메뉴 건너뛰기




Volumn 46, Issue 24, 2007, Pages 8044-8049

Proactive scheduling under uncertainty: A parametric optimization approach

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; COMPUTER PROGRAMMING; OPTIMIZATION; PROBLEM SOLVING;

EID: 36749101348     PISSN: 08885885     EISSN: None     Source Type: Journal    
DOI: 10.1021/ie070018j     Document Type: Article
Times cited : (38)

References (34)
  • 1
    • 36749082884 scopus 로고    scopus 로고
    • Reklaitis, G. V. Perspectives of scheduling and planning of process operations. In Proceedings of the Process Systems Engineering Conference, PSE'91, 4th International Symposium on Process Systems Engineering, Montebello, Quebec, Canada, June 1991.
    • Reklaitis, G. V. Perspectives of scheduling and planning of process operations. In Proceedings of the Process Systems Engineering Conference, PSE'91, 4th International Symposium on Process Systems Engineering, Montebello, Quebec, Canada, June 1991.
  • 3
    • 0002822583 scopus 로고    scopus 로고
    • Single and Multisite Planning and Scheduling: Current Status and Future Challenges
    • Snowbird, UT, CACHE Corp, Austin, TX
    • Shah, N. Single and Multisite Planning and Scheduling: Current Status and Future Challenges. In Proceedings of Foundations of Computer Aided Process Operations (FOCAPO), Snowbird, UT, 1998; CACHE Corp.: Austin, TX, 1998.
    • (1998) Proceedings of Foundations of Computer Aided Process Operations (FOCAPO)
    • Shah, N.1
  • 4
    • 0022129820 scopus 로고
    • Deterministic Variability Analysis for Intermediate Storage in Noncontinuous Processes. Part I: Allowability Conditions
    • Karimi, I. A.; Reklaitis, G. V. Deterministic Variability Analysis for Intermediate Storage in Noncontinuous Processes. Part I: Allowability Conditions. AIChE J. 1985, 31, 1516-1527.
    • (1985) AIChE J , vol.31 , pp. 1516-1527
    • Karimi, I.A.1    Reklaitis, G.V.2
  • 5
    • 0022132055 scopus 로고
    • Deterministic Variability Analysis for Intermediate Storage in Noncontinuous Processes. Part II: Storage Sizing for Serial Systems
    • Karimi, I. A.; Reklaitis, G. V. Deterministic Variability Analysis for Intermediate Storage in Noncontinuous Processes. Part II: Storage Sizing for Serial Systems. AIChE J. 1985, 31, 1528-1537.
    • (1985) AIChE J , vol.31 , pp. 1528-1537
    • Karimi, I.A.1    Reklaitis, G.V.2
  • 6
    • 0022914862 scopus 로고
    • An On-line Operating Control System for a Class of Combined Batch/Semi Continuous Processes
    • Onogi, K.; Nishimura, Y.; Nakata, Y.; Inomata, T. An On-line Operating Control System for a Class of Combined Batch/Semi Continuous Processes. J. Chem. Eng. Jpn. 1986, 19, 542-548.
    • (1986) J. Chem. Eng. Jpn , vol.19 , pp. 542-548
    • Onogi, K.1    Nishimura, Y.2    Nakata, Y.3    Inomata, T.4
  • 7
    • 0027628278 scopus 로고
    • Scheduling of Batch Digesters According to Different Control Targets and Servicing Limitations
    • Hvala, N.; Strmčnik, S.; Černetič, J. Scheduling of Batch Digesters According to Different Control Targets and Servicing Limitations. Comput. Chem. Eng. 1993, 17, 739-750.
    • (1993) Comput. Chem. Eng , vol.17 , pp. 739-750
    • Hvala, N.1    Strmčnik, S.2    Černetič, J.3
  • 8
    • 0001499525 scopus 로고
    • Minimizing the effects of batch process variability using online schedule modification
    • Cott, B. J.; Macchietto, S. Minimizing the effects of batch process variability using online schedule modification. Comput. Chem. Eng. 1989, 13, 105-113.
    • (1989) Comput. Chem. Eng , vol.13 , pp. 105-113
    • Cott, B.J.1    Macchietto, S.2
  • 10
    • 0029224646 scopus 로고
    • Incorporating on-line scheduling strategies in integrated batch production control
    • Huercio, A.; Espuña, A.; Puigjaner, L. Incorporating on-line scheduling strategies in integrated batch production control. Comput. Chem. Eng. 1995, 19, S609-S614.
    • (1995) Comput. Chem. Eng , vol.19
    • Huercio, A.1    Espuña, A.2    Puigjaner, L.3
  • 11
    • 0030083915 scopus 로고    scopus 로고
    • A process-variability-based online scheduling system in multiproduct batch process
    • Ishii, N.; Muraki, M. A process-variability-based online scheduling system in multiproduct batch process. Comput. Chem. Eng. 1996, 20, 111-234.
    • (1996) Comput. Chem. Eng , vol.20 , pp. 111-234
    • Ishii, N.1    Muraki, M.2
  • 12
    • 33845602972 scopus 로고    scopus 로고
    • General Algorithms for Reactive Scheduling of Multipurpose Plants
    • Presented at the, Los Angeles, CA
    • Schilling, G.; Pantelides, C. C. General Algorithms for Reactive Scheduling of Multipurpose Plants. Presented at the AIChE Annual Meeting, Los Angeles, CA, 1997.
    • (1997) AIChE Annual Meeting
    • Schilling, G.1    Pantelides, C.C.2
  • 13
    • 0034332903 scopus 로고    scopus 로고
    • Vin, J. P.; Ierapetritou, M. G. A New Approach for Efficient Rescheduling of Multiproduct Batch Plants. Ind. Eng. Chem. Res. 2000, 39, 4228-4238.
    • Vin, J. P.; Ierapetritou, M. G. A New Approach for Efficient Rescheduling of Multiproduct Batch Plants. Ind. Eng. Chem. Res. 2000, 39, 4228-4238.
  • 14
    • 0031100306 scopus 로고    scopus 로고
    • A multiparametric programming approach for linear process engineering problems under uncertainty
    • Acevedo, J.; Pistikopoulos, E. N. A multiparametric programming approach for linear process engineering problems under uncertainty. Ind. Eng. Chem. Res. 1997, 36, 717-728.
    • (1997) Ind. Eng. Chem. Res , vol.36 , pp. 717-728
    • Acevedo, J.1    Pistikopoulos, E.N.2
  • 15
    • 0032688041 scopus 로고    scopus 로고
    • An algorithm for multiparametric mixed integer linear programming problems under uncertainty
    • Acevedo, J.; Pistikopoulos, E. N. An algorithm for multiparametric mixed integer linear programming problems under uncertainty. Oper. Res. Lett. 1999, 24, 139-148.
    • (1999) Oper. Res. Lett , vol.24 , pp. 139-148
    • Acevedo, J.1    Pistikopoulos, E.N.2
  • 16
    • 0006201049 scopus 로고    scopus 로고
    • Planning under uncertainty; a parametric optimization approach
    • Pekny, J. F, Blau, G. E, Eds, CACHE Corp, Austin, TX
    • Pistikopoulos, E. N.; Dua, V. Planning under uncertainty; a parametric optimization approach. In Proceedings of the Third International Conference on FOCAPO; Pekny, J. F., Blau, G. E., Eds.; CACHE Corp.: Austin, TX, 1998; pp 164-169.
    • (1998) Proceedings of the Third International Conference on FOCAPO , pp. 164-169
    • Pistikopoulos, E.N.1    Dua, V.2
  • 17
    • 0032021725 scopus 로고    scopus 로고
    • Optimization techniques for process synthesis and material design under uncertainty
    • Dua, V.; Pistikopoulos, E. N. Optimization techniques for process synthesis and material design under uncertainty. Trans. Inst. Chem. Eng. 1998, 76 (Part A), 408-416.
    • (1998) Trans. Inst. Chem. Eng , vol.76 , Issue.PART A , pp. 408-416
    • Dua, V.1    Pistikopoulos, E.N.2
  • 18
    • 0042188408 scopus 로고    scopus 로고
    • An algorithm for the solution of multiparametric mixed integer linear programming problems
    • Dua, V.; Pistikopoulos, E. N. An algorithm for the solution of multiparametric mixed integer linear programming problems. Ann. Oper. Res. 2000, 99, 123-139.
    • (2000) Ann. Oper. Res , vol.99 , pp. 123-139
    • Dua, V.1    Pistikopoulos, E.N.2
  • 20
    • 0036027604 scopus 로고    scopus 로고
    • The explicitlinear quadratic regulator for constrained systems
    • Bemporad, A.; Morari, M.; Dua, V.; Pistikopoulos, E. N. The explicitlinear quadratic regulator for constrained systems. Automatica 2002, 38, 3-20.
    • (2002) Automatica , vol.38 , pp. 3-20
    • Bemporad, A.1    Morari, M.2    Dua, V.3    Pistikopoulos, E.N.4
  • 22
    • 77956763968 scopus 로고    scopus 로고
    • Dua, V.; Bozinis, N. A.; Pistikopoulos, E. N. A new multiparametric mixed-integer quadratic programming algorithm. In Proceedings of ESCAPE-11, Kolding, Denmark, May 27-30, 2001; Gani, R., Jørgensen, S. B., Eds.; Elsevier B.V. Science Publishers: Amsterdam, 2001.
    • Dua, V.; Bozinis, N. A.; Pistikopoulos, E. N. A new multiparametric mixed-integer quadratic programming algorithm. In Proceedings of ESCAPE-11, Kolding, Denmark, May 27-30, 2001; Gani, R., Jørgensen, S. B., Eds.; Elsevier B.V. Science Publishers: Amsterdam, 2001.
  • 23
    • 0002543023 scopus 로고    scopus 로고
    • A parametric mixed-integer global optimization framework for the solution of process engineering problems under uncertainty
    • Dua, V.; Papalexandri, K. P.; Pistikopoulos, E. N. A parametric mixed-integer global optimization framework for the solution of process engineering problems under uncertainty. Comput. Chem. Eng. 1999, 23, S19-S22.
    • (1999) Comput. Chem. Eng , vol.23
    • Dua, V.1    Papalexandri, K.P.2    Pistikopoulos, E.N.3
  • 24
    • 0029736129 scopus 로고    scopus 로고
    • A parametric MINLP algorithm for process synthesis problem under uncertainty
    • Acevedo, J., Pistikopoulos, E. N. A parametric MINLP algorithm for process synthesis problem under uncertainty. Ind. Eng. Chem. Res. 1996, 35, 147-158.
    • (1996) Ind. Eng. Chem. Res , vol.35 , pp. 147-158
    • Acevedo, J.1    Pistikopoulos, E.N.2
  • 25
    • 0032070763 scopus 로고    scopus 로고
    • A parametric mixed integer optimization algorithm for multi-objective engineering problems involving discrete decisions
    • Papalexandri, K. P.; Dimkou, T. I. A parametric mixed integer optimization algorithm for multi-objective engineering problems involving discrete decisions. Ind. Eng. Chem. Res. 1998, 37, 1866-1882.
    • (1998) Ind. Eng. Chem. Res , vol.37 , pp. 1866-1882
    • Papalexandri, K.P.1    Dimkou, T.I.2
  • 26
    • 0001052070 scopus 로고    scopus 로고
    • Parametric optimization of MILP programs and a framework for the parametric optimization of MINLPs
    • Pertsinidis, A.; Grossmann, I. E.; McRae, G. J. Parametric optimization of MILP programs and a framework for the parametric optimization of MINLPs. Comput. Chem. Eng. 1998, 22, S205-S210.
    • (1998) Comput. Chem. Eng , vol.22
    • Pertsinidis, A.1    Grossmann, I.E.2    McRae, G.J.3
  • 27
    • 0033494781 scopus 로고    scopus 로고
    • Algorithms for the solutions of multiparametric mixed-integer nonlinear optimization problems
    • Dua, V.; Pistikopoulos, E. N. Algorithms for the solutions of multiparametric mixed-integer nonlinear optimization problems. Ind. Eng. Chem. Res. 1999, 38, 3976-3987.
    • (1999) Ind. Eng. Chem. Res , vol.38 , pp. 3976-3987
    • Dua, V.1    Pistikopoulos, E.N.2
  • 28
    • 0036138955 scopus 로고    scopus 로고
    • Hené, T. S.; Dua, V.; Pistikopoulos, E. N. A Hybrid Parametric/Stochastic Programming Approach for Mixed-Integer Nonlinear Problems under Uncertainty. Ind. Eng. Chem. Res. 2001, 41, 66-11.
    • Hené, T. S.; Dua, V.; Pistikopoulos, E. N. A Hybrid Parametric/Stochastic Programming Approach for Mixed-Integer Nonlinear Problems under Uncertainty. Ind. Eng. Chem. Res. 2001, 41, 66-11.
  • 29
    • 0024036354 scopus 로고
    • Optimal retrofit design for improving process flexibility in linear systems
    • Pistikopoulos, E. N.; Grossmann, I. E. Optimal retrofit design for improving process flexibility in linear systems. Comput. Chem. Eng. 1988, 12, 719-731.
    • (1988) Comput. Chem. Eng , vol.12 , pp. 719-731
    • Pistikopoulos, E.N.1    Grossmann, I.E.2
  • 30
    • 1942468138 scopus 로고    scopus 로고
    • A bilevel programming framework for enterprise-wide process networks under uncertainty
    • Ryu, J.; Dua, V.; Pistikopoulos, E. N. A bilevel programming framework for enterprise-wide process networks under uncertainty. Comput. Chem. Eng. 2004, 28, 1121-1129.
    • (2004) Comput. Chem. Eng , vol.28 , pp. 1121-1129
    • Ryu, J.1    Dua, V.2    Pistikopoulos, E.N.3
  • 31
    • 33845605931 scopus 로고    scopus 로고
    • A novel approach to scheduling of zero-wait batch processes under processing time variations
    • Ryu, J.; Pistikopoulos, E. N. A novel approach to scheduling of zero-wait batch processes under processing time variations. Comput. Chem. Eng. 2001, 31, 101-106.
    • (2001) Comput. Chem. Eng , vol.31 , pp. 101-106
    • Ryu, J.1    Pistikopoulos, E.N.2
  • 32
    • 0031384829 scopus 로고    scopus 로고
    • A new completion time algorithm considering an out-of-phase policy in batch processes
    • Ryu, J.; Lee, I. A new completion time algorithm considering an out-of-phase policy in batch processes. Ind. Eng. Chem. Res. 1997, 36, 5321-5328.
    • (1997) Ind. Eng. Chem. Res , vol.36 , pp. 5321-5328
    • Ryu, J.1    Lee, I.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.