-
2
-
-
34249982545
-
A branch and bound algorithm for scheduling trains in a railway network
-
2-s2.0-34249982545 10.1016/j.ejor.2006.10.034
-
D'Ariano A., Pacciarelli D., Pranzo M., A branch and bound algorithm for scheduling trains in a railway network. European Journal of Operational Research 2007 183 2 643 657 2-s2.0-34249982545 10.1016/j.ejor.2006.10.034
-
(2007)
European Journal of Operational Research
, vol.183
, Issue.2
, pp. 643-657
-
-
D'Ariano, A.1
Pacciarelli, D.2
Pranzo, M.3
-
3
-
-
33845274298
-
Single-track train timetabling with guaranteed optimality: Branch-and-bound algorithms with enhanced lower bounds
-
2-s2.0-33845274298 10.1016/j.trb.2006.05.003
-
Zhou X., Zhong M., Single-track train timetabling with guaranteed optimality: Branch-and-bound algorithms with enhanced lower bounds. Transportation Research Part B 2007 41 3 320 341 2-s2.0-33845274298 10.1016/j.trb.2006.05.003
-
(2007)
Transportation Research Part B
, vol.41
, Issue.3
, pp. 320-341
-
-
Zhou, X.1
Zhong, M.2
-
4
-
-
80054114657
-
Optimal inter-area coordination of train rescheduling decisions
-
10.1016/j.tre.2011.05.002
-
Corman F., D'Ariano A., Pacciarelli D., Pranzo M., Optimal inter-area coordination of train rescheduling decisions. Transportation Research Part E 2012 48 1 71 88 10.1016/j.tre.2011.05.002
-
(2012)
Transportation Research Part e
, vol.48
, Issue.1
, pp. 71-88
-
-
Corman, F.1
D'Ariano, A.2
Pacciarelli, D.3
Pranzo, M.4
-
5
-
-
78650812863
-
Optimizing the demand captured by a railway system with a regular timetable
-
2-s2.0-78650812863 10.1016/j.trb.2010.09.001
-
Cordone R., Redaelli F., Optimizing the demand captured by a railway system with a regular timetable. Transportation Research Part B 2011 45 2 430 446 2-s2.0-78650812863 10.1016/j.trb.2010.09.001
-
(2011)
Transportation Research Part B
, vol.45
, Issue.2
, pp. 430-446
-
-
Cordone, R.1
Redaelli, F.2
-
6
-
-
33845266135
-
N-tracked railway traffic re-scheduling during disturbances
-
2-s2.0-33845266135 10.1016/j.trb.2006.06.001
-
Törnquist J., Persson J. A., N-tracked railway traffic re-scheduling during disturbances. Transportation Research Part B 2007 41 3 342 362 2-s2.0-33845266135 10.1016/j.trb.2006.06.001
-
(2007)
Transportation Research Part B
, vol.41
, Issue.3
, pp. 342-362
-
-
Törnquist, J.1
Persson, J.A.2
-
7
-
-
33748691351
-
Railway timetable stability analysis using max-plus system theory
-
2-s2.0-33748691351 10.1016/j.trb.2006.02.003
-
Goverde R. M. P., Railway timetable stability analysis using max-plus system theory. Transportation Research Part B 2007 41 2 179 201 2-s2.0-33748691351 10.1016/j.trb.2006.02.003
-
(2007)
Transportation Research Part B
, vol.41
, Issue.2
, pp. 179-201
-
-
Goverde, R.M.P.1
-
8
-
-
33646079626
-
Developing railway timetables which guarantee a better service
-
2-s2.0-33646079626 10.1016/j.ejor.2004.12.013
-
Vansteenwegen P., Oudheusden D. V., Developing railway timetables which guarantee a better service. European Journal of Operational Research 2006 173 1 337 350 2-s2.0-33646079626 10.1016/j.ejor.2004.12.013
-
(2006)
European Journal of Operational Research
, vol.173
, Issue.1
, pp. 337-350
-
-
Vansteenwegen, P.1
Oudheusden, D.V.2
-
9
-
-
77956184648
-
Timetabling optimization of a mixed double- and single-tracked railway network
-
2718477 ZBL1205.90118 2-s2.0-77956184648 10.1016/j.apm.2010.07.041
-
Castillo E., Gallego I., Ureña J. M., Coronado J. M., Timetabling optimization of a mixed double- and single-tracked railway network. Applied Mathematical Modelling 2011 35 2 859 878 2718477 ZBL1205.90118 2-s2.0-77956184648 10.1016/j.apm.2010.07.041
-
(2011)
Applied Mathematical Modelling
, vol.35
, Issue.2
, pp. 859-878
-
-
Castillo, E.1
Gallego, I.2
Ureña, J.M.3
Coronado, J.M.4
-
10
-
-
0142156064
-
Scheduling trains on a railway network using a discrete event model of railway traffic
-
2-s2.0-0142156064 10.1016/S0191-2615(03)00006-7
-
Dorfman M. J., Medanic J., Scheduling trains on a railway network using a discrete event model of railway traffic. Transportation Research Part B 2004 38 1 81 98 2-s2.0-0142156064 10.1016/S0191-2615(03)00006-7
-
(2004)
Transportation Research Part B
, vol.38
, Issue.1
, pp. 81-98
-
-
Dorfman, M.J.1
Medanic, J.2
-
11
-
-
0032188680
-
Knowledge-based system for railway scheduling
-
10.1016/S0169-023X(97)00040-2 2-s2.0-0032188680
-
Chiang T. W., Hau H. Y., Chiang H. M., Ko S. Y., Hsieh C. H., Knowledge-based system for railway scheduling. Data and Knowledge Engineering 1998 27 3 289 312 10.1016/S0169-023X(97)00040-2 2-s2.0-0032188680
-
(1998)
Data and Knowledge Engineering
, vol.27
, Issue.3
, pp. 289-312
-
-
Chiang, T.W.1
Hau, H.Y.2
Chiang, H.M.3
Ko, S.Y.4
Hsieh, C.H.5
-
12
-
-
0034508998
-
A fuzzy knowledge-based system for railway traffic control
-
2-s2.0-0034508998 10.1016/S0952-1976(00)00027-0
-
Fay A., A fuzzy knowledge-based system for railway traffic control. Engineering Applications of Artificial Intelligence 2000 13 6 719 729 2-s2.0-0034508998 10.1016/S0952-1976(00)00027-0
-
(2000)
Engineering Applications of Artificial Intelligence
, vol.13
, Issue.6
, pp. 719-729
-
-
Fay, A.1
-
13
-
-
71549158818
-
A tabu search algorithm for rerouting trains during rail operations
-
2-s2.0-71549158818 10.1016/j.trb.2009.05.004
-
Corman F., D'Ariano A., Pacciarelli D., Pranzo M., A tabu search algorithm for rerouting trains during rail operations. Transportation Research Part B 2010 44 1 175 192 2-s2.0-71549158818 10.1016/j.trb.2009.05.004
-
(2010)
Transportation Research Part B
, vol.44
, Issue.1
, pp. 175-192
-
-
Corman, F.1
D'Ariano, A.2
Pacciarelli, D.3
Pranzo, M.4
-
14
-
-
33845888024
-
Tabu search algorithm on location for railway baggage and parcel base and distribution sites
-
2-s2.0-33845888024
-
Yin C. Z., Bu L., Cheng X. Q., Pu Y., Tabu search algorithm on location for railway baggage and parcel base and distribution sites. Control and Decision 2006 21 11 1316 1320 2-s2.0-33845888024
-
(2006)
Control and Decision
, vol.21
, Issue.11
, pp. 1316-1320
-
-
Yin, C.Z.1
Bu, L.2
Cheng, X.Q.3
Pu, Y.4
-
15
-
-
24044534458
-
Tabu search for train operation adjustment on double-track line
-
2-s2.0-24044534458
-
Dong S. Q., Wang J. Y., Yan H. F., Tabu search for train operation adjustment on double-track line. China Railway Science 2005 26 4 114 119 2-s2.0-24044534458
-
(2005)
China Railway Science
, vol.26
, Issue.4
, pp. 114-119
-
-
Dong, S.Q.1
Wang, J.Y.2
Yan, H.F.3
-
16
-
-
84855433912
-
Optimizing trains movement on a railway network
-
10.1016/j.omega.2011.12.001
-
Yang L., Li K., Gao Z., Li X., Optimizing trains movement on a railway network. Omega 2012 40 5 619 633 10.1016/j.omega.2011.12.001
-
(2012)
Omega
, vol.40
, Issue.5
, pp. 619-633
-
-
Yang, L.1
Li, K.2
Gao, Z.3
Li, X.4
-
17
-
-
50649089826
-
A hybrid genetic algorithm for train sequencing in the Korean railway
-
2-s2.0-50649089826 10.1016/j.omega.2007.12.001
-
Chung J. W., Oh S. M., Choi I. C., A hybrid genetic algorithm for train sequencing in the Korean railway. Omega 2009 37 3 555 565 2-s2.0-50649089826 10.1016/j.omega.2007.12.001
-
(2009)
Omega
, vol.37
, Issue.3
, pp. 555-565
-
-
Chung, J.W.1
Oh, S.M.2
Choi, I.C.3
-
18
-
-
0033748898
-
Fuzzy dispatching model and genetic algorithms for railyards operations
-
2-s2.0-0033748898 10.1016/S0377-2217(99)00383-5
-
He S., Song R., Chaudhry S. S., Fuzzy dispatching model and genetic algorithms for railyards operations. European Journal of Operational Research 2000 124 2 307 331 2-s2.0-0033748898 10.1016/S0377-2217(99)00383-5
-
(2000)
European Journal of Operational Research
, vol.124
, Issue.2
, pp. 307-331
-
-
He, S.1
Song, R.2
Chaudhry, S.S.3
-
19
-
-
34247278650
-
Bi-criteria passenger trains scheduling optimal planning based on integrated particle swarm optimization
-
2-s2.0-34247278650
-
Ren P., Li N., Gao L. Q., Bi-criteria passenger trains scheduling optimal planning based on integrated particle swarm optimization. Journal of System Simulation 2007 19 7 1449 1452 2-s2.0-34247278650
-
(2007)
Journal of System Simulation
, vol.19
, Issue.7
, pp. 1449-1452
-
-
Ren, P.1
Li, N.2
Gao, L.Q.3
-
20
-
-
79551584093
-
Train timetable optimizing and rescheduling based on improved particle swarm algorithm
-
2-s2.0-79551584093 10.3141/2197-09
-
Meng X., Jia L., Qin Y., Train timetable optimizing and rescheduling based on improved particle swarm algorithm. Transportation Research Record 2010 2197 71 79 2-s2.0-79551584093 10.3141/2197-09
-
(2010)
Transportation Research Record
, Issue.2197
, pp. 71-79
-
-
Meng, X.1
Jia, L.2
Qin, Y.3
-
21
-
-
81855178277
-
Train service timetabling in railway open markets by particle swarm optimisation
-
10.1016/j.eswa.2011.07.084
-
Ho T. K., Tsang C. W., Ip K. H., Kwan K. S., Train service timetabling in railway open markets by particle swarm optimisation. Expert Systems with Applications 2012 39 1 861 868 10.1016/j.eswa.2011.07.084
-
(2012)
Expert Systems with Applications
, vol.39
, Issue.1
, pp. 861-868
-
-
Ho, T.K.1
Tsang, C.W.2
Ip, K.H.3
Kwan, K.S.4
-
22
-
-
35348963536
-
Optimization of transit route network, vehicle headways and timetables for large-scale transit networks
-
2363721 ZBL1138.90350 2-s2.0-35348963536 10.1016/j.ejor.2007.02.005
-
Zhao F., Zeng X., Optimization of transit route network, vehicle headways and timetables for large-scale transit networks. European Journal of Operational Research 2008 186 2 841 855 2363721 ZBL1138.90350 2-s2.0-35348963536 10.1016/j.ejor.2007.02.005
-
(2008)
European Journal of Operational Research
, vol.186
, Issue.2
, pp. 841-855
-
-
Zhao, F.1
Zeng, X.2
-
23
-
-
84859433393
-
Solving a periodic single-track train timetabling problem by an efficient hybrid algorithm
-
10.1016/j.engappai.2012.01.020
-
Jamili A., Shafia M. A., Sadjadi S. J., Tavakkoli-Moghaddamc R., Solving a periodic single-track train timetabling problem by an efficient hybrid algorithm. Engineering Applications of Artificial Intelligence 2012 25 4 793 800 10.1016/j.engappai.2012.01.020
-
(2012)
Engineering Applications of Artificial Intelligence
, vol.25
, Issue.4
, pp. 793-800
-
-
Jamili, A.1
Shafia, M.A.2
Sadjadi, S.J.3
Tavakkoli-Moghaddamc, R.4
-
24
-
-
79959786879
-
Scheduling freight trains traveling on complex networks
-
2-s2.0-79959786879 10.1016/j.trb.2011.05.021
-
Mu S., Dessouky M., Scheduling freight trains traveling on complex networks. Transportation Research Part B 2011 45 7 1103 1123 2-s2.0-79959786879 10.1016/j.trb.2011.05.021
-
(2011)
Transportation Research Part B
, vol.45
, Issue.7
, pp. 1103-1123
-
-
Mu, S.1
Dessouky, M.2
-
25
-
-
13544267417
-
Bicriteria train scheduling for high-speed passenger railroad planning applications
-
2157069 ZBL1077.90033 2-s2.0-13544267417 10.1016/j.ejor.2004.07.019
-
Zhou X., Zhong M., Bicriteria train scheduling for high-speed passenger railroad planning applications. European Journal of Operational Research 2005 167 3 752 771 2157069 ZBL1077.90033 2-s2.0-13544267417 10.1016/j.ejor.2004.07. 019
-
(2005)
European Journal of Operational Research
, vol.167
, Issue.3
, pp. 752-771
-
-
Zhou, X.1
Zhong, M.2
-
26
-
-
33644594453
-
A Lagrangian heuristic algorithm for a real-world train timetabling problem
-
2207561 ZBL1120.90324 2-s2.0-33644594453 10.1016/j.dam.2005.05.026
-
Caprara A., Monaci M., Toth P., Guida P. L., A Lagrangian heuristic algorithm for a real-world train timetabling problem. Discrete Applied Mathematics 2006 154 5 738 753 2207561 ZBL1120.90324 2-s2.0-33644594453 10.1016/j.dam.2005.05.026
-
(2006)
Discrete Applied Mathematics
, vol.154
, Issue.5
, pp. 738-753
-
-
Caprara, A.1
Monaci, M.2
Toth, P.3
Guida, P.L.4
-
27
-
-
44249124294
-
Study on the dynamic performance of the train running time in the section
-
Zha W. X., Xiong G., Study on the dynamic performance of the train running time in the section. Systems Engineering 2001 19 1 47 51
-
(2001)
Systems Engineering
, vol.19
, Issue.1
, pp. 47-51
-
-
Zha, W.X.1
Xiong, G.2
-
28
-
-
79953672688
-
Analysis of β -function distribution for deviation of train running time in section
-
Zhang X. C., Hu A. Z., Analysis of β -function distribution for deviation of train running time in section. Journal of the China Railway Society 1996 18 3 1 6
-
(1996)
Journal of the China Railway Society
, vol.18
, Issue.3
, pp. 1-6
-
-
Zhang, X.C.1
Hu, A.Z.2
-
29
-
-
0028387951
-
Distributed intelligent railway traffic control based on fuzzy decisionmaking
-
2-s2.0-0028387951
-
Jia L. M., Zhang X. D., Distributed intelligent railway traffic control based on fuzzy decisionmaking. Fuzzy Sets and Systems 1994 62 3 255 265 2-s2.0-0028387951
-
(1994)
Fuzzy Sets and Systems
, vol.62
, Issue.3
, pp. 255-265
-
-
Jia, L.M.1
Zhang, X.D.2
-
30
-
-
67149111853
-
Train timetable problem on a single-line railway with fuzzy passenger demand
-
2-s2.0-67149111853 10.1109/TFUZZ.2008.924198
-
Yang L., Li K., Gao Z., Train timetable problem on a single-line railway with fuzzy passenger demand. IEEE Transactions on Fuzzy Systems 2009 17 3 617 629 2-s2.0-67149111853 10.1109/TFUZZ.2008.924198
-
(2009)
IEEE Transactions on Fuzzy Systems
, vol.17
, Issue.3
, pp. 617-629
-
-
Yang, L.1
Li, K.2
Gao, Z.3
-
31
-
-
77957914119
-
Railway freight transportation planning with mixed uncertainty of randomness and fuzziness
-
2-s2.0-77957914119 10.1016/j.asoc.2009.12.039
-
Yang L., Gao Z., Li K., Railway freight transportation planning with mixed uncertainty of randomness and fuzziness. Applied Soft Computing Journal 2011 11 1 778 792 2-s2.0-77957914119 10.1016/j.asoc.2009.12.039
-
(2011)
Applied Soft Computing Journal
, vol.11
, Issue.1
, pp. 778-792
-
-
Yang, L.1
Gao, Z.2
Li, K.3
-
32
-
-
81155155628
-
The periodicity and robustness in a single-track train scheduling problem
-
10.1016/j.asoc.2011.08.026
-
Shafia M. A., Sadjadi S. J., Jamili A., Tavakkoli-Moghaddamb R., Pourseyed-Aghaeec M., The periodicity and robustness in a single-track train scheduling problem. Applied Soft Computing 2012 12 1 440 452 10.1016/j.asoc.2011.08.026
-
(2012)
Applied Soft Computing
, vol.12
, Issue.1
, pp. 440-452
-
-
Shafia, M.A.1
Sadjadi, S.J.2
Jamili, A.3
Tavakkoli-Moghaddamb, R.4
Pourseyed-Aghaeec, M.5
-
33
-
-
84868375022
-
Fuzzy optimal schedule of high speed train operation to minimize energy consumption with uncertain delays and driver's behavioral response
-
Cucala A. P., Fernández A., Sicre C., Domínguez M., Fuzzy optimal schedule of high speed train operation to minimize energy consumption with uncertain delays and driver's behavioral response. Engineering Applications of Artificial Intelligence 2012 25 8 1548 1557
-
(2012)
Engineering Applications of Artificial Intelligence
, vol.25
, Issue.8
, pp. 1548-1557
-
-
Cucala, A.P.1
Fernández, A.2
Sicre, C.3
Domínguez, M.4
-
35
-
-
80052777070
-
A safety-based behavioural approaching model with various driving characteristics
-
10.1016/j.trc.2011.02.002
-
Wang W. H., Zhang W., Guo H. W., Bubb H., Ikeuchi K., A safety-based behavioural approaching model with various driving characteristics. Transportation Research Part C 2011 19 6 1202 1214 10.1016/j.trc.2011.02.002
-
(2011)
Transportation Research Part C
, vol.19
, Issue.6
, pp. 1202-1214
-
-
Wang, W.H.1
Zhang, W.2
Guo, H.W.3
Bubb, H.4
Ikeuchi, K.5
-
36
-
-
84862790326
-
Reliability analysis of pedestrian safety crossing in urban traffic environment
-
10.1016/j.ssci.2011.12.027
-
Guo H. W., Wang W. H., Guo W. W., Jiang X. B., Bubb H., Reliability analysis of pedestrian safety crossing in urban traffic environment. Safety Science 2012 50 4 968 973 10.1016/j.ssci.2011.12.027
-
(2012)
Safety Science
, vol.50
, Issue.4
, pp. 968-973
-
-
Guo, H.W.1
Wang, W.H.2
Guo, W.W.3
Jiang, X.B.4
Bubb, H.5
-
37
-
-
84862917997
-
A two-layer optimization model for high-speed railway line planning
-
10.1631/jzus.A11GT016
-
Wang L., Jia L. M., Qin Y., Xu J., Mo W., A two-layer optimization model for high-speed railway line planning. Journal of Zhejiang University SCIENCE A 2011 12 12 902 912 10.1631/jzus.A11GT016
-
(2011)
Journal of Zhejiang University SCIENCE A
, vol.12
, Issue.12
, pp. 902-912
-
-
Wang, L.1
Jia, L.M.2
Qin, Y.3
Xu, J.4
Mo, W.5
-
38
-
-
55149110271
-
Research on train headway time of high speed railway in China
-
Shi X. M., Research on train headway time of high speed railway in China. Chinese Railways 2005 5 32 35
-
(2005)
Chinese Railways
, Issue.5
, pp. 32-35
-
-
Shi, X.M.1
-
40
-
-
0030576486
-
Fuzzy linear programming and applications
-
2-s2.0-0030576486 10.1016/0377-2217(95)00008-9
-
Rommelfanger H., Fuzzy linear programming and applications. European Journal of Operational Research 1996 92 3 512 527 2-s2.0-0030576486 10.1016/0377-2217(95)00008-9
-
(1996)
European Journal of Operational Research
, vol.92
, Issue.3
, pp. 512-527
-
-
Rommelfanger, H.1
-
41
-
-
0023381033
-
An interactive fuzzy programming system
-
894613 ZBL0634.90076 2-s2.0-0023381033
-
Werners B., An interactive fuzzy programming system. Fuzzy Sets and Systems 1987 23 1 131 147 894613 ZBL0634.90076 2-s2.0-0023381033
-
(1987)
Fuzzy Sets and Systems
, vol.23
, Issue.1
, pp. 131-147
-
-
Werners, B.1
|