메뉴 건너뛰기




Volumn 39, Issue 11, 2000, Pages 4228-4238

A new approach for efficient rescheduling of multiproduct batch plants

Author keywords

[No Author keywords available]

Indexed keywords

BINARY SEQUENCES; COMPUTATIONAL METHODS; CONSTRAINT THEORY; GRAPH THEORY; LINEAR PROGRAMMING; MATHEMATICAL MODELS;

EID: 0034332903     PISSN: 08885885     EISSN: None     Source Type: Journal    
DOI: 10.1021/ie000233z     Document Type: Article
Times cited : (96)

References (13)
  • 1
    • 0022129820 scopus 로고
    • Deterministic variability analysis for intermediate storage in noncontinuous processes. Part I: Allowability conditions
    • Karimi, I. A.;-Reklaitis, G. V. Deterministic variability analysis for intermediate storage in noncontinuous processes. Part i: Allowability conditions. AIChE J. 1985, 31, 1516.
    • (1985) AIChE J. , vol.31 , pp. 1516
    • Karimi, I.A.1    Reklaitis, G.V.2
  • 2
    • 0022132055 scopus 로고
    • Deterministic variability analysis for intermediate storage in noncontinuous processes. Part ii: Storage sizing for serial systems
    • Karimi, I. A.; Reklaitis, G. V. Deterministic variability analysis for intermediate storage in noncontinuous processes. Part ii: Storage sizing for serial systems. AIChE J. 1985, 31, 1528.
    • (1985) AIChE J. , vol.31 , pp. 1528
    • Karimi, I.A.1    Reklaitis, G.V.2
  • 3
    • 0022914862 scopus 로고
    • An online operating control system for a class of combined batch/semi continuous processes
    • Onogi, K.; Nishimura, Y.; Nakata, Y.; Inomata, T. An online operating control system for a class of combined batch/semi continuous processes. J. Chem. Eng. Jpn. 1986, 19, 542.
    • (1986) J. Chem. Eng. Jpn. , vol.19 , pp. 542
    • Onogi, K.1    Nishimura, Y.2    Nakata, Y.3    Inomata, T.4
  • 4
    • 0001499525 scopus 로고
    • Minimizing the effects of batch process variability using on-line schedule modification
    • Cott, B. J.; Machietto, S. Minimizing the effects of batch process variability using on-line schedule modification. Comput. Chem. Eng. 1989, 13, 105.
    • (1989) Comput. Chem. Eng. , vol.13 , pp. 105
    • Cott, B.J.1    Machietto, S.2
  • 6
    • 0030786875 scopus 로고    scopus 로고
    • Reactive schedule modification in multipurpose batch chemical plants
    • Jain, A. K.; Elmaraghy, A. Reactive schedule modification in multipurpose batch chemical plants. Int. J. Prod. Res. 1997, 35, 281.
    • (1997) Int. J. Prod. Res. , vol.35 , pp. 281
    • Jain, A.K.1    Elmaraghy, A.2
  • 7
    • 0032000378 scopus 로고    scopus 로고
    • Evaluation of ordering strategies for constraint satisfaction reactive scheduling
    • Shu, M. S.; Lee, A.; Lee, Y. J.; Ko, Y. K. Evaluation of ordering strategies for constraint satisfaction reactive scheduling. Dec. Sup. Sys. 1998, 22, 187.
    • (1998) Dec. Sup. Sys. , vol.22 , pp. 187
    • Shu, M.S.1    Lee, A.2    Lee, Y.J.3    Ko, Y.K.4
  • 8
    • 0032216021 scopus 로고    scopus 로고
    • Effective continuous-time formulation for short-term scheduling: I. Multipurpose batch processes
    • Ierapetritou, M. G.; Floudas, C. A. Effective continuous-time formulation for short-term scheduling: I. Multipurpose batch processes. Ind. Eng. Chem. Res. 1998, 37, 4341.
    • (1998) Ind. Eng. Chem. Res. , vol.37 , pp. 4341
    • Ierapetritou, M.G.1    Floudas, C.A.2
  • 9
    • 0004284838 scopus 로고    scopus 로고
    • ILOG Corporation: Incline Village, NV
    • CPLEX Manual, ILOG Corporation: Incline Village, NV, 1998.
    • (1998) CPLEX Manual
  • 11
    • 0000802739 scopus 로고
    • Optimization for design problems having more than one objective function
    • Clark, P. A.; Westerberg, A. W. Optimization for Design Problems Having more than One Objective Function. Comput. Chem. Eng. 1983, 7, 259.
    • (1983) Comput. Chem. Eng. , vol.7 , pp. 259
    • Clark, P.A.1    Westerberg, A.W.2
  • 12
    • 0031186347 scopus 로고    scopus 로고
    • Planning and scheduling of parallel semicontinuous processes. 2. Short-term scheduling
    • Karimi, I. A.; McDonald, C. M. Planning and Scheduling of Parallel Semicontinuous Processes. 2. Short-term Scheduling. Ind. Eng. Chem. Res. 1997, 36, 2701.
    • (1997) Ind. Eng. Chem. Res. , vol.36 , pp. 2701
    • Karimi, I.A.1    McDonald, C.M.2
  • 13
    • 0032877613 scopus 로고    scopus 로고
    • Effective continuous-time formulation for short-term scheduling. Multiple intermediate due dates
    • Ierapetritou M. G.; Hene, T. S.; Floudas, C. A. Effective continuous-time formulation for short-term scheduling. Multiple intermediate due dates. Ind. Eng. Chem. Res. 1999, 38, 3446.
    • (1999) Ind. Eng. Chem. Res. , vol.38 , pp. 3446
    • Ierapetritou, M.G.1    Hene, T.S.2    Floudas, C.A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.