메뉴 건너뛰기




Volumn 157, Issue 16, 2006, Pages 2273-2285

A fuzzy logic based production scheduling/rescheduling in the presence of uncertain disruptions

Author keywords

Fuzzy inference systems; Genetic algorithms; Level 2 fuzzy sets; Predictive scheduling; Rescheduling

Indexed keywords

DECISION SUPPORT SYSTEMS; FUZZY SETS; GENETIC ALGORITHMS; PARAMETER ESTIMATION; PROBLEM SOLVING; SCHEDULING;

EID: 33746054949     PISSN: 01650114     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.fss.2006.04.009     Document Type: Article
Times cited : (83)

References (31)
  • 1
    • 0031189107 scopus 로고    scopus 로고
    • Rescheduling job shops under random disruptions
    • Abumaizar R.J., and Svestka J.A. Rescheduling job shops under random disruptions. Int. J. Prod. Res. 35 (1997) 2065-2082
    • (1997) Int. J. Prod. Res. , vol.35 , pp. 2065-2082
    • Abumaizar, R.J.1    Svestka, J.A.2
  • 2
    • 0030576471 scopus 로고    scopus 로고
    • A fuzzy-linguistic approach to a multi-criteria sequencing problem
    • Adamopoulos G.I., and Pappis C.P. A fuzzy-linguistic approach to a multi-criteria sequencing problem. European J. Oper. Res. 92 (1996) 628-636
    • (1996) European J. Oper. Res. , vol.92 , pp. 628-636
    • Adamopoulos, G.I.1    Pappis, C.P.2
  • 3
    • 5144232431 scopus 로고    scopus 로고
    • Executing production schedules in the face of uncertainties: a review and some future directions
    • Aytug H., Lawley M.A., McKay K., Mohan S., and Uzsoy R. Executing production schedules in the face of uncertainties: a review and some future directions. European J. Oper. Res. 161 (2005) 86-110
    • (2005) European J. Oper. Res. , vol.161 , pp. 86-110
    • Aytug, H.1    Lawley, M.A.2    McKay, K.3    Mohan, S.4    Uzsoy, R.5
  • 4
    • 27944495605 scopus 로고    scopus 로고
    • Implementing global factory schedules in the face of stochastic disruptions
    • Barua A., Raghavan A., Upasani R., and Uzsoy R. Implementing global factory schedules in the face of stochastic disruptions. Int. J. Prod. Res. 43 (2005) 793-818
    • (2005) Int. J. Prod. Res. , vol.43 , pp. 793-818
    • Barua, A.1    Raghavan, A.2    Upasani, R.3    Uzsoy, R.4
  • 5
    • 0347138149 scopus 로고    scopus 로고
    • Modelling of job-shop scheduling with multiple quantitative and qualitative objectives and a GA/TS mixture approach
    • Chang P.-T., and Lo Y.-T. Modelling of job-shop scheduling with multiple quantitative and qualitative objectives and a GA/TS mixture approach. Int. J. Comput. Integr. Manuf. 14 (2001) 367-384
    • (2001) Int. J. Comput. Integr. Manuf. , vol.14 , pp. 367-384
    • Chang, P.-T.1    Lo, Y.-T.2
  • 6
    • 0000522889 scopus 로고
    • Analysis of periodic and event driven rescheduling policies in dynamic shops
    • Church L.K., and Uzsoy R. Analysis of periodic and event driven rescheduling policies in dynamic shops. Int. J. Comput. Integr. Manuf. 5 (1992) 153-163
    • (1992) Int. J. Comput. Integr. Manuf. , vol.5 , pp. 153-163
    • Church, L.K.1    Uzsoy, R.2
  • 7
    • 33646814009 scopus 로고    scopus 로고
    • Analysis of performance of fuzzy logic-based production scheduling by simulation
    • Gelbukh A., de Albornoz A., and Terashima-Marin H. (Eds), Springer, Berlin
    • Duenas A., Petrovic D., and Petrovic S. Analysis of performance of fuzzy logic-based production scheduling by simulation. In: Gelbukh A., de Albornoz A., and Terashima-Marin H. (Eds). Lecture Notes in Artificial Intelligence, MICAI 2005, Advances in Artificial Intelligence (2005), Springer, Berlin 234-243
    • (2005) Lecture Notes in Artificial Intelligence, MICAI 2005, Advances in Artificial Intelligence , pp. 234-243
    • Duenas, A.1    Petrovic, D.2    Petrovic, S.3
  • 8
    • 0028408966 scopus 로고
    • Dispatching rules in scheduling: a fuzzy approach
    • Grabot B., and Geneste L. Dispatching rules in scheduling: a fuzzy approach. Int. J. Prod. Res. 32 (1994) 903-915
    • (1994) Int. J. Prod. Res. , vol.32 , pp. 903-915
    • Grabot, B.1    Geneste, L.2
  • 9
    • 19744366708 scopus 로고    scopus 로고
    • Rescheduling for new orders
    • Hall N.G., and Potts C.N. Rescheduling for new orders. Oper. Res. 52 (2004) 440-453
    • (2004) Oper. Res. , vol.52 , pp. 440-453
    • Hall, N.G.1    Potts, C.N.2
  • 10
    • 1542502674 scopus 로고    scopus 로고
    • Robust and reactive project scheduling: a review and classification of procedures
    • Herroelen W., and Leus R. Robust and reactive project scheduling: a review and classification of procedures. Int. J. Prod. Res. 42 (2004) 1599-1620
    • (2004) Int. J. Prod. Res. , vol.42 , pp. 1599-1620
    • Herroelen, W.1    Leus, R.2
  • 11
    • 0032673230 scopus 로고    scopus 로고
    • New triangular fuzzy Johnson algorithm
    • Hong T., and Chuang T. New triangular fuzzy Johnson algorithm. Comput. Ind. Eng. 36 (1999) 179-200
    • (1999) Comput. Ind. Eng. , vol.36 , pp. 179-200
    • Hong, T.1    Chuang, T.2
  • 12
    • 33646429432 scopus 로고    scopus 로고
    • Flowshop scheduling with fuzzy duedate and fuzzy processing time
    • Slowiński R., and Hapke M. (Eds), Physica-Verlag, Heidelberg
    • Ishibuchi H., and Murata T. Flowshop scheduling with fuzzy duedate and fuzzy processing time. In: Slowiński R., and Hapke M. (Eds). Scheduling Under Fuzziness (2000), Physica-Verlag, Heidelberg
    • (2000) Scheduling Under Fuzziness
    • Ishibuchi, H.1    Murata, T.2
  • 13
    • 0029638856 scopus 로고
    • Single machine scheduling problem with fuzzy precedence relation
    • Ishii H., and Tada M. Single machine scheduling problem with fuzzy precedence relation. European J. Oper. Res. 87 (1995) 284-288
    • (1995) European J. Oper. Res. , vol.87 , pp. 284-288
    • Ishii, H.1    Tada, M.2
  • 14
    • 8644277055 scopus 로고    scopus 로고
    • Modelling and rescheduling of a re-entrant wafer fabrication line involving machine unreliability
    • Kumar R., Tiwari M.K., and Allada V. Modelling and rescheduling of a re-entrant wafer fabrication line involving machine unreliability. Int. J. Prod. Res. 42 (2004) 4431-4455
    • (2004) Int. J. Prod. Res. , vol.42 , pp. 4431-4455
    • Kumar, R.1    Tiwari, M.K.2    Allada, V.3
  • 16
    • 0037139673 scopus 로고    scopus 로고
    • Multicriteria scheduling using fuzzy theory and tabu search
    • Lee H.T., Chen S.H., and Kang H.Y. Multicriteria scheduling using fuzzy theory and tabu search. Int. J. Prod. Res. 40 (2002) 1221-1234
    • (2002) Int. J. Prod. Res. , vol.40 , pp. 1221-1234
    • Lee, H.T.1    Chen, S.H.2    Kang, H.Y.3
  • 17
    • 0002054180 scopus 로고    scopus 로고
    • Predictable scheduling of a single machine subject to breakdowns
    • Mehta S.V., and Uzsoy R. Predictable scheduling of a single machine subject to breakdowns. Int. J. Comput. Integr. Manuf. 12 (1999) 15-38
    • (1999) Int. J. Comput. Integr. Manuf. , vol.12 , pp. 15-38
    • Mehta, S.V.1    Uzsoy, R.2
  • 19
    • 0032306052 scopus 로고    scopus 로고
    • Multi-objective scheduling with fuzzy due-date
    • Murata T., Gen M., and Ishibuchi H. Multi-objective scheduling with fuzzy due-date. Comput. Ind. Eng. 35 (1998) 439-442
    • (1998) Comput. Ind. Eng. , vol.35 , pp. 439-442
    • Murata, T.1    Gen, M.2    Ishibuchi, H.3
  • 20
    • 0033343706 scopus 로고    scopus 로고
    • Predictable scheduling of a single machine with breakdown and sensitive jobs
    • O'Donovan R., Uzsoy R., and McKay K.N. Predictable scheduling of a single machine with breakdown and sensitive jobs. Int. J. Prod. Res. 37 (1999) 4217-4233
    • (1999) Int. J. Prod. Res. , vol.37 , pp. 4217-4233
    • O'Donovan, R.1    Uzsoy, R.2    McKay, K.N.3
  • 22
    • 0035815823 scopus 로고    scopus 로고
    • Multicriteria Ranking of Inventory Replenishment Policies in the Presence of Uncertainty in Customer Demand
    • Petrovic R., and Petrovic D. Multicriteria Ranking of Inventory Replenishment Policies in the Presence of Uncertainty in Customer Demand. Int. J. Prod. Econom. 71 (2001) 439-446
    • (2001) Int. J. Prod. Econom. , vol.71 , pp. 439-446
    • Petrovic, R.1    Petrovic, D.2
  • 24
    • 4444220587 scopus 로고    scopus 로고
    • Schedule nervousness in manufacturing system: a case study
    • Pujawan I.N. Schedule nervousness in manufacturing system: a case study. Prod. Plann. Control 15 (2004) 515-524
    • (2004) Prod. Plann. Control , vol.15 , pp. 515-524
    • Pujawan, I.N.1
  • 25
    • 0033881797 scopus 로고    scopus 로고
    • Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy duedate through genetic algorithms
    • Sakawa M., and Kubota R. Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy duedate through genetic algorithms. European J. Oper. Res. 120 (2000) 393-407
    • (2000) European J. Oper. Res. , vol.120 , pp. 393-407
    • Sakawa, M.1    Kubota, R.2
  • 26
    • 0030108090 scopus 로고    scopus 로고
    • Scheduling as a fuzzy multiple criteria optimization problem
    • Slany W. Scheduling as a fuzzy multiple criteria optimization problem. Fuzzy Sets and Systems 78 2 (1996) 197-222
    • (1996) Fuzzy Sets and Systems , vol.78 , Issue.2 , pp. 197-222
    • Slany, W.1
  • 29
    • 0242703954 scopus 로고    scopus 로고
    • Rescheduling manufacturing systems: a framework of strategies, policies, and methods
    • Vieira G.E., Herrmann J.W., and Lin E. Rescheduling manufacturing systems: a framework of strategies, policies, and methods. J. Schedul. 6 (2003) 39-62
    • (2003) J. Schedul. , vol.6 , pp. 39-62
    • Vieira, G.E.1    Herrmann, J.W.2    Lin, E.3
  • 30
    • 0015558134 scopus 로고
    • Outline of a new approach to the analysis of complex systems and decision processes
    • Zadeh L.A. Outline of a new approach to the analysis of complex systems and decision processes. IEEE Trans. Systems, Man, Cybernet. SMC-3 (1973) 28-44
    • (1973) IEEE Trans. Systems, Man, Cybernet. , vol.SMC-3 , pp. 28-44
    • Zadeh, L.A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.