메뉴 건너뛰기




Volumn 44, Issue 11, 2005, Pages 4001-4021

A multilevel, control-theoretic framework for integration of planning, scheduling, and rescheduling

Author keywords

[No Author keywords available]

Indexed keywords

ABSTRACTING; CASCADE CONTROL SYSTEMS; CONSTRAINT THEORY; DECISION MAKING; HIERARCHICAL SYSTEMS; INVENTORY CONTROL; MATHEMATICAL MODELS; PLANNING; PRODUCTION; SCHEDULING;

EID: 20344400593     PISSN: 08885885     EISSN: None     Source Type: Journal    
DOI: 10.1021/ie040142s     Document Type: Article
Times cited : (32)

References (18)
  • 1
    • 0034216113 scopus 로고    scopus 로고
    • Planning, scheduling and control systems: Why can they network together
    • Shobrys, D. E.; White, D. C. Planning, scheduling and control systems: why can they network together. Comput. Chem. Eng. 2000, 24, 163.
    • (2000) Comput. Chem. Eng. , vol.24 , pp. 163
    • Shobrys, D.E.1    White, D.C.2
  • 2
    • 0002822583 scopus 로고    scopus 로고
    • Single and multisite planning and scheduling: Current status and future challenges
    • Shah, N. Single and multisite planning and scheduling: current status and future challenges. AIChE Symp. Ser. 1998, 94 (320), 75.
    • (1998) AIChE Symp. Ser. , vol.94 , Issue.320 , pp. 75
    • Shah, N.1
  • 3
    • 0242718574 scopus 로고    scopus 로고
    • Discrete optimization methods and their role in the integration of planning and scheduling
    • Grossmann, I. E.; Van den Heever, S. A.; Harjunkoski, I. Discrete optimization methods and their role in the integration of planning and scheduling. AIChE Symp. Ser. 2001, 98 (326), 150.
    • (2001) AIChE Symp. Ser. , vol.98 , Issue.326 , pp. 150
    • Grossmann, I.E.1    Van Den Heever, S.A.2    Harjunkoski, I.3
  • 4
    • 0038310819 scopus 로고    scopus 로고
    • Refinery short-term scheduling using continuous time formulation: Crude-oil operations
    • Jia, Z.; Ierapetritou, M.; Kelly, J. D. Refinery short-term scheduling using continuous time formulation: crude-oil operations. Ind. Eng. Chem. Res. 2003, 42, 3085.
    • (2003) Ind. Eng. Chem. Res. , vol.42 , pp. 3085
    • Jia, Z.1    Ierapetritou, M.2    Kelly, J.D.3
  • 5
    • 0242642748 scopus 로고    scopus 로고
    • A strategy for the integration of production planning and reactive scheduling in the optimization of a hydrogen supply network
    • Van den Heever, S. A.; Grossmann, I. E. A strategy for the integration of production planning and reactive scheduling in the optimization of a hydrogen supply network. Comput. Chem. Eng. 2003, 27, 1813.
    • (2003) Comput. Chem. Eng. , vol.27 , pp. 1813
    • Van Den Heever, S.A.1    Grossmann, I.E.2
  • 6
    • 0029236537 scopus 로고
    • A framework for investigating schedule robustness under uncertainty
    • Mignon, D. J.; Honkomp, S. J.; Reklaitis, G. V. A framework for investigating schedule robustness under uncertainty. Comput. Chem. Eng. 1995, 19, S615.
    • (1995) Comput. Chem. Eng. , vol.19
    • Mignon, D.J.1    Honkomp, S.J.2    Reklaitis, G.V.3
  • 8
    • 0029723654 scopus 로고    scopus 로고
    • A combined scheduling/ reactive scheduling strategy to minimize the effect of process operations uncertainty in batch plants
    • Sanmarti, E.; Huercio, A.; Espuna, A.; Puigjaner, L. A combined scheduling/ reactive scheduling strategy to minimize the effect of process operations uncertainty in batch plants. Comput. Chem. Eng. 1996, 20, S1263.
    • (1996) Comput. Chem. Eng. , vol.20
    • Sanmarti, E.1    Huercio, A.2    Espuna, A.3    Puigjaner, L.4
  • 9
    • 0034306985 scopus 로고    scopus 로고
    • Knowledge based predictive and reactive scheduling in industrial environments
    • Henning, G. P.; Cerda, J. Knowledge based predictive and reactive scheduling in industrial environments. Comput. Chem. Eng. 2000, 24, 2315.
    • (2000) Comput. Chem. Eng. , vol.24 , pp. 2315
    • Henning, G.P.1    Cerda, J.2
  • 10
    • 0344320671 scopus 로고    scopus 로고
    • A dynamic reactive scheduling mechanism for responding to changes of production orders and manufacturing resources
    • Sun, J.; Xue, D. A dynamic reactive scheduling mechanism for responding to changes of production orders and manufacturing resources. Comput. Ind. 2001, 46, 189.
    • (2001) Comput. Ind. , vol.46 , pp. 189
    • Sun, J.1    Xue, D.2
  • 11
    • 0034661653 scopus 로고    scopus 로고
    • Dynamic modeling and classical control theory for supply chain management
    • Perea E.; Grossmann, I. E.; Ydstie, E.; Tahmassebi, T. Dynamic modeling and classical control theory for supply chain management. Comput. Chem. Eng. 2000, 24, 1143.
    • (2000) Comput. Chem. Eng. , vol.24 , pp. 1143
    • Perea, E.1    Grossmann, I.E.2    Ydstie, E.3    Tahmassebi, T.4
  • 12
    • 0034283808 scopus 로고    scopus 로고
    • Multilayer optimization and scheduling using model predictive control: Application to reentrant semiconductor manufacturing lines
    • Vargas-Villamil, F. D.; Rivera, D. E. Multilayer optimization and scheduling using model predictive control: application to reentrant semiconductor manufacturing lines. Comput. Chem. Eng. 2000, 24, 2009.
    • (2000) Comput. Chem. Eng. , vol.24 , pp. 2009
    • Vargas-Villamil, F.D.1    Rivera, D.E.2
  • 13
    • 0034661221 scopus 로고    scopus 로고
    • A model predictive framework for planning and scheduling problems: A case study of consumer goods supply chain
    • Bose, S.; Pekny, J. F. A model predictive framework for planning and scheduling problems: a case study of consumer goods supply chain. Comput. Chem. Eng. 2000, 24, 329.
    • (2000) Comput. Chem. Eng. , vol.24 , pp. 329
    • Bose, S.1    Pekny, J.F.2
  • 14
    • 0042306179 scopus 로고    scopus 로고
    • A model predictive control strategy for supply chain optimization
    • Perea-Lopez E.; Ydstie, B. E.; Grossmann, I. E. A model predictive control strategy for supply chain optimization. Comput. Chem. Eng. 2003, 27, 1201.
    • (2003) Comput. Chem. Eng. , vol.27 , pp. 1201
    • Perea-Lopez, E.1    Ydstie, B.E.2    Grossmann, I.E.3
  • 15
    • 0242298604 scopus 로고    scopus 로고
    • Cyclic scheduling of continuous multiproduct plants in a hybrid flowshop facility
    • Munawar, S. A.; Bhushan, M.; Gudi, R. D.; Belliappa, A. M. Cyclic scheduling of continuous multiproduct plants in a hybrid flowshop facility. Ind. Eng. Chem. Res. 2003, 42, 5861.
    • (2003) Ind. Eng. Chem. Res. , vol.42 , pp. 5861
    • Munawar, S.A.1    Bhushan, M.2    Gudi, R.D.3    Belliappa, A.M.4
  • 16
    • 0345830728 scopus 로고    scopus 로고
    • Scheduling under machine break down in a continuous process industry
    • Liao, C. J.; Chen, W. J. Scheduling under machine break down in a continuous process industry. Comput. Oper. Res. 2004, 31, 415.
    • (2004) Comput. Oper. Res. , vol.31 , pp. 415
    • Liao, C.J.1    Chen, W.J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.