메뉴 건너뛰기




Volumn , Issue , 2011, Pages 395-404

Disruption management with rescheduling of trips and vehicle circulations

Author keywords

[No Author keywords available]

Indexed keywords

CONFLICT FREE; DISRUPTION MANAGEMENT; EVENT-BASED; REAL-LIFE TEST; RECOVERY PLANS; SIZE REDUCTIONS; SUBWAY SYSTEMS; TIME WINDOWS; TRANSPORTATION SYSTEM;

EID: 84860231109     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1115/JRC2011-56040     Document Type: Conference Paper
Times cited : (9)

References (25)
  • 1
    • 77956302319 scopus 로고    scopus 로고
    • Disruption management in passenger railway transportation
    • R. K. Ahuja, R. H. Möhring, and C. D. Zaroliagis, eds. of Lecture Notes in Computer Science. Springer
    • Jespersen-Groth, J., Potthoff, D., Clausen, J., Huisman, D., Kroon, L. G., Maróti, G., and Nielsen, M. N., 2009. "Disruption management in passenger railway transportation". In Robust and Online Large-Scale Optimization, R. K. Ahuja, R. H. Möhring, and C. D. Zaroliagis, eds., Vol. 5868 of Lecture Notes in Computer Science. Springer, pp. 399-421.
    • (2009) Robust and Online Large-scale Optimization , vol.5868 , pp. 399-421
    • Jespersen-Groth, J.1    Potthoff, D.2    Clausen, J.3    Huisman, D.4    Kroon, L.G.5    Maróti, G.6    Nielsen, M.N.7
  • 3
    • 18944406568 scopus 로고    scopus 로고
    • A model for the delay management problem based on mixed-integer programming
    • Schöbel, A., 2001. "A model for the delay management problem based on mixed-integer programming". Electronic Notes in Theoretical Computer Science, 50(1).
    • (2001) Electronic Notes in Theoretical Computer Science , vol.50 , Issue.1
    • Schöbel, A.1
  • 8
    • 0036759198 scopus 로고    scopus 로고
    • Modeling and solving the train timetabling problem
    • Caprara, A., Fischetti, M., and Toth, P., 2002. "Modeling and solving the train timetabling problem". Operations Research, 50(5), pp. 851-861.
    • (2002) Operations Research , vol.50 , Issue.5 , pp. 851-861
    • Caprara, A.1    Fischetti, M.2    Toth, P.3
  • 10
    • 84885302325 scopus 로고    scopus 로고
    • Decision support tools for customer-oriented dispatching
    • F. Geraets, L. G. Kroon, A. Schöbel, D. Wagner, and C. D. Zaroliagis, eds. of Lecture Notes in Computer Science, Springer
    • Biederbick, C., and Suhl, L., 2004. "Decision support tools for customer-oriented dispatching". In ATMOS, F. Geraets, L. G. Kroon, A. Schöbel, D. Wagner, and C. D. Zaroliagis, eds., Vol. 4359 of Lecture Notes in Computer Science, Springer, pp. 171-183.
    • (2004) ATMOS , vol.4359 , pp. 171-183
    • Biederbick, C.1    Suhl, L.2
  • 11
    • 84860228814 scopus 로고    scopus 로고
    • A cooperative framework between optimization and simulation to adress on-line re-scheduling problems
    • Gely, L., Feillee, D., and Dessagne, G., 2009. A cooperative framework between optimization and simulation to adress on-line re-scheduling problems. Tech. Rep. 178, ARRIVAL project.
    • (2009) Tech. Rep. 178, ARRIVAL Project
    • Gely, L.1    Feillee, D.2    Dessagne, G.3
  • 12
    • 78649431753 scopus 로고    scopus 로고
    • Computer-based decision support for railway traffic scheduling and dispatching: A review of models and algorithms
    • L. G. Kroon and R. H. Möhring, eds., Schloss Dagstuhl
    • Törnquist, J., 2006. "Computer-based decision support for railway traffic scheduling and dispatching: A review of models and algorithms". In 5th Workshop on Algorithmic Methods and Models for Optimization of Railways, L. G. Kroon and R. H. Möhring, eds., Schloss Dagstuhl. http://drops.dagstuhl.de/opus/volltexte/2006/659.
    • (2006) 5th Workshop on Algorithmic Methods and Models for Optimization of Railways
    • Törnquist, J.1
  • 13
    • 33845266135 scopus 로고    scopus 로고
    • N-tracked railway traffic re-scheduling during disturbances
    • DOI 10.1016/j.trb.2006.06.001, PII S0191261506000749
    • Törnquist, J., and Persson, J. A., 2007. "N-tracked railway traffic re-scheduling during disturbances". Transportation Research Part B: Methodological, 41(3), pp. 342-362. (Pubitemid 44858115)
    • (2007) Transportation Research Part B: Methodological , vol.41 , Issue.3 , pp. 342-362
    • Tornquist, J.1    Persson, J.A.2
  • 15
    • 77956334402 scopus 로고    scopus 로고
    • A decision support framework for rolling stock rescheduling
    • Nielsen, L. K., 2008. A Decision Support Framework for Rolling Stock Rescheduling. Tech. Rep. 158, ARRIVAL Project.
    • (2008) Tech. Rep. 158, ARRIVAL Project
    • Nielsen, L.K.1
  • 16
    • 79959799673 scopus 로고    scopus 로고
    • Solving railway track allocation problems
    • J. Kalcsics and S. Nickel, eds.
    • Borndörfer, R., and Schlechte, T., 2007. "Solving railway track allocation problems". In Operations Research Proceedings 2007, J. Kalcsics and S. Nickel, eds., pp. 117-122.
    • (2007) Operations Research Proceedings 2007 , pp. 117-122
    • Borndörfer, R.1    Schlechte, T.2
  • 17
    • 43949092779 scopus 로고    scopus 로고
    • A column generation approach to train timetabling on a corridor
    • Cacchiani, V., Caprara, A., and Toth, P., 2008. "A column generation approach to train timetabling on a corridor". 4OR, 6(2), pp. 125-142.
    • (2008) 4OR , vol.6 , Issue.2 , pp. 125-142
    • Cacchiani, V.1    Caprara, A.2    Toth, P.3
  • 18
    • 33846417621 scopus 로고    scopus 로고
    • A column generation approach for the rail crew re-scheduling problem
    • DOI 10.1016/j.ejor.2006.04.026, PII S0377221706002736
    • Huisman, D., 2007. "A column generation approach for the rail crew re-scheduling problem". European Journal of Operational Research, 180(1), pp. 163-173. (Pubitemid 46138028)
    • (2007) European Journal of Operational Research , vol.180 , Issue.1 , pp. 163-173
    • Huisman, D.1
  • 19
    • 84885321479 scopus 로고    scopus 로고
    • Railway crew rescheduling with retiming
    • Erasmus University Rotterdam, Econometric Institute
    • Veelenturf, L., Potthoff, D., Huisman, D., and Kroon, L., 2009. Railway crew rescheduling with retiming. Econometric Institute Report EI 2009-24, Erasmus University Rotterdam, Econometric Institute. http://ideas.repec.org/p/ dgr/eureir/1765016746.html.
    • (2009) Econometric Institute Report EI 2009-24
    • Veelenturf, L.1    Potthoff, D.2    Huisman, D.3    Kroon, L.4
  • 20
    • 70350622986 scopus 로고    scopus 로고
    • Disruption management in the airline industry-concepts, models and methods
    • Clausen, J., Larsen, A., Larsen, J., and Rezanova, N. J., 2010. "Disruption management in the airline industry-concepts, models and methods". Computers and Operations Research, 37(5), pp. 809-821.
    • (2010) Computers and Operations Research , vol.37 , Issue.5 , pp. 809-821
    • Clausen, J.1    Larsen, A.2    Larsen, J.3    Rezanova, N.J.4
  • 21
    • 84885314004 scopus 로고    scopus 로고
    • Linien-, Fahrplan-, Umlauf- und Dienstplanoptimierung: Wie weit können diese bereits integriert werden?
    • M. Friedrich, ed., FGSV Verlag
    • Liebchen, C., 2008. "Linien-, Fahrplan-, Umlauf- und Dienstplanoptimierung: Wie weit können diese bereits integriert werden?". In Heureka '08 - Optimierung in Transport und Verkehr, Tagungsbericht, M. Friedrich, ed., FGSV Verlag.
    • (2008) Heureka '08 - Optimierung in Transport und Verkehr, Tagungsbericht
    • Liebchen, C.1
  • 22
    • 0008917539 scopus 로고
    • A mathematical model for periodic scheduling problems
    • Serafini, P., and Ukovich, W., 1989. "A mathematical model for periodic scheduling problems". SIAM Journal on Discrete Mathematics, 2(4), pp. 550-581.
    • (1989) SIAM Journal on Discrete Mathematics , vol.2 , Issue.4 , pp. 550-581
    • Serafini, P.1    Ukovich, W.2
  • 25
    • 84885295186 scopus 로고    scopus 로고
    • Falko: Fahrplan-validierung und -konstruktion für spurgebundene verkehrssysteme
    • H. S.
    • K.-H. Erhard, Y. Schmidtke, H. S., 2000. "Falko: Fahrplan-validierung und -konstruktion für spurgebundene verkehrssysteme". Signal+Draht, 92.
    • (2000) Signal+Draht , vol.92
    • Erhard, K.-H.1    Schmidtke, Y.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.