-
1
-
-
0031169242
-
A hybrid parametric/stochastic programming approach for mixed-integer linear problems under uncertainty
-
Acevedo J., and Pistikopoulos E.N. A hybrid parametric/stochastic programming approach for mixed-integer linear problems under uncertainty. Industrial and Engineering Chemistry Research 36 6 (1997) 2262-2270
-
(1997)
Industrial and Engineering Chemistry Research
, vol.36
, Issue.6
, pp. 2262-2270
-
-
Acevedo, J.1
Pistikopoulos, E.N.2
-
2
-
-
0031100306
-
A multiparametric programming approach for linear process engineering problems under uncertainty
-
Acevedo J., and Pistikopoulos E.N. A multiparametric programming approach for linear process engineering problems under uncertainty. Industrial and Engineering Chemistry Research 36 3 (1997) 717-728
-
(1997)
Industrial and Engineering Chemistry Research
, vol.36
, Issue.3
, pp. 717-728
-
-
Acevedo, J.1
Pistikopoulos, E.N.2
-
3
-
-
5144232431
-
Executing production schedules in the face of uncertainties: A review and some future directions
-
Aytug H., Lawley M.A., McKay K., Mohan S., and Uzsoy R. Executing production schedules in the face of uncertainties: A review and some future directions. European Journal of Operational Research 161 1 (2005) 86-110
-
(2005)
European Journal of Operational Research
, vol.161
, Issue.1
, pp. 86-110
-
-
Aytug, H.1
Lawley, M.A.2
McKay, K.3
Mohan, S.4
Uzsoy, R.5
-
4
-
-
0037081993
-
A novel branch and bound algorithm for scheduling flowshop plants with uncertain processing times
-
Balasubramanian J., and Grossmann I.E. A novel branch and bound algorithm for scheduling flowshop plants with uncertain processing times. Computers and Chemical Engineering 26 1 (2002) 41-57
-
(2002)
Computers and Chemical Engineering
, vol.26
, Issue.1
, pp. 41-57
-
-
Balasubramanian, J.1
Grossmann, I.E.2
-
5
-
-
0037445865
-
Scheduling optimization under uncertainty-an alternative approach
-
Balasubramanian J., and Grossmann I.E. Scheduling optimization under uncertainty-an alternative approach. Computers and Chemical Engineering 27 4 (2003) 469-490
-
(2003)
Computers and Chemical Engineering
, vol.27
, Issue.4
, pp. 469-490
-
-
Balasubramanian, J.1
Grossmann, I.E.2
-
6
-
-
3042702298
-
Approximation to multistage stochastic optimization in multiperiod batch plant scheduling under demand uncertainty
-
Balasubramanian J., and Grossmann I.E. Approximation to multistage stochastic optimization in multiperiod batch plant scheduling under demand uncertainty. Industrial and Engineering Chemistry Research 43 14 (2004) 3695-3713
-
(2004)
Industrial and Engineering Chemistry Research
, vol.43
, Issue.14
, pp. 3695-3713
-
-
Balasubramanian, J.1
Grossmann, I.E.2
-
7
-
-
0030417871
-
Decomposition techniques for the solution of large-scale scheduling problems
-
Bassett M.H., Pekny J.F., and Reklaitis G.V. Decomposition techniques for the solution of large-scale scheduling problems. AIChE Journal 42 12 (1996) 3373-3387
-
(1996)
AIChE Journal
, vol.42
, Issue.12
, pp. 3373-3387
-
-
Bassett, M.H.1
Pekny, J.F.2
Reklaitis, G.V.3
-
8
-
-
0031146289
-
Using detailed scheduling to obtain realistic operating policies for a batch processing facility
-
Bassett M.H., Pekny J.F., and Reklaitis J.F. Using detailed scheduling to obtain realistic operating policies for a batch processing facility. Industrial and Engineering Chemistry Research 36 5 (1997) 1717-1726
-
(1997)
Industrial and Engineering Chemistry Research
, vol.36
, Issue.5
, pp. 1717-1726
-
-
Bassett, M.H.1
Pekny, J.F.2
Reklaitis, J.F.3
-
10
-
-
84870613023
-
Robust discrete optimization and network flows
-
Bertsimas D., and Sim M. Robust discrete optimization and network flows. Mathematical Programming 98 (2003) 49-71
-
(2003)
Mathematical Programming
, vol.98
, pp. 49-71
-
-
Bertsimas, D.1
Sim, M.2
-
11
-
-
0025416591
-
Simultaneous production planning and scheduling in multiproduct batch plants
-
Birewar D.B., and Grossmann I.E. Simultaneous production planning and scheduling in multiproduct batch plants. Industrial and Engineering Chemistry Research 29 4 (1990) 570-580
-
(1990)
Industrial and Engineering Chemistry Research
, vol.29
, Issue.4
, pp. 570-580
-
-
Birewar, D.B.1
Grossmann, I.E.2
-
12
-
-
1642498232
-
Risk management in the scheduling of batch plants under uncertain market demand
-
Bonfill A., Bagajewicz M., Espuña A., and Puigjaner L. Risk management in the scheduling of batch plants under uncertain market demand. Industrial and Engineering Chemistry Research 43 3 (2004) 741-750
-
(2004)
Industrial and Engineering Chemistry Research
, vol.43
, Issue.3
, pp. 741-750
-
-
Bonfill, A.1
Bagajewicz, M.2
Espuña, A.3
Puigjaner, L.4
-
13
-
-
14344251891
-
Addressing robustness in scheduling batch processes with uncertain operation times
-
Bonfill A., Espuna A., and Puigjaner L. Addressing robustness in scheduling batch processes with uncertain operation times. Industrial and Engineering Chemistry Research 44 5 (2005) 1524-1534
-
(2005)
Industrial and Engineering Chemistry Research
, vol.44
, Issue.5
, pp. 1524-1534
-
-
Bonfill, A.1
Espuna, A.2
Puigjaner, L.3
-
14
-
-
0000522889
-
Analysis of periodic and event-driven rescheduling policies in dynamic shops
-
Churh L., and Uzsoy R. Analysis of periodic and event-driven rescheduling policies in dynamic shops. Internetional Computer Integrated Manufacturing 5 (1992) 153-163
-
(1992)
Internetional Computer Integrated Manufacturing
, vol.5
, pp. 153-163
-
-
Churh, L.1
Uzsoy, R.2
-
15
-
-
0001499525
-
Minimizing the effects of batch process variability using online schedule modification
-
Cott B.J., and Macchietto S. Minimizing the effects of batch process variability using online schedule modification. Computers and Chemical Engineering 13 (1989) 105-113
-
(1989)
Computers and Chemical Engineering
, vol.13
, pp. 105-113
-
-
Cott, B.J.1
Macchietto, S.2
-
16
-
-
0029254356
-
Robust scheduling to hedge against processing time uncertainty in single-stage production
-
Daniels R.L., and Kouvelis P. Robust scheduling to hedge against processing time uncertainty in single-stage production. Management Science 41 (1995) 363-376
-
(1995)
Management Science
, vol.41
, pp. 363-376
-
-
Daniels, R.L.1
Kouvelis, P.2
-
17
-
-
4143089013
-
An outer-approximation algorithm for the solution of multiparametric MINLP problems
-
Dua V., and Pistikopoulos E.N. An outer-approximation algorithm for the solution of multiparametric MINLP problems. Computers and Chemical Engineering 22 (1998) S955-S958
-
(1998)
Computers and Chemical Engineering
, vol.22
-
-
Dua, V.1
Pistikopoulos, E.N.2
-
18
-
-
0033494781
-
Algorithms for the solution of multiparametric mixed-integer nonlinear optimization problems
-
Dua V., and Pistikopoulos E.N. Algorithms for the solution of multiparametric mixed-integer nonlinear optimization problems. Industrial and Engineering Chemistry Research 38 (1999) 3976-3987
-
(1999)
Industrial and Engineering Chemistry Research
, vol.38
, pp. 3976-3987
-
-
Dua, V.1
Pistikopoulos, E.N.2
-
21
-
-
0033131859
-
A modeling and an algorithmic framework for oil supply, transformation and distribution optimization under uncertainty
-
Escudero L., Quintana F.J., and Salmeron J. A modeling and an algorithmic framework for oil supply, transformation and distribution optimization under uncertainty. European Journal of Operational Research 114 (1999) 638-656
-
(1999)
European Journal of Operational Research
, vol.114
, pp. 638-656
-
-
Escudero, L.1
Quintana, F.J.2
Salmeron, J.3
-
23
-
-
2442583184
-
Continuous-time versus discrete-time approaches for scheduling of chemical processes: A review
-
Floudas C.A., and Lin X. Continuous-time versus discrete-time approaches for scheduling of chemical processes: A review. Computers and Chemical Engineering 28 (2004) 2109-2129
-
(2004)
Computers and Chemical Engineering
, vol.28
, pp. 2109-2129
-
-
Floudas, C.A.1
Lin, X.2
-
24
-
-
2342539060
-
A stochastic programming approach to planning of offshore gas field developments under uncertainty in reserves
-
Goel V., and Grossmann I.E. A stochastic programming approach to planning of offshore gas field developments under uncertainty in reserves. Computers and Chemical Engineering 28 (2004) 1409-1429
-
(2004)
Computers and Chemical Engineering
, vol.28
, pp. 1409-1429
-
-
Goel, V.1
Grossmann, I.E.2
-
25
-
-
0348231896
-
Sensitivity analysis of tree scheduling on two machines with communication delays
-
Guinand F., Moukrim A., and Sanlaville E. Sensitivity analysis of tree scheduling on two machines with communication delays. Parallel Computing 30 1 (2004) 103-120
-
(2004)
Parallel Computing
, vol.30
, Issue.1
, pp. 103-120
-
-
Guinand, F.1
Moukrim, A.2
Sanlaville, E.3
-
26
-
-
3543072290
-
Sensitivity analysis for scheduling problems
-
Hall N.G., and Posner M.E. Sensitivity analysis for scheduling problems. Journal of Scheduling 7 1 (2004) 49-83
-
(2004)
Journal of Scheduling
, vol.7
, Issue.1
, pp. 49-83
-
-
Hall, N.G.1
Posner, M.E.2
-
27
-
-
0036138955
-
A hybrid parametric/stochastic programming approach for mixed- integer nonlinear problems under uncertainty
-
Hene T.S., Dua V., and Pistikopoulos E.N. A hybrid parametric/stochastic programming approach for mixed- integer nonlinear problems under uncertainty. Industrial and Engineering Chemistry Research 41 (2002) 67-77
-
(2002)
Industrial and Engineering Chemistry Research
, vol.41
, pp. 67-77
-
-
Hene, T.S.1
Dua, V.2
Pistikopoulos, E.N.3
-
29
-
-
0029224646
-
Incorporating on-line scheduling strategies in integrated batch production control
-
Huercio A., Espuna A., and Puigjaner L. Incorporating on-line scheduling strategies in integrated batch production control. Computers and Chemical Engineering 19 (1995) S609-S615
-
(1995)
Computers and Chemical Engineering
, vol.19
-
-
Huercio, A.1
Espuna, A.2
Puigjaner, L.3
-
30
-
-
0032216021
-
Effective continuous-time formulation for short-term scheduling. I. Multipurpose batch processes
-
Ierapetritou M.G., and Floudas C.A. Effective continuous-time formulation for short-term scheduling. I. Multipurpose batch processes. Industrial and Engineering Chemistry Research 37 11 (1998) 4341-4359
-
(1998)
Industrial and Engineering Chemistry Research
, vol.37
, Issue.11
, pp. 4341-4359
-
-
Ierapetritou, M.G.1
Floudas, C.A.2
-
31
-
-
0032216046
-
Effective continuous-time formulation for short-term scheduling. II. Multipurpose/multiproduct continuous processes
-
Ierapetritou M.G., and Floudas C.A. Effective continuous-time formulation for short-term scheduling. II. Multipurpose/multiproduct continuous processes. Industrial and Engineering Chemistry Research 37 11 (1998) 4360-4374
-
(1998)
Industrial and Engineering Chemistry Research
, vol.37
, Issue.11
, pp. 4360-4374
-
-
Ierapetritou, M.G.1
Floudas, C.A.2
-
32
-
-
0003346032
-
Global optimization for stochastic planning, scheduling and design problems
-
Grossmann I.E. (Ed), Kluwer Academic Publishers
-
Ierapetritou M.G., and Pistikopoulos E.N. Global optimization for stochastic planning, scheduling and design problems. In: Grossmann I.E. (Ed). Global optimization in engineering design (1996), Kluwer Academic Publishers 231-287
-
(1996)
Global optimization in engineering design
, pp. 231-287
-
-
Ierapetritou, M.G.1
Pistikopoulos, E.N.2
-
33
-
-
33846071077
-
Production scheduling of a large-scale industrial batch plant. II. Reactive scheduling
-
Janak S.L., and Floudas C.A. Production scheduling of a large-scale industrial batch plant. II. Reactive scheduling. Industrial and Engineering Chemistry Research 45 25 (2006) 8253-8269
-
(2006)
Industrial and Engineering Chemistry Research
, vol.45
, Issue.25
, pp. 8253-8269
-
-
Janak, S.L.1
Floudas, C.A.2
-
34
-
-
33845624253
-
A new robust optimization approach for scheduling under uncertainty. II. Uncertainty with known probability distribution
-
Janak S.L., Lin X., and Floudas C.A. A new robust optimization approach for scheduling under uncertainty. II. Uncertainty with known probability distribution. Computers and Chemical Engineering 31 (2007) 171-195
-
(2007)
Computers and Chemical Engineering
, vol.31
, pp. 171-195
-
-
Janak, S.L.1
Lin, X.2
Floudas, C.A.3
-
36
-
-
33846267725
-
Generate pareto optimal solutions of scheduling problems using normal boundary intersection technique
-
Jia Z., and Ierapetritou M.G. Generate pareto optimal solutions of scheduling problems using normal boundary intersection technique. Computers and Chemical Engineering 31 (2006) 268-280
-
(2006)
Computers and Chemical Engineering
, vol.31
, pp. 268-280
-
-
Jia, Z.1
Ierapetritou, M.G.2
-
37
-
-
33745739750
-
Uncertainty analysis on the right-hand-side for MILP problems
-
Jia Z., and Ierapetritou M.G. Uncertainty analysis on the right-hand-side for MILP problems. AIChE Journal 52 (2006) 2486-2495
-
(2006)
AIChE Journal
, vol.52
, pp. 2486-2495
-
-
Jia, Z.1
Ierapetritou, M.G.2
-
39
-
-
38849151403
-
-
Karabuk, S., & Sabuncuoglu, I. (1997). Rescheduling frequency in an FMS with uncertain processing times and unreliable machines. Research Report: IEOR-9704.
-
Karabuk, S., & Sabuncuoglu, I. (1997). Rescheduling frequency in an FMS with uncertain processing times and unreliable machines. Research Report: IEOR-9704.
-
-
-
-
40
-
-
0027545176
-
A general algorithm for short-term scheduling of batch operations. I. MILP formulation
-
Kondili E., Pantelides C.C., and Sargent R.W.H. A general algorithm for short-term scheduling of batch operations. I. MILP formulation. Computers and Chemical Engineering 17 (1993) 211-227
-
(1993)
Computers and Chemical Engineering
, vol.17
, pp. 211-227
-
-
Kondili, E.1
Pantelides, C.C.2
Sargent, R.W.H.3
-
41
-
-
0032208369
-
Applying robust optimization to capacity expansion of one location in telecommunications with demand uncertainty
-
Laguna M. Applying robust optimization to capacity expansion of one location in telecommunications with demand uncertainty. Management Science 44 (1998) S101-S110
-
(1998)
Management Science
, vol.44
-
-
Laguna, M.1
-
42
-
-
1942532282
-
A new robust optimization approach for scheduling under uncertainty. I. Bounded uncertainty
-
Lin X., Janak S.L., and Floudas C.A. A new robust optimization approach for scheduling under uncertainty. I. Bounded uncertainty. Computers and Chemical Engineering 28 (2004) 1069-1085
-
(2004)
Computers and Chemical Engineering
, vol.28
, pp. 1069-1085
-
-
Lin, X.1
Janak, S.L.2
Floudas, C.A.3
-
44
-
-
1942500440
-
An MILP framework for batch reactive scheduling with limited discrete resources
-
Méndez C.A., and Cerdá J. An MILP framework for batch reactive scheduling with limited discrete resources. Computers and Chemical Engineering 28 (2004) 1059-1068
-
(2004)
Computers and Chemical Engineering
, vol.28
, pp. 1059-1068
-
-
Méndez, C.A.1
Cerdá, J.2
-
45
-
-
33748102266
-
State-of-the-art review of optimization methods for short-term scheduling of batch processes
-
Méndez C.A., Cerdá J., Grossmann I.E., Harjunkoski I., and Fahl M. State-of-the-art review of optimization methods for short-term scheduling of batch processes. Computers and Chemical Engineering 30 6/7 (2006) 913-946
-
(2006)
Computers and Chemical Engineering
, vol.30
, Issue.6-7
, pp. 913-946
-
-
Méndez, C.A.1
Cerdá, J.2
Grossmann, I.E.3
Harjunkoski, I.4
Fahl, M.5
-
50
-
-
0031271861
-
Multiperiod planning and scheduling of multiproduct batch plants under demand uncertainty
-
Petkov S.B., and Maranas C.D. Multiperiod planning and scheduling of multiproduct batch plants under demand uncertainty. Industrial and Engineering Chemistry Research 36 11 (1997) 4864-4881
-
(1997)
Industrial and Engineering Chemistry Research
, vol.36
, Issue.11
, pp. 4864-4881
-
-
Petkov, S.B.1
Maranas, C.D.2
-
51
-
-
33746054949
-
A fuzzy logic based production scheduling/rescheduling in the presence of uncertain disruptions
-
Petrovic D., and Duenas A. A fuzzy logic based production scheduling/rescheduling in the presence of uncertain disruptions. Fuzzy Sets and Systems 157 (2006) 2273-2285
-
(2006)
Fuzzy Sets and Systems
, vol.157
, pp. 2273-2285
-
-
Petrovic, D.1
Duenas, A.2
-
54
-
-
0035339890
-
An MILP-based reordering algorithm for complex industrial scheduling and rescheduling
-
Roslöf J., Harjunkoski I., Bjorkqvist J., Karlsson S., and Westerlund T. An MILP-based reordering algorithm for complex industrial scheduling and rescheduling. Computers and Chemical Engineering 25 (2001) 821-828
-
(2001)
Computers and Chemical Engineering
, vol.25
, pp. 821-828
-
-
Roslöf, J.1
Harjunkoski, I.2
Bjorkqvist, J.3
Karlsson, S.4
Westerlund, T.5
-
55
-
-
0035339891
-
On-line fault diagnosis system support for reactive scheduling in multipurpose batch chemical plants
-
Ruiz D., Cantón J., Mara N.J., Espuna A., and Puigjaner L. On-line fault diagnosis system support for reactive scheduling in multipurpose batch chemical plants. Computers and Chemical Engineering 25 (2001) 829-837
-
(2001)
Computers and Chemical Engineering
, vol.25
, pp. 829-837
-
-
Ruiz, D.1
Cantón, J.2
Mara, N.J.3
Espuna, A.4
Puigjaner, L.5
-
56
-
-
1942468138
-
A bilevel programming framework for enterprise-wide process networks under uncertainty
-
Ryu J.-H., Dua V., and Pistikopoulos E.N. A bilevel programming framework for enterprise-wide process networks under uncertainty. Computers and Chemical Engineering 28 6/7 (2004) 1121-1129
-
(2004)
Computers and Chemical Engineering
, vol.28
, Issue.6-7
, pp. 1121-1129
-
-
Ryu, J.-H.1
Dua, V.2
Pistikopoulos, E.N.3
-
57
-
-
38849132674
-
-
Sabuncuoglu, I. & Bayiz, M. (1998). Analysis of reactive scheduling problems in a job shop environment. Research Report: IEOR-9826.
-
Sabuncuoglu, I. & Bayiz, M. (1998). Analysis of reactive scheduling problems in a job shop environment. Research Report: IEOR-9826.
-
-
-
-
59
-
-
0031193217
-
Batch production and preventive maintenance scheduling under equipment failure uncertainty
-
Sanmartí E., Espuña A., and Puigjaner L. Batch production and preventive maintenance scheduling under equipment failure uncertainty. Computers and Chemical Engineering 21 10 (1997) 1157-1168
-
(1997)
Computers and Chemical Engineering
, vol.21
, Issue.10
, pp. 1157-1168
-
-
Sanmartí, E.1
Espuña, A.2
Puigjaner, L.3
-
60
-
-
0029723654
-
A combined scheduling/reactive scheduling strategy to minimize the effect of process operations uncertainty in batch plants
-
Sanmarti E., Huercio A., Espuña A., and Puigjaner L. A combined scheduling/reactive scheduling strategy to minimize the effect of process operations uncertainty in batch plants. Computers and Chemical Engineering 20 (1996) 1263-1268
-
(1996)
Computers and Chemical Engineering
, vol.20
, pp. 1263-1268
-
-
Sanmarti, E.1
Huercio, A.2
Espuña, A.3
Puigjaner, L.4
-
61
-
-
0010680207
-
Convex programming with set-inclusive constraints and applications to inexact linear programming
-
Soyster A.L. Convex programming with set-inclusive constraints and applications to inexact linear programming. Operations Research 21 (1973) 1154-1157
-
(1973)
Operations Research
, vol.21
, pp. 1154-1157
-
-
Soyster, A.L.1
-
62
-
-
0034661239
-
A simulation-optimization framework for addressing combinatorial and stochastic aspects of an R&D pipeline management problem
-
Subramanian D., Pekny J.F., and Reklaitis G.V. A simulation-optimization framework for addressing combinatorial and stochastic aspects of an R&D pipeline management problem. Computers and Chemical Engineering 24 (2000) 1005-1011
-
(2000)
Computers and Chemical Engineering
, vol.24
, pp. 1005-1011
-
-
Subramanian, D.1
Pekny, J.F.2
Reklaitis, G.V.3
-
63
-
-
0041974673
-
A problem expanding parametric programming method for solving the job shop scheduling problem
-
Thompson G.L., and Zawack D.J. A problem expanding parametric programming method for solving the job shop scheduling problem. Annals of Operations Research 4 1 (1985) 327-342
-
(1985)
Annals of Operations Research
, vol.4
, Issue.1
, pp. 327-342
-
-
Thompson, G.L.1
Zawack, D.J.2
-
65
-
-
0035904351
-
Robust short-term scheduling of multiproduct batch plants under demand uncertainty
-
Vin J.P., and Ierapetritou M.G. Robust short-term scheduling of multiproduct batch plants under demand uncertainty. Industrial and Engineering Chemistry Research 40 (2001) 4543-4554
-
(2001)
Industrial and Engineering Chemistry Research
, vol.40
, pp. 4543-4554
-
-
Vin, J.P.1
Ierapetritou, M.G.2
-
66
-
-
0141859879
-
A fuzzy robust scheduling approach for product development projects
-
Wang J. A fuzzy robust scheduling approach for product development projects. European Journal of Operational Research 152 1 (2004) 180-194
-
(2004)
European Journal of Operational Research
, vol.152
, Issue.1
, pp. 180-194
-
-
Wang, J.1
-
67
-
-
38849152689
-
-
Wu, D. (2005). Unified Frameworks for the Optimal Production Planning and Scheduling Chemical and Biochemical Department, Rutgers University. PhD Thesis.
-
Wu, D. (2005). Unified Frameworks for the Optimal Production Planning and Scheduling Chemical and Biochemical Department, Rutgers University. PhD Thesis.
-
-
-
-
68
-
-
0033881526
-
A robust optimization model for stochastic logistic problems
-
Yu C., and Li H. A robust optimization model for stochastic logistic problems. International Journal of Production Economics 64 (2000) 385-397
-
(2000)
International Journal of Production Economics
, vol.64
, pp. 385-397
-
-
Yu, C.1
Li, H.2
|