scopus 로고    scopus 로고
    • A simple new continuous-time formulation for short-term scheduling of multipurpose batch processes
    • Giannelos N, Georgiadis M. A simple new continuous-time formulation for short-term scheduling of multipurpose batch processes. Ind Eng Chem Res. 2002;41(9):2178-2184.
    • (2002) Ind Eng Chem Res. , vol.41 , Issue.9 , pp. 2178-2184
    • Giannelos, N.1    Georgiadis, M.2
  • 54
    • 2442436591 scopus 로고    scopus 로고
    • Enhanced continuous-time unit-specific event-based formulation for short-term scheduling of multipurpose batch processes: resource constraints and mixed storage policies
    • Janak S, Lin X, Floudas C. Enhanced continuous-time unit-specific event-based formulation for short-term scheduling of multipurpose batch processes: resource constraints and mixed storage policies. Ind Eng Chem Res. 2004;43(10):2516-2533.
    • (2004) Ind Eng Chem Res. , vol.43 , Issue.10 , pp. 2516-2533
    • Janak, S.1    Lin, X.2    Floudas, C.3
  • 55
    • 33947498929 scopus 로고    scopus 로고
    • Improved unit-specific event-based continuous-time model for short-term scheduling of continuous processes: rigorous treatment of storage requirements
    • Shaik M, Floudas C. Improved unit-specific event-based continuous-time model for short-term scheduling of continuous processes: rigorous treatment of storage requirements. Ind Eng Chem Res. 2007;46(6):1764-1779.
    • (2007) Ind Eng Chem Res. , vol.46 , Issue.6 , pp. 1764-1779
    • Shaik, M.1    Floudas, C.2
  • 56
    • 35549009402 scopus 로고    scopus 로고
    • Unit-specific event-based continuous-time approach for short-term scheduling of batch plants using RTN framework
    • Shaik M, Floudas C. Unit-specific event-based continuous-time approach for short-term scheduling of batch plants using RTN framework. Comp Chem Eng. 2008;32(1-2):260-274.
    • (2008) Comp Chem Eng. , vol.32 , Issue.1-2 , pp. 260-274
    • Shaik, M.1    Floudas, C.2
  • 57
    • 65349119397 scopus 로고    scopus 로고
    • Novel Unified Modeling Approach for Short-Term Scheduling
    • Shaik M, Floudas C. Novel Unified Modeling Approach for Short-Term Scheduling. Ind Eng Chem Res. 2009;48(6):2947-2964.
    • (2009) Ind Eng Chem Res. , vol.48 , Issue.6 , pp. 2947-2964
    • Shaik, M.1    Floudas, C.2
  • 58
    • 77955820606 scopus 로고    scopus 로고
    • A novel approach to scheduling multipurpose batch plants using unit-slots
    • Susarla N, Li J, Karimi I. A novel approach to scheduling multipurpose batch plants using unit-slots. AIChE J. 2009;56(7):1859-1879.
    • (2009) AIChE J. , vol.56 , Issue.7 , pp. 1859-1879
    • Susarla, N.1    Li, J.2    Karimi, I.3
  • 59
    • 81055157692 scopus 로고    scopus 로고
    • A robust mathematical formulation for multipurpose batch plants
    • Seid R, Majozi T. A robust mathematical formulation for multipurpose batch plants. Chem Eng Sci. 2012;68(1):36-53.
    • (2012) Chem Eng Sci. , vol.68 , Issue.1 , pp. 36-53
    • Seid, R.1    Majozi, T.2
  • 60
    • 84861209435 scopus 로고    scopus 로고
    • Improved three-index unit-specific event-based model for short-term scheduling of batch plants
    • Vooradi R, Shaik M. Improved three-index unit-specific event-based model for short-term scheduling of batch plants. Comp Chem Eng. 2012;43(19):148-172.
    • (2012) Comp Chem Eng. , vol.43 , Issue.19 , pp. 148-172
    • Vooradi, R.1    Shaik, M.2
  • 61
    • 84884170101 scopus 로고    scopus 로고
    • Rigorous unit-specific event-based model for short-term scheduling of batch plants using conditional sequencing and unit-wait times
    • Vooradi R, Shaik M. Rigorous unit-specific event-based model for short-term scheduling of batch plants using conditional sequencing and unit-wait times. Ind Eng Chem Res. 2013;52(36):12950-12972.
    • (2013) Ind Eng Chem Res. , vol.52 , Issue.36 , pp. 12950-12972
    • Vooradi, R.1    Shaik, M.2
  • 62
    • 20344400107 scopus 로고    scopus 로고
    • Short-term scheduling of batch processes. A comparative study of different approaches
    • Mishra B, Mayer E, Raisch J, Kienle A. Short-term scheduling of batch processes. A comparative study of different approaches. Ind Eng Chem Res. 2005;44(11):4022.
    • (2005) Ind Eng Chem Res. , vol.44 , Issue.11 , pp. 4022
    • Mishra, B.1    Mayer, E.2    Raisch, J.3    Kienle, A.4
  • 63
    • 33748760882 scopus 로고    scopus 로고
    • Continuous-time models for short-term scheduling of multipurpose batch plants: a comparative study
    • Shaik M, Janak S, Floudas C. Continuous-time models for short-term scheduling of multipurpose batch plants: a comparative study. Ind Eng Chem Res. 2006;45(18):6190-6209.
    • (2006) Ind Eng Chem Res. , vol.45 , Issue.18 , pp. 6190-6209
    • Shaik, M.1    Janak, S.2    Floudas, C.3
  • 64
    • 84880049940 scopus 로고    scopus 로고
    • The robust capacitated vehicle routing problem under demand uncertainty
    • Gounaris C, Wiesemann W, Floudas C. The robust capacitated vehicle routing problem under demand uncertainty. Operat Res. 2013;61(3):677-693.
    • (2013) Operat Res. , vol.61 , Issue.3 , pp. 677-693
    • Gounaris, C.1    Wiesemann, W.2    Floudas, C.3
  • 65
    • 85052184870 scopus 로고    scopus 로고
    • Polyhedral approximation of ellipsoidal uncertainty sets via extended formulations.
    • Bärmann A, Heidt A, Martin A. Polyhedral approximation of ellipsoidal uncertainty sets via extended formulations. www.optimization-online.org, 2014.
    • (2014)
    • Bärmann, A.1    Heidt, A.2    Martin, A.3
  • 66
    • 33745684030 scopus 로고    scopus 로고
    • A class of stochastic programs with decision dependent uncertainty
    • Goel V, Grossmann I. A class of stochastic programs with decision dependent uncertainty. Math Prog. 2006;108(2-3):355-394.
    • (2006) Math Prog. , vol.108 , Issue.2-3 , pp. 355-394
    • Goel, V.1    Grossmann, I.2
  • 67
    • 77953873455 scopus 로고    scopus 로고
    • Optimization of R&D project portfolios under endogenous uncertainty
    • Solak S, Clarke J, Johnson E, Barnes E. Optimization of R&D project portfolios under endogenous uncertainty. European J Operat Res. 2010;207(1):420-433.
    • (2010) European J Operat Res. , vol.207 , Issue.1 , pp. 420-433
    • Solak, S.1    Clarke, J.2    Johnson, E.3    Barnes, E.4
  • 68
    • 80052630415 scopus 로고    scopus 로고
    • Solution strategies for multistage stochastic programming with endogenous uncertainties
    • Gupta V, Grossmann I. Solution strategies for multistage stochastic programming with endogenous uncertainties. Comp Chem Eng. 2011;35(11):2235-2247.
    • (2011) Comp Chem Eng. , vol.35 , Issue.11 , pp. 2235-2247
    • Gupta, V.1    Grossmann, I.2
  • 69
    • 84890710370 scopus 로고    scopus 로고
    • A new decomposition algorithm for multistage stochastic programs with endogenous uncertainties
    • Gupta V, Grossmann I. A new decomposition algorithm for multistage stochastic programs with endogenous uncertainties. Comp Chem Eng. 2014;62:62-79.
    • (2014) Comp Chem Eng. , vol.62 , pp. 62-79
    • Gupta, V.1    Grossmann, I.2
  • 70
    • 61449252886 scopus 로고    scopus 로고
    • A linear decision-based approximation approach to stochastic programming
    • Chen X, Sim M, Sun P, Zhang J. A linear decision-based approximation approach to stochastic programming. Operat Res. 2008;56(2):344-357.
    • (2008) Operat Res. , vol.56 , Issue.2 , pp. 344-357
    • Chen, X.1    Sim, M.2    Sun, P.3    Zhang, J.4
  • 71
    • 84991915268 scopus 로고    scopus 로고
    • Inc. Gurobi Optimizer Reference Manual.
    • Gurobi Optimization, Inc. Gurobi Optimizer Reference Manual. 2015.
    • (2015)
  • 72
    • 0027545176 scopus 로고
    • A general algorithm for short-term scheduling of batch operationsI. MILP formulation
    • Kondili E, Pantelides C, Sargent R. A general algorithm for short-term scheduling of batch operationsI. MILP formulation. Comp Chem Eng. 1993;17(2):211-227.
    • (1993) Comp Chem Eng. , vol.17 , Issue.2 , pp. 211-227
    • Kondili, E.1    Pantelides, C.2    Sargent, R.3
  • 73
    • 79955548378 scopus 로고    scopus 로고
    • Optimal event point determination for short-term scheduling of multipurpose batch plants via unit-specific event-based continuous-time approaches
    • Li J, Floudas C. Optimal event point determination for short-term scheduling of multipurpose batch plants via unit-specific event-based continuous-time approaches. Ind Eng Chem Res. 2010;49(16):7446-7469.
    • (2010) Ind Eng Chem Res. , vol.49 , Issue.16 , pp. 7446-7469
    • Li, J.1    Floudas, C.2
  • 74
    • 75249090444 scopus 로고    scopus 로고
    • An analysis of some unit-specific event-based models for the short-term scheduling of noncontinuous processes
    • Li J, Susarla N, Karimi I, Shaik M, Floudas C. An analysis of some unit-specific event-based models for the short-term scheduling of noncontinuous processes. Ind Eng Chem Res. 2010;49(2):633-647.
    • (2010) Ind Eng Chem Res. , vol.49 , Issue.2 , pp. 633-647
    • Li, J.1    Susarla, N.2    Karimi, I.3    Shaik, M.4    Floudas, C.5
  • 75
    • 81055156609 scopus 로고    scopus 로고
    • A novel technique for prediction of time points for scheduling of multipurpose batch plants
    • Seid R, Majozi T. A novel technique for prediction of time points for scheduling of multipurpose batch plants. Chem Eng Sci. 2012;68(1):54-71.
    • (2012) Chem Eng Sci. , vol.68 , Issue.1 , pp. 54-71
    • Seid, R.1    Majozi, T.2
  • 76
    • 0031186347 scopus 로고    scopus 로고
    • Planning and scheduling of parallel semicontinuous processes. 2. Short-term scheduling
    • Karimi I, McDonald C. Planning and scheduling of parallel semicontinuous processes. 2. Short-term scheduling. Ind Eng Chem Res. 1997;36(7):2701-2714.
    • (1997) Ind Eng Chem Res. , vol.36 , Issue.7 , pp. 2701-2714
    • Karimi, I.1    McDonald, C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.