메뉴 건너뛰기




Volumn 63, Issue , 2014, Pages 15-37

An overview of recovery models and algorithms for real-time railway rescheduling

Author keywords

Disturbances and disruptions; Optimization models and algorithms; Railway rescheduling; Real time; Review paper

Indexed keywords

OPERATIONS RESEARCH; OPTIMIZATION; RAILROADS; TRANSPORTATION;

EID: 84896786219     PISSN: 01912615     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.trb.2014.01.009     Document Type: Review
Times cited : (558)

References (94)
  • 3
    • 78650130562 scopus 로고    scopus 로고
    • A MIP-based local search method for the railway rescheduling problem
    • Acuna-Agost R., Michelon P., Feillet D., Gueye S. A MIP-based local search method for the railway rescheduling problem. Networks 2011, 57(1):69-86.
    • (2011) Networks , vol.57 , Issue.1 , pp. 69-86
    • Acuna-Agost, R.1    Michelon, P.2    Feillet, D.3    Gueye, S.4
  • 4
    • 79960905667 scopus 로고    scopus 로고
    • SAPI: statistical analysis of propagation of incidents. A new approach for rescheduling trains after disruptions
    • Acuna-Agost R., Michelon P., Feillet D., Gueye S. SAPI: statistical analysis of propagation of incidents. A new approach for rescheduling trains after disruptions. European Journal of Operational Research 2011, 215(1):227-243.
    • (2011) European Journal of Operational Research , vol.215 , Issue.1 , pp. 227-243
    • Acuna-Agost, R.1    Michelon, P.2    Feillet, D.3    Gueye, S.4
  • 5
    • 0023977010 scopus 로고
    • The shifting bottleneck procedure for job shop scheduling
    • Adams J., Balas E., Zawack D. The shifting bottleneck procedure for job shop scheduling. Management Science 1988, 34:391-401.
    • (1988) Management Science , vol.34 , pp. 391-401
    • Adams, J.1    Balas, E.2    Zawack, D.3
  • 7
    • 84870243337 scopus 로고    scopus 로고
    • Rescheduling rail networks with maintenance disruptions using problem space search
    • Albrecht A.R., Panton D.M., Lee D.H. Rescheduling rail networks with maintenance disruptions using problem space search. Computers & Operations Research 2013, 40:703-712.
    • (2013) Computers & Operations Research , vol.40 , pp. 703-712
    • Albrecht, A.R.1    Panton, D.M.2    Lee, D.H.3
  • 8
    • 84896778621 scopus 로고    scopus 로고
    • An overview on real-time speed control in rail-bound public transportation systems.
    • Proceedings of the 2nd International Conference on Models and Technologies for Intelligent Transportation Systems, Leuven, Belgium.
    • Albrecht, T., Binder, A., Gassel, C., 2011. An overview on real-time speed control in rail-bound public transportation systems. In: Proceedings of the 2nd International Conference on Models and Technologies for Intelligent Transportation Systems, Leuven, Belgium.
    • (2011)
    • Albrecht, T.1    Binder, A.2    Gassel, C.3
  • 9
    • 84870238126 scopus 로고    scopus 로고
    • On-line reschedule optimization for passenger railways in case of emergencies
    • Almodóvar M., García-Ródenas R. On-line reschedule optimization for passenger railways in case of emergencies. Computers & Operations Research 2013, 40(3):725-736.
    • (2013) Computers & Operations Research , vol.40 , Issue.3 , pp. 725-736
    • Almodóvar, M.1    García-Ródenas, R.2
  • 10
    • 84887082868 scopus 로고    scopus 로고
    • The dispatching problem on multitrack territories: heuristic approaches based on mixed integer linear programming
    • Boccia M., Mannino C., Vasilyev I. The dispatching problem on multitrack territories: heuristic approaches based on mixed integer linear programming. Networks 2013, 62(4):315-326.
    • (2013) Networks , vol.62 , Issue.4 , pp. 315-326
    • Boccia, M.1    Mannino, C.2    Vasilyev, I.3
  • 11
  • 12
    • 84865251883 scopus 로고    scopus 로고
    • Models and algorithms for the train unit assignment problem
    • Springer-Verlag, Berlin Heidelberg, A.R. Mahjoub (Ed.) Proceedings of ISCO 2012
    • Cacchiani V., Caprara A., Toth P. Models and algorithms for the train unit assignment problem. LNCS 2012, vol. 7422:24-35. Springer-Verlag, Berlin Heidelberg. A.R. Mahjoub (Ed.).
    • (2012) LNCS , vol.7422 , pp. 24-35
    • Cacchiani, V.1    Caprara, A.2    Toth, P.3
  • 14
    • 84866123463 scopus 로고    scopus 로고
    • Integration of timetable planning and rolling stock in rapid transit networks
    • Cadarso L., Marín Á Integration of timetable planning and rolling stock in rapid transit networks. Annals of Operations Research 2012, 199(1):113-135.
    • (2012) Annals of Operations Research , vol.199 , Issue.1 , pp. 113-135
    • Cadarso, L.1    Marín Á2
  • 16
    • 84859705420 scopus 로고    scopus 로고
    • A model predictive control approach for discrete-time rescheduling in complex central railway station areas
    • Caimi G., Fuchsberger M., Laumanns M., Lüthi M. A model predictive control approach for discrete-time rescheduling in complex central railway station areas. Computers & Operations Research 2012, 39:2578-2593.
    • (2012) Computers & Operations Research , vol.39 , pp. 2578-2593
    • Caimi, G.1    Fuchsberger, M.2    Laumanns, M.3    Lüthi, M.4
  • 17
    • 84882960736 scopus 로고    scopus 로고
    • Almost 20 years of combinatorial optimization for railway planning: from Lagrangian relaxation to column generation
    • Erlebach, T., Lübbecke, M. (Eds.), Proceedings of the 10th Workshop on Algorithmic Approaches for Transportation Modeling, Optimization, and Systems (ATMOS10), OpenAccess Series in Informatics (OASIcs).
    • Caprara, A., 2010. Almost 20 years of combinatorial optimization for railway planning: from Lagrangian relaxation to column generation. In: Erlebach, T., Lübbecke, M. (Eds.), Proceedings of the 10th Workshop on Algorithmic Approaches for Transportation Modeling, Optimization, and Systems (ATMOS10), OpenAccess Series in Informatics (OASIcs).
    • (2010)
    • Caprara, A.1
  • 19
    • 0033351565 scopus 로고    scopus 로고
    • A heuristic method for the set covering problem
    • Caprara A., Fischetti M., Toth P. A heuristic method for the set covering problem. Operations Research 1999, 47:730-743.
    • (1999) Operations Research , vol.47 , pp. 730-743
    • Caprara, A.1    Fischetti, M.2    Toth, P.3
  • 22
    • 0036542288 scopus 로고    scopus 로고
    • A constraint-based interactive train rescheduling tool
    • Chiu C.K., Chou C.M., Lee J.H.M., Leung H., Leung Y.W. A constraint-based interactive train rescheduling tool. Constraints 2002, 7(2):167-198.
    • (2002) Constraints , vol.7 , Issue.2 , pp. 167-198
    • Chiu, C.K.1    Chou, C.M.2    Lee, J.H.M.3    Leung, H.4    Leung, Y.W.5
  • 24
    • 78649410947 scopus 로고    scopus 로고
    • Disruption handling in large railway networks
    • Proceedings of Computers in Railways, Beijing, China
    • Corman, F., D'Ariano, A., Hansen, I.A., 2010. Disruption handling in large railway networks. In: Proceedings of Computers in Railways, Beijing, China, pp. 629-640.
    • (2010) , pp. 629-640
    • Corman, F.1    D'Ariano, A.2    Hansen, I.A.3
  • 25
    • 79959976508 scopus 로고    scopus 로고
    • Dispatching trains during seriously disrupted traffic situations
    • Proceedings of the IEEE International Conference on Networking, Sensing and Control
    • Corman, F., D'Ariano, A., Hansen, I.A., Pacciarelli, D., Pranzo, M., 2011. Dispatching trains during seriously disrupted traffic situations. In: Proceedings of the IEEE International Conference on Networking, Sensing and Control, pp. 323-328.
    • (2011) , pp. 323-328
    • Corman, F.1    D'Ariano, A.2    Hansen, I.A.3    Pacciarelli, D.4    Pranzo, M.5
  • 27
    • 79953200769 scopus 로고    scopus 로고
    • Centralized versus distributed systems to reschedule trains in two dispatching areas
    • Corman F., D'Ariano A., Pacciarelli D., Pranzo M. Centralized versus distributed systems to reschedule trains in two dispatching areas. Public Transport 2010, 2(3):219-247.
    • (2010) Public Transport , vol.2 , Issue.3 , pp. 219-247
    • Corman, F.1    D'Ariano, A.2    Pacciarelli, D.3    Pranzo, M.4
  • 29
  • 30
    • 79958004969 scopus 로고    scopus 로고
    • Effectiveness of dynamic reordering and rerouting of trains in a complicated and densely occupied station area
    • Corman F., D'Ariano A., Pranzo M., Hansen I.A. Effectiveness of dynamic reordering and rerouting of trains in a complicated and densely occupied station area. Transportation Planning and Technology 2011, 34(4):341-362.
    • (2011) Transportation Planning and Technology , vol.34 , Issue.4 , pp. 341-362
    • Corman, F.1    D'Ariano, A.2    Pranzo, M.3    Hansen, I.A.4
  • 31
    • 58849132604 scopus 로고    scopus 로고
    • Improving Real-Time Train Dispatching
    • Models, Algorithms and Applications. PhD thesis, TRAIL Thesis Series T2008/6, The Netherlands.
    • D'Ariano, A., 2008. Improving Real-Time Train Dispatching: Models, Algorithms and Applications. PhD thesis, TRAIL Thesis Series T2008/6, The Netherlands.
    • (2008)
    • D'Ariano, A.1
  • 32
    • 70449635732 scopus 로고    scopus 로고
    • Reordering and local rerouting strategies to manage train traffic in real time
    • D'Ariano A., Corman F., Pacciarelli D., Pranzo M. Reordering and local rerouting strategies to manage train traffic in real time. Transportation Science 2008, 42(4):405-419.
    • (2008) Transportation Science , vol.42 , Issue.4 , pp. 405-419
    • D'Ariano, A.1    Corman, F.2    Pacciarelli, D.3    Pranzo, M.4
  • 34
    • 38849099559 scopus 로고    scopus 로고
    • Assessment of flexible timetables in real-time traffic management of a railway bottleneck
    • D'Ariano A., Pacciarelli D., Pranzo M. Assessment of flexible timetables in real-time traffic management of a railway bottleneck. Transportation Research Part C 2008, 16(2):232-245.
    • (2008) Transportation Research Part C , vol.16 , Issue.2 , pp. 232-245
    • D'Ariano, A.1    Pacciarelli, D.2    Pranzo, M.3
  • 35
    • 59749089450 scopus 로고    scopus 로고
    • An advanced real-time train dispatching system for minimizing the propagation of delays in a dispatching area under severe disturbances
    • D'Ariano A., Pranzo M. An advanced real-time train dispatching system for minimizing the propagation of delays in a dispatching area under severe disturbances. Networks and Spatial Economics 2009, 9(1):63-84.
    • (2009) Networks and Spatial Economics , vol.9 , Issue.1 , pp. 63-84
    • D'Ariano, A.1    Pranzo, M.2
  • 36
  • 37
    • 84893317416 scopus 로고    scopus 로고
    • Delay Management and Dispatching in Railways
    • PhD thesis, Erasmus University Rotterdam.
    • Dollevoet, T., 2013. Delay Management and Dispatching in Railways. PhD thesis, Erasmus University Rotterdam.
    • (2013)
    • Dollevoet, T.1
  • 38
    • 84868625850 scopus 로고    scopus 로고
    • Delay management including capacities of stations
    • Caprara, A., Kontogiannis, S. (Eds.), Proceedings of the 11th Workshop on Algorithmic Approaches for Transportation Modelling, Optimization, and Systems, volume 20 of OpenAccess Series in Informatics (OASIcs), Dagstuhl, Germany. Schloss Dagstuhl-Leibniz-Zentrum für Informatik
    • Dollevoet, T., Huisman, D., Schmidt, M., Schöbel, A., 2011. Delay management including capacities of stations. In: Caprara, A., Kontogiannis, S. (Eds.), Proceedings of the 11th Workshop on Algorithmic Approaches for Transportation Modelling, Optimization, and Systems, volume 20 of OpenAccess Series in Informatics (OASIcs), Dagstuhl, Germany. Schloss Dagstuhl-Leibniz-Zentrum für Informatik, pp. 88-99.
    • (2011) , pp. 88-99
    • Dollevoet, T.1    Huisman, D.2    Schmidt, M.3    Schöbel, A.4
  • 40
    • 84871663732 scopus 로고    scopus 로고
    • Train re-scheduling with genetic algorithms and artificial neural networks for single-track railways
    • Dündar S., Şahin I. Train re-scheduling with genetic algorithms and artificial neural networks for single-track railways. Transportation Research Part C: Emerging Technologies 2013, 27(0):1-15.
    • (2013) Transportation Research Part C: Emerging Technologies , vol.27 , Issue.0 , pp. 1-15
    • Dündar, S.1    Şahin, I.2
  • 41
    • 0031988720 scopus 로고    scopus 로고
    • Real-time deadheading problem in transit operations control
    • Eberlein X.J. Real-time deadheading problem in transit operations control. Transportation Research B 1998, 32:77-100.
    • (1998) Transportation Research B , vol.32 , pp. 77-100
    • Eberlein, X.J.1
  • 42
    • 84896783496 scopus 로고    scopus 로고
    • Disruption management with rescheduling of trips and vehicle circulations
    • 5th ASME/ASCE/IEEE Joint Rail Conference.
    • Fekete, S.P., Kröller, A., Lorek, M., Pfetsch, M., 2011. Disruption management with rescheduling of trips and vehicle circulations. In: 5th ASME/ASCE/IEEE Joint Rail Conference.
    • (2011)
    • Fekete, S.P.1    Kröller, A.2    Lorek, M.3    Pfetsch, M.4
  • 46
    • 84896758073 scopus 로고    scopus 로고
    • Modelling train re-scheduling with optimization and operational research techniques
    • results and applications at SNCF. In: Proceedings of WCRR, Montréal.
    • Gély, L., Dessagne, G., Lerin, C., 2006. Modelling train re-scheduling with optimization and operational research techniques: results and applications at SNCF. In: Proceedings of WCRR, Montréal.
    • (2006)
    • Gély, L.1    Dessagne, G.2    Lerin, C.3
  • 47
    • 0031234257 scopus 로고    scopus 로고
    • Heuristic techniques for single line train scheduling
    • Higgins A., Kozan E., Ferreira L. Heuristic techniques for single line train scheduling. Journal of Heuristics 1997, 3(1):43-62.
    • (1997) Journal of Heuristics , vol.3 , Issue.1 , pp. 43-62
    • Higgins, A.1    Kozan, E.2    Ferreira, L.3
  • 48
    • 62749142613 scopus 로고    scopus 로고
    • A train stop deployment planning algorithm using a petri-net-based modelling approach
    • Hirai C., Kunimatsu T., Tomii N., Kondou S., Takaba M. A train stop deployment planning algorithm using a petri-net-based modelling approach. Quarterly Report of RTRI 2009, 50(1):8-13.
    • (2009) Quarterly Report of RTRI , vol.50 , Issue.1 , pp. 8-13
    • Hirai, C.1    Kunimatsu, T.2    Tomii, N.3    Kondou, S.4    Takaba, M.5
  • 49
    • 85015495224 scopus 로고    scopus 로고
    • A column generation approach for the rail crew re-scheduling problem
    • Huisman D. A column generation approach for the rail crew re-scheduling problem. European Journal of Operational Research 2005, 53:1007-1023.
    • (2005) European Journal of Operational Research , vol.53 , pp. 1007-1023
    • Huisman, D.1
  • 51
    • 0003666178 scopus 로고    scopus 로고
    • Scheduling a production line to minimize maximum tardiness
    • Research Report 43, Management Science Research Project.
    • Jackson, J.R., 1955. Scheduling a production line to minimize maximum tardiness. Research Report 43, Management Science Research Project.
    • Jackson, J.R.1
  • 52
    • 84896764608 scopus 로고    scopus 로고
    • Decision Support for the Rolling Stock Dispatcher
    • PhD thesis, DTU, Copenhagen, Denmark.
    • Jespersen-Groth, J.J., 2008. Decision Support for the Rolling Stock Dispatcher. PhD thesis, DTU, Copenhagen, Denmark.
    • (2008)
    • Jespersen-Groth, J.J.1
  • 53
    • 77956312792 scopus 로고    scopus 로고
    • Optimal reinsertion of cancelled train lines
    • Technical report, IMM-DTU, aug 2006. < >
    • Jespersen-Groth, J.J., Clausen, J., Larsen, J., 2006. Optimal reinsertion of cancelled train lines. Technical report, IMM-DTU, aug 2006. .
    • (2006)
    • Jespersen-Groth, J.J.1    Clausen, J.2    Larsen, J.3
  • 54
    • 77956302319 scopus 로고    scopus 로고
    • Disruption management in passenger railway transportation
    • Springer, R.K. Ahuja, R.H. Möhring, C. Zaroliagis (Eds.) Robust and Online Large-Scale Optimization
    • Jespersen-Groth J.J., Potthoff D., Clausen J., Huisman D., Kroon L.G., Maróti G., Nielsen M.N. Disruption management in passenger railway transportation. LNCS 2009, vol. 5868:399-421. Springer. R.K. Ahuja, R.H. Möhring, C. Zaroliagis (Eds.).
    • (2009) LNCS , vol.5868 , pp. 399-421
    • Jespersen-Groth, J.J.1    Potthoff, D.2    Clausen, J.3    Huisman, D.4    Kroon, L.G.5    Maróti, G.6    Nielsen, M.N.7
  • 55
    • 84856894208 scopus 로고    scopus 로고
    • An optimal delay management algorithm from passengers' viewpoints considering the whole railway network
    • Kanai S., Shiina K., Harada S., Tomii N. An optimal delay management algorithm from passengers' viewpoints considering the whole railway network. Journal of Rail Transport Planning & Management 2011, 1:25-37.
    • (2011) Journal of Rail Transport Planning & Management , vol.1 , pp. 25-37
    • Kanai, S.1    Shiina, K.2    Harada, S.3    Tomii, N.4
  • 56
    • 84882989278 scopus 로고    scopus 로고
    • Train scheduling and rescheduling in the UK with a modified shifting bottleneck procedure
    • Delling, D., Liberti, L. (Eds.), Proceedings of the 12th Workshop on Algorithmic Approaches for Transportation Modelling, Optimization, and Systems, volume 25 of OpenAccess Series in Informatics (OASIcs), Dagstuhl, Germany. Schloss Dagstuhl-Leibniz-Zentrum für Informatik
    • Khosravi, B., Bennell, J.A., Potts, C.N., 2012. Train scheduling and rescheduling in the UK with a modified shifting bottleneck procedure. In: Delling, D., Liberti, L. (Eds.), Proceedings of the 12th Workshop on Algorithmic Approaches for Transportation Modelling, Optimization, and Systems, volume 25 of OpenAccess Series in Informatics (OASIcs), Dagstuhl, Germany. Schloss Dagstuhl-Leibniz-Zentrum für Informatik, pp. 120-131.
    • (2012) , pp. 120-131
    • Khosravi, B.1    Bennell, J.A.2    Potts, C.N.3
  • 57
    • 85029889395 scopus 로고    scopus 로고
    • forthcoming. Rescheduling of railway rolling stock with dynamic passenger flows. Transportation Science, Erasmus Research Institute of Management, Rotterdam: ERS-2010-045-LIS.
    • Kroon, L.G., Maróti, G., Nielsen, L.K., forthcoming. Rescheduling of railway rolling stock with dynamic passenger flows. Transportation Science, Erasmus Research Institute of Management, Rotterdam: ERS-2010-045-LIS.
    • Kroon, L.G.1    Maróti, G.2    Nielsen, L.K.3
  • 58
    • 84896745925 scopus 로고    scopus 로고
    • A novel train rescheduling algorithm for correcting disrupted train operations in a dense urban environment
    • Wit Press/Computational Mechanics, I.A. Hansen (Ed.)
    • Kumazawa K., Hara K., Koseki T. A novel train rescheduling algorithm for correcting disrupted train operations in a dense urban environment. Timetable Planning and Information Quality 2010, Wit Press/Computational Mechanics. I.A. Hansen (Ed.).
    • (2010) Timetable Planning and Information Quality
    • Kumazawa, K.1    Hara, K.2    Koseki, T.3
  • 59
    • 84879729692 scopus 로고    scopus 로고
    • An exact decomposition approach for the real-time train dispatching problem
    • Technical Report No. A23274, SINTEF ICT, Norway.
    • Lamorgese, L., Mannino, C., 2012. An exact decomposition approach for the real-time train dispatching problem. Technical Report No. A23274, SINTEF ICT, Norway.
    • (2012)
    • Lamorgese, L.1    Mannino, C.2
  • 62
    • 84894472686 scopus 로고    scopus 로고
    • Adjusting a railway timetable in case of partial or complete blockades
    • Louwerse I., Huisman D. Adjusting a railway timetable in case of partial or complete blockades. European Journal of Operational Research 2014, 235(3):583-593.
    • (2014) European Journal of Operational Research , vol.235 , Issue.3 , pp. 583-593
    • Louwerse, I.1    Huisman, D.2
  • 63
    • 79960086387 scopus 로고    scopus 로고
    • Railway track allocation: models and methods
    • Lusby R.M., Larsen J., Ehrgott M., Ryan D.M. Railway track allocation: models and methods. OR Spectrum 2011, 33(4):843-883.
    • (2011) OR Spectrum , vol.33 , Issue.4 , pp. 843-883
    • Lusby, R.M.1    Larsen, J.2    Ehrgott, M.3    Ryan, D.M.4
  • 65
    • 84896794508 scopus 로고    scopus 로고
    • Evaluation of an integrated real-time rescheduling and train control system for heavily used areas
    • Proceedings of the International Seminar on Railway Operations Modelling and Analysis (IAROR) 2007 Conference, Hannover, Germany.
    • Lüthi, M., Medeossi, G., Nash, A., 2007. Evaluation of an integrated real-time rescheduling and train control system for heavily used areas. In: Proceedings of the International Seminar on Railway Operations Modelling and Analysis (IAROR) 2007 Conference, Hannover, Germany.
    • (2007)
    • Lüthi, M.1    Medeossi, G.2    Nash, A.3
  • 66
    • 84882970149 scopus 로고    scopus 로고
    • Real-time traffic control in railway systems
    • Caprara, A., Kontogiannis, S., (Eds.), Proceedings of ATMOS'11. OASICS
    • Mannino, C., 2011. Real-time traffic control in railway systems. In: Caprara, A., Kontogiannis, S., (Eds.), Proceedings of ATMOS'11. OASICS, vol. 20.
    • (2011) , vol.20
    • Mannino, C.1
  • 67
    • 69949109733 scopus 로고    scopus 로고
    • Optimal real-time traffic control in metro stations
    • Mannino C., Mascis A. Optimal real-time traffic control in metro stations. Operations Research 2009, 57(4):1026-1039.
    • (2009) Operations Research , vol.57 , Issue.4 , pp. 1026-1039
    • Mannino, C.1    Mascis, A.2
  • 70
  • 71
    • 79959808568 scopus 로고    scopus 로고
    • Robust single-track train dispatching model under a dynamic and stochastic environment: A scenario based rolling horizon solution approach
    • Meng L., Zhou X. Robust single-track train dispatching model under a dynamic and stochastic environment: A scenario based rolling horizon solution approach. Transportation Research Part B 2011, 45:1080-1102.
    • (2011) Transportation Research Part B , vol.45 , pp. 1080-1102
    • Meng, L.1    Zhou, X.2
  • 72
    • 78650824016 scopus 로고    scopus 로고
    • An appraisal of a column-generation-based algorithm for centralized train-conflict resolution on a metropolitan railway network
    • Min Y.H., Park M.J., Hong S.P., Hong S.H. An appraisal of a column-generation-based algorithm for centralized train-conflict resolution on a metropolitan railway network. Transportation Research Part B 2011, 45:409-429.
    • (2011) Transportation Research Part B , vol.45 , pp. 409-429
    • Min, Y.H.1    Park, M.J.2    Hong, S.P.3    Hong, S.H.4
  • 73
    • 84896774557 scopus 로고    scopus 로고
    • A practical train rescheduling algorithm using three predetermined factors
    • Proceedings of the 4th International Seminar on Railway Operations Modelling and Analysis - RailRome 2011, Rome, Italy, February 2011.
    • Nakamura, T., Hirai, C., Nishioka, Y., 2011. A practical train rescheduling algorithm using three predetermined factors. In: Proceedings of the 4th International Seminar on Railway Operations Modelling and Analysis - RailRome 2011, Rome, Italy, February 2011.
    • (2011)
    • Nakamura, T.1    Hirai, C.2    Nishioka, Y.3
  • 74
    • 84881612519 scopus 로고    scopus 로고
    • Modelling disruptions and resolving conflicts optimally in a railway schedule
    • Narayanaswami S., Rangaraj N. Modelling disruptions and resolving conflicts optimally in a railway schedule. Computers & Industrial Engineering 2013, 64(1):469-481.
    • (2013) Computers & Industrial Engineering , vol.64 , Issue.1 , pp. 469-481
    • Narayanaswami, S.1    Rangaraj, N.2
  • 76
    • 84882965992 scopus 로고    scopus 로고
    • Real time railway traffic management modeling track-circuits
    • Delling, D., Liberti, L. (Eds.), Proceedings of the 12th Workshop on Algorithmic Approaches for Transportation Modelling, Optimization, and Systems, volume 25 of OpenAccess Series in Informatics (OASIcs), Dagstuhl, Germany. Schloss Dagstuhl-Leibniz-Zentrum für Informatik
    • Pellegrini, P., Marlière, G., Rodriguez, J., 2012. Real time railway traffic management modeling track-circuits. In: Delling, D., Liberti, L. (Eds.), Proceedings of the 12th Workshop on Algorithmic Approaches for Transportation Modelling, Optimization, and Systems, volume 25 of OpenAccess Series in Informatics (OASIcs), Dagstuhl, Germany. Schloss Dagstuhl-Leibniz-Zentrum für Informatik, pp. 23-34.
    • (2012) , pp. 23-34
    • Pellegrini, P.1    Marlière, G.2    Rodriguez, J.3
  • 77
    • 84870607554 scopus 로고    scopus 로고
    • Railway Crew Rescheduling
    • PhD thesis, Erasmus University, Rotterdam, The Netherlands.
    • Potthoff, D., 2010. Railway Crew Rescheduling: Novel Approaches and Extensions. PhD thesis, Erasmus University, Rotterdam, The Netherlands.
    • (2010) Novel Approaches and Extensions
    • Potthoff, D.1
  • 78
    • 78649761026 scopus 로고    scopus 로고
    • Column generation with dynamic duty selection for railway crew rescheduling
    • Potthoff D., Huisman D., Desaulniers G. Column generation with dynamic duty selection for railway crew rescheduling. Transportation Science 2010, 44:493-505.
    • (2010) Transportation Science , vol.44 , pp. 493-505
    • Potthoff, D.1    Huisman, D.2    Desaulniers, G.3
  • 79
    • 70449133340 scopus 로고    scopus 로고
    • The train driver recovery problem - a set partitioning based model and solution method
    • Rezanova N.J., Ryan D.M. The train driver recovery problem - a set partitioning based model and solution method. Computers & Operations Research 2009, 37:845-856.
    • (2009) Computers & Operations Research , vol.37 , pp. 845-856
    • Rezanova, N.J.1    Ryan, D.M.2
  • 80
    • 33748695294 scopus 로고    scopus 로고
    • A constraint programming model for real-time train scheduling at junctions
    • Rodriguez J. A constraint programming model for real-time train scheduling at junctions. Transportation Research Part B 2007, 41:231-245.
    • (2007) Transportation Research Part B , vol.41 , pp. 231-245
    • Rodriguez, J.1
  • 81
    • 79958014036 scopus 로고    scopus 로고
    • Real-time freight train driver rescheduling during disruptions
    • Sato K., Fukumura N. Real-time freight train driver rescheduling during disruptions. IEICE Transactions 2011, 94(6):1222-1229.
    • (2011) IEICE Transactions , vol.94 , Issue.6 , pp. 1222-1229
    • Sato, K.1    Fukumura, N.2
  • 82
    • 84861636902 scopus 로고    scopus 로고
    • Real-time freight locomotive rescheduling and uncovered train detection during disruption
    • Sato K., Fukumura N. Real-time freight locomotive rescheduling and uncovered train detection during disruption. European Journal of Operational Research 2012, 221:636-648.
    • (2012) European Journal of Operational Research , vol.221 , pp. 636-648
    • Sato, K.1    Fukumura, N.2
  • 84
    • 84896803827 scopus 로고    scopus 로고
    • Dynamic traffic management in the Schiphol bottleneck
    • Hansen, I.A., Radtke, A., Pachl, J., Wendler, E. (Eds.), Proceedings of the Second International Seminar on Railway Operations Modelling and Analysis, Hannover, Germany.
    • Schaafsma, A., Bartholomeus, M., 2007. Dynamic traffic management in the Schiphol bottleneck. In: Hansen, I.A., Radtke, A., Pachl, J., Wendler, E. (Eds.), Proceedings of the Second International Seminar on Railway Operations Modelling and Analysis, Hannover, Germany.
    • (2007)
    • Schaafsma, A.1    Bartholomeus, M.2
  • 85
    • 77955639714 scopus 로고    scopus 로고
    • To wait or not to wait and who goes first? Delay management with priority decisions
    • Schachtebeck M., Schöbel A. To wait or not to wait and who goes first? Delay management with priority decisions. Transportation Science 2010, 44:307-321.
    • (2010) Transportation Science , vol.44 , pp. 307-321
    • Schachtebeck, M.1    Schöbel, A.2
  • 86
    • 49949111098 scopus 로고    scopus 로고
    • Integer programming approaches for solving the delay management problem
    • Springer, F. Geraets, L.G. Kroon, A. Schöbel, D. Wagner, C. Zaroliagis (Eds.) Robust and Online Large-Scale Optimization
    • Schöbel A. Integer programming approaches for solving the delay management problem. LNCS 2007, vol. 4359:145-170. Springer. F. Geraets, L.G. Kroon, A. Schöbel, D. Wagner, C. Zaroliagis (Eds.).
    • (2007) LNCS , vol.4359 , pp. 145-170
    • Schöbel, A.1
  • 87
    • 77955597779 scopus 로고    scopus 로고
    • Capacity constraints in delay management
    • Schöbel A. Capacity constraints in delay management. Public Transport 2009, 1(2):135-154.
    • (2009) Public Transport , vol.1 , Issue.2 , pp. 135-154
    • Schöbel, A.1
  • 88
    • 84896793542 scopus 로고    scopus 로고
    • The proposal system for Shinkansen using constraint programming
    • Proceedings of the 8th World Congress of Railway Research.
    • Shimizu, H., Tanabe, H., Yamamoto, M., 2008. The proposal system for Shinkansen using constraint programming. In: Proceedings of the 8th World Congress of Railway Research.
    • (2008)
    • Shimizu, H.1    Tanabe, H.2    Yamamoto, M.3
  • 89
    • 80054777781 scopus 로고    scopus 로고
    • Design of an effective algorithm for fast response to the rescheduling of railway traffic during disturbances
    • Törnquist J. Design of an effective algorithm for fast response to the rescheduling of railway traffic during disturbances. Transportation Research Part C 2012, 20:62-78.
    • (2012) Transportation Research Part C , vol.20 , pp. 62-78
    • Törnquist, J.1
  • 90
    • 33845266135 scopus 로고    scopus 로고
    • N-tracked railway traffic re-scheduling during disturbances
    • Törnquist J., Persson J.A. N-tracked railway traffic re-scheduling during disturbances. Transportation Research Part B 2007, 41(3):342-362.
    • (2007) Transportation Research Part B , vol.41 , Issue.3 , pp. 342-362
    • Törnquist, J.1    Persson, J.A.2
  • 91
    • 84896798077 scopus 로고    scopus 로고
    • Passenger oriented disruption management by adapting stopping patterns and rolling stock schedules
    • Proceedings of the 4th International Seminar on Railway Operations Modelling and Analysis - RailRome 2011, Rome, Italy, February 2011.
    • Veelenturf, L.P., Nielsen, L.K., Maróti, G., Kroon, L.G., 2011. Passenger oriented disruption management by adapting stopping patterns and rolling stock schedules. In: Proceedings of the 4th International Seminar on Railway Operations Modelling and Analysis - RailRome 2011, Rome, Italy, February 2011.
    • (2011)
    • Veelenturf, L.P.1    Nielsen, L.K.2    Maróti, G.3    Kroon, L.G.4
  • 93
    • 10644237939 scopus 로고    scopus 로고
    • Simultaneous disruption recovery of a train timetable and crew roster in real time
    • Walker C.G., Snowdon J.N., Ryan D.M. Simultaneous disruption recovery of a train timetable and crew roster in real time. Computers & Operations Research 2005, 32:2077-2094.
    • (2005) Computers & Operations Research , vol.32 , pp. 2077-2094
    • Walker, C.G.1    Snowdon, J.N.2    Ryan, D.M.3
  • 94
    • 84896795332 scopus 로고    scopus 로고
    • Serious breakdowns in the track infrastructure - calculation of the effects on rail traffic
    • Proceedings of the 2nd International Seminar on Railway Operations Modelling and Analysis - RailHannover 2007, Hannover, Germany, March 2007.
    • Wiklund, M., 2007. Serious breakdowns in the track infrastructure - calculation of the effects on rail traffic. In: Proceedings of the 2nd International Seminar on Railway Operations Modelling and Analysis - RailHannover 2007, Hannover, Germany, March 2007.
    • (2007)
    • Wiklund, M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.