A survey of dynamic scheduling in manufacturing systems

Author keywords

Agent based scheduling; Dynamic scheduling; Predictive reactive scheduling; Robust scheduling

Indexed keywords

AGENT-BASED SCHEDULING; ARTIFICIAL INTELLIGENCE TECHNIQUES; DYNAMIC SCHEDULING; MANUFACTURING SYSTEM; META HEURISTICS; MULTI-AGENT SYSTEM; ON DYNAMICS; OPTIMAL SCHEDULE; PREDICTIVE-REACTIVE SCHEDULING; REACTIVE PROCESS; REAL WORLD ENVIRONMENTS; REAL-TIME INFORMATION; ROBUST SCHEDULING; SHOP FLOOR; STATIC APPROACH; STATIC SCHEDULING;

EID: 68249099005     PISSN: 10946136     EISSN: None     Source Type: Journal    
DOI: 10.1007/s10951-008-0090-8     Document Type: Review
Times cited : (785)

References (107)
  • 3
    • 0034325416 scopus 로고    scopus 로고
    • Dynamic job-shop scheduling using reinforcement learning agents
    • DOI 10.1016/S0921-8890(00)00087-7
    • M. E. Aydin E. Öztemel 2000 Job-shop scheduling using reinforcement learning agents Robotics and Autonomous Systems 33 2-3 169 178 (Pubitemid 30960177)
    • (2000) Robotics and Autonomous Systems , vol.33 , Issue.2 , pp. 169-178
    • Aydin, M.E.1    Oztemel, E.2
  • 4
    • 5144232431 scopus 로고    scopus 로고
    • Executing production schedules in the face of uncertainties: A review and some future directions
    • H. Aytug M. A. Lawley K. McKay S. Mohan R. Uzsoy 2005 Executing production schedules in the face of uncertainties: A review and some future directions European Journal of Operational Research 161 1 86 110
    • (2005) European Journal of Operational Research , vol.161 , Issue.1 , pp. 86-110
    • Aytug, H.1    Lawley, M.A.2    McKay, K.3    Mohan, S.4    Uzsoy, R.5
  • 6
    • 0030142880 scopus 로고    scopus 로고
    • Combining knowledge-based systems and simulation to solve rescheduling problems
    • DOI 10.1016/0167-9236(95)00029-1
    • R. Belz P. Mertens 1996 Combining knowledge-based systems and simulation to solve rescheduling problems Decision Support Systems 17 2 141 157 (Pubitemid 126374657)
    • (1996) Decision Support Systems , vol.17 , Issue.2 , pp. 141-157
    • Belz, R.1    Mertens, P.2
  • 7
    • 0033093715 scopus 로고    scopus 로고
    • Production scheduling and rescheduling with genetic algorithms
    • C. Bierwirth D. C. Mattfeld 1999 Production scheduling and rescheduling with genetic algorithms Evolutionary Computation 7 1 1 17
    • (1999) Evolutionary Computation , vol.7 , Issue.1 , pp. 1-17
    • Bierwirth, C.1    Mattfeld, D.C.2
  • 8
    • 0034298313 scopus 로고    scopus 로고
    • Hierarchy in distributed shop floor control
    • DOI 10.1016/S0166-3615(00)00062-2
    • L. Bongaerts L. Monostori D. McFarlane B. Kadar 2000 Hierarchy in distributed shop floor control Computers in Industry 43 2 123 137 (Pubitemid 30939642)
    • (2000) Computers in Industry , vol.43 , Issue.2 , pp. 123-137
    • Bongaerts, L.1    Monostori, L.2    McFarlane, D.3    Kadar, B.4
  • 10
    • 0035475186 scopus 로고    scopus 로고
    • Evaluating the performance of reactive control architectures for manufacturing production control
    • DOI 10.1016/S0166-3615(01)00108-7, PII S0166361501001087
    • R. W. Brennan D. H. Norrie 2001 Evaluating the performance of reactive control architectures for manufacturing production control Computers in Industry 46 3 235 245 (Pubitemid 32943402)
    • (2001) Computers in Industry , vol.46 , Issue.3 , pp. 235-245
    • Brennan, R.W.1    Norrie, D.H.2
  • 11
    • 0034298926 scopus 로고    scopus 로고
    • Experimental benchmarking of two multi-agent architectures for production scheduling and control
    • DOI 10.1016/S0166-3615(00)00063-4
    • S. Cavalieri M. Garetti M. Macchi M. Taisch 2000 An experimental benchmarking of two multi-agent architectures for production scheduling and control Computers in Industry 43 2 139 152 (Pubitemid 30939643)
    • (2000) Computers in Industry , vol.43 , Issue.2 , pp. 139-152
    • Cavalieri, S.1    Garetti, M.2    MacChi, M.3    Taisch, M.4
  • 12
    • 0035360038 scopus 로고    scopus 로고
    • Dynamic scheduling of manufacturing job shops using genetic algorithms
    • G. Chryssolouris V. Subramaniam 2001 Dynamic scheduling of manufacturing job shops using genetic algorithms Journal of Intelligent Manufacturing 12 3 281 293
    • (2001) Journal of Intelligent Manufacturing , vol.12 , Issue.3 , pp. 281-293
    • Chryssolouris, G.1    Subramaniam, V.2
  • 14
    • 0036604832 scopus 로고    scopus 로고
    • Using real time information for effective dynamic scheduling
    • DOI 10.1016/S0377-2217(01)00355-1, PII S0377221701003551
    • P. I. Cowling M. Johansson 2002 Using real-time information for effective dynamic scheduling European Journal of Operational Research 139 2 230 244 (Pubitemid 34201236)
    • (2002) European Journal of Operational Research , vol.139 , Issue.2 , pp. 230-244
    • Cowling, P.1    Johansson, M.2
  • 19
    • 0029254356 scopus 로고
    • Robust scheduling to hedge against processing time uncertainty in single-stage production
    • R. L. Daniels P. Kouvelis 1995 Robust scheduling to hedge against processing time uncertainty in single-stage production Management Science 41 2 363 737
    • (1995) Management Science , vol.41 , Issue.2 , pp. 363-737
    • Daniels, R.L.1    Kouvelis, P.2
  • 22
    • 0009707516 scopus 로고
    • Reactive scheduling: Improving the robustness of schedules and restricting the effects of shop floor disturbances by fuzzy reasoning
    • J. Dorn R. M. Kerr G. Thalhammer 1995 Reactive scheduling: improving the robustness of schedules and restricting the effects of shop floor disturbances by fuzzy reasoning International Journal of Human Computer Studies 42 687 704
    • (1995) International Journal of Human Computer Studies , vol.42 , pp. 687-704
    • Dorn, J.1    Kerr, R.M.2    Thalhammer, G.3
  • 23
    • 46149135961 scopus 로고
    • Non-hierarchical control of manufacturing systems
    • N. A. Duffie R. S. Piper 1986 Non-hierarchical control of manufacturing systems Journal of Manufacturing Systems 5 2 137 139
    • (1986) Journal of Manufacturing Systems , vol.5 , Issue.2 , pp. 137-139
    • Duffie, N.A.1    Piper, R.S.2
  • 24
    • 0025555793 scopus 로고
    • Reacting to scheduling exceptions in FMS environments
    • A. Dutta 1990 Reacting to scheduling exceptions in FMS environments IIE Transactions 22 4 33 314
    • (1990) IIE Transactions , vol.22 , Issue.4 , pp. 33-314
    • Dutta, A.1
  • 25
    • 0002540072 scopus 로고
    • ISIS: A retrospective. Intelligent scheduling
    • Morgan Kaufmann San Mateo
    • Fox, M. S. (1994). ISIS: A retrospective. Intelligent scheduling. In M. Zweben & M. S. Fox (Eds.), Intelligent scheduling (pp. 1-28). San Mateo: Morgan Kaufmann.
    • (1994) Intelligent Scheduling , pp. 1-28
    • Fox, M.S.1    Zweben, M.2    Fox, M.S.3
  • 27
    • 0027961993 scopus 로고
    • Application of neuronal network process in reactive scheduling
    • North-Holland Amsterdam
    • Garner, B. J., & Ridley, G. J. (1994). Application of neuronal network process in reactive scheduling. In E. Szelke & R. M. Kerr (Eds.), Knowledge-based reactive scheduling (pp. 19-28). Amsterdam: North-Holland.
    • (1994) Knowledge-based Reactive Scheduling , pp. 19-28
    • Garner, B.J.1    Ridley, G.J.2    Szelke, E.3    Kerr, R.M.4
  • 29
    • 0028368125 scopus 로고
    • Genetic algorithms and tabu search: Hybrids for optimisation
    • F. Glover J. P. Kelly M. Laguna 1995 Genetic algorithms and tabu search: hybrids for optimisation Computers of Operation Research 22 1 111 134
    • (1995) Computers of Operation Research , vol.22 , Issue.1 , pp. 111-134
    • Glover, F.1    Kelly, J.P.2    Laguna, M.3
  • 31
    • 0032202838 scopus 로고    scopus 로고
    • Holonic manufacturing scheduling: Architecture, cooperation mechanism, and implementation
    • PII S0166361598001006
    • L. Gou P. B. Luh Y. Kyoya 1998 Holonic manufacturing scheduling: architecture, cooperation mechanism, and implementation Computers in Industry 37 3 213 231 (Pubitemid 128419942)
    • (1998) Computers in Industry , vol.37 , Issue.3 , pp. 213-231
    • Gou, L.1    Luh, P.B.2    Kyoya, Y.3
  • 32
    • 0034306985 scopus 로고    scopus 로고
    • Knowledge-based predictive and reactive scheduling in industrial environments
    • DOI 10.1016/S0098-1354(00)00589-5, PII S0098135400005895
    • G. P. Henning J. Cerda 2000 Knowledge-based predictive and reactive scheduling in industrial environments Computers and Chemical Engineering 24 9 2315 2338 (Pubitemid 30728682)
    • (2000) Computers and Chemical Engineering , vol.24 , Issue.9-10 , pp. 2315-2338
    • Henning, G.P.1    Cerda, J.2
  • 33
    • 13444269168 scopus 로고    scopus 로고
    • Project scheduling under uncertainty: Survey and research potentials
    • DOI 10.1016/j.ejor.2004.04.002, PII S0377221704002401, Project Management and Scheduling
    • W. Herroelen R. Leus 2005 Project scheduling under uncertainty: Survey and research potentials European Journal of Operational Research 165 2 289 306 (Pubitemid 40206362)
    • (2005) European Journal of Operational Research , vol.165 , Issue.2 , pp. 289-306
    • Herroelen, W.1    Leus, R.2
  • 34
    • 0037995671 scopus 로고    scopus 로고
    • Intelligent dynamic scheduling system: The application of genetic algorithms
    • M. Jahangirian G. V. Conroy 2000 Intelligent dynamic scheduling system: the application of genetic algorithms Integrated Manufacturing Systems 11 4 247 257
    • (2000) Integrated Manufacturing Systems , vol.11 , Issue.4 , pp. 247-257
    • Jahangirian, M.1    Conroy, G.V.2
  • 36
    • 1642270229 scopus 로고    scopus 로고
    • Improving robustness and flexibility of tardiness and total flow-time job shops using robustness measures
    • PII S1568494601000059
    • M. T. Jensen 2001 Improving robustness and flexibility of tardiness and total flow-time job shops using robustness measures Applied Soft Computing 1 1 35 52 (Pubitemid 33718563)
    • (2001) Applied Soft Computing , vol.1 , Issue.1 , pp. 35-52
    • Jensen, M.T.1
  • 39
    • 0035922494 scopus 로고    scopus 로고
    • Routing-based reactive scheduling policies for machine failures in dynamic job shops
    • DOI 10.1080/00207540110057909
    • E. Kutanoglu I. Sabuncuoglu 2001 Routing-based reactive scheduling policies for machine failures in dynamic job shops International Journal of Production Research 39 14 3141 3158 (Pubitemid 35165535)
    • (2001) International Journal of Production Research , vol.39 , Issue.14 , pp. 3141-3158
    • Kutanoglu, E.1    Sabuncuoglu, I.2
  • 40
    • 0011790070 scopus 로고
    • Scheduling as intelligent control of decision-making and constraint propagation
    • Morgan Kaufmann San Mateo
    • Le Pape, C. (1994). Scheduling as intelligent control of decision-making and constraint propagation. In M. Zweben & M. S. Fox (Eds.), Intelligent scheduling (pp. 67-98). San Mateo: Morgan Kaufmann.
    • (1994) Intelligent Scheduling , pp. 67-98
    • Le Pape, C.1    Zweben, M.2    Fox, M.S.3
  • 41
    • 0032804081 scopus 로고    scopus 로고
    • Minimizing makespan on a single batch processing machine with dynamic job arrivals
    • C. Y. Lee R. Uzsoy 1999 Minimizing makespan on a single batch processing machine with dynamic job arrivals International Journal of Production Research 37 1 219 236
    • (1999) International Journal of Production Research , vol.37 , Issue.1 , pp. 219-236
    • Lee, C.Y.1    Uzsoy, R.2
  • 42
    • 0028499648 scopus 로고
    • Robustness measures and robust scheduling for job shops
    • V. J. Leon S. D. Wu R. H. Storer 1994 Robustness measures and robust scheduling for job shops IIE Transactions 26 5 32 41
    • (1994) IIE Transactions , vol.26 , Issue.5 , pp. 32-41
    • Leon, V.J.1    Wu, S.D.2    Storer, R.H.3
  • 43
    • 9644275655 scopus 로고    scopus 로고
    • The complexity of machine scheduling for stability with a single disrupted job
    • R. Leus W. Herroelen 2005 The complexity of machine scheduling for stability with a single disrupted job Operations Research Letters 33 2 151 156
    • (2005) Operations Research Letters , vol.33 , Issue.2 , pp. 151-156
    • Leus, R.1    Herroelen, W.2
  • 44
    • 0033749166 scopus 로고    scopus 로고
    • Production rescheduling expert simulation system
    • DOI 10.1016/S0377-2217(99)00381-1
    • H. Li Z. Li L. X. Li B. Hu 2000 A production rescheduling expert simulation system European Journal of Operational Research 124 2 283 293 (Pubitemid 30864241)
    • (2000) European Journal of Operational Research , vol.124 , Issue.2 , pp. 283-293
    • Li, H.1    Li, Z.2    Li, L.X.3    Hu, B.4
  • 45
    • 84950937653 scopus 로고
    • Integrated shop floor control using autonomous agents
    • G. Y. Lin J. J. Solberg 1992 Integrated shop floor control using autonomous agents IIE Transactions 24 3 57 71
    • (1992) IIE Transactions , vol.24 , Issue.3 , pp. 57-71
    • Lin, G.Y.1    Solberg, J.J.2
  • 47
    • 0027146758 scopus 로고
    • Addressing the gap in scheduling research: a review of optimization and heuristic methods in production scheduling
    • B. L. MacCarthy J. Liu 1993 Addressing the gap in scheduling research: a review of optimization and heuristic methods in production scheduling International Journal of Production Research 31 1 59 79 (Pubitemid 23619847)
    • (1993) International Journal of Production Research , vol.31 , Issue.1 , pp. 59-79
    • Maccarthy, B.L.1    Liu Jiyin2
  • 48
    • 0032663605 scopus 로고    scopus 로고
    • MetaMorph: An adaptive agent-based architecture for intelligent manufacturing
    • F. Maturana W. Shen D. H. Norrie 1999 MetaMorph: an adaptive agent-based architecture for intelligent manufacturing International Journal of Production Research 37 10 2159 2173
    • (1999) International Journal of Production Research , vol.37 , Issue.10 , pp. 2159-2173
    • Maturana, F.1    Shen, W.2    Norrie, D.H.3
  • 50
    • 0002912454 scopus 로고    scopus 로고
    • Intelligent systems in manufacturing: Current developments and future prospects
    • F. Meziane S. Vadera K. Kobbacy N. Proudlove 2000 Intelligent systems in manufacturing: current developments and future prospects Integrated Manufacturing Systems 11 4 218 238
    • (2000) Integrated Manufacturing Systems , vol.11 , Issue.4 , pp. 218-238
    • Meziane, F.1    Vadera, S.2    Kobbacy, K.3    Proudlove, N.4
  • 51
    • 0029332288 scopus 로고
    • CABINS: A framework of knowledge acquisition and iterative revision for schedule improvement and reactive repair
    • K. Miyashita K. Sycara 1995 CABINS: a framework of knowledge acquisition and iterative revision for schedule improvement and reactive repair Artificial Intelligence 76 1 377 426
    • (1995) Artificial Intelligence , vol.76 , Issue.1 , pp. 377-426
    • Miyashita, K.1    Sycara, K.2
  • 53
    • 0001466672 scopus 로고
    • Adaptive/predictive scheduling: Review and a general framework
    • S. Y. Nof F. H. Grant 1991 Adaptive/predictive scheduling: review and a general framework Production Planning & Control 2 4 298 312
    • (1991) Production Planning & Control , vol.2 , Issue.4 , pp. 298-312
    • Nof, S.Y.1    Grant, F.H.2
  • 54
    • 0033343706 scopus 로고    scopus 로고
    • Predictable scheduling of a single machine with breakdowns and sensitive jobs
    • R. O'Donovan R. Uzsoy K. N. McKay 1999 Predictable scheduling of a single machine with breakdowns and sensitive jobs International Journal of Production Research 37 18 4217 4233 (Pubitemid 30519011)
    • (1999) International Journal of Production Research , vol.37 , Issue.18 , pp. 4217-4233
    • O'Donovan, R.1    Uzsoy, R.2    McKay, K.N.3
  • 56
    • 0034292136 scopus 로고    scopus 로고
    • Knowledge-based system for reactive scheduling decision-making in FMS
    • DOI 10.1023/A:1008970213581
    • J. F. O'Kane 2000 A knowledge-based system for reactive scheduling decision-making in FMS Journal of Intelligent Manufacturing 11 5 461 474 (Pubitemid 32067226)
    • (2000) Journal of Intelligent Manufacturing , vol.11 , Issue.5 , pp. 461-474
    • O'Kane, J.F.1
  • 61
    • 0344444825 scopus 로고    scopus 로고
    • Utility and stability measures for agent-based dynamic scheduling of steel continuous casting
    • Taipei, Taiwan. Selected in the finalist best student award
    • Ouelhadj, D., Cowling, P. I., & Petrovic, S. (2003b). Utility and stability measures for agent-based dynamic scheduling of steel continuous casting. In Proceedings of the IEEE international conference on robotics and automation (pp. 175-180). Taipei, Taiwan. Selected in the finalist best student award.
    • (2003) Proceedings of the IEEE International Conference on Robotics and Automation , pp. 175-180
    • Ouelhadj, D.1    Cowling, P.I.2    Petrovic, S.3
  • 62
    • 0028452709 scopus 로고
    • Rolling horizon algorithms for a single-machine dynamic scheduling problem with sequence-dependent set-up times
    • I. M. Ovacik R. Uzsoy 1994 Rolling horizon algorithms for a single-machine dynamic scheduling problem with sequence-dependent set-up times International Journal of Production Research 32 6 1243 1263
    • (1994) International Journal of Production Research , vol.32 , Issue.6 , pp. 1243-1263
    • Ovacik, I.M.1    Uzsoy, R.2
  • 64
    • 0001538571 scopus 로고
    • Manufacturing experience with the contract net
    • Pitman London
    • Parunak, H. V. (1987). Manufacturing experience with the contract net. In M. Huhns (Ed.), Distributed artificial intelligence (pp. 285-310). London: Pitman.
    • (1987) Distributed Artificial Intelligence , pp. 285-310
    • Parunak, H.V.1    Huhns, M.2
  • 66
    • 0345982691 scopus 로고    scopus 로고
    • Agents in overalls: Experiences and issues in the development and deployment of industrial agent-based systems
    • H. V. Parunak 2000 Agents in overalls: experiences and issues in the development and deployment of industrial agent-based systems International Journal of Cooperative Information Systems 9 3 209 227
    • (2000) International Journal of Cooperative Information Systems , vol.9 , Issue.3 , pp. 209-227
    • Parunak, H.V.1
  • 68
    • 0001027563 scopus 로고    scopus 로고
    • A computational study on design and performance issues of multi-agent intelligent systems for dynamic scheduling environments
    • PII S0957417498000669
    • P. C. Pendharkar 1999 A computational study on design and performance issues of multi-agent intelligent systems for dynamic scheduling environments Expert Systems with Applications 16 2 121 133 (Pubitemid 129667276)
    • (1999) Expert Systems with Applications , vol.16 , Issue.2 , pp. 121-133
    • Pendharkar, P.C.1
  • 69
    • 33746054949 scopus 로고    scopus 로고
    • A fuzzy logic based production scheduling/rescheduling in the presence of uncertain disruptions
    • DOI 10.1016/j.fss.2006.04.009, PII S0165011406001746
    • D. Petrovic A. Duenas 2006 A fuzzy logic based production scheduling/rescheduling in the presence of uncertain disruptions Fuzzy Sets and Systems 157 16 2273 2285 (Pubitemid 44080322)
    • (2006) Fuzzy Sets and Systems , vol.157 , Issue.16 , pp. 2273-2285
    • Petrovic, D.1    Duenas, A.2
  • 71
    • 0032649737 scopus 로고    scopus 로고
    • A comparative study of dispatching rules in dynamic flow shops and job shops
    • C. Rajendran O. Holthaus 1999 A comparative study of dispatching rules in dynamic flow shops and job shops European Journal of Operational Research 116 1 156 170
    • (1999) European Journal of Operational Research , vol.116 , Issue.1 , pp. 156-170
    • Rajendran, C.1    Holthaus, O.2
  • 72
    • 29444438437 scopus 로고
    • Dynamic job shop scheduling: A survey of simulation research
    • R. Ramasesh 1990 Dynamic job shop scheduling: a survey of simulation research OMEGA International Journal of Management Science 18 1 43 57
    • (1990) OMEGA International Journal of Management Science , vol.18 , Issue.1 , pp. 43-57
    • Ramasesh, R.1
  • 73
  • 74
    • 0034627942 scopus 로고    scopus 로고
    • Dynamic scheduling of FMS using a real-time genetic algorithm
    • DOI 10.1080/002075400189545
    • A. Rossi G. Dini 2000 Dynamic scheduling of FMS using a real-time genetic algorithm International Journal of Production Research 38 1 1 20 (Pubitemid 35393632)
    • (2000) International Journal of Production Research , vol.38 , Issue.1 , pp. 1-20
    • Rossi, A.1    Dini, G.2
  • 75
    • 0035339891 scopus 로고    scopus 로고
    • On-line fault diagnosis system support for reactive scheduling in multipurpose batch chemical plants
    • DOI 10.1016/S0098-1354(01)00657-3, PII S0098135401006573
    • D. Ruiz J. Canton N. J. Mara A. Espuna L. Puigjaner 2001 On-line fault diagnosis system support for reactive scheduling in multipurpose batch chemical plants Computers and Chemical Engineering 25 4 829 837 (Pubitemid 32373888)
    • (2001) Computers and Chemical Engineering , vol.25 , Issue.4-6 , pp. 829-837
    • Ruiz, D.1    Canton, J.2    Maria Nougues, J.3    Espuna, A.4    Puigjaner, L.5
  • 76
    • 0032000897 scopus 로고    scopus 로고
    • A study of scheduling rules of flexible manufacturing systems: A simulation approach
    • I. Sabuncuoglu 1998 A study of scheduling rules of flexible manufacturing systems: a simulation approach International Journal of Operational Research 36 2 527 546 (Pubitemid 128565064)
    • (1998) International Journal of Production Research , vol.36 , Issue.2 , pp. 527-546
    • Sabuncuoglu, I.1
  • 77
    • 0034326104 scopus 로고    scopus 로고
    • Analysis of reactive scheduling problems in a job shop environment
    • DOI 10.1016/S0377-2217(99)00311-2
    • I. Sabuncuoglu M. Bayiz 2000 Analysis of reactive scheduling problems in a job shop environment European Journal of Operational Research 126 3 567 586 (Pubitemid 30923774)
    • (2000) European Journal of Operational Research , vol.126 , Issue.3 , pp. 567-586
    • Sabuncuoglu, I.1    Bayiz, M.2
  • 78
    • 0000179190 scopus 로고    scopus 로고
    • Rescheduling frequency in an FMS with uncertain processing times and unreliable machines
    • I. Sabuncuoglu S. Karabuk 1999 Rescheduling frequency in an FMS with uncertain processing times and unreliable machines Journal of Manufacturing Systems 18 4 268 283
    • (1999) Journal of Manufacturing Systems , vol.18 , Issue.4 , pp. 268-283
    • Sabuncuoglu, I.1    Karabuk, S.2
  • 79
    • 0034204917 scopus 로고    scopus 로고
    • Automated contracting in distributed manufacturing among independent companies
    • DOI 10.1023/A:1008971326005
    • T. W. Sandholm 2000 Automated contracting in distributed manufacturing among independent companies Journal of Intelligent Manufacturing 11 3 271 283 (Pubitemid 30903570)
    • (2000) Journal of Intelligent Manufacturing , vol.11 , Issue.3 , pp. 271-283
    • Sandholm, T.W.1
  • 81
    • 0028014740 scopus 로고
    • How to apply fuzzy logic to reactive scheduling
    • North-Holland Amsterdam
    • Schmidt, G. (1994). How to apply fuzzy logic to reactive scheduling. In E. Szelke & R. M. Kerr (Eds.), Knowledge-based reactive scheduling (pp. 57-67). Amsterdam: North-Holland.
    • (1994) Knowledge-based Reactive Scheduling , pp. 57-67
    • Schmidt, G.1    Szelke, E.2    Kerr, R.M.3
  • 82
    • 0033226070 scopus 로고    scopus 로고
    • Workshop scheduling using practical (inaccurate) data Part 1: the performance of heuristic scheduling rules in a dynamic job shop environment using a rolling time horizon approach
    • R. Shafaei P. Brunn 1999 Workshop scheduling using practical (inaccurate) data, Part 1: The performance of heuristic scheduling rules in a dynamic job shop environment using a rolling time horizon approach International Journal of Production Research 37 17 3913 3925 (Pubitemid 30531937)
    • (1999) International Journal of Production Research , vol.37 , Issue.17 , pp. 3913-3925
    • Shafaei, R.1    Brunn, P.2
  • 83
    • 0023830408 scopus 로고
    • Dynamic scheduling in cellular manufacturing systems: A framework for Network decision making
    • J. M. Shaw 1988 Dynamic scheduling in cellular manufacturing systems: a framework for Network decision making Journal of Manufacturing Systems 7 2 83 94
    • (1988) Journal of Manufacturing Systems , vol.7 , Issue.2 , pp. 83-94
    • Shaw, J.M.1
  • 85
    • 0034205722 scopus 로고    scopus 로고
    • MetaMorph II: An agent-based architecture for distributed intelligent design and manufacturing
    • DOI 10.1023/A:1008915208259
    • W. Shen F. Maturana D. H. Norrie 2000 MetaMorph II: an agent-based architecture for distributed intelligent design and manufacturing Journal of Intelligent Manufacturing 11 3 237 251 (Pubitemid 30903572)
    • (2000) Journal of Intelligent Manufacturing , vol.11 , Issue.3 , pp. 237-251
    • Shen, W.1    Maturana, F.2    Norrie, D.H.3
  • 87
    • 0030399084 scopus 로고    scopus 로고
    • The state of the art in intelligent real-time FMS control: A comprehensive survey
    • C. S. Shukla F. F. Chen 1996 The state of the art in intelligent real-time FMS control: a comprehensive survey Journal of Intelligent Manufacturing 7 441 455 (Pubitemid 126717767)
    • (1996) Journal of Intelligent Manufacturing , vol.7 , Issue.6 , pp. 441-455
    • Shukla, C.S.1    Chen, F.F.2
  • 88
    • 0019180974 scopus 로고
    • CONTRACT NET PROTOCOL: HIGH-LEVEL COMMUNICATION AND CONTROL IN A DISTRIBUTED PROBLEM SOLVER.
    • R. Smith 1980 The contract net protocol: high level communication and control in distributed problem solver IEEE Transactions on Computers 29 12 1104 1113 (Pubitemid 11460672)
    • (1980) IEEE Transactions on Computers , vol.C-29 , Issue.12 , pp. 1104-1113
    • Smith Reid, G.1
  • 89
    • 0002753338 scopus 로고
    • OPIS: A methodology and architecture for reactive scheduling
    • Morgan Kaufmann San Mateo
    • Smith, F. S. (1994). OPIS: A methodology and architecture for reactive scheduling. In M. Zweben & M. S. Fox (Eds.), Intelligent scheduling (pp. 29-66). San Mateo: Morgan Kaufmann.
    • (1994) Intelligent Scheduling , pp. 29-66
    • Smith, F.S.1    Zweben, M.2    Fox, M.S.3
  • 91
    • 0032624359 scopus 로고    scopus 로고
    • A distributed architecture and negotiation protocol for scheduling in manufacturing systems
    • P. Sousa C. Ramos 1999 A distributed architecture and negotiation protocol for scheduling in manufacturing systems Computers in Industry 38 2 103 113
    • (1999) Computers in Industry , vol.38 , Issue.2 , pp. 103-113
    • Sousa, P.1    Ramos, C.2
  • 93
    • 0344320671 scopus 로고    scopus 로고
    • A dynamic reactive scheduling mechanism for responding to changes of production orders and manufacturing resources
    • J. Sun D. Xue 2001 A dynamic reactive scheduling mechanism for responding to changes of production orders and manufacturing resources Computers in Industry 46 2 189 207
    • (2001) Computers in Industry , vol.46 , Issue.2 , pp. 189-207
    • Sun, J.1    Xue, D.2
  • 96
    • 0031245009 scopus 로고    scopus 로고
    • Approaches and issues in scheduling a distributed shop-floor environment
    • PII S0166361597000602
    • A. Tharumarajah R. Bemelman 1997 Approaches and issues in scheduling a distributed shop-floor environment Computers in Industry 34 1 95 109 (Pubitemid 127400982)
    • (1997) Computers in Industry , vol.34 , Issue.1 , pp. 95-109
    • Tharumarajah, A.1    Bemelman, R.2
  • 97
    • 0035241047 scopus 로고    scopus 로고
    • Survey of resource allocation methods for distributed manufacturing systems
    • DOI 10.1080/09537280150203988
    • A. Tharumarajah 2001 Survey of resource allocation methods for distributed manufacturing systems Production Planning & Control 12 1 58 68 (Pubitemid 35393695)
    • (2001) Production Planning and Control , vol.12 , Issue.1 , pp. 58-68
    • Tharumarajah, A.1
  • 98
    • 0034690558 scopus 로고    scopus 로고
    • Analytical models to predict the performance of a single-machine system under periodic and event-driven rescheduling strategies
    • DOI 10.1080/002075400188654
    • G. E. Vieira J. W. Herrmann E. Lin 2000 Analytical models to predict the performance of a single machine system under periodic and event-driven rescheduling strategies International Journal of Production Research 38 8 1899 1915 (Pubitemid 35395497)
    • (2000) International Journal of Production Research , vol.38 , Issue.8 , pp. 1899-1915
    • Vieira, G.E.1    Herrmann, J.W.2    Lin, E.3
  • 99
    • 0040518040 scopus 로고    scopus 로고
    • Predicting the performance of rescheduling strategies for parallel machine systems
    • G. E. Vieira J. W. Hermann E. Lin 2000 Predicting the performance of rescheduling strategies for parallel machine systems Journal of Manufacturing Systems 19 4 256 266
    • (2000) Journal of Manufacturing Systems , vol.19 , Issue.4 , pp. 256-266
    • Vieira, G.E.1    Hermann, J.W.2    Lin, E.3
  • 100
    • 0242703954 scopus 로고    scopus 로고
    • Rescheduling manufacturing systems: A framework of strategies, policies and methods
    • G. E. Vieira J. W. Hermann E. Lin 2003 Rescheduling manufacturing systems: a framework of strategies, policies and methods Journal of Scheduling 6 1 36 92
    • (2003) Journal of Scheduling , vol.6 , Issue.1 , pp. 36-92
    • Vieira, G.E.1    Hermann, J.W.2    Lin, E.3
  • 102
    • 0027224847 scopus 로고
    • One-machine rescheduling heuristics with efficiency and stability as criteria
    • DOI 10.1016/0305-0548(93)90091-V
    • S. D. Wu R. H. Storer P. C. Chang 1993 One machine rescheduling heuristics with efficiency and stability as criteria Computers Operations Research 20 1 1 14 (Pubitemid 23634781)
    • (1993) Computers and Operations Research , vol.20 , Issue.1 , pp. 1-14
    • Wu S.David1    Storer Robert, H.2    Chang Pei-Chann3
  • 103
    • 0022097890 scopus 로고
    • Scheduling/rescheduling in the manufacturing operating system environment
    • M. Yamamoto S. Y. Nof 1985 Scheduling/rescheduling in the manufacturing operating system environment International Journal of Production Research 23 4 705 722
    • (1985) International Journal of Production Research , vol.23 , Issue.4 , pp. 705-722
    • Yamamoto, M.1    Nof, S.Y.2
  • 104
    • 0035312109 scopus 로고    scopus 로고
    • Evolutionary algorithms, simulated annealing and tabu search: A comparative study
    • DOI 10.1016/S0952-1976(00)00065-8
    • H. Youssef S. M. Sait H. Adiche 2001 Evolutionary algorithms, simulated annealing and tabu search: a comparative study Engineering Applications of Artificial Intelligence 14 2 167 181 (Pubitemid 32264645)
    • (2001) Engineering Applications of Artificial Intelligence , vol.14 , Issue.2 , pp. 167-181
    • Youssef, H.1    M. Sait, S.2    Adiche, H.3
  • 105
    • 0035399781 scopus 로고    scopus 로고
    • The hybrid heuristic genetic algorithm for job shop scheduling
    • DOI 10.1016/S0360-8352(01)00017-1, PII S0360835201000171
    • H. Zhou Y. Feng L. Han 2001 The hybrid heuristic genetic algorithm for job shop scheduling Computers and Industrial Engineering 40 3 191 200 (Pubitemid 32573623)
    • (2001) Computers and Industrial Engineering , vol.40 , Issue.3 , pp. 191-200
    • Zhou, H.1    Feng, Y.2    Han, L.3
  • 107
    • 0002292918 scopus 로고
    • Scheduling and rescheduling with iterative repair
    • Morgan Kaufmann San Mateo
    • Zweben, M., Daun, B., & Deale, M. (1994). Scheduling and rescheduling with iterative repair. In M. Zweben & M. S. Fox (Eds.), Intelligent scheduling (pp. 241-254). San Mateo: Morgan Kaufmann.
    • (1994) Intelligent Scheduling , pp. 241-254
    • Zweben, M.1    Daun, B.2    Deale, M.3    Zweben, M.4    Fox, M.S.5