-
1
-
-
71749086095
-
Enterprise-wide optimization in an integrated chemical complex
-
Wassick J. M., 2009, Enterprise-wide optimization in an integrated chemical complex, Computers & Chemical Engineering, 33, 1950-1963.
-
(2009)
Computers & Chemical Engineering
, vol.33
, pp. 1950-1963
-
-
Wassick, J.M.1
-
2
-
-
0027545176
-
A general algorithm for short-term scheduling of batch operations-I. MILP formulation
-
Kondili E., Pantelides C. C., Sargent R. W. H., 1993, A general algorithm for short-term scheduling of batch operations-I. MILP formulation, Computers & Chemical Engineering, 17, 211-227.
-
(1993)
Computers & Chemical Engineering
, vol.17
, pp. 211-227
-
-
Kondili, E.1
Pantelides, C.C.2
Sargent, R.W.H.3
-
3
-
-
0442264225
-
Advanced production scheduling for batch plants in process industries
-
Neumann K., Schwindt C., Trautmann N., 2002, Advanced production scheduling for batch plants in process industries, OR Spectrum, 24, 251-279.
-
(2002)
OR Spectrum
, vol.24
, pp. 251-279
-
-
Neumann, K.1
Schwindt, C.2
Trautmann, N.3
-
4
-
-
33846049584
-
Production scheduling of a large-scale industrial batch plant. I. Short-term and medium-term scheduling
-
Janak S., Floudas C., Kallrath J., Vormbrock N., 2006, Production scheduling of a large-scale industrial batch plant. I. Short-term and medium-term scheduling, Industrial & engineering chemistry research, 45, 8234-8252.
-
(2006)
Industrial & Engineering Chemistry Research
, vol.45
, pp. 8234-8252
-
-
Janak, S.1
Floudas, C.2
Kallrath, J.3
Vormbrock, N.4
-
5
-
-
0032216046
-
Effective continuous- time formulation for short-term scheduling. 2. Continuous and semicontinuous processes
-
Ierapetritou M., Floudas C., 1998, Effective continuous- time formulation for short-term scheduling. 2. Continuous and semicontinuous processes, Industrial & engineering chemistry research, 37, 4360-4374.
-
(1998)
Industrial & Engineering Chemistry Research
, vol.37
, pp. 4360-4374
-
-
Ierapetritou, M.1
Floudas, C.2
-
6
-
-
59249096047
-
Production scheduling of a large-scale industrial continuous plant: Short-term and medium-term scheduling
-
Shaik M., Floudas C., Kallrath J., Pitz H., 2009, Production scheduling of a large-scale industrial continuous plant: Short-term and medium-term scheduling, Computers & Chemical Engineering, 33, 670-686.
-
(2009)
Computers & Chemical Engineering
, vol.33
, pp. 670-686
-
-
Shaik, M.1
Floudas, C.2
Kallrath, J.3
Pitz, H.4
-
7
-
-
84884300108
-
Hierarchical scheduling and utility disturbance management in the process industry
-
Saint Petersburg, Russia. Accepted
-
Lindholm A., Johnsson C., Quttineh N-H., Lidestam H., Henningsson M., Wikner J., Tang O., Nytzén N-P., Forsman K., 2013, Hierarchical scheduling and utility disturbance management in the process industry, In: Proceedings of the IFAC Conference on Manufacturing Modelling, Management and Control, Saint Petersburg, Russia. Accepted.
-
(2013)
Proceedings of the IFAC Conference on Manufacturing Modelling, Management and Control
-
-
Lindholm, A.1
Johnsson, C.2
Quttineh, N.-H.3
Lidestam, H.4
Henningsson, M.5
Wikner, J.6
Tang, O.7
Nytzén, N.-P.8
Forsman, K.9
-
9
-
-
36048944234
-
Integration of economical optimization and control for intentionally transient process operation
-
Kadam J., Marquardt W., 2007, Integration of economical optimization and control for intentionally transient process operation, In: Assessment and Future Directions of Nonlinear Model Predictive Control, Lecture Notes in Control and Information Sciences, 358, 419-434.
-
(2007)
Assessment and Future Directions of Nonlinear Model Predictive Control, Lecture Notes in Control and Information Sciences
, vol.358
, pp. 419-434
-
-
Kadam, J.1
Marquardt, W.2
-
10
-
-
0000204502
-
A general frame-work for modeling production
-
Hackman S. T., Leachman R. C., 1989, A general frame-work for modeling production, Management Science, 35, 478-495.
-
(1989)
Management Science
, vol.35
, pp. 478-495
-
-
Hackman, S.T.1
Leachman, R.C.2
|