-
1
-
-
59749084340
-
The influence of anticipating train driving on the dispatching process in railway conflict situations
-
Albrecht T. The influence of anticipating train driving on the dispatching process in railway conflict situations. Network and Spatial Economics 9 (2009) 85-101
-
(2009)
Network and Spatial Economics
, vol.9
, pp. 85-101
-
-
Albrecht, T.1
-
3
-
-
69249227153
-
Beschrijving ARI-functionaliteit
-
in Dutch, Utrecht, The Netherlands
-
Berends, N., Ouburg, N., 2005. Beschrijving ARI-functionaliteit. ProRail Internal Specification (in Dutch). Utrecht, The Netherlands.
-
(2005)
ProRail Internal Specification
-
-
Berends, N.1
Ouburg, N.2
-
4
-
-
0032203702
-
A survey of optimization models for train routing and scheduling
-
Cordeau J.F., Toth P., and Vigo D. A survey of optimization models for train routing and scheduling. Transportation Science 32 4 (1998) 380-420
-
(1998)
Transportation Science
, vol.32
, Issue.4
, pp. 380-420
-
-
Cordeau, J.F.1
Toth, P.2
Vigo, D.3
-
5
-
-
85029878715
-
-
D'Ariano, A., 2008. Improving Real-Time Train Dispatching: Models, Algorithms and Applications. PhD Thesis, TRAIL Thesis Series T2008/6, Delft, The Netherlands.
-
D'Ariano, A., 2008. Improving Real-Time Train Dispatching: Models, Algorithms and Applications. PhD Thesis, TRAIL Thesis Series T2008/6, Delft, The Netherlands.
-
-
-
-
9
-
-
58849108695
-
-
Eurailpress, Hamburg, Germany
-
Hansen I.A., and Pachl J. Railway Timetable and Traffic: Analysis, Modelling and Simulation (2008), Eurailpress, Hamburg, Germany
-
(2008)
Railway Timetable and Traffic: Analysis, Modelling and Simulation
-
-
Hansen, I.A.1
Pachl, J.2
-
10
-
-
4644349692
-
Sperrzeiten als Grundlage für die Fahrplankonstruktion
-
Happel O. Sperrzeiten als Grundlage für die Fahrplankonstruktion. Eisenbahntechnische Rundschau (ETR) 8 (1959) 79-90
-
(1959)
Eisenbahntechnische Rundschau (ETR)
, vol.8
, pp. 79-90
-
-
Happel, O.1
-
11
-
-
69249242607
-
-
Internal Report, Holland Railconsult, Utrecht, The Netherlands
-
Hemelrijk, R., Kruijer, J., de Vries, D.K., 2003. Schiphol Tunnel 2007. Description of the Situation. Internal Report, Holland Railconsult, Utrecht, The Netherlands.
-
(2003)
Schiphol Tunnel 2007. Description of the Situation
-
-
Hemelrijk, R.1
Kruijer, J.2
de Vries, D.K.3
-
13
-
-
53749098943
-
Scheduling models for short-term railway traffic optimisation
-
Hickman M., Mirchandani P., and Voss S. (Eds), Springer
-
Mascis A., Pacciarelli D., and Pranzo M. Scheduling models for short-term railway traffic optimisation. In: Hickman M., Mirchandani P., and Voss S. (Eds). Computer-aided Systems in Public Transport, Lecture Notes in Economics and Mathematical Systems 600 (2008), Springer 71-90
-
(2008)
Computer-aided Systems in Public Transport, Lecture Notes in Economics and Mathematical Systems 600
, pp. 71-90
-
-
Mascis, A.1
Pacciarelli, D.2
Pranzo, M.3
-
14
-
-
33748698838
-
A traffic management system for real-time traffic optimisation in railways
-
Mazzarello M., and Ottaviani E. A traffic management system for real-time traffic optimisation in railways. Transportation Research Part B 41 2 (2007) 246-274
-
(2007)
Transportation Research Part B
, vol.41
, Issue.2
, pp. 246-274
-
-
Mazzarello, M.1
Ottaviani, E.2
-
17
-
-
0011877979
-
Optimal train scheduling on a single track railway
-
Amsterdam, The Netherlands, pp
-
Szpigel, B., 1973. Optimal train scheduling on a single track railway. In: Proceedings of Operational Research 1972, Amsterdam, The Netherlands, pp. 343-352.
-
(1972)
Proceedings of Operational Research
, pp. 343-352
-
-
Szpigel, B.1
|