메뉴 건너뛰기




Volumn 94, Issue , 2016, Pages 312-330

On deterministic online scheduling: Major considerations, paradoxes and remedies

Author keywords

Chemical production scheduling; Closed loop solution; Mixed integer programming; Rescheduling

Indexed keywords

OPTIMIZATION; PRODUCTION CONTROL; SCHEDULING;

EID: 84984982147     PISSN: 00981354     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.compchemeng.2016.08.006     Document Type: Article
Times cited : (61)

References (62)
  • 1
    • 3042702298 scopus 로고    scopus 로고
    • Approximation to multistage stochastic optimization in multiperiod batch plant scheduling under demand uncertainty
    • Balasubramanian, J., Grossmann, I., Approximation to multistage stochastic optimization in multiperiod batch plant scheduling under demand uncertainty. Ind. Eng. Chem. Res. 43:14 (2004), 3695–3713.
    • (2004) Ind. Eng. Chem. Res. , vol.43 , Issue.14 , pp. 3695-3713
    • Balasubramanian, J.1    Grossmann, I.2
  • 2
    • 0037445865 scopus 로고    scopus 로고
    • Scheduling optimization under uncertainty – an alternative approach
    • Balasubramanian, J., Grossmann, I.E., Scheduling optimization under uncertainty – an alternative approach. Comput. Chem. Eng. 27:4 (2003), 469–490.
    • (2003) Comput. Chem. Eng. , vol.27 , Issue.4 , pp. 469-490
    • Balasubramanian, J.1    Grossmann, I.E.2
  • 3
    • 0030417871 scopus 로고    scopus 로고
    • Decomposition techniques for the solution of large-scale scheduling problems
    • Bassett, M.H., Pekny, J.F., Reklaitis, G.V., Decomposition techniques for the solution of large-scale scheduling problems. AIChE J. 42:12 (1996), 3373–3387.
    • (1996) AIChE J. , vol.42 , Issue.12 , pp. 3373-3387
    • Bassett, M.H.1    Pekny, J.F.2    Reklaitis, G.V.3
  • 4
    • 0031146289 scopus 로고    scopus 로고
    • Using detailed scheduling to obtain realistic operating policies for a batch processing facility
    • Bassett, M.H., Pekny, J.F., Reklaitis, G.V., Using detailed scheduling to obtain realistic operating policies for a batch processing facility. Ind. Eng. Chem. Res. 36:5 (1997), 1717–1726.
    • (1997) Ind. Eng. Chem. Res. , vol.36 , Issue.5 , pp. 1717-1726
    • Bassett, M.H.1    Pekny, J.F.2    Reklaitis, G.V.3
  • 5
    • 1642498232 scopus 로고    scopus 로고
    • Risk management in the scheduling of batch plants under uncertain market demand
    • Bonfill, A., Bagajewicz, M., Espuña, A., Puigjaner, L., Risk management in the scheduling of batch plants under uncertain market demand. Ind. Eng. Chem. Res. 43:3 (2004), 741–750.
    • (2004) Ind. Eng. Chem. Res. , vol.43 , Issue.3 , pp. 741-750
    • Bonfill, A.1    Bagajewicz, M.2    Espuña, A.3    Puigjaner, L.4
  • 6
    • 14344251891 scopus 로고    scopus 로고
    • Addressing robustness in scheduling batch processes with uncertain operation times
    • Bonfill, A., Espuña, A., Puigjaner, L., Addressing robustness in scheduling batch processes with uncertain operation times. Ind. Eng. Chem. Res. 44:5 (2005), 1524–1534.
    • (2005) Ind. Eng. Chem. Res. , vol.44 , Issue.5 , pp. 1524-1534
    • Bonfill, A.1    Espuña, A.2    Puigjaner, L.3
  • 7
    • 0001499525 scopus 로고
    • Minimizing the effects of batch process variability using online schedule modification
    • Cott, B., Macchietto, S., Minimizing the effects of batch process variability using online schedule modification. Comput. Chem. Eng. 13:1 (1989), 105–113.
    • (1989) Comput. Chem. Eng. , vol.13 , Issue.1 , pp. 105-113
    • Cott, B.1    Macchietto, S.2
  • 8
    • 77950368077 scopus 로고    scopus 로고
    • Medium-term planning of a multiproduct batch plant under evolving multi-period multi-uncertainty by means of a moving horizon strategy
    • Cui, J., Engell, S., Medium-term planning of a multiproduct batch plant under evolving multi-period multi-uncertainty by means of a moving horizon strategy. Comput. Chem. Eng. 34:5 (2010), 598–619.
    • (2010) Comput. Chem. Eng. , vol.34 , Issue.5 , pp. 598-619
    • Cui, J.1    Engell, S.2
  • 9
    • 84985026441 scopus 로고    scopus 로고
    • GDXMRW-Interfacing GAMS and MATLAB, GAMS Documentation/Tools/Data Exchange
    • (accessed 08.02.16)
    • Dirkse, S., Ferris, M.C., Ramakrishnan, J., GDXMRW-Interfacing GAMS and MATLAB, GAMS Documentation/Tools/Data Exchange. 2014 http://www.gams.com/help/ (accessed 08.02.16).
    • (2014)
    • Dirkse, S.1    Ferris, M.C.2    Ramakrishnan, J.3
  • 10
    • 84929409676 scopus 로고    scopus 로고
    • A time scale-bridging approach for integrating production scheduling and process control
    • Du, J., Park, J., Harjunkoski, I., Baldea, M., A time scale-bridging approach for integrating production scheduling and process control. Comput. Chem. Eng. 79 (2015), 59–69.
    • (2015) Comput. Chem. Eng. , vol.79 , pp. 59-69
    • Du, J.1    Park, J.2    Harjunkoski, I.3    Baldea, M.4
  • 12
    • 0033135294 scopus 로고    scopus 로고
    • A framework for schedule evaluation with processing uncertainty
    • Honkomp, S., Mockus, L., Reklaitis, G., A framework for schedule evaluation with processing uncertainty. Comput. Chem. Eng. 23:4 (1999), 595–609.
    • (1999) Comput. Chem. Eng. , vol.23 , Issue.4 , pp. 595-609
    • Honkomp, S.1    Mockus, L.2    Reklaitis, G.3
  • 13
    • 84985016155 scopus 로고    scopus 로고
    • Department of Computer Sciences
    • University of Wisconsin-Madison (accessed 08.02.16)
    • HTCondor 8.5.0, Department of Computer Sciences. 2015, University of Wisconsin-Madison https://research.cs.wisc.edu/htcondor/ (accessed 08.02.16).
    • (2015)
    • HTCondor 8.5.01
  • 14
    • 0029224646 scopus 로고
    • Incorporating on-line scheduling strategies in integrated batch production control
    • Huercio, A., Espuna, A., Puigjaner, L., Incorporating on-line scheduling strategies in integrated batch production control. Comput. Chem. Eng. 19 (1995), 609–614.
    • (1995) Comput. Chem. Eng. , vol.19 , pp. 609-614
    • Huercio, A.1    Espuna, A.2    Puigjaner, L.3
  • 15
    • 33846071077 scopus 로고    scopus 로고
    • Production scheduling of a large-scale industrial batch plant. II. Reactive scheduling
    • Janak, S.L., Floudas, C.A., Kallrath, J., Vormbrock, N., Production scheduling of a large-scale industrial batch plant. II. Reactive scheduling. Ind. Eng. Chem. Res. 45:25 (2006), 8253–8269.
    • (2006) Ind. Eng. Chem. Res. , vol.45 , Issue.25 , pp. 8253-8269
    • Janak, S.L.1    Floudas, C.A.2    Kallrath, J.3    Vormbrock, N.4
  • 16
    • 33845624253 scopus 로고    scopus 로고
    • A new robust optimization approach for scheduling under uncertainty: II. Uncertainty with known probability distribution
    • Janak, S.L., Lin, X., Floudas, C.A., A new robust optimization approach for scheduling under uncertainty: II. Uncertainty with known probability distribution. Comput. Chem. Eng. 31:3 (2007), 171–195.
    • (2007) Comput. Chem. Eng. , vol.31 , Issue.3 , pp. 171-195
    • Janak, S.L.1    Lin, X.2    Floudas, C.A.3
  • 18
    • 0034333693 scopus 로고    scopus 로고
    • New lot-sizing formulations for less nervous production schedules
    • Kazan, O., Nagi, R., Rump, C.M., New lot-sizing formulations for less nervous production schedules. Comput. Oper. Res. 27:13 (2000), 1325–1345.
    • (2000) Comput. Oper. Res. , vol.27 , Issue.13 , pp. 1325-1345
    • Kazan, O.1    Nagi, R.2    Rump, C.M.3
  • 19
    • 0037803568 scopus 로고    scopus 로고
    • Crude oil blend scheduling optimization: an application with multimillion dollar benefits – Part 1: Process/plant optimization
    • Kelly, J., Mann, J., Crude oil blend scheduling optimization: an application with multimillion dollar benefits – Part 1: Process/plant optimization. Hydrocarb. Process. 82:6 (2003), 47–53.
    • (2003) Hydrocarb. Process. , vol.82 , Issue.6 , pp. 47-53
    • Kelly, J.1    Mann, J.2
  • 20
    • 0041346170 scopus 로고    scopus 로고
    • Crude oil blend scheduling optimization: an application with multimillion dollar benefits. Part 2
    • Kelly, J., Mann, J., Crude oil blend scheduling optimization: an application with multimillion dollar benefits. Part 2. Hydrocarb. Process. 82:7 (2003), 72–79.
    • (2003) Hydrocarb. Process. , vol.82 , Issue.7 , pp. 72-79
    • Kelly, J.1    Mann, J.2
  • 21
    • 50549101227 scopus 로고    scopus 로고
    • Hierarchical decomposition heuristic for scheduling: coordinated reasoning for decentralized and distributed decision-making problems
    • Kelly, J.D., Zyngier, D., Hierarchical decomposition heuristic for scheduling: coordinated reasoning for decentralized and distributed decision-making problems. Comput. Chem. Eng. 32:11 (2008), 2684–2705.
    • (2008) Comput. Chem. Eng. , vol.32 , Issue.11 , pp. 2684-2705
    • Kelly, J.D.1    Zyngier, D.2
  • 22
    • 0027545176 scopus 로고
    • A general algorithm for short-term scheduling of batch operations-I. MILP formulation
    • Kondili, E., Pantelides, C., Sargent, R., A general algorithm for short-term scheduling of batch operations-I. MILP formulation. Comput. Chem. Eng. 17:2 (1993), 211–227.
    • (1993) Comput. Chem. Eng. , vol.17 , Issue.2 , pp. 211-227
    • Kondili, E.1    Pantelides, C.2    Sargent, R.3
  • 23
    • 57249089354 scopus 로고    scopus 로고
    • Costs for rescheduling actions: a critical issue for reducing the gap between scheduling theory and practice
    • Kopanos, G.M., Capon-Garcia, E., Espuna, A., Puigjaner, L., Costs for rescheduling actions: a critical issue for reducing the gap between scheduling theory and practice. Ind. Eng. Chem. Res. 47:22 (2008), 8785–8795.
    • (2008) Ind. Eng. Chem. Res. , vol.47 , Issue.22 , pp. 8785-8795
    • Kopanos, G.M.1    Capon-Garcia, E.2    Espuna, A.3    Puigjaner, L.4
  • 24
    • 84896531795 scopus 로고    scopus 로고
    • Reactive scheduling by a multiparametric programming rolling horizon framework: a case of a network of combined heat and power units
    • Kopanos, G.M., Pistikopoulos, E.N., Reactive scheduling by a multiparametric programming rolling horizon framework: a case of a network of combined heat and power units. Ind. Eng. Chem. Res. 53:11 (2014), 4366–4386.
    • (2014) Ind. Eng. Chem. Res. , vol.53 , Issue.11 , pp. 4366-4386
    • Kopanos, G.M.1    Pistikopoulos, E.N.2
  • 25
    • 38849148294 scopus 로고    scopus 로고
    • Process scheduling under uncertainty: review and challenges
    • Li, Z., Ierapetritou, M., Process scheduling under uncertainty: review and challenges. Comput. Chem. Eng. 32:4 (2008), 715–727.
    • (2008) Comput. Chem. Eng. , vol.32 , Issue.4 , pp. 715-727
    • Li, Z.1    Ierapetritou, M.2
  • 26
    • 54949139556 scopus 로고    scopus 로고
    • Reactive scheduling using parametric programming
    • Li, Z., Ierapetritou, M.G., Reactive scheduling using parametric programming. AIChE J. 54:10 (2008), 2610–2623.
    • (2008) AIChE J. , vol.54 , Issue.10 , pp. 2610-2623
    • Li, Z.1    Ierapetritou, M.G.2
  • 27
    • 1942532282 scopus 로고    scopus 로고
    • A new robust optimization approach for scheduling under uncertainty: I. Bounded uncertainty
    • Lin, X., Janak, S.L., Floudas, C.A., A new robust optimization approach for scheduling under uncertainty: I. Bounded uncertainty. Comput. Chem. Eng. 28:6 (2004), 1069–1085.
    • (2004) Comput. Chem. Eng. , vol.28 , Issue.6 , pp. 1069-1085
    • Lin, X.1    Janak, S.L.2    Floudas, C.A.3
  • 29
    • 84860610233 scopus 로고    scopus 로고
    • General framework and modeling approach classification for chemical production scheduling
    • Maravelias, C.T., General framework and modeling approach classification for chemical production scheduling. AIChE J. 58:6 (2012), 1812–1828.
    • (2012) AIChE J. , vol.58 , Issue.6 , pp. 1812-1828
    • Maravelias, C.T.1
  • 30
    • 0042807254 scopus 로고    scopus 로고
    • Dynamic scheduling in multiproduct batch plants
    • Méndez, C.A., Cerdá, J., Dynamic scheduling in multiproduct batch plants. Comput. Chem. Eng. 27:8 (2003), 1247–1259.
    • (2003) Comput. Chem. Eng. , vol.27 , Issue.8 , pp. 1247-1259
    • Méndez, C.A.1    Cerdá, J.2
  • 31
    • 33748102266 scopus 로고    scopus 로고
    • State-of-the-art review of optimization methods for short-term scheduling of batch processes
    • Méndez, C.A., Cerdá, J., Grossmann, I.E., Harjunkoski, I., Fahl, M., State-of-the-art review of optimization methods for short-term scheduling of batch processes. Comput. Chem. Eng. 30:6 (2006), 913–946.
    • (2006) Comput. Chem. Eng. , vol.30 , Issue.6 , pp. 913-946
    • Méndez, C.A.1    Cerdá, J.2    Grossmann, I.E.3    Harjunkoski, I.4    Fahl, M.5
  • 32
    • 84945412727 scopus 로고    scopus 로고
    • Preprocessing and tightening methods for time-indexed MIP chemical production scheduling models
    • Merchan, A.F., Maravelias, C.T., Preprocessing and tightening methods for time-indexed MIP chemical production scheduling models. Comput. Chem. Eng. 84 (2016), 516–535.
    • (2016) Comput. Chem. Eng. , vol.84 , pp. 516-535
    • Merchan, A.F.1    Maravelias, C.T.2
  • 33
    • 20344400593 scopus 로고    scopus 로고
    • A multilevel, control-theoretic framework for integration of planning, scheduling, and rescheduling
    • Munawar, S., Gudi, R., A multilevel, control-theoretic framework for integration of planning, scheduling, and rescheduling. Ind. Eng. Chem. Res. 44:11 (2005), 4001–4021.
    • (2005) Ind. Eng. Chem. Res. , vol.44 , Issue.11 , pp. 4001-4021
    • Munawar, S.1    Gudi, R.2
  • 34
    • 84910071771 scopus 로고    scopus 로고
    • Extended discrete–time resource task network formulation for the reactive scheduling of a mixed batch/continuous process
    • Nie, Y., Biegler, L.T., Wassick, J.M., Villa, C.M., Extended discrete–time resource task network formulation for the reactive scheduling of a mixed batch/continuous process. Ind. Eng. Chem. Res. 53:44 (2014), 17112–17123.
    • (2014) Ind. Eng. Chem. Res. , vol.53 , Issue.44 , pp. 17112-17123
    • Nie, Y.1    Biegler, L.T.2    Wassick, J.M.3    Villa, C.M.4
  • 35
    • 77957922318 scopus 로고    scopus 로고
    • Reactive scheduling framework based on domain knowledge and constraint programming
    • Novas, J.M., Henning, G.P., Reactive scheduling framework based on domain knowledge and constraint programming. Comput. Chem. Eng. 34:12 (2010), 2129–2148.
    • (2010) Comput. Chem. Eng. , vol.34 , Issue.12 , pp. 2129-2148
    • Novas, J.M.1    Henning, G.P.2
  • 36
    • 84861578980 scopus 로고    scopus 로고
    • A comprehensive constraint programming approach for the rolling horizon-based scheduling of automated wet-etch stations
    • Novas, J.M., Henning, G.P., A comprehensive constraint programming approach for the rolling horizon-based scheduling of automated wet-etch stations. Comput. Chem. Eng. 42 (2012), 189–205.
    • (2012) Comput. Chem. Eng. , vol.42 , pp. 189-205
    • Novas, J.M.1    Henning, G.P.2
  • 38
    • 33746054949 scopus 로고    scopus 로고
    • A fuzzy logic based production scheduling/rescheduling in the presence of uncertain disruptions
    • Petrovic, D., Duenas, A., A fuzzy logic based production scheduling/rescheduling in the presence of uncertain disruptions. Fuzzy Sets Syst. 157:16 (2006), 2273–2285.
    • (2006) Fuzzy Sets Syst. , vol.157 , Issue.16 , pp. 2273-2285
    • Petrovic, D.1    Duenas, A.2
  • 39
    • 77949487107 scopus 로고    scopus 로고
    • Model Predictive Control: Theory and Design
    • Nob Hill Pub
    • Rawlings, J.B., Mayne, D.Q., Model Predictive Control: Theory and Design. 2009, Nob Hill Pub.
    • (2009)
    • Rawlings, J.B.1    Mayne, D.Q.2
  • 40
    • 34548247313 scopus 로고    scopus 로고
    • Reactive scheduling framework for a multiproduct pipeline with inventory management
    • Relvas, S., Matos, H.A., Barbosa-Póvoa, A.P.F., Fialho, J., Reactive scheduling framework for a multiproduct pipeline with inventory management. Ind. Eng. Chem. Res. 46:17 (2007), 5659–5672.
    • (2007) Ind. Eng. Chem. Res. , vol.46 , Issue.17 , pp. 5659-5672
    • Relvas, S.1    Matos, H.A.2    Barbosa-Póvoa, A.P.F.3    Fialho, J.4
  • 41
    • 0029723234 scopus 로고    scopus 로고
    • Reactive scheduling approach for multipurpose chemical batch plants
    • Rodrigues, M., Gimeno, L., Passos, C., Campos, M., Reactive scheduling approach for multipurpose chemical batch plants. Comput. Chem. Eng. 20 (1996), S1215–S1220.
    • (1996) Comput. Chem. Eng. , vol.20 , pp. S1215-S1220
    • Rodrigues, M.1    Gimeno, L.2    Passos, C.3    Campos, M.4
  • 42
    • 36749101348 scopus 로고    scopus 로고
    • Proactive scheduling under uncertainty: a parametric optimization approach
    • Ryu, J.-h., Dua, V., Pistikopoulos, E.N., Proactive scheduling under uncertainty: a parametric optimization approach. Ind. Eng. Chem. Res. 46:24 (2007), 8044–8049.
    • (2007) Ind. Eng. Chem. Res. , vol.46 , Issue.24 , pp. 8044-8049
    • Ryu, J.-H.1    Dua, V.2    Pistikopoulos, E.N.3
  • 43
    • 1942500439 scopus 로고    scopus 로고
    • Modeling and solving real-time scheduling problems by stochastic integer programming
    • Sand, G., Engell, S., Modeling and solving real-time scheduling problems by stochastic integer programming. Comput. Chem. Eng. 28:6 (2004), 1087–1103.
    • (2004) Comput. Chem. Eng. , vol.28 , Issue.6 , pp. 1087-1103
    • Sand, G.1    Engell, S.2
  • 44
    • 0027545175 scopus 로고
    • A general algorithm for short-term scheduling of batch operations – II. Computational issues
    • Shah, N., Pantelides, C., Sargent, R., A general algorithm for short-term scheduling of batch operations – II. Computational issues. Comput. Chem. Eng. 17:2 (1993), 229–244.
    • (1993) Comput. Chem. Eng. , vol.17 , Issue.2 , pp. 229-244
    • Shah, N.1    Pantelides, C.2    Sargent, R.3
  • 45
    • 0037082299 scopus 로고    scopus 로고
    • Planning, scheduling and control systems: why cannot they work together
    • Shobrys, D.E., White, D.C., Planning, scheduling and control systems: why cannot they work together. Comput. Chem. Eng. 26:2 (2002), 149–160.
    • (2002) Comput. Chem. Eng. , vol.26 , Issue.2 , pp. 149-160
    • Shobrys, D.E.1    White, D.C.2
  • 46
    • 0030164381 scopus 로고    scopus 로고
    • Application of distributed computing to batch plant design and scheduling
    • Subrahmanyam, S., Kudva, G.K., Bassett, M.H., Pekny, J.F., Application of distributed computing to batch plant design and scheduling. AIChE J. 42:6 (1996), 1648–1661.
    • (1996) AIChE J. , vol.42 , Issue.6 , pp. 1648-1661
    • Subrahmanyam, S.1    Kudva, G.K.2    Bassett, M.H.3    Pekny, J.F.4
  • 48
    • 84894262785 scopus 로고    scopus 로고
    • Economic model predictive control for inventory management in supply chains
    • Subramanian, K., Rawlings, J.B., Maravelias, C.T., Economic model predictive control for inventory management in supply chains. Comput. Chem. Eng. 64 (2014), 71–80.
    • (2014) Comput. Chem. Eng. , vol.64 , pp. 71-80
    • Subramanian, K.1    Rawlings, J.B.2    Maravelias, C.T.3
  • 49
    • 79955536361 scopus 로고    scopus 로고
    • Computational study of network-based mixed-integer programming approaches for chemical production scheduling
    • Sundaramoorthy, A., Maravelias, C.T., Computational study of network-based mixed-integer programming approaches for chemical production scheduling. Ind. Eng. Chem. Res. 50:9 (2011), 5023–5040.
    • (2011) Ind. Eng. Chem. Res. , vol.50 , Issue.9 , pp. 5023-5040
    • Sundaramoorthy, A.1    Maravelias, C.T.2
  • 50
    • 84877663545 scopus 로고    scopus 로고
    • A branch-and-bound algorithm for the solution of chemical production scheduling MIP models using parallel computing
    • Velez, S., Maravelias, C.T., A branch-and-bound algorithm for the solution of chemical production scheduling MIP models using parallel computing. Comput. Chem. Eng. 55 (2013), 28–39.
    • (2013) Comput. Chem. Eng. , vol.55 , pp. 28-39
    • Velez, S.1    Maravelias, C.T.2
  • 51
    • 84875778960 scopus 로고    scopus 로고
    • Multiple and nonuniform time grids in discrete–time MIP models for chemical production scheduling
    • Velez, S., Maravelias, C.T., Multiple and nonuniform time grids in discrete–time MIP models for chemical production scheduling. Comput. Chem. Eng. 53 (2013), 70–85.
    • (2013) Comput. Chem. Eng. , vol.53 , pp. 70-85
    • Velez, S.1    Maravelias, C.T.2
  • 52
    • 84875000745 scopus 로고    scopus 로고
    • Reformulations and branching methods for mixed-integer programming chemical production scheduling models
    • Velez, S., Maravelias, C.T., Reformulations and branching methods for mixed-integer programming chemical production scheduling models. Ind. Eng. Chem. Res. 52:10 (2013), 3832–3841.
    • (2013) Ind. Eng. Chem. Res. , vol.52 , Issue.10 , pp. 3832-3841
    • Velez, S.1    Maravelias, C.T.2
  • 53
    • 84908287569 scopus 로고    scopus 로고
    • Theoretical framework for formulating MIP scheduling models with multiple and non-uniform discrete–time grids
    • Velez, S., Maravelias, C.T., Theoretical framework for formulating MIP scheduling models with multiple and non-uniform discrete–time grids. Comput. Chem. Eng. 72 (2015), 233–254.
    • (2015) Comput. Chem. Eng. , vol.72 , pp. 233-254
    • Velez, S.1    Maravelias, C.T.2
  • 54
    • 84874546620 scopus 로고    scopus 로고
    • Valid inequalities based on demand propagation for chemical production scheduling MIP models
    • Velez, S., Sundaramoorthy, A., Maravelias, C.T., Valid inequalities based on demand propagation for chemical production scheduling MIP models. AIChE J. 59:3 (2013), 872–887.
    • (2013) AIChE J. , vol.59 , Issue.3 , pp. 872-887
    • Velez, S.1    Sundaramoorthy, A.2    Maravelias, C.T.3
  • 55
    • 0242703954 scopus 로고    scopus 로고
    • Rescheduling manufacturing systems: a framework of strategies, policies, and methods
    • Vieira, G.E., Herrmann, J.W., Lin, E., Rescheduling manufacturing systems: a framework of strategies, policies, and methods. J. Sched. 6:1 (2003), 39–62.
    • (2003) J. Sched. , vol.6 , Issue.1 , pp. 39-62
    • Vieira, G.E.1    Herrmann, J.W.2    Lin, E.3
  • 56
    • 0034332903 scopus 로고    scopus 로고
    • A new approach for efficient rescheduling of multiproduct batch plants
    • Vin, J.P., Ierapetritou, M.G., A new approach for efficient rescheduling of multiproduct batch plants. Ind. Eng. Chem. Res. 39:11 (2000), 4228–4238.
    • (2000) Ind. Eng. Chem. Res. , vol.39 , Issue.11 , pp. 4228-4238
    • Vin, J.P.1    Ierapetritou, M.G.2
  • 57
    • 0141859879 scopus 로고    scopus 로고
    • A fuzzy robust scheduling approach for product development projects
    • Wang, J., A fuzzy robust scheduling approach for product development projects. Eur. J. Oper. Res. 152:1 (2004), 180–194.
    • (2004) Eur. J. Oper. Res. , vol.152 , Issue.1 , pp. 180-194
    • Wang, J.1
  • 58
    • 0004180332 scopus 로고    scopus 로고
    • Integer Programming, vol. 42
    • Wiley New York
    • Wolsey, L.A., Integer Programming, vol. 42. 1998, Wiley, New York.
    • (1998)
    • Wolsey, L.A.1
  • 59
    • 0004062334 scopus 로고
    • Introductory statistics, vol. 19690
    • John Wiley and Sons
    • Wonnacott, T.H., Wonnacott, R.J., Introductory statistics, vol. 19690. 1972, John Wiley and Sons.
    • (1972)
    • Wonnacott, T.H.1    Wonnacott, R.J.2
  • 60
    • 0000965083 scopus 로고    scopus 로고
    • Improving the efficiency of discrete time scheduling formulation
    • Yee, K., Shah, N., Improving the efficiency of discrete time scheduling formulation. Comput. Chem. Eng. 22 (1998), S403–S410.
    • (1998) Comput. Chem. Eng. , vol.22 , pp. S403-S410
    • Yee, K.1    Shah, N.2
  • 61
    • 0033881526 scopus 로고    scopus 로고
    • A robust optimization model for stochastic logistic problems
    • Yu, C.-S., Li, H.-L., A robust optimization model for stochastic logistic problems. Int. J. Prod. Econ. 64:1 (2000), 385–397.
    • (2000) Int. J. Prod. Econ. , vol.64 , Issue.1 , pp. 385-397
    • Yu, C.-S.1    Li, H.-L.2
  • 62
    • 84863191392 scopus 로고    scopus 로고
    • Integration of scheduling and control with closed loop implementation
    • Zhuge, J., Ierapetritou, M.G., Integration of scheduling and control with closed loop implementation. Ind. Eng. Chem. Res. 51:25 (2012), 8550–8565.
    • (2012) Ind. Eng. Chem. Res. , vol.51 , Issue.25 , pp. 8550-8565
    • Zhuge, J.1    Ierapetritou, M.G.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.