메뉴 건너뛰기




Volumn 32, Issue 8, 2008, Pages 1689-1706

Proactive approach to address the uncertainty in short-term scheduling

Author keywords

Proactive scheduling; Rescheduling; Robustness; Uncertainty

Indexed keywords

MATHEMATICAL MODELS; PROBLEM SOLVING; ROBUSTNESS (CONTROL SYSTEMS); SUPPLY CHAIN MANAGEMENT;

EID: 44349131406     PISSN: 00981354     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.compchemeng.2007.08.014     Document Type: Article
Times cited : (27)

References (47)
  • 1
    • 5144232431 scopus 로고    scopus 로고
    • Executing production schedules in the face of uncertainties: A review and some future directions
    • Aytug H., Lawley M., McKay K., Mohan S., and Uzsoy R. Executing production schedules in the face of uncertainties: A review and some future directions. European Journal of Operational Research 161 (2005) 86-110
    • (2005) European Journal of Operational Research , vol.161 , pp. 86-110
    • Aytug, H.1    Lawley, M.2    McKay, K.3    Mohan, S.4    Uzsoy, R.5
  • 3
    • 0037081993 scopus 로고    scopus 로고
    • A novel branch and bound algorithm for scheduling flowshop plants with uncertain processing times
    • Balasubramanian J., and Grossmann I. A novel branch and bound algorithm for scheduling flowshop plants with uncertain processing times. Computers and Chemical Engineering 26 (2002) 41-57
    • (2002) Computers and Chemical Engineering , vol.26 , pp. 41-57
    • Balasubramanian, J.1    Grossmann, I.2
  • 4
    • 44349192826 scopus 로고    scopus 로고
    • Björkqvist, J. (2005, February). Scheduling batch processing: Genetic algorithm versus mathematical programming. In: Cape forum. Romania: Cluj-Napoca. http://www.tucs.fi/publications/attachment.php?fname=inpBjorkqvist05a.pdf.
    • Björkqvist, J. (2005, February). Scheduling batch processing: Genetic algorithm versus mathematical programming. In: Cape forum. Romania: Cluj-Napoca. http://www.tucs.fi/publications/attachment.php?fname=inpBjorkqvist05a.pdf.
  • 7
    • 44349153096 scopus 로고    scopus 로고
    • Cantón, J. (2003). Integrated support system for planning and scheduling of batch chemical plants. Ph.D. thesis. Universitat Politècnica de Catalunya. http://www.tdx.cesca.es/TDX-0707103-125200/index_cs.html.
    • Cantón, J. (2003). Integrated support system for planning and scheduling of batch chemical plants. Ph.D. thesis. Universitat Politècnica de Catalunya. http://www.tdx.cesca.es/TDX-0707103-125200/index_cs.html.
  • 8
    • 44349140202 scopus 로고    scopus 로고
    • Chipperfield, A., Fleming, P., Pohlheim, H., & Fonseca, C. (1994). Genetic Algorithm Toolbox for use with MATLAB Version 1.2 User's Guide. Department of Automatic Control and Systems Engineering. University of Sheffield, UK, http://www.pohlheim.com/papers_pohlheim.html.
    • Chipperfield, A., Fleming, P., Pohlheim, H., & Fonseca, C. (1994). Genetic Algorithm Toolbox for use with MATLAB Version 1.2 User's Guide. Department of Automatic Control and Systems Engineering. University of Sheffield, UK, http://www.pohlheim.com/papers_pohlheim.html.
  • 10
    • 0037322687 scopus 로고    scopus 로고
    • A novel sampling approach to combinatorial optimization under uncertainty
    • Diwekar U. A novel sampling approach to combinatorial optimization under uncertainty. Computational Optimization and Applications 24 (2003) 335-371
    • (2003) Computational Optimization and Applications , vol.24 , pp. 335-371
    • Diwekar, U.1
  • 11
    • 0031075349 scopus 로고    scopus 로고
    • Efficient sampling technique for optimization under uncertainty
    • Diwekar U.M., and Kalagnanam J.R. Efficient sampling technique for optimization under uncertainty. AIChE Journal 43 2 (1997) 440-447
    • (1997) AIChE Journal , vol.43 , Issue.2 , pp. 440-447
    • Diwekar, U.M.1    Kalagnanam, J.R.2
  • 12
    • 25144487283 scopus 로고    scopus 로고
    • Research challenges, opportunities and synergism in systems engineering and computational biology
    • Floudas C. Research challenges, opportunities and synergism in systems engineering and computational biology. AIChE Journal 51 7 (2005) 1872-1884
    • (2005) AIChE Journal , vol.51 , Issue.7 , pp. 1872-1884
    • Floudas, C.1
  • 13
    • 44349161840 scopus 로고    scopus 로고
    • Galassi, M., Davis, J., Theiler, J., Gough, B., Jungman, G., Booth, M., & Rossi, F. (2001). GNU scientific library. http://www.gnu.org/software/gsl/; http://gnuwin32.sourceforge.net/packages/gsl.htm, version 1.0.
    • Galassi, M., Davis, J., Theiler, J., Gough, B., Jungman, G., Booth, M., & Rossi, F. (2001). GNU scientific library. http://www.gnu.org/software/gsl/; http://gnuwin32.sourceforge.net/packages/gsl.htm, version 1.0.
  • 15
    • 77956837920 scopus 로고    scopus 로고
    • Robust mixed stochastic enumerative search technique for batch sequencing problems
    • Pierucci S. (Ed), Elsevier
    • Graells M., Cantón J., and Puigjaner L. Robust mixed stochastic enumerative search technique for batch sequencing problems. In: Pierucci S. (Ed). European symposium on computer-aided process engineering (2000), Elsevier 1129-1134
    • (2000) European symposium on computer-aided process engineering , pp. 1129-1134
    • Graells, M.1    Cantón, J.2    Puigjaner, L.3
  • 16
    • 9744249461 scopus 로고    scopus 로고
    • Challenges in the new millennium: Product discovery and design, enterprise and supply chain optimization, global life cycle assessment
    • Grossmann I.E. Challenges in the new millennium: Product discovery and design, enterprise and supply chain optimization, global life cycle assessment. Computers and Chemical Engineering 29 (2004) 29-39
    • (2004) Computers and Chemical Engineering , vol.29 , pp. 29-39
    • Grossmann, I.E.1
  • 19
    • 1542502674 scopus 로고    scopus 로고
    • Robust and reactive project scheduling: A review and classification of procedures
    • Herroelen W., and Leus R. Robust and reactive project scheduling: A review and classification of procedures. International Journal of Production Research 42 8 (2004) 1599-1620
    • (2004) International Journal of Production Research , vol.42 , Issue.8 , pp. 1599-1620
    • Herroelen, W.1    Leus, R.2
  • 20
    • 13444269168 scopus 로고    scopus 로고
    • Project scheduling under uncertainty: Survey and research potentials
    • Herroelen W., and Leus R. Project scheduling under uncertainty: Survey and research potentials. European Journal of Operational Research 165 (2005) 289-306
    • (2005) European Journal of Operational Research , vol.165 , pp. 289-306
    • Herroelen, W.1    Leus, R.2
  • 22
    • 44349181022 scopus 로고    scopus 로고
    • International Society for Measurement and Control. (1995, October). ANSI/ISA-S88.01-1995, batch control. Part I. Models and terminology.
    • International Society for Measurement and Control. (1995, October). ANSI/ISA-S88.01-1995, batch control. Part I. Models and terminology.
  • 23
    • 44349107176 scopus 로고    scopus 로고
    • International Society for Measurement and Control. (1999). ANSI/ISA-S88.01-1995, batch control. Part II. Data structures and guidelines for languages.
    • International Society for Measurement and Control. (1999). ANSI/ISA-S88.01-1995, batch control. Part II. Data structures and guidelines for languages.
  • 24
    • 0038479948 scopus 로고    scopus 로고
    • Generating robust and flexible job shop schedules using genetic algorithms
    • Jensen M. Generating robust and flexible job shop schedules using genetic algorithms. IEEE Transactions on Evolutionary Computation 7 3 (2003) 275-288
    • (2003) IEEE Transactions on Evolutionary Computation , vol.7 , Issue.3 , pp. 275-288
    • Jensen, M.1
  • 25
    • 0037028987 scopus 로고    scopus 로고
    • Efficient combinatorial optimization under uncertainty. 1. Algorithmic development
    • Kim K., and Diwekar U.M. Efficient combinatorial optimization under uncertainty. 1. Algorithmic development. Industrial and Engineering Chemistry Research 41 (2002) 1276-1284
    • (2002) Industrial and Engineering Chemistry Research , vol.41 , pp. 1276-1284
    • Kim, K.1    Diwekar, U.M.2
  • 26
    • 0031152363 scopus 로고    scopus 로고
    • Computational investigations of low-discrepancy sequences
    • Kocis L., and Whiten W. Computational investigations of low-discrepancy sequences. ACM Transactions on Mathematical Software 23 2 (1997) 266-294
    • (1997) ACM Transactions on Mathematical Software , vol.23 , Issue.2 , pp. 266-294
    • Kocis, L.1    Whiten, W.2
  • 28
    • 0035836308 scopus 로고    scopus 로고
    • Batch process schedule optimization under parameter volatility
    • Lee Y.G., and Malone M.F. Batch process schedule optimization under parameter volatility. International Journal of Production Research 39 4 (2001) 603-623
    • (2001) International Journal of Production Research , vol.39 , Issue.4 , pp. 603-623
    • Lee, Y.G.1    Malone, M.F.2
  • 30
    • 0028499648 scopus 로고
    • Robustness measures and robust scheduling for job shops
    • Leon V., Wu S.D., and Storer R. Robustness measures and robust scheduling for job shops. IIE Transactions 26 5 (1994) 32-43
    • (1994) IIE Transactions , vol.26 , Issue.5 , pp. 32-43
    • Leon, V.1    Wu, S.D.2    Storer, R.3
  • 31
    • 1942532282 scopus 로고    scopus 로고
    • A new robust optimization approach for scheduling under uncertainty. I. Bounded uncertainty
    • Lin X., Janak S., and Floudas C. A new robust optimization approach for scheduling under uncertainty. I. Bounded uncertainty. Computers and Chemical Engineering 28 6-7 (2004) 1069-1085
    • (2004) Computers and Chemical Engineering , vol.28 , Issue.6-7 , pp. 1069-1085
    • Lin, X.1    Janak, S.2    Floudas, C.3
  • 32
    • 0032097829 scopus 로고    scopus 로고
    • Predictable scheduling of a job shop subject to breakdowns
    • Mehta S., and Uzsoy R. Predictable scheduling of a job shop subject to breakdowns. IEEE Transactions on Robotics and Automation 14 3 (1998) 365-378
    • (1998) IEEE Transactions on Robotics and Automation , vol.14 , Issue.3 , pp. 365-378
    • Mehta, S.1    Uzsoy, R.2
  • 33
    • 1942500440 scopus 로고    scopus 로고
    • An MILP framework for batch reactive scheduling with limited discrete resources
    • [rescheduling]
    • Mendez C., and Cerdá J. An MILP framework for batch reactive scheduling with limited discrete resources. Computers and Chemical Engineering 28 (2004) 1059-1068 [rescheduling]
    • (2004) Computers and Chemical Engineering , vol.28 , pp. 1059-1068
    • Mendez, C.1    Cerdá, J.2
  • 34
    • 0033343706 scopus 로고    scopus 로고
    • Predictable scheduling of a single machine with breakdowns and sensitive jobs
    • O'Donovan R., Uzsoy R., and McKay K. Predictable scheduling of a single machine with breakdowns and sensitive jobs. International Journal of Production Research 37 18 (1999) 4217-4233
    • (1999) International Journal of Production Research , vol.37 , Issue.18 , pp. 4217-4233
    • O'Donovan, R.1    Uzsoy, R.2    McKay, K.3
  • 35
    • 0037084885 scopus 로고    scopus 로고
    • Algorithm architectures to support large-scale process systems engineering applications involving combinatorics, uncertainty, and risk management
    • Pekny J.F. Algorithm architectures to support large-scale process systems engineering applications involving combinatorics, uncertainty, and risk management. Computers and Chemical Engineering 26 (2002) 239-267
    • (2002) Computers and Chemical Engineering , vol.26 , pp. 239-267
    • Pekny, J.F.1
  • 36
    • 0031271861 scopus 로고    scopus 로고
    • Multiperiod planning and scheduling of multiproduct batch plants under demand uncertainty
    • Petkov S., and Maranas C. Multiperiod planning and scheduling of multiproduct batch plants under demand uncertainty. Industrial and Engineering Chemistry Research 36 (1997) 4864-4881
    • (1997) Industrial and Engineering Chemistry Research , vol.36 , pp. 4864-4881
    • Petkov, S.1    Maranas, C.2
  • 37
    • 0034287910 scopus 로고    scopus 로고
    • Overview of planning and scheduling technologies
    • Reklaitis G. Overview of planning and scheduling technologies. Latin American Applied Research 30 (2000) 285-293
    • (2000) Latin American Applied Research , vol.30 , pp. 285-293
    • Reklaitis, G.1
  • 38
    • 0029723654 scopus 로고    scopus 로고
    • A combined scheduling/reactive scheduling strategy to minimize the effect of process operations uncertainty in batch plants
    • Sanmartí E., Huercio A., Espuña A., and Puigjaner L. A combined scheduling/reactive scheduling strategy to minimize the effect of process operations uncertainty in batch plants. Computers and Chemical Engineering 20 (1996) S1263-S1268
    • (1996) Computers and Chemical Engineering , vol.20
    • Sanmartí, E.1    Huercio, A.2    Espuña, A.3    Puigjaner, L.4
  • 40
    • 44349137019 scopus 로고    scopus 로고
    • Shah, N. (1998). Foundations of computer-aided process operations. AIChE symposium series. Ch. Single- and multisite planning and scheduling: current status and future challenges, pp. 75-90.
    • Shah, N. (1998). Foundations of computer-aided process operations. AIChE symposium series. Ch. Single- and multisite planning and scheduling: current status and future challenges, pp. 75-90.
  • 41
    • 0034550507 scopus 로고    scopus 로고
    • On the rate of convergence of optimal solutions of monte carlo applications of stochastic programs
    • Shapiro A., and Homem-de-Mello T. On the rate of convergence of optimal solutions of monte carlo applications of stochastic programs. SIAM Journal on Optimization 11 1 (2000) 70-86
    • (2000) SIAM Journal on Optimization , vol.11 , Issue.1 , pp. 70-86
    • Shapiro, A.1    Homem-de-Mello, T.2
  • 42
    • 0000672684 scopus 로고    scopus 로고
    • A simulation-optimization framework for research and development pipeline management
    • Subramanian D., Pekny J.F., and Reklaitis G.V. A simulation-optimization framework for research and development pipeline management. AIChE Journal 47 10 (2001) 2226-2241
    • (2001) AIChE Journal , vol.47 , Issue.10 , pp. 2226-2241
    • Subramanian, D.1    Pekny, J.F.2    Reklaitis, G.V.3
  • 43
    • 0037236678 scopus 로고    scopus 로고
    • Simulation-optimization framework for stochastic optimization of R&D pipeline management
    • Subramanian D., Pekny J.F., Reklaitis G.V., and Blau G.E. Simulation-optimization framework for stochastic optimization of R&D pipeline management. AIChE Journal 49 1 (2003) 96-112
    • (2003) AIChE Journal , vol.49 , Issue.1 , pp. 96-112
    • Subramanian, D.1    Pekny, J.F.2    Reklaitis, G.V.3    Blau, G.E.4
  • 44
    • 44349148011 scopus 로고    scopus 로고
    • Van de Vonder, S., Demeulemeester, E., & Herroelen, W. (2005). Heuristic procedures for generating stable project baseline schedules. Tech. Rep. Research report 0516. K.U. Leuven, Belgium: Department of Applied Economics.
    • Van de Vonder, S., Demeulemeester, E., & Herroelen, W. (2005). Heuristic procedures for generating stable project baseline schedules. Tech. Rep. Research report 0516. K.U. Leuven, Belgium: Department of Applied Economics.
  • 45
    • 0035904351 scopus 로고    scopus 로고
    • Robust short-term scheduling of multiproduct batch plants under demand uncertainty
    • Vin J., and Ierapetritou M. Robust short-term scheduling of multiproduct batch plants under demand uncertainty. Industrial and Engineering Chemistry Research 40 (2001) 4543-4554
    • (2001) Industrial and Engineering Chemistry Research , vol.40 , pp. 4543-4554
    • Vin, J.1    Ierapetritou, M.2
  • 46
    • 44349094433 scopus 로고    scopus 로고
    • Wall, M. (1996). Galib: A C++ library of genetic algorithm components. Version 2.4. http://lancet.mit.edu/ga.
    • Wall, M. (1996). Galib: A C++ library of genetic algorithm components. Version 2.4. http://lancet.mit.edu/ga.
  • 47
    • 0342757703 scopus 로고    scopus 로고
    • A genetic algorithm for online-scheduling of a multiproduct polymer batch plant
    • Wang K., Löhl T., Stobbe M., and Engell S. A genetic algorithm for online-scheduling of a multiproduct polymer batch plant. Computers and Chemical Engineering 24 (2000) 393-400
    • (2000) Computers and Chemical Engineering , vol.24 , pp. 393-400
    • Wang, K.1    Löhl, T.2    Stobbe, M.3    Engell, S.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.