-
2
-
-
0004245694
-
-
New York: Dover Publications
-
Abramowitz, M., & Stegun, I. A. (1972). Handbook of mathematical functions with formulas, graphs, and mathematical tables (p. 886). New York: Dover Publications.
-
(1972)
Handbook of Mathematical Functions with Formulas, Graphs, and Mathematical Tables
, pp. 886
-
-
Abramowitz, M.1
Stegun, I.A.2
-
4
-
-
0037081993
-
A novel branch and bound algorithm for scheduling flowshop plants with uncertain processing times
-
Balasubramanian, J., & Grossmann, I. E. (2002). A novel branch and bound algorithm for scheduling flowshop plants with uncertain processing times. Computers and Chemical Engineering 26, 41.
-
(2002)
Computers and Chemical Engineering
, vol.26
, pp. 41
-
-
Balasubramanian, J.1
Grossmann, I.E.2
-
6
-
-
0024731347
-
Efficient optimization algorithms for zero-wait scheduling of multiproduct batch plants
-
Birewar, D. B., & Grossmann, I. E. (1989). Efficient optimization algorithms for zero-wait scheduling of multiproduct batch plants. Industrial and Engineering Chemistry Research 28, 1333.
-
(1989)
Industrial and Engineering Chemistry Research
, vol.28
, pp. 1333
-
-
Birewar, D.B.1
Grossmann, I.E.2
-
7
-
-
0014807274
-
A heuristic algorithm for the n-job m-machine sequencing problem
-
Campbell, H. G., Dudek, R. A., & Smith, M. L. (1970). A heuristic algorithm for the n-job m-machine sequencing problem. Management Science 16, 630.
-
(1970)
Management Science
, vol.16
, pp. 630
-
-
Campbell, H.G.1
Dudek, R.A.2
Smith, M.L.3
-
12
-
-
0031268178
-
Jobshop scheduling with imprecise durations: A fuzzy approach
-
Fortemps, P. (1997). Jobshop scheduling with imprecise durations: a fuzzy approach. IEEE Transactions on Fuzzy Systems 5 (4), 557.
-
(1997)
IEEE Transactions on Fuzzy Systems
, vol.5
, Issue.4
, pp. 557
-
-
Fortemps, P.1
-
13
-
-
0030230803
-
Ranking and defuzzification methods based on area compensation
-
Fortemps, P., & Roubens, M. (1996). Ranking and defuzzification methods based on area compensation. Fuzzy Sets and Systems 82, 319.
-
(1996)
Fuzzy Sets and Systems
, vol.82
, pp. 319
-
-
Fortemps, P.1
Roubens, M.2
-
14
-
-
0035340459
-
Expert control of DO in the aerobic reactor of an activated sludge process
-
Galluzzo, M., Ducato, R., Bartolozzi, V., & Picciotto, A. (2001). Expert control of DO in the aerobic reactor of an activated sludge process. Computers and Chemical Engineering 25, 619.
-
(2001)
Computers and Chemical Engineering
, vol.25
, pp. 619
-
-
Galluzzo, M.1
Ducato, R.2
Bartolozzi, V.3
Picciotto, A.4
-
15
-
-
0002703574
-
Tabu search: A tutorial
-
Glover, F. (1990). Tabu search: a tutorial. Interfaces 20, 74.
-
(1990)
Interfaces
, vol.20
, pp. 74
-
-
Glover, F.1
-
16
-
-
84987049329
-
Computational complexity of PERT problems
-
Hagstrom, J. N. (1988). Computational complexity of PERT problems. Networks 18, 139.
-
(1988)
Networks
, vol.18
, pp. 139
-
-
Hagstrom, J.N.1
-
17
-
-
0030286425
-
Fuzzy priority heuristics for project scheduling
-
Hapke, M., & Slowinski, R. (1996). Fuzzy priority heuristics for project scheduling. Fuzzy Sets and Systems 83, 291.
-
(1996)
Fuzzy Sets and Systems
, vol.83
, pp. 291
-
-
Hapke, M.1
Slowinski, R.2
-
18
-
-
0033135294
-
A framework for schedule evaluation with processing uncertainty
-
Honkomp, S. J., Mockus, L., & Reklaitis, G. V. (1999). A framework for schedule evaluation with processing uncertainty. Computers and Chemical Engineering 23, 595.
-
(1999)
Computers and Chemical Engineering
, vol.23
, pp. 595
-
-
Honkomp, S.J.1
Mockus, L.2
Reklaitis, G.V.3
-
19
-
-
0034387803
-
A novel MILP formulation for short-term scheduling of multi-stage multiproduct batch plants with sequence-dependent constraints
-
Hui, C.-W., Gupta, A., & van der Meulen, H. A. J. (2000). A novel MILP formulation for short-term scheduling of multi-stage multiproduct batch plants with sequence-dependent constraints. Computers and Chemical Engineering 24, 2705.
-
(2000)
Computers and Chemical Engineering
, vol.24
, pp. 2705
-
-
Hui, C.-W.1
Gupta, A.2
Van der Meulen, H.A.J.3
-
21
-
-
0028523480
-
Genetic algorithms and neighborhood search algorithms for fuzzy flowshop scheduling problems
-
Ishibuchi, H., Yamamoto, N., Murata, T., & Tanaka, H. (1994). Genetic algorithms and neighborhood search algorithms for fuzzy flowshop scheduling problems. Fuzzy Sets and Systems 67, 81.
-
(1994)
Fuzzy Sets and Systems
, vol.67
, pp. 81
-
-
Ishibuchi, H.1
Yamamoto, N.2
Murata, T.3
Tanaka, H.4
-
22
-
-
0023998151
-
A theory of design reliability using probability and fuzzy sets
-
Kubic, W. L., Jr, & Stein, F. P. (1988). A theory of design reliability using probability and fuzzy sets. AIChE Journal 34, 583.
-
(1988)
AIChE Journal
, vol.34
, pp. 583
-
-
Kubic W.L., Jr.1
Stein, F.P.2
-
24
-
-
0001501655
-
Application of a technique for research and development program evaluation
-
Malcolm, D. G., Roseboom, J. H., Clark, C. E., & Fazar, W. (1959). Application of a technique for research and development program evaluation. Operations Research 12, 16.
-
(1959)
Operations Research
, vol.12
, pp. 16
-
-
Malcolm, D.G.1
Roseboom, J.H.2
Clark, C.E.3
Fazar, W.4
-
25
-
-
0012484633
-
A combined fuzzy set theory and MILP approach in integration of planning and scheduling of batch plants
-
Reno, 2001
-
Majozi, T., Zhu, X. X. (2001). A combined fuzzy set theory and MILP approach in integration of planning and scheduling of batch plants. Presented at AIChE Annual Conference, Reno, 2001.
-
(2001)
AIChE Annual Conference
-
-
Majozi, T.1
Zhu, X.X.2
-
27
-
-
0031186347
-
Planning and scheduling of parallel semi-continuous process. 2: Short-term scheduling
-
McDonald, C. M., & Karimi, I. (1997). Planning and scheduling of parallel semi-continuous process. 2: Short-term scheduling. Industrial and Engineering Chemistry Research 36, 2701.
-
(1997)
Industrial and Engineering Chemistry Research
, vol.36
, pp. 2701
-
-
McDonald, C.M.1
Karimi, I.2
-
31
-
-
0026256602
-
Exact solution of the no-wait flowshop scheduling problem with a comparison to heuristic methods
-
Pekny, J. F., & Miller, D. L. (1991). Exact solution of the no-wait flowshop scheduling problem with a comparison to heuristic methods. Computers and Chemical Engineering 15, 741.
-
(1991)
Computers and Chemical Engineering
, vol.15
, pp. 741
-
-
Pekny, J.F.1
Miller, D.L.2
-
32
-
-
0031271861
-
Multiperiod planning and scheduling of multiproduct batch plants under demand uncertainty
-
Petkov, S. B., & Maranas, C. D. (1997). Multiperiod planning and scheduling of multiproduct batch plants under demand uncertainty. Industrial and Engineering Chemistry Research 36, 4864.
-
(1997)
Industrial and Engineering Chemistry Research
, vol.36
, pp. 4864
-
-
Petkov, S.B.1
Maranas, C.D.2
-
33
-
-
0001690679
-
A continuous time mixed integer linear programming model for short-term scheduling of multistage batch plants
-
Pinto, J., & Grossmann, I. E. (1995). A continuous time mixed integer linear programming model for short-term scheduling of multistage batch plants. Industrial and Engineering Chemistry Research 34, 3037.
-
(1995)
Industrial and Engineering Chemistry Research
, vol.34
, pp. 3037
-
-
Pinto, J.1
Grossmann, I.E.2
-
34
-
-
0002584921
-
An alternate MILP model for short-term scheduling of batch plants with pre-ordering constraints
-
Pinto, J., & Grossmann, I. E. (1996). An alternate MILP model for short-term scheduling of batch plants with pre-ordering constraints. Industrial and Engineering Chemistry Research 35, 338.
-
(1996)
Industrial and Engineering Chemistry Research
, vol.35
, pp. 338
-
-
Pinto, J.1
Grossmann, I.E.2
-
35
-
-
0033922805
-
MIMO fuzzy model-based controller
-
Postlethwaite, B., & Edgar, C. (2000). MIMO fuzzy model-based controller. Chemical Engineering Research and Design, Part A: Transactions of the Institute of Chemical Engineers 78, 557.
-
(2000)
Chemical Engineering Research and Design, Part A: Transactions of the Institute of Chemical Engineers
, vol.78
, pp. 557
-
-
Postlethwaite, B.1
Edgar, C.2
-
36
-
-
38249026095
-
Completion times in serial mixed-storage multiproduct processes with transfer and set-up times
-
Rajagopalan, D., & Karimi, I. A. (1989). Completion times in serial mixed-storage multiproduct processes with transfer and set-up times. Computers and Chemical Engineering 13, 175.
-
(1989)
Computers and Chemical Engineering
, vol.13
, pp. 175
-
-
Rajagopalan, D.1
Karimi, I.A.2
-
37
-
-
0034661258
-
Approximation of an ideal online scheduler for a multiproduct batch plant
-
Sand, G., Engell, A., Märkert, A., Schultz, R., & Schulz, C. (2000). Approximation of an ideal online scheduler for a multiproduct batch plant. Computers and Chemical Engineering 24, 361.
-
(2000)
Computers and Chemical Engineering
, vol.24
, pp. 361
-
-
Sand, G.1
Engell, A.2
Märkert, A.3
Schultz, R.4
Schulz, C.5
-
38
-
-
0012541023
-
-
Ph.D. thesis, Department of Chemical Engineering, Carnegie Mellon University, Pittsburgh, PA
-
Schmidt, C. (1998). Optimal scheduling of the agricultural chemical new product development process. Ph.D. thesis, Department of Chemical Engineering, Carnegie Mellon University, Pittsburgh, PA.
-
(1998)
Optimal Scheduling of the Agricultural Chemical New Product Development Process
-
-
Schmidt, C.1
-
39
-
-
0030258708
-
Optimization models for the scheduling of testing tasks in new product development
-
Schmidt, C., & Grossmann, I. E. (1996). Optimization models for the scheduling of testing tasks in new product development. Industrial and Engineering Chemistry Research 35, 3498.
-
(1996)
Industrial and Engineering Chemistry Research
, vol.35
, pp. 3498
-
-
Schmidt, C.1
Grossmann, I.E.2
-
40
-
-
0034326162
-
The exact overall time distribution of a project with uncertain task durations
-
Schmidt, C., & Grossmann, I. E. (2000). The exact overall time distribution of a project with uncertain task durations. European Journal of Operational Research 126 (3), 614.
-
(2000)
European Journal of Operational Research
, vol.126
, Issue.3
, pp. 614
-
-
Schmidt, C.1
Grossmann, I.E.2
-
41
-
-
0002822583
-
Single- and multisite planning and scheduling: Current status and future challenges
-
Shah, N. (1998). Single- and multisite planning and scheduling: current status and future challenges. AIChE Symposium Series 320 (94), 75.
-
(1998)
AIChE Symposium Series
, vol.320
, Issue.94
, pp. 75
-
-
Shah, N.1
-
44
-
-
0026461248
-
Jobshop scheduling by simulated annealing
-
van Laarhoven, P. J. M., Aarts, E. H. L., & Lenstra, J. K. (1992). Jobshop scheduling by simulated annealing. Operations Research 40, 113.
-
(1992)
Operations Research
, vol.40
, pp. 113
-
-
Van Laarhoven, P.J.M.1
Aarts, E.H.L.2
Lenstra, J.K.3
-
45
-
-
0033283751
-
A fuzzy set approach to activity scheduling for product development
-
Wang, J. R. (1999). A fuzzy set approach to activity scheduling for product development. Journal of the Operational Research Society 50, 1217.
-
(1999)
Journal of the Operational Research Society
, vol.50
, pp. 1217
-
-
Wang, J.R.1
-
46
-
-
0016084468
-
Stochastic programming with fixed recourse: The equivalent deterministic program
-
Wets, R. J.-B. (1974). Stochastic programming with fixed recourse: the equivalent deterministic program. SIAM Review 16, 309.
-
(1974)
SIAM Review
, vol.16
, pp. 309
-
-
Wets, R.J.-B.1
|