메뉴 건너뛰기




Volumn 16, Issue 6, 2015, Pages 2997-3016

A Survey on Problem Models and Solution Approaches to Rescheduling in Railway Networks

Author keywords

alternative graphs; heuristics; meta heuristics; mixed integer programming; railway networks; Rescheduling

Indexed keywords

COMPUTATION THEORY; INTEGER PROGRAMMING; RAILROADS; SURVEYS;

EID: 84956668751     PISSN: 15249050     EISSN: None     Source Type: Journal    
DOI: 10.1109/TITS.2015.2446985     Document Type: Review
Times cited : (182)

References (128)
  • 1
    • 84891122548 scopus 로고    scopus 로고
    • Scheduling and rescheduling of railway operations: A review and expository analysis
    • Dec
    • S. Narayanaswami and N. Rangaraj, "Scheduling and rescheduling of railway operations: A review and expository analysis," Technol. Oper. Manage., vol. 2, no. 2, pp. 102-122, Dec. 2011.
    • (2011) Technol. Oper. Manage. , vol.2 , Issue.2 , pp. 102-122
    • Narayanaswami, S.1    Rangaraj, N.2
  • 2
    • 78649431753 scopus 로고    scopus 로고
    • Computer-based decision support for railway traffic scheduling and dispatching: A review of models and algorithms
    • J. Törnquist, "Computer-based decision support for railway traffic scheduling and dispatching: A review of models and algorithms," in Proc. 5th Workshop Algorithmic Methods Models Optim. Railways, 2006, p. 659.
    • (2006) Proc. 5th Workshop Algorithmic Methods Models Optim. Railways , pp. 659
    • Törnquist, J.1
  • 3
    • 0242703954 scopus 로고    scopus 로고
    • Rescheduling manufacturing systems: A framework of strategies, policies, and methods
    • Jan
    • G. E. Vieira, J. W. Herrmann, and E. Lin, "Rescheduling manufacturing systems: A framework of strategies, policies, and methods," J. Sched., vol. 6, no. 1, pp. 39-62, Jan. 2003.
    • (2003) J. Sched. , vol.6 , Issue.1 , pp. 39-62
    • Vieira, G.E.1    Herrmann, J.W.2    Lin, E.3
  • 4
    • 0028532251 scopus 로고
    • Extending a train pathing model from one-way to two-way track
    • Oct
    • M. Carey, "Extending a train pathing model from one-way to two-way track," Transp. Res. B, Methodol., vol. 28, no. 5, pp. 395-400, Oct. 1994.
    • (1994) Transp. Res. B, Methodol. , vol.28 , Issue.5 , pp. 395-400
    • Carey, M.1
  • 5
    • 0028530808 scopus 로고
    • A model and strategy for train pathing with choice of lines, platforms, and routes
    • Oct
    • M. Carey, "A model and strategy for train pathing with choice of lines, platforms, and routes," Transp. Res. B, Methodol., vol. 28, no. 5, pp. 333-353, Oct. 1994.
    • (1994) Transp. Res. B, Methodol. , vol.28 , Issue.5 , pp. 333-353
    • Carey, M.1
  • 6
    • 0029236610 scopus 로고
    • A model, algorithms and strategy for train pathing
    • Aug
    • M. Carey and D. Lockwood, "A model, algorithms and strategy for train pathing," J. Oper. Res. Soc., vol. 46, no. 8, pp. 988-1005, Aug. 1995.
    • (1995) J. Oper. Res. Soc. , vol.46 , Issue.8 , pp. 988-1005
    • Carey, M.1    Lockwood, D.2
  • 7
    • 69849092328 scopus 로고    scopus 로고
    • Constraint programming and mixed integer linear programming for rescheduling trains under disrupted operations
    • Proc. 6th Int. Conf. Integr. AI OR Tech. Constraint Programm. Combinatorial Optim. Probl.
    • R. Acuna-Agost, P. Michelon, D. Feillet, and S. Gueye, "Constraint programming and mixed integer linear programming for rescheduling trains under disrupted operations," in Proc. 6th Int. Conf. Integr. AI OR Tech. Constraint Programm. Combinatorial Optim. Probl., 2009, vol. 5547, Lecture Notes in Computer Science, pp. 312-313.
    • (2009) Lecture Notes in Computer Science , vol.5547 , pp. 312-313
    • Acuna-Agost, R.1    Michelon, P.2    Feillet, D.3    Gueye, S.4
  • 8
    • 85018760733 scopus 로고    scopus 로고
    • Introduction and classification of existing rescheduling literature
    • Lyngby, Denmark, Course Lecture
    • D. Pacciarelli, "Introduction and classification of existing rescheduling literature," in Proc. 5th Int. Semin. Rail Oper. Modeling Anal. Rail-Copenhagen, Lyngby, Denmark, Course Lecture, 2013, pp. 1-48.
    • (2013) Proc. 5th Int. Semin. Rail Oper. Modeling Anal. Rail-Copenhagen , pp. 1-48
    • Pacciarelli, D.1
  • 9
    • 84896786219 scopus 로고    scopus 로고
    • An overview of recovery models and algorithms for real-time railway rescheduling
    • May
    • V. Cacchiani et al., "An overview of recovery models and algorithms for real-time railway rescheduling," Transp. Res. B, Methodol., vol. 63, pp. 15-37, May 2014.
    • (2014) Transp. Res. B, Methodol. , vol.63 , pp. 15-37
    • Cacchiani, V.1
  • 11
    • 84893291436 scopus 로고    scopus 로고
    • A review on quantitative models in railway rescheduling
    • Jun
    • Z. Alwadood, A. Shuib, and N. A. Hamid, "A review on quantitative models in railway rescheduling," Int. J. Sci. Eng. Res., vol. 3, no. 6, pp. 1-7, Jun. 2012.
    • (2012) Int. J. Sci. Eng. Res. , vol.3 , Issue.6 , pp. 1-7
    • Alwadood, Z.1    Shuib, A.2    Hamid, N.A.3
  • 12
    • 84893333915 scopus 로고    scopus 로고
    • A review of online dynamic models and algorithms for railway traffic management
    • Jun
    • F. Corman and L. Meng, "A review of online dynamic models and algorithms for railway traffic management," IEEE Trans. Intell. Transp. Syst., vol. 16, no. 3, pp. 1274-1284, Jun. 2014.
    • (2014) IEEE Trans. Intell. Transp. Syst. , vol.16 , Issue.3 , pp. 1274-1284
    • Corman, F.1    Meng, L.2
  • 13
    • 49949111098 scopus 로고    scopus 로고
    • Integer programming approaches for solving the delay management problem
    • Proc. 4th Int. Workshop Algorithmic Methods Railway Optim.
    • A. Schöbel, "Integer programming approaches for solving the delay management problem," in Proc. 4th Int. Workshop Algorithmic Methods Railway Optim., 2007, vol. 4359, Lecture Notes in Computer Science, pp. 145-170.
    • (2007) Lecture Notes in Computer Science , vol.4359 , pp. 145-170
    • Schöbel, A.1
  • 14
    • 77956309171 scopus 로고    scopus 로고
    • IP-based techniques for delay management with priority decisions
    • Karlsruhe, Germany
    • M. Schachtebeck and A. Schöbel, "IP-based techniques for delay management with priority decisions," in Proc. 8th Workshop Algorithmic ATMOS, Karlsruhe, Germany, vol. 9, 2008, pp. 1-16.
    • (2008) Proc. 8th Workshop Algorithmic ATMOS , vol.9 , pp. 1-16
    • Schachtebeck, M.1    Schöbel, A.2
  • 15
    • 77955597779 scopus 로고    scopus 로고
    • Capacity constraints in delay management
    • Jun
    • A. Schöbel, "Capacity constraints in delay management," Public Transp., vol. 1, no. 2, pp. 135-154, Jun. 2009.
    • (2009) Public Transp. , vol.1 , Issue.2 , pp. 135-154
    • Schöbel, A.1
  • 16
    • 77955639714 scopus 로고    scopus 로고
    • To wait or not to wait and who goes first? Delay management with priority decisions
    • M. Schachtebeck and A. Schöbel, "To wait or not to wait and who goes first? Delay management with priority decisions," Transp. Sci., vol. 44, no. 3, pp. 307-321, 2010.
    • (2010) Transp. Sci. , vol.44 , Issue.3 , pp. 307-321
    • Schachtebeck, M.1    Schöbel, A.2
  • 18
    • 84859780630 scopus 로고    scopus 로고
    • Delay management with rerouting of passengers
    • Feb
    • T. Dollevoet, D. Huisman, M. Schmidt, and A. Schöbel, "Delay management with rerouting of passengers," Transp. Sci., vol. 46, no. 1, pp. 74-89, Feb. 2012.
    • (2012) Transp. Sci. , vol.46 , Issue.1 , pp. 74-89
    • Dollevoet, T.1    Huisman, D.2    Schmidt, M.3    Schöbel, A.4
  • 19
    • 84960092795 scopus 로고    scopus 로고
    • Fast heuristics for delay management with passenger rerouting
    • The Netherlands, Tech. Rep. Econometric Inst. Oct
    • T. Dollevoet and D. Huisman, "Fast heuristics for delay management with passenger rerouting," Erasmus Univ. Rotterdam, Rotterdam, The Netherlands, Tech. Rep. Econometric Inst. EI2011-35, Oct. 2011.
    • (2011) Erasmus Univ. Rotterdam, Rotterdam
    • Dollevoet, T.1    Huisman, D.2
  • 20
    • 10644237939 scopus 로고    scopus 로고
    • Simultaneous disruption recovery of a train timetable and crew roster in real time
    • Aug
    • C. G. Walker, J. N. Snowdon, and D. M. Ryan, "Simultaneous disruption recovery of a train timetable and crew roster in real time," Comput. Oper. Res., vol. 32, no. 8, pp. 2077-2094, Aug. 2005.
    • (2005) Comput. Oper. Res. , vol.32 , Issue.8 , pp. 2077-2094
    • Walker, C.G.1    Snowdon, J.N.2    Ryan, D.M.3
  • 21
    • 0012700693 scopus 로고    scopus 로고
    • Periodic network optimization with different arc frequencies
    • Aug
    • K. Nachtigall, "Periodic network optimization with different arc frequencies," Discr. Appl. Math., vol. 69, no. 1/2, pp. 1-17, Aug. 1996.
    • (1996) Discr. Appl. Math. , vol.69 , Issue.1-2 , pp. 1-17
    • Nachtigall, K.1
  • 23
    • 77949508569 scopus 로고    scopus 로고
    • Crew and vehicle rescheduling based on a network flow model and its application to a railway train operation
    • Sep
    • T. Sato, S. Sakikawa, T. Morita, N. Ueki, and T. Muratay, "Crew and vehicle rescheduling based on a network flow model and its application to a railway train operation," IAENG Int. J. Appl. Math., vol. 39, no. 3, pp. 142-150, Sep. 2009.
    • (2009) IAENG Int. J. Appl. Math. , vol.39 , Issue.3 , pp. 142-150
    • Sato, T.1    Sakikawa, S.2    Morita, T.3    Ueki, N.4    Muratay, T.5
  • 24
    • 77953258592 scopus 로고    scopus 로고
    • An algorithm for freight train driver rescheduling in disruption situations
    • K. Sato and N. Fukumura, "An algorithm for freight train driver rescheduling in disruption situations," Quart. Rep. RTRI, vol. 51, no. 2, pp. 72-76, 2010.
    • (2010) Quart. Rep. RTRI , vol.51 , Issue.2 , pp. 72-76
    • Sato, K.1    Fukumura, N.2
  • 25
    • 84863027874 scopus 로고    scopus 로고
    • A Lagrangian relaxation method for crew and vehicle rescheduling of railway passenger transportation and its application
    • T. Sato, T. Tomiyama, T. Morita, and T. Murata, "A Lagrangian relaxation method for crew and vehicle rescheduling of railway passenger transportation and its application," IEEJ Trans. Electron., Inf. Syst., vol. 132, no. 2, pp. 260-268, 2012.
    • (2012) IEEJ Trans. Electron., Inf. Syst. , vol.132 , Issue.2 , pp. 260-268
    • Sato, T.1    Tomiyama, T.2    Morita, T.3    Murata, T.4
  • 26
    • 84859705420 scopus 로고    scopus 로고
    • A model predictive control approach for discrete-time rescheduling in complex central railway station areas
    • Nov
    • G. Caimi, M. Fuchsberger, M. Laumanns, and M. Lüthi, "A model predictive control approach for discrete-time rescheduling in complex central railway station areas," Comput. Oper. Res., vol. 39, no. 11, pp. 2578-2593, Nov. 2012.
    • (2012) Comput. Oper. Res. , vol.39 , Issue.11 , pp. 2578-2593
    • Caimi, G.1    Fuchsberger, M.2    Laumanns, M.3    Lüthi, M.4
  • 27
    • 0028436769 scopus 로고
    • A fast heuristic for the train scheduling problem
    • May
    • X. Cai and C. J. Goh, "A fast heuristic for the train scheduling problem," Comput. Oper. Res., vol. 21, no. 5, pp. 499-510, May 1994.
    • (1994) Comput. Oper. Res. , vol.21 , Issue.5 , pp. 499-510
    • Cai, X.1    Goh, C.J.2
  • 28
    • 0032070192 scopus 로고    scopus 로고
    • Greedy heuristics for rapid scheduling of trains on a single track
    • X. Cai, C. J. Goh, and A. I. Mees, "Greedy heuristics for rapid scheduling of trains on a single track," IIE Trans., vol. 30, no. 5, pp. 481-493, 1998.
    • (1998) IIE Trans. , vol.30 , Issue.5 , pp. 481-493
    • Cai, X.1    Goh, C.J.2    Mees, A.I.3
  • 29
    • 36448977879 scopus 로고    scopus 로고
    • Railway traffic disturbance management - An experimental analysis of disturbance complexity, management objectives and limitations in planning horizon
    • Mar
    • J. Törnquist, "Railway traffic disturbance management - An experimental analysis of disturbance complexity, management objectives and limitations in planning horizon," Transp. Res. A, Policy Pract., vol. 41, no. 3, pp. 249-266, Mar. 2007.
    • (2007) Transp. Res. A, Policy Pract. , vol.41 , Issue.3 , pp. 249-266
    • Törnquist, J.1
  • 30
    • 33845266135 scopus 로고    scopus 로고
    • N-tracked railway traffic re-scheduling during disturbances
    • Mar
    • J. Törnquist and J. A. Persson, "N-tracked railway traffic re-scheduling during disturbances," Transp. Res. B, Methodol., vol. 41, no. 3, pp. 342-362, Mar. 2007.
    • (2007) Transp. Res. B, Methodol. , vol.41 , Issue.3 , pp. 342-362
    • Törnquist, J.1    Persson, J.A.2
  • 32
    • 78751483806 scopus 로고    scopus 로고
    • Greedy algorithm for railway traffic re-scheduling during disturbances: A Swedish case
    • Dec
    • J. Törnquist, "Greedy algorithm for railway traffic re-scheduling during disturbances: A Swedish case," IET Intell. Transp. Syst., vol. 4, no. 4, pp. 375-386, Dec. 2010.
    • (2010) IET Intell. Transp. Syst. , vol.4 , Issue.4 , pp. 375-386
    • Törnquist, J.1
  • 33
    • 80054777781 scopus 로고    scopus 로고
    • Design of an effective algorithm for fast response to the re-scheduling of railway traffic during disturbances
    • Feb
    • J. Törnquist, "Design of an effective algorithm for fast response to the re-scheduling of railway traffic during disturbances," Transp. Res. C, Emerging Technol., vol. 20, no. 1, pp. 62-78, Feb. 2012.
    • (2012) Transp. Res. C, Emerging Technol. , vol.20 , Issue.1 , pp. 62-78
    • Törnquist, J.1
  • 34
    • 84861976184 scopus 로고    scopus 로고
    • A parallel rescheduling algorithm for railway traffic disturbance management - Initial results
    • H. Grahn and J. Törnquist, "A parallel rescheduling algorithm for railway traffic disturbance management - Initial results," in Proc. 2nd Int. Conf. Models Technol. Intell. Transp. Syst., 2011, pp. 1-4.
    • (2011) Proc. 2nd Int. Conf. Models Technol. Intell. Transp. Syst. , pp. 1-4
    • Grahn, H.1    Törnquist, J.2
  • 35
    • 84870583345 scopus 로고    scopus 로고
    • A comparative evaluation of rescheduling strategies for train dispatching during disturbances
    • S. Iqbal, H. Grahn, and J. Törnquist, "A comparative evaluation of rescheduling strategies for train dispatching during disturbances," in Proc. 13th Int. Conf. Des. COMPRAIL Eng., 2012, pp. 567-579.
    • (2012) Proc. 13th Int. Conf. Des. COMPRAIL Eng. , pp. 567-579
    • Iqbal, S.1    Grahn, H.2    Törnquist, J.3
  • 36
    • 79960905667 scopus 로고    scopus 로고
    • SAPI: Statistical analysis of propagation of incidents. A new approach for rescheduling trains after disruptions
    • Nov
    • R. Acuna-Agost, P. Michelon, D. Feillet, and S. Gueye, "SAPI: Statistical analysis of propagation of incidents. A new approach for rescheduling trains after disruptions," Eur. J. Oper. Res., vol. 215, no. 1, pp. 227-243, Nov. 2011.
    • (2011) Eur. J. Oper. Res. , vol.215 , Issue.1 , pp. 227-243
    • Acuna-Agost, R.1    Michelon, P.2    Feillet, D.3    Gueye, S.4
  • 37
    • 0039258445 scopus 로고    scopus 로고
    • On-line timetable re-scheduling in regional train services
    • Aug
    • B. Adenso-Díaz, M. O. González, and P. González-Torre, "On-line timetable re-scheduling in regional train services," Transp. Res. B, Methodol., vol. 33, no. 6, pp. 387-398, Aug. 1999.
    • (1999) Transp. Res. B, Methodol. , vol.33 , Issue.6 , pp. 387-398
    • Adenso-Díaz, B.1    González, M.O.2    González-Torre, P.3
  • 38
    • 78650824016 scopus 로고    scopus 로고
    • An appraisal of a column-generation-based algorithm for centralized train-conflict resolution on a metropolitan railway network
    • Feb
    • Y.-H. Min, M.-J. Park, S.-P. Hong, and S.-H. Hong, "An appraisal of a column-generation-based algorithm for centralized train-conflict resolution on a metropolitan railway network," Transp. Res. B, Methodol., vol. 45, no. 2, pp. 409-429, Feb. 2011.
    • (2011) Transp. Res. B, Methodol. , vol.45 , Issue.2 , pp. 409-429
    • Min, Y.-H.1    Park, M.-J.2    Hong, S.-P.3    Hong, S.-H.4
  • 39
    • 30544435688 scopus 로고    scopus 로고
    • An exact solution procedure to determine the optimal dispatching times for complex rail networks
    • Feb
    • M. Dessouky, Q. Lu, J. Zhao, and R. Leachman, "An exact solution procedure to determine the optimal dispatching times for complex rail networks," IIE Trans., vol. 38, no. 2, pp. 141-152, Feb. 2006.
    • (2006) IIE Trans. , vol.38 , Issue.2 , pp. 141-152
    • Dessouky, M.1    Lu, Q.2    Zhao, J.3    Leachman, R.4
  • 43
    • 84893260074 scopus 로고    scopus 로고
    • Performance analysis of MILP based model predictive control algorithms for dynamic railway scheduling
    • J. Rudan, B. Kersbergen, T. van den Boom, and K. Hangos, "Performance analysis of MILP based model predictive control algorithms for dynamic railway scheduling," in Proc. Eur. Control Conf., 2013, pp. 4562-4567.
    • (2013) Proc. Eur. Control Conf. , pp. 4562-4567
    • Rudan, J.1    Kersbergen, B.2    Van Den Boom, T.3    Hangos, K.4
  • 44
    • 84872800397 scopus 로고    scopus 로고
    • A fuzzy optimization model for high-speed railway timetable rescheduling
    • L. Wang, Y. Qin, J. Xu, and L. Jia, "A fuzzy optimization model for high-speed railway timetable rescheduling," Discr. Dyn. Nat. Soc., vol. 2012, 2012, Art. ID. 827 073.
    • (2012) Discr. Dyn. Nat. Soc. , vol.2012
    • Wang, L.1    Qin, Y.2    Xu, J.3    Jia, L.4
  • 45
    • 78650137333 scopus 로고    scopus 로고
    • A note on the online nature of the railway delay management problem
    • Jan
    • N. Kliewer and L. Suhl, "A note on the online nature of the railway delay management problem," Networks, vol. 57, no. 1, pp. 28-37, Jan. 2011.
    • (2011) Networks , vol.57 , Issue.1 , pp. 28-37
    • Kliewer, N.1    Suhl, L.2
  • 46
    • 84896758073 scopus 로고    scopus 로고
    • Modelling train rescheduling with optimization and operational research techniques - Results and applications at SNCF
    • Montreal QC, Canada
    • L. Gély, G. Dessagne, and C. Lérin, "Modelling train rescheduling with optimization and operational research techniques - results and applications at SNCF," in Proc. World Congr. Railway Res., Montreal QC, Canada, 2006.
    • (2006) Proc. World Congr. Railway Res.
    • Gély, L.1    Dessagne, G.2    Lérin, C.3
  • 47
    • 85026931143 scopus 로고    scopus 로고
    • Solving the dispatching problem on multi-track territories by mixed integer linear programming
    • M. Boccia, C. Mannino, and I. Vasiliev, "Solving the dispatching problem on multi-track territories by mixed integer linear programming," in Proc. RAS Competition/INFORMS Meet., 2012, pp. 1-16.
    • (2012) Proc. RAS Competition/INFORMS Meet. , pp. 1-16
    • Boccia, M.1    Mannino, C.2    Vasiliev, I.3
  • 48
    • 84887082868 scopus 로고    scopus 로고
    • The dispatching problem on multitrack territories: Heuristic approaches based on mixed integer linear programming
    • Dec
    • M. Boccia, C. Mannino, and I. Vasilyev, "The dispatching problem on multitrack territories: Heuristic approaches based on mixed integer linear programming," Networks, vol. 62, no. 4, pp. 315-326, Dec. 2013.
    • (2013) Networks , vol.62 , Issue.4 , pp. 315-326
    • Boccia, M.1    Mannino, C.2    Vasilyev, I.3
  • 49
    • 79959786879 scopus 로고    scopus 로고
    • Scheduling freight trains traveling on complex networks
    • Aug
    • S. Mu and M. Dessouky, "Scheduling freight trains traveling on complex networks," Transp. Res. B, Methodol., vol. 45, no. 7, pp. 1103-1123, Aug. 2011.
    • (2011) Transp. Res. B, Methodol. , vol.45 , Issue.7 , pp. 1103-1123
    • Mu, S.1    Dessouky, M.2
  • 50
    • 84930969977 scopus 로고    scopus 로고
    • Mixed-integer programming based approaches for the movement planner problem: Model, heuristics and decomposition
    • C. Yan and L. Yang, "Mixed-integer programming based approaches for the movement planner problem: Model, heuristics and decomposition," in Proc. RAS Problem Solving Competition, 2012, pp. 1-14.
    • (2012) Proc. RAS Problem Solving Competition , pp. 1-14
    • Yan, C.1    Yang, L.2
  • 51
    • 84870241953 scopus 로고    scopus 로고
    • A set packing inspired method for real-time junction train routing
    • Mar
    • R. M. Lusby, J. Larsen, M. Ehrgott, and D. M. Ryan, "A set packing inspired method for real-time junction train routing," Comput. Oper. Res., vol. 40, no. 3, pp. 713-724, Mar. 2013.
    • (2013) Comput. Oper. Res. , vol.40 , Issue.3 , pp. 713-724
    • Lusby, R.M.1    Larsen, J.2    Ehrgott, M.3    Ryan, D.M.4
  • 52
    • 84881612519 scopus 로고    scopus 로고
    • Modelling disruptions and resolving conflicts optimally in a railway schedule
    • Jan
    • S. Narayanaswami and N. Rangaraj, "Modelling disruptions and resolving conflicts optimally in a railway schedule," Comput. Ind. Eng., vol. 64, no. 1, pp. 469-481, Jan. 2013.
    • (2013) Comput. Ind. Eng. , vol.64 , Issue.1 , pp. 469-481
    • Narayanaswami, S.1    Rangaraj, N.2
  • 53
    • 78650130562 scopus 로고    scopus 로고
    • A MIP-based local search method for the railway rescheduling problem
    • Jan
    • R. Acuna-Agost, P. Michelon, D. Feillet, and S. Gueye, "A MIP-based local search method for the railway rescheduling problem," Networks, vol. 57, no. 1, pp. 69-86, Jan. 2011.
    • (2011) Networks , vol.57 , Issue.1 , pp. 69-86
    • Acuna-Agost, R.1    Michelon, P.2    Feillet, D.3    Gueye, S.4
  • 54
    • 84889610071 scopus 로고    scopus 로고
    • Optimal train routing and scheduling for managing traffic perturbations in complex junctions
    • Jan
    • P. Pellegrini, G. Marlière, and J. Rodriguez, "Optimal train routing and scheduling for managing traffic perturbations in complex junctions," Transp. Res. B, Methodol., vol. 59, pp. 58-80, Jan. 2014.
    • (2014) Transp. Res. B, Methodol. , vol.59 , pp. 58-80
    • Pellegrini, P.1    Marlière, G.2    Rodriguez, J.3
  • 55
    • 0029416680 scopus 로고
    • Real-time scheduling of freight railroads
    • Jun
    • D. R. Kraay and P. T. Harker, "Real-time scheduling of freight railroads," Transp. Res. B, Methodol., vol. 29, no. 3, pp. 213-229, Jun. 1995.
    • (1995) Transp. Res. B, Methodol. , vol.29 , Issue.3 , pp. 213-229
    • Kraay, D.R.1    Harker, P.T.2
  • 57
    • 33748695294 scopus 로고    scopus 로고
    • A constraint programming model for real-time train scheduling at junctions
    • Feb
    • J. Rodriguez, "A constraint programming model for real-time train scheduling at junctions," Transp. Res. B, Methodol., vol. 41, no. 2, pp. 231-245, Feb. 2007.
    • (2007) Transp. Res. B, Methodol. , vol.41 , Issue.2 , pp. 231-245
    • Rodriguez, J.1
  • 59
    • 0036542288 scopus 로고    scopus 로고
    • A constraint-based interactive train rescheduling tool
    • Apr
    • C. K. Chiu, C. M. Chou, J. H. M. Lee, H. F. Leung, and Y. W. Leung, "A constraint-based interactive train rescheduling tool," Constraints, vol. 7, no. 2, pp. 167-198, Apr. 2002.
    • (2002) Constraints , vol.7 , Issue.2 , pp. 167-198
    • Chiu, C.K.1    Chou, C.M.2    Lee, J.H.M.3    Leung, H.F.4    Leung, Y.W.5
  • 60
    • 33644605120 scopus 로고    scopus 로고
    • A job-shop scheduling model for the single-track railway scheduling problem
    • Leeds, U.K.: University of Leeds School of Computer Studies
    • E. Oliveira and B. M. Smith, "A job-shop scheduling model for the single-track railway scheduling problem," in Research Report Series, no. 21. Leeds, U.K.: University of Leeds School of Computer Studies, 2000.
    • (2000) Research Report Series , Issue.21
    • Oliveira, E.1    Smith, B.M.2
  • 62
    • 34247631802 scopus 로고    scopus 로고
    • A combined constraint-based search method for single-track railway scheduling problem
    • Proc. 10th EPIA Portuguese Conf. Artif. Intell.
    • E. Oliveira and B. M. Smith, "A combined constraint-based search method for single-track railway scheduling problem," in Proc. 10th EPIA Portuguese Conf. Artif. Intell., 2001, vol. 2258, Lecture Notes in Computer Science, pp. 371-378.
    • (2001) Lecture Notes in Computer Science , vol.2258 , pp. 371-378
    • Oliveira, E.1    Smith, B.M.2
  • 63
    • 33748698838 scopus 로고    scopus 로고
    • A traffic management system for real-time traffic optimisation in railways
    • Feb
    • M. Mazzarello and E. Ottaviani, "A traffic management system for real-time traffic optimisation in railways," Transp. Res. B, Methodol., vol. 41, no. 2, pp. 246-274, Feb. 2007.
    • (2007) Transp. Res. B, Methodol. , vol.41 , Issue.2 , pp. 246-274
    • Mazzarello, M.1    Ottaviani, E.2
  • 64
    • 34249982545 scopus 로고    scopus 로고
    • A branch and bound algorithm for scheduling trains in a railway network
    • Dec
    • A. D'Ariano, D. Pacciarelli, and M. Pranzo, "A branch and bound algorithm for scheduling trains in a railway network," Eur. J. Oper. Res., vol. 183, no. 2, pp. 643-657, Dec. 2007.
    • (2007) Eur. J. Oper. Res. , vol.183 , Issue.2 , pp. 643-657
    • D'Ariano, A.1    Pacciarelli, D.2    Pranzo, M.3
  • 65
    • 34249889301 scopus 로고    scopus 로고
    • Conflict resolution and train speed coordination for solving real-time timetable perturbations
    • Jun
    • A. D'Ariano, M. Pranzo, and I. A. Hansen, "Conflict resolution and train speed coordination for solving real-time timetable perturbations," IEEE Trans. Intell. Transp. Syst., vol. 8, no. 2, pp. 208-222, Jun. 2007.
    • (2007) IEEE Trans. Intell. Transp. Syst. , vol.8 , Issue.2 , pp. 208-222
    • D'Ariano, A.1    Pranzo, M.2    Hansen, I.A.3
  • 66
    • 38849099559 scopus 로고    scopus 로고
    • Assessment of flexible timetables in real-time traffic management of a railway bottleneck
    • Jun
    • A. D'Ariano, D. Pacciarelli, and M. Pranzo, "Assessment of flexible timetables in real-time traffic management of a railway bottleneck," Transp. Res. C, Emerging Technol., vol. 16, no. 2, pp. 232-245, Jun. 2008.
    • (2008) Transp. Res. C, Emerging Technol. , vol.16 , Issue.2 , pp. 232-245
    • D'Ariano, A.1    Pacciarelli, D.2    Pranzo, M.3
  • 67
    • 70449635732 scopus 로고    scopus 로고
    • Reordering and local rerouting strategies to manage train traffic in real time
    • Nov
    • A. D'Ariano, F. Corman, D. Pacciarelli, and M. Pranzo, "Reordering and local rerouting strategies to manage train traffic in real time," Transp. Sci., vol. 42, no. 4, pp. 405-419, Nov. 2008.
    • (2008) Transp. Sci. , vol.42 , Issue.4 , pp. 405-419
    • D'Ariano, A.1    Corman, F.2    Pacciarelli, D.3    Pranzo, M.4
  • 68
    • 77949903477 scopus 로고    scopus 로고
    • Innovative decision support system for railway traffic control
    • Winter
    • A. D'Ariano, "Innovative decision support system for railway traffic control," IEEE Intell. Transp. Syst. Mag., vol. 1, no. 4, pp. 8-16, Winter 2009.
    • (2009) IEEE Intell. Transp. Syst. Mag. , vol.1 , Issue.4 , pp. 8-16
    • D'Ariano, A.1
  • 69
    • 69249202566 scopus 로고    scopus 로고
    • Evaluation of green wave policy in real-time railway traffic management
    • Dec
    • F. Corman, A. D'Ariano, D. Pacciarelli, and M. Pranzo, "Evaluation of green wave policy in real-time railway traffic management," Transp. Res. C, Emerging Technol., vol. 17, no. 6, pp. 607-616, Dec. 2009.
    • (2009) Transp. Res. C, Emerging Technol. , vol.17 , Issue.6 , pp. 607-616
    • Corman, F.1    D'Ariano, A.2    Pacciarelli, D.3    Pranzo, M.4
  • 70
    • 77956307098 scopus 로고    scopus 로고
    • Rescheduling dense train traffic over complex station interlocking areas
    • Robust and Online Large-Scale Optimization, ser. Berlin, Germany: Springer-Verlag, ch. 16
    • F. Corman, R. M. P. Goverde, and A. D'Ariano, "Rescheduling dense train traffic over complex station interlocking areas," Robust and Online Large-Scale Optimization, vol. 5868, ser. Lecture Notes in Computer Science. Berlin, Germany: Springer-Verlag, 2009, ch. 16, pp. 369-386.
    • (2009) Lecture Notes in Computer Science , vol.5868 , pp. 369-386
    • Corman, F.1    Goverde, R.M.P.2    D'Ariano, A.3
  • 71
    • 59749089450 scopus 로고    scopus 로고
    • An advanced real-time train dispatching system for minimizing the propagation of delays in a dispatching area under severe disturbances
    • Mar
    • A. D'Ariano and M. Pranzo, "An advanced real-time train dispatching system for minimizing the propagation of delays in a dispatching area under severe disturbances," Netw. Spatial Econ., vol. 9, no. 1, pp. 63-84, Mar. 2009.
    • (2009) Netw. Spatial Econ. , vol.9 , Issue.1 , pp. 63-84
    • D'Ariano, A.1    Pranzo, M.2
  • 72
    • 79953200769 scopus 로고    scopus 로고
    • Centralized versus distributed systems to reschedule trains in two dispatching areas
    • Aug
    • F. Corman, A. D'Ariano, D. Pacciarelli, and M. Pranzo, "Centralized versus distributed systems to reschedule trains in two dispatching areas," Public Transp., vol. 2, no. 3, pp. 219-247, Aug. 2010.
    • (2010) Public Transp. , vol.2 , Issue.3 , pp. 219-247
    • Corman, F.1    D'Ariano, A.2    Pacciarelli, D.3    Pranzo, M.4
  • 73
    • 71549158818 scopus 로고    scopus 로고
    • A tabu search algorithm for rerouting trains during rail operations
    • Jan
    • F. Corman, A. D'Ariano, D. Pacciarelli, and M. Pranzo, "A tabu search algorithm for rerouting trains during rail operations," Transp. Res. B, Methodol., vol. 44, no. 1, pp. 175-192, Jan. 2010.
    • (2010) Transp. Res. B, Methodol. , vol.44 , Issue.1 , pp. 175-192
    • Corman, F.1    D'Ariano, A.2    Pacciarelli, D.3    Pranzo, M.4
  • 76
    • 79958004969 scopus 로고    scopus 로고
    • Effectiveness of dynamic reordering and rerouting of trains in a complicated and densely occupied station area
    • Jun
    • F. Corman, A. D'Ariano, M. Pranzo, and I. A. Hansen, "Effectiveness of dynamic reordering and rerouting of trains in a complicated and densely occupied station area," Transp. Planning Technol., vol. 34, no. 4, pp. 341-362, Jun. 2011.
    • (2011) Transp. Planning Technol. , vol.34 , Issue.4 , pp. 341-362
    • Corman, F.1    D'Ariano, A.2    Pranzo, M.3    Hansen, I.A.4
  • 77
    • 80054790040 scopus 로고    scopus 로고
    • Bi-objective conflict detection and resolution in railway traffic management
    • Feb
    • F. Corman, A. D'Ariano, D. Pacciarelli, and M. Pranzo, "Bi-objective conflict detection and resolution in railway traffic management," Transp. Res. C, Emerging Technol., vol. 20, no. 1, pp. 79-94, Feb. 2012.
    • (2012) Transp. Res. C, Emerging Technol. , vol.20 , Issue.1 , pp. 79-94
    • Corman, F.1    D'Ariano, A.2    Pacciarelli, D.3    Pranzo, M.4
  • 79
    • 84883393703 scopus 로고    scopus 로고
    • Rescheduling models for railway traffic management in large-scale networks
    • Sep
    • P. Kecman, F. Corman, A. D'Ariano, and R. M. P. Goverde, "Rescheduling models for railway traffic management in large-scale networks," Public Transp., vol. 5, no. 1/2, pp. 95-123, Sep. 2013.
    • (2013) Public Transp. , vol.5 , Issue.1-2 , pp. 95-123
    • Kecman, P.1    Corman, F.2    D'Ariano, A.3    Goverde, R.M.P.4
  • 80
    • 84912041490 scopus 로고    scopus 로고
    • An iterative optimization framework for delay management and train scheduling
    • Dec
    • T. Dollevoet, F. Corman, A. D'Ariano, and D. Huisman, "An iterative optimization framework for delay management and train scheduling," Flexible Serv. Manuf. J., vol. 26, no. 4, pp. 490-515, Dec. 2014.
    • (2014) Flexible Serv. Manuf. J. , vol.26 , Issue.4 , pp. 490-515
    • Dollevoet, T.1    Corman, F.2    D'Ariano, A.3    Huisman, D.4
  • 81
    • 84912051240 scopus 로고    scopus 로고
    • Susceptibility of optimal train schedules to stochastic disturbances of process times
    • Dec
    • R. Larsen, M. Pranzo, A. D'Ariano, F. Corman, and D. Pacciarelli, "Susceptibility of optimal train schedules to stochastic disturbances of process times," Flexible Serv. Manuf. J., vol. 26, no. 4, pp. 466-489, Dec. 2014.
    • (2014) Flexible Serv. Manuf. J. , vol.26 , Issue.4 , pp. 466-489
    • Larsen, R.1    Pranzo, M.2    D'Ariano, A.3    Corman, F.4    Pacciarelli, D.5
  • 82
    • 84895529646 scopus 로고    scopus 로고
    • Evaluating disturbance robustness of railway schedules
    • Jan
    • F. Corman, A. D'Ariano, and I. A. Hansen, "Evaluating disturbance robustness of railway schedules," J. Intell. Transp. Syst., vol. 18, no. 1, pp. 106-120, Jan. 2013.
    • (2013) J. Intell. Transp. Syst. , vol.18 , Issue.1 , pp. 106-120
    • Corman, F.1    D'Ariano, A.2    Hansen, I.A.3
  • 83
    • 84894290886 scopus 로고    scopus 로고
    • Intelligent decision support for scheduling and rerouting trains on an Italian railway line
    • G. Zaninotto, A. D'Ariano, D. Pacciarelli, and M. Pranzo, "Intelligent decision support for scheduling and rerouting trains on an Italian railway line," in Proc. 16th IEEE ITSC, 2013, pp. 779-784.
    • (2013) Proc. 16th IEEE ITSC , pp. 779-784
    • Zaninotto, G.1    D'Ariano, A.2    Pacciarelli, D.3    Pranzo, M.4
  • 84
    • 84889688307 scopus 로고    scopus 로고
    • Dispatching and coordination in multi-area railway traffic management
    • Apr
    • F. Corman, A. D'Ariano, D. Pacciarelli, and M. Pranzo, "Dispatching and coordination in multi-area railway traffic management," Comput. Oper. Res., vol. 44, pp. 146-160, Apr. 2014.
    • (2014) Comput. Oper. Res. , vol.44 , pp. 146-160
    • Corman, F.1    D'Ariano, A.2    Pacciarelli, D.3    Pranzo, M.4
  • 85
    • 4644246215 scopus 로고    scopus 로고
    • Automated dispatching of train operations using genetic algorithms
    • S. Wegele and E. Schnieder, "Automated dispatching of train operations using genetic algorithms," in Proc. Int. Conf. Comput. Railways, 2004, pp. 775-784.
    • (2004) Proc. Int. Conf. Comput. Railways , pp. 775-784
    • Wegele, S.1    Schnieder, E.2
  • 86
    • 0034300620 scopus 로고    scopus 로고
    • Adaptive fuzzy Petri nets for dynamic knowledge representation and inference
    • Oct
    • X. Li and F. Lara-Rosano, "Adaptive fuzzy Petri nets for dynamic knowledge representation and inference," Expert Syst. Appl., vol. 19, no. 3, pp. 235-241, Oct. 2000.
    • (2000) Expert Syst. Appl. , vol.19 , Issue.3 , pp. 235-241
    • Li, X.1    Lara-Rosano, F.2
  • 87
    • 0034508998 scopus 로고    scopus 로고
    • A fuzzy knowledge-based system for railway traffic control
    • Dec
    • A. Fay, "A fuzzy knowledge-based system for railway traffic control," Eng. Appl. Artif. Intell., vol. 13, no. 6, pp. 719-729, Dec. 2000.
    • (2000) Eng. Appl. Artif. Intell. , vol.13 , Issue.6 , pp. 719-729
    • Fay, A.1
  • 88
    • 60249086557 scopus 로고    scopus 로고
    • A fuzzy Petri nets approach for railway traffic control in case of abnormality: Evidence from Taiwan railway system
    • May
    • Y. H. Cheng and L. A. Yang, "A fuzzy Petri nets approach for railway traffic control in case of abnormality: Evidence from Taiwan railway system," Expert Syst. Appl., vol. 36, no. 4, pp. 8040-8048, May 2009.
    • (2009) Expert Syst. Appl. , vol.36 , Issue.4 , pp. 8040-8048
    • Cheng, Y.H.1    Yang, L.A.2
  • 90
    • 26544435244 scopus 로고
    • An expert system for real-time train dispatching
    • H. Schaefer and S. Pferdmenges, "An expert system for real-time train dispatching," Trans. Built Environ., vol. 7, pp. 27-34, 1994.
    • (1994) Trans. Built Environ. , vol.7 , pp. 27-34
    • Schaefer, H.1    Pferdmenges, S.2
  • 91
    • 0029777050 scopus 로고    scopus 로고
    • SEPIA: A real-time expert system that automates train route management
    • Jan
    • Y. Larroche, R. Moulin, and D. Gauyacq, "SEPIA: A real-time expert system that automates train route management," Control Eng. Pract., vol. 4, no. 1, pp. 27-34, Jan. 1996.
    • (1996) Control Eng. Pract. , vol.4 , Issue.1 , pp. 27-34
    • Larroche, Y.1    Moulin, R.2    Gauyacq, D.3
  • 92
    • 0030193278 scopus 로고    scopus 로고
    • Online rescheduling of mass rapid transit systems: Fuzzy expert system approach
    • Jul
    • C. S. Chang and B. S. Thia, "Online rescheduling of mass rapid transit systems: Fuzzy expert system approach," Proc. Inst. Elect. Eng.-Elect. Power Appl., vol. 143, no. 4, pp. 307-316, Jul. 1996.
    • (1996) Proc. Inst. Elect. Eng.-Elect. Power Appl. , vol.143 , Issue.4 , pp. 307-316
    • Chang, C.S.1    Thia, B.S.2
  • 94
    • 0142156064 scopus 로고    scopus 로고
    • Scheduling trains on a railway network using a discrete event model of railway traffic
    • Jan
    • M. J. Dorfman and J. Medanic, "Scheduling trains on a railway network using a discrete event model of railway traffic," Transp. Res. B, Methodol., vol. 38, no. 1, pp. 81-98, Jan. 2004.
    • (2004) Transp. Res. B, Methodol. , vol.38 , Issue.1 , pp. 81-98
    • Dorfman, M.J.1    Medanic, J.2
  • 95
    • 52749094717 scopus 로고    scopus 로고
    • Efficient scheduling of railway traffic based on global information of train
    • Dec
    • F. Li, Z. Gao, K. Li, and L. Yang, "Efficient scheduling of railway traffic based on global information of train," Transp. Res. B, Methodol., vol. 42, no. 10, pp. 1008-1030, Dec. 2008.
    • (2008) Transp. Res. B, Methodol. , vol.42 , Issue.10 , pp. 1008-1030
    • Li, F.1    Gao, Z.2    Li, K.3    Yang, L.4
  • 96
    • 84861373223 scopus 로고    scopus 로고
    • A discrete event-based simulation model for real-time traffic management in railways
    • Apr
    • J. L. Espinosa-Aranda and R. García-Ródenas, "A discrete event-based simulation model for real-time traffic management in railways," J. Intell. Transp. Syst., vol. 16, no. 2, pp. 94-107, Apr. 2012.
    • (2012) J. Intell. Transp. Syst. , vol.16 , Issue.2 , pp. 94-107
    • Espinosa-Aranda, J.L.1    García-Ródenas, R.2
  • 97
    • 84870238126 scopus 로고    scopus 로고
    • On-line reschedule optimization for passenger railways in case of emergencies
    • Mar
    • M. Almodóvar and R. García-Ródenas, "On-line reschedule optimization for passenger railways in case of emergencies," Comput. Oper. Res., vol. 40, no. 3, pp. 725-736, Mar. 2013.
    • (2013) Comput. Oper. Res. , vol.40 , Issue.3 , pp. 725-736
    • Almodóvar, M.1    García-Ródenas, R.2
  • 98
    • 77952289414 scopus 로고    scopus 로고
    • A delay propagation algorithm for large-scale railway traffic networks
    • Jun
    • R. M. P. Goverde, "A delay propagation algorithm for large-scale railway traffic networks," Transp. Res. C, Emerging Technol., vol. 18, no. 3, pp. 269-287, Jun. 2010.
    • (2010) Transp. Res. C, Emerging Technol. , vol.18 , Issue.3 , pp. 269-287
    • Goverde, R.M.P.1
  • 100
    • 0036968445 scopus 로고    scopus 로고
    • A model predictive control approach for recovery from delays in railway systems
    • B. De Schutter, T. van den Boom, and A. Hegyi, "A model predictive control approach for recovery from delays in railway systems," Transp. Res. Rec., vol. 1793, pp. 15-20, 2002.
    • (2002) Transp. Res. Rec. , vol.1793 , pp. 15-20
    • De Schutter, B.1    Van Den Boom, T.2    Hegyi, A.3
  • 101
    • 33744907504 scopus 로고    scopus 로고
    • Modelling and control of discrete event systems using switching max-plus-linear systems
    • Oct
    • T. van den Boom and B. De Schutter, "Modelling and control of discrete event systems using switching max-plus-linear systems," Control Eng. Pract., vol. 14, no. 10, pp. 1199-1211, Oct. 2006.
    • (2006) Control Eng. Pract. , vol.14 , Issue.10 , pp. 1199-1211
    • Van Den Boom, T.1    De Schutter, B.2
  • 102
    • 0035119102 scopus 로고    scopus 로고
    • Railway junction traffic control by heuristic methods
    • Jan
    • T. K. Ho and T. H. Yeung, "Railway junction traffic control by heuristic methods," Proc. Inst. Elect. Eng. - Elect. Power Appl., vol. 148, no. 1, pp. 77-84, Jan. 2001.
    • (2001) Proc. Inst. Elect. Eng. - Elect. Power Appl. , vol.148 , Issue.1 , pp. 77-84
    • Ho, T.K.1    Yeung, T.H.2
  • 103
    • 3042554079 scopus 로고    scopus 로고
    • Modeling train movements through complex rail networks
    • Jan
    • Q. Lu, M. Dessouky, and R. C. Leachman, "Modeling train movements through complex rail networks," ACM Trans. Modeling Comput. Simul., vol. 14, no. 1, pp. 48-75, Jan. 2004.
    • (2004) ACM Trans. Modeling Comput. Simul. , vol.14 , Issue.1 , pp. 48-75
    • Lu, Q.1    Dessouky, M.2    Leachman, R.C.3
  • 104
    • 85026931925 scopus 로고    scopus 로고
    • Minimising train delays in a mixed traffic railway network with consideration of passenger delay
    • Montreal QC, Canada
    • P. Weston et al., "Minimising train delays in a mixed traffic railway network with consideration of passenger delay," in Proc. 7th World Congr. Railway Res., Montreal QC, Canada, 2006.
    • (2006) Proc. 7th World Congr. Railway Res.
    • Weston, P.1
  • 107
    • 26944478149 scopus 로고    scopus 로고
    • Train rescheduling algorithm which minimizes passengers dissatisfaction
    • ser. Innovations in Applied Artificial Intelligence, Berlin, Germany: Springer-Verlag
    • N. Tomii, Y. Tashiro, N. Tanabe, C. Hirai, and K. Muraki, "Train rescheduling algorithm which minimizes passengers dissatisfaction," Innovations in Applied Artificial Intelligence, vol. 3533, ser. Lecture Notes in Computer Science. Berlin, Germany: Springer-Verlag, 2005, pp. 829-838.
    • (2005) Lecture Notes in Computer Science , vol.3533 , pp. 829-838
    • Tomii, N.1    Tashiro, Y.2    Tanabe, N.3    Hirai, C.4    Muraki, K.5
  • 108
    • 84856894208 scopus 로고    scopus 로고
    • An optimal delay management algorithm from passengers' viewpoints considering the whole railway network
    • Nov
    • S. Kanai, K. Shiina, S. Harada, and N. Tomii, "An optimal delay management algorithm from passengers' viewpoints considering the whole railway network," J. Rail Transp. Planning Manage., vol. 1, no. 1, pp. 25-37, Nov. 2011.
    • (2011) J. Rail Transp. Planning Manage. , vol.1 , Issue.1 , pp. 25-37
    • Kanai, S.1    Shiina, K.2    Harada, S.3    Tomii, N.4
  • 110
    • 0030711252 scopus 로고    scopus 로고
    • An object-oriented approach to an information and decision support system for railway traffic control
    • M. Missikoff, "An object-oriented approach to an information and decision support system for railway traffic control," in Proc. 1st Int. Conf. Knowl.-Based Intell. Electron. Syst., 1997, vol. 2, pp. 633-641.
    • (1997) Proc. 1st Int. Conf. Knowl.-Based Intell. Electron. Syst. , vol.2 , pp. 633-641
    • Missikoff, M.1
  • 112
    • 70449133340 scopus 로고    scopus 로고
    • The train driver recovery problem - A set partitioning based model and solution method
    • May
    • N. J. Rezanova and D. M. Ryan, "The train driver recovery problem - A set partitioning based model and solution method," Comput. Oper. Res., vol. 37, no. 5, pp. 845-856, May 2010.
    • (2010) Comput. Oper. Res. , vol.37 , Issue.5 , pp. 845-856
    • Rezanova, N.J.1    Ryan, D.M.2
  • 115
    • 84870243337 scopus 로고    scopus 로고
    • Rescheduling rail networks with maintenance disruptions using problem space search
    • Mar
    • A. R. Albrecht, D. M. Panton, and D. H. Lee, "Rescheduling rail networks with maintenance disruptions using problem space search," Comput. Oper. Res., vol. 40, no. 3, pp. 703-712, Mar. 2013.
    • (2013) Comput. Oper. Res. , vol.40 , Issue.3 , pp. 703-712
    • Albrecht, A.R.1    Panton, D.M.2    Lee, D.H.3
  • 117
    • 0037121475 scopus 로고    scopus 로고
    • Job-shop scheduling with blocking and no-wait constraints
    • Dec
    • A. Mascis and D. Pacciarelli, "Job-shop scheduling with blocking and no-wait constraints," Eur. J. Oper. Res., vol. 143, no. 3, pp. 498-517, Dec. 2002.
    • (2002) Eur. J. Oper. Res. , vol.143 , Issue.3 , pp. 498-517
    • Mascis, A.1    Pacciarelli, D.2
  • 118
    • 53749098943 scopus 로고    scopus 로고
    • Scheduling models for short-term railway traffic optimisation
    • Computer-aided Systems in Public Transport, Berlin, Germany: Springer-Verlag
    • A. Mascis, D. Pacciarelli, and M. Pranzo, "Scheduling models for short-term railway traffic optimisation," in Computer-aided Systems in Public Transport, vol. 600, Lecture Notes in Economics and Mathematical Systems. Berlin, Germany: Springer-Verlag, 2008, pp. 71-90.
    • (2008) Lecture Notes in Economics and Mathematical Systems , vol.600 , pp. 71-90
    • Mascis, A.1    Pacciarelli, D.2    Pranzo, M.3
  • 119
    • 84901007306 scopus 로고    scopus 로고
    • Stability analysis of railway dispatching solutions under a stochastic and dynamic environment
    • E. Quaglietta, F. Corman, and R. M. P. Goverde, "Stability analysis of railway dispatching solutions under a stochastic and dynamic environment," J. Rail Transp. Planning Manage., pp. 137-149, 2013.
    • (2013) J. Rail Transp. Planning Manage. , pp. 137-149
    • Quaglietta, E.1    Corman, F.2    Goverde, R.M.P.3
  • 120
    • 71549158323 scopus 로고    scopus 로고
    • Evaluation of an integrated real-time rescheduling and train control system for heavily used areas
    • M. Lüthi, G. Medeossi, and A. Nash, "Evaluation of an integrated real-time rescheduling and train control system for heavily used areas," in Proc. IAROR Int. Semin. Railway Oper. Model. Anal., 2007, pp. 1-14.
    • (2007) Proc. IAROR Int. Semin. Railway Oper. Model. Anal. , pp. 1-14
    • Lüthi, M.1    Medeossi, G.2    Nash, A.3
  • 121
    • 77957593400 scopus 로고    scopus 로고
    • Population-based algorithm portfolios for numerical optimization
    • Oct
    • F. Peng, K. Tang, G. Chen, and X. Yao, "Population-based algorithm portfolios for numerical optimization," IEEE Trans. Evol. Comput., vol. 14, no. 5, pp. 782-800, Oct. 2010.
    • (2010) IEEE Trans. Evol. Comput. , vol.14 , Issue.5 , pp. 782-800
    • Peng, F.1    Tang, K.2    Chen, G.3    Yao, X.4
  • 122
    • 84901843905 scopus 로고    scopus 로고
    • Population-based algorithm portfolios with automated constituent algorithms selection
    • Sep
    • K. Tang, F. Peng, G. Chen, and X. Yao, "Population-based algorithm portfolios with automated constituent algorithms selection," Inf. Sci., vol. 279, pp. 94-104, Sep. 2014.
    • (2014) Inf. Sci. , vol.279 , pp. 94-104
    • Tang, K.1    Peng, F.2    Chen, G.3    Yao, X.4
  • 123
    • 0032884348 scopus 로고    scopus 로고
    • Railway traffic control and train scheduling based on intertrain conflict management
    • Sep
    • I. Sahin, "Railway traffic control and train scheduling based on intertrain conflict management," Transp. Res. B, Methodol., vol. 33, no. 7, pp. 511-534, Sep. 1999.
    • (1999) Transp. Res. B, Methodol. , vol.33 , Issue.7 , pp. 511-534
    • Sahin, I.1
  • 124
    • 84901838355 scopus 로고    scopus 로고
    • Cooperative co-evolution with differential grouping for large scale optimization
    • Jun
    • M. N. Omidvar, X. Li, Y. Mei, and X. Yao, "Cooperative co-evolution with differential grouping for large scale optimization," IEEE Trans. Evol. Comput., vol. 18, no. 3, pp. 378-393, Jun. 2014.
    • (2014) IEEE Trans. Evol. Comput. , vol.18 , Issue.3 , pp. 378-393
    • Omidvar, M.N.1    Li, X.2    Mei, Y.3    Yao, X.4
  • 125
    • 85028143019 scopus 로고    scopus 로고
    • A competitive swarm optimizer for large scale optimization
    • Feb
    • C. Ran and J. Yaochu, "A competitive swarm optimizer for large scale optimization," IEEE Trans. Cybern., vol. 45, no. 2, pp. 191-204, Feb. 2015.
    • (2015) IEEE Trans. Cybern. , vol.45 , Issue.2 , pp. 191-204
    • Ran, C.1    Yaochu, J.2
  • 126
    • 84905581607 scopus 로고    scopus 로고
    • An evolutionary many-objective optimization algorithm using reference-point based non-dominated sorting approach - Part I: Solving problems with box constraints
    • Aug
    • K. Deb and H. Jain, "An evolutionary many-objective optimization algorithm using reference-point based non-dominated sorting approach - Part I: Solving problems with box constraints," IEEE Trans. Evol. Comput., vol. 18, no. 4, pp. 577-601, Aug. 2013.
    • (2013) IEEE Trans. Evol. Comput. , vol.18 , Issue.4 , pp. 577-601
    • Deb, K.1    Jain, H.2
  • 127
    • 84938564711 scopus 로고    scopus 로고
    • Two-Arch2: An improved two-archive algorithm for many-objective optimization
    • Aug
    • H. Wang, L. Jiao, and X. Yao, "Two-Arch2: An improved two-archive algorithm for many-objective optimization," IEEE Trans. Evol. Comput., vol. 19, no. 4, pp. 524-541, Aug. 2015.
    • (2015) IEEE Trans. Evol. Comput. , vol.19 , Issue.4 , pp. 524-541
    • Wang, H.1    Jiao, L.2    Yao, X.3
  • 128
    • 34548108555 scopus 로고    scopus 로고
    • MOEA/D: A multiobjective evolutionary algorithm based on decomposition
    • Dec
    • Q. Zhang and H. Li, "MOEA/D: A multiobjective evolutionary algorithm based on decomposition," IEEE Trans. Evol. Comput., vol. 11, no. 6, pp. 712-731, Dec. 2007.
    • (2007) IEEE Trans. Evol. Comput. , vol.11 , Issue.6 , pp. 712-731
    • Zhang, Q.1    Li, H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.