메뉴 건너뛰기




Volumn 27, Issue 4, 2003, Pages 469-490

Scheduling optimization under uncertainty - An alternative approach

Author keywords

Flowshop plants; Fuzzy numbers; MILP models; New product development; Scheduling; Tabu search; Uncertainty

Indexed keywords

FUZZY SETS; INTEGER PROGRAMMING; LINEAR PROGRAMMING; PROBABILITY DISTRIBUTIONS; PRODUCT DEVELOPMENT; PRODUCTION ENGINEERING;

EID: 0037445865     PISSN: 00981354     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0098-1354(02)00221-1     Document Type: Article
Times cited : (110)

References (48)
  • 4
    • 0037081993 scopus 로고    scopus 로고
    • A novel branch and bound algorithm for scheduling flowshop plants with uncertain processing times
    • Balasubramanian, J., & Grossmann, I. E. (2002). A novel branch and bound algorithm for scheduling flowshop plants with uncertain processing times. Computers and Chemical Engineering 26, 41.
    • (2002) Computers and Chemical Engineering , vol.26 , pp. 41
    • Balasubramanian, J.1    Grossmann, I.E.2
  • 6
    • 0024731347 scopus 로고
    • Efficient optimization algorithms for zero-wait scheduling of multiproduct batch plants
    • Birewar, D. B., & Grossmann, I. E. (1989). Efficient optimization algorithms for zero-wait scheduling of multiproduct batch plants. Industrial and Engineering Chemistry Research 28, 1333.
    • (1989) Industrial and Engineering Chemistry Research , vol.28 , pp. 1333
    • Birewar, D.B.1    Grossmann, I.E.2
  • 7
    • 0014807274 scopus 로고
    • A heuristic algorithm for the n-job m-machine sequencing problem
    • Campbell, H. G., Dudek, R. A., & Smith, M. L. (1970). A heuristic algorithm for the n-job m-machine sequencing problem. Management Science 16, 630.
    • (1970) Management Science , vol.16 , pp. 630
    • Campbell, H.G.1    Dudek, R.A.2    Smith, M.L.3
  • 10
    • 0023548442 scopus 로고
    • The mean value of a fuzzy number
    • Dubois, D., & Prade, H. (1987). The mean value of a fuzzy number. Fuzzy Sets and Systems 24, 279.
    • (1987) Fuzzy Sets and Systems , vol.24 , pp. 279
    • Dubois, D.1    Prade, H.2
  • 12
    • 0031268178 scopus 로고    scopus 로고
    • Jobshop scheduling with imprecise durations: A fuzzy approach
    • Fortemps, P. (1997). Jobshop scheduling with imprecise durations: a fuzzy approach. IEEE Transactions on Fuzzy Systems 5 (4), 557.
    • (1997) IEEE Transactions on Fuzzy Systems , vol.5 , Issue.4 , pp. 557
    • Fortemps, P.1
  • 13
    • 0030230803 scopus 로고    scopus 로고
    • Ranking and defuzzification methods based on area compensation
    • Fortemps, P., & Roubens, M. (1996). Ranking and defuzzification methods based on area compensation. Fuzzy Sets and Systems 82, 319.
    • (1996) Fuzzy Sets and Systems , vol.82 , pp. 319
    • Fortemps, P.1    Roubens, M.2
  • 15
    • 0002703574 scopus 로고
    • Tabu search: A tutorial
    • Glover, F. (1990). Tabu search: a tutorial. Interfaces 20, 74.
    • (1990) Interfaces , vol.20 , pp. 74
    • Glover, F.1
  • 16
    • 84987049329 scopus 로고
    • Computational complexity of PERT problems
    • Hagstrom, J. N. (1988). Computational complexity of PERT problems. Networks 18, 139.
    • (1988) Networks , vol.18 , pp. 139
    • Hagstrom, J.N.1
  • 17
    • 0030286425 scopus 로고    scopus 로고
    • Fuzzy priority heuristics for project scheduling
    • Hapke, M., & Slowinski, R. (1996). Fuzzy priority heuristics for project scheduling. Fuzzy Sets and Systems 83, 291.
    • (1996) Fuzzy Sets and Systems , vol.83 , pp. 291
    • Hapke, M.1    Slowinski, R.2
  • 19
    • 0034387803 scopus 로고    scopus 로고
    • A novel MILP formulation for short-term scheduling of multi-stage multiproduct batch plants with sequence-dependent constraints
    • Hui, C.-W., Gupta, A., & van der Meulen, H. A. J. (2000). A novel MILP formulation for short-term scheduling of multi-stage multiproduct batch plants with sequence-dependent constraints. Computers and Chemical Engineering 24, 2705.
    • (2000) Computers and Chemical Engineering , vol.24 , pp. 2705
    • Hui, C.-W.1    Gupta, A.2    Van der Meulen, H.A.J.3
  • 21
    • 0028523480 scopus 로고
    • Genetic algorithms and neighborhood search algorithms for fuzzy flowshop scheduling problems
    • Ishibuchi, H., Yamamoto, N., Murata, T., & Tanaka, H. (1994). Genetic algorithms and neighborhood search algorithms for fuzzy flowshop scheduling problems. Fuzzy Sets and Systems 67, 81.
    • (1994) Fuzzy Sets and Systems , vol.67 , pp. 81
    • Ishibuchi, H.1    Yamamoto, N.2    Murata, T.3    Tanaka, H.4
  • 22
    • 0023998151 scopus 로고
    • A theory of design reliability using probability and fuzzy sets
    • Kubic, W. L., Jr, & Stein, F. P. (1988). A theory of design reliability using probability and fuzzy sets. AIChE Journal 34, 583.
    • (1988) AIChE Journal , vol.34 , pp. 583
    • Kubic W.L., Jr.1    Stein, F.P.2
  • 24
    • 0001501655 scopus 로고
    • Application of a technique for research and development program evaluation
    • Malcolm, D. G., Roseboom, J. H., Clark, C. E., & Fazar, W. (1959). Application of a technique for research and development program evaluation. Operations Research 12, 16.
    • (1959) Operations Research , vol.12 , pp. 16
    • Malcolm, D.G.1    Roseboom, J.H.2    Clark, C.E.3    Fazar, W.4
  • 25
    • 0012484633 scopus 로고    scopus 로고
    • A combined fuzzy set theory and MILP approach in integration of planning and scheduling of batch plants
    • Reno, 2001
    • Majozi, T., Zhu, X. X. (2001). A combined fuzzy set theory and MILP approach in integration of planning and scheduling of batch plants. Presented at AIChE Annual Conference, Reno, 2001.
    • (2001) AIChE Annual Conference
    • Majozi, T.1    Zhu, X.X.2
  • 27
    • 0031186347 scopus 로고    scopus 로고
    • Planning and scheduling of parallel semi-continuous process. 2: Short-term scheduling
    • McDonald, C. M., & Karimi, I. (1997). Planning and scheduling of parallel semi-continuous process. 2: Short-term scheduling. Industrial and Engineering Chemistry Research 36, 2701.
    • (1997) Industrial and Engineering Chemistry Research , vol.36 , pp. 2701
    • McDonald, C.M.1    Karimi, I.2
  • 31
    • 0026256602 scopus 로고
    • Exact solution of the no-wait flowshop scheduling problem with a comparison to heuristic methods
    • Pekny, J. F., & Miller, D. L. (1991). Exact solution of the no-wait flowshop scheduling problem with a comparison to heuristic methods. Computers and Chemical Engineering 15, 741.
    • (1991) Computers and Chemical Engineering , vol.15 , pp. 741
    • Pekny, J.F.1    Miller, D.L.2
  • 32
    • 0031271861 scopus 로고    scopus 로고
    • Multiperiod planning and scheduling of multiproduct batch plants under demand uncertainty
    • Petkov, S. B., & Maranas, C. D. (1997). Multiperiod planning and scheduling of multiproduct batch plants under demand uncertainty. Industrial and Engineering Chemistry Research 36, 4864.
    • (1997) Industrial and Engineering Chemistry Research , vol.36 , pp. 4864
    • Petkov, S.B.1    Maranas, C.D.2
  • 33
    • 0001690679 scopus 로고
    • A continuous time mixed integer linear programming model for short-term scheduling of multistage batch plants
    • Pinto, J., & Grossmann, I. E. (1995). A continuous time mixed integer linear programming model for short-term scheduling of multistage batch plants. Industrial and Engineering Chemistry Research 34, 3037.
    • (1995) Industrial and Engineering Chemistry Research , vol.34 , pp. 3037
    • Pinto, J.1    Grossmann, I.E.2
  • 34
    • 0002584921 scopus 로고    scopus 로고
    • An alternate MILP model for short-term scheduling of batch plants with pre-ordering constraints
    • Pinto, J., & Grossmann, I. E. (1996). An alternate MILP model for short-term scheduling of batch plants with pre-ordering constraints. Industrial and Engineering Chemistry Research 35, 338.
    • (1996) Industrial and Engineering Chemistry Research , vol.35 , pp. 338
    • Pinto, J.1    Grossmann, I.E.2
  • 36
    • 38249026095 scopus 로고
    • Completion times in serial mixed-storage multiproduct processes with transfer and set-up times
    • Rajagopalan, D., & Karimi, I. A. (1989). Completion times in serial mixed-storage multiproduct processes with transfer and set-up times. Computers and Chemical Engineering 13, 175.
    • (1989) Computers and Chemical Engineering , vol.13 , pp. 175
    • Rajagopalan, D.1    Karimi, I.A.2
  • 39
    • 0030258708 scopus 로고    scopus 로고
    • Optimization models for the scheduling of testing tasks in new product development
    • Schmidt, C., & Grossmann, I. E. (1996). Optimization models for the scheduling of testing tasks in new product development. Industrial and Engineering Chemistry Research 35, 3498.
    • (1996) Industrial and Engineering Chemistry Research , vol.35 , pp. 3498
    • Schmidt, C.1    Grossmann, I.E.2
  • 40
    • 0034326162 scopus 로고    scopus 로고
    • The exact overall time distribution of a project with uncertain task durations
    • Schmidt, C., & Grossmann, I. E. (2000). The exact overall time distribution of a project with uncertain task durations. European Journal of Operational Research 126 (3), 614.
    • (2000) European Journal of Operational Research , vol.126 , Issue.3 , pp. 614
    • Schmidt, C.1    Grossmann, I.E.2
  • 41
    • 0002822583 scopus 로고    scopus 로고
    • Single- and multisite planning and scheduling: Current status and future challenges
    • Shah, N. (1998). Single- and multisite planning and scheduling: current status and future challenges. AIChE Symposium Series 320 (94), 75.
    • (1998) AIChE Symposium Series , vol.320 , Issue.94 , pp. 75
    • Shah, N.1
  • 45
    • 0033283751 scopus 로고    scopus 로고
    • A fuzzy set approach to activity scheduling for product development
    • Wang, J. R. (1999). A fuzzy set approach to activity scheduling for product development. Journal of the Operational Research Society 50, 1217.
    • (1999) Journal of the Operational Research Society , vol.50 , pp. 1217
    • Wang, J.R.1
  • 46
    • 0016084468 scopus 로고
    • Stochastic programming with fixed recourse: The equivalent deterministic program
    • Wets, R. J.-B. (1974). Stochastic programming with fixed recourse: the equivalent deterministic program. SIAM Review 16, 309.
    • (1974) SIAM Review , vol.16 , pp. 309
    • Wets, R.J.-B.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.