메뉴 건너뛰기




Volumn 45, Issue 2, 2011, Pages 409-429

An appraisal of a column-generation-based algorithm for centralized train-conflict resolution on a metropolitan railway network

Author keywords

Column generation; Fix and regenerate; NP hardness; Train conflict resolution

Indexed keywords

ELECTRIC LOAD DISPATCHING; OPTIMIZATION; RAILROAD TRANSPORTATION; RAILROADS; TRANSPORTATION;

EID: 78650824016     PISSN: 01912615     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.trb.2010.08.001     Document Type: Article
Times cited : (47)

References (29)
  • 2
    • 3042795380 scopus 로고    scopus 로고
    • Complexity results for flow-shop and open-shop scheduling problems with transportation delays
    • Brucker P., Knust S., Cheng T., Sharkhlevich N. Complexity results for flow-shop and open-shop scheduling problems with transportation delays. Annals of Operations Research 2004, 129(1-4):81-106.
    • (2004) Annals of Operations Research , vol.129 , Issue.1-4 , pp. 81-106
    • Brucker, P.1    Knust, S.2    Cheng, T.3    Sharkhlevich, N.4
  • 4
    • 0028436769 scopus 로고
    • A faster heuristic for the train scheduling problem
    • Cai X., Goh C. A faster heuristic for the train scheduling problem. Computers & Operations Research 1994, 21(5):499-510.
    • (1994) Computers & Operations Research , vol.21 , Issue.5 , pp. 499-510
    • Cai, X.1    Goh, C.2
  • 5
    • 0032070192 scopus 로고    scopus 로고
    • Greedy heuristic for rapid scheduling of trains on a single track
    • Cai X., Goh C., Mees A. Greedy heuristic for rapid scheduling of trains on a single track. IIE Transactions 1998, 30(5):481-493.
    • (1998) IIE Transactions , vol.30 , Issue.5 , pp. 481-493
    • Cai, X.1    Goh, C.2    Mees, A.3
  • 6
    • 0036759198 scopus 로고    scopus 로고
    • Modeling and solving the train timetabling problem
    • Caprara A., Fischetti M., Toth P. Modeling and solving the train timetabling problem. Operations Research 2002, 50(5):851-861.
    • (2002) Operations Research , vol.50 , Issue.5 , pp. 851-861
    • Caprara, A.1    Fischetti, M.2    Toth, P.3
  • 7
    • 33644594453 scopus 로고    scopus 로고
    • A lagrangian heuristic algorithm for a real-world train timetabling problem
    • Caprara A., Monaci M., Toth P., Guida P. A lagrangian heuristic algorithm for a real-world train timetabling problem. Discrete Applied Mathematics 2006, 154(5):738-753.
    • (2006) Discrete Applied Mathematics , vol.154 , Issue.5 , pp. 738-753
    • Caprara, A.1    Monaci, M.2    Toth, P.3    Guida, P.4
  • 8
    • 0028532251 scopus 로고
    • Extending a train pathing model from one-way to two-way track
    • Carey M. Extending a train pathing model from one-way to two-way track. Transportation Research Part B 1994, 28(5):395-400.
    • (1994) Transportation Research Part B , vol.28 , Issue.5 , pp. 395-400
    • Carey, M.1
  • 9
    • 0028530808 scopus 로고
    • A model and strategy for train pathing with choices of lines, platforms and routes
    • Carey M. A model and strategy for train pathing with choices of lines, platforms and routes. Transportation Research Part B 1994, 28(5):333-353.
    • (1994) Transportation Research Part B , vol.28 , Issue.5 , pp. 333-353
    • Carey, M.1
  • 12
    • 34249889301 scopus 로고    scopus 로고
    • Conflict resolution and train speed coordination for solving real-time timetable perturbations
    • D'Ariano A., Pranzo M., Hansen I. Conflict resolution and train speed coordination for solving real-time timetable perturbations. IEEE Transactions on Intelligent Transportation Systems 2007, 8(2):208-222.
    • (2007) IEEE Transactions on Intelligent Transportation Systems , vol.8 , Issue.2 , pp. 208-222
    • D'Ariano, A.1    Pranzo, M.2    Hansen, I.3
  • 13
    • 0027542554 scopus 로고
    • Single machine scheduling with early and tardy completion costs
    • Davis J., Kanet J. Single machine scheduling with early and tardy completion costs. Naval Research Logistics 1993, 40(1):85-101.
    • (1993) Naval Research Logistics , vol.40 , Issue.1 , pp. 85-101
    • Davis, J.1    Kanet, J.2
  • 14
    • 30544435688 scopus 로고    scopus 로고
    • An exact solution procedure to determine the optimal dispatching times for complex rail networks
    • Dessouky M., Lu Q., Zhao J., Leachman R. An exact solution procedure to determine the optimal dispatching times for complex rail networks. IIE Transactions 2006, 38(2):141-152.
    • (2006) IIE Transactions , vol.38 , Issue.2 , pp. 141-152
    • Dessouky, M.1    Lu, Q.2    Zhao, J.3    Leachman, R.4
  • 15
    • 0024010206 scopus 로고
    • One-processor scheduling with symmetric earliness and tardiness penalties
    • Garey M., Tarjan R., Wilfong G. One-processor scheduling with symmetric earliness and tardiness penalties. Mathematics of Operations Research 1988, 13(2):330-348.
    • (1988) Mathematics of Operations Research , vol.13 , Issue.2 , pp. 330-348
    • Garey, M.1    Tarjan, R.2    Wilfong, G.3
  • 17
    • 0029416680 scopus 로고
    • Real-time scheduling of freight railroads
    • Kraay D., Harker P. Real-time scheduling of freight railroads. Transportation Research Part B 1995, 29(3):213-229.
    • (1995) Transportation Research Part B , vol.29 , Issue.3 , pp. 213-229
    • Kraay, D.1    Harker, P.2
  • 18
    • 0002175846 scopus 로고
    • Optimal pacing of trains in freight railroads: model formulation and solution
    • Kraay D., Harker P., Chen B. Optimal pacing of trains in freight railroads: model formulation and solution. Operations Research 1991, 39(1):82-99.
    • (1991) Operations Research , vol.39 , Issue.1 , pp. 82-99
    • Kraay, D.1    Harker, P.2    Chen, B.3
  • 21
    • 33748698838 scopus 로고    scopus 로고
    • A traffic management system for real-time traffic optimisation in railways
    • Mazzarello M., Ottaviani E. A traffic management system for real-time traffic optimisation in railways. Transportation Research Part B 2007, 41(2):246-274.
    • (2007) Transportation Research Part B , vol.41 , Issue.2 , pp. 246-274
    • Mazzarello, M.1    Ottaviani, E.2
  • 22
    • 0000245614 scopus 로고
    • The single machine early/tardy problem
    • Ow P., Morton E. The single machine early/tardy problem. Management Science 1989, 35(2):177-191.
    • (1989) Management Science , vol.35 , Issue.2 , pp. 177-191
    • Ow, P.1    Morton, E.2
  • 23
    • 0032884348 scopus 로고    scopus 로고
    • Railway traffic control and train scheduling based on inter-train conflict management
    • Sahin I. Railway traffic control and train scheduling based on inter-train conflict management. Transportation Research Part B 1999, 33(24):511-534.
    • (1999) Transportation Research Part B , vol.33 , Issue.24 , pp. 511-534
    • Sahin, I.1
  • 24
    • 78649431753 scopus 로고    scopus 로고
    • Computer-based decision support for railway traffic scheduling and dispatching: a review of models and algorithms
    • Proceedings of ATMOS2005 (Algorithmic MeThods and Models for Optimization of RailwayS), Palma de Mallorca, Spain, October 2005, Dagstuhl Research Online Publication Server (DROPS).
    • Törnquist, J., 2006. Computer-based decision support for railway traffic scheduling and dispatching: a review of models and algorithms. In: Proceedings of ATMOS2005 (Algorithmic MeThods and Models for Optimization of RailwayS), Palma de Mallorca, Spain, October 2005, Dagstuhl Research Online Publication Server (DROPS).
    • (2006)
    • Törnquist, J.1
  • 25
    • 36448977879 scopus 로고    scopus 로고
    • Railway traffic disturbance management - an experimental analysis of disturbance complexity, management objectives and limitations in planning horizon
    • Törnquist J. Railway traffic disturbance management - an experimental analysis of disturbance complexity, management objectives and limitations in planning horizon. Transportation Research Part A 2007, 41(3):249-266.
    • (2007) Transportation Research Part A , vol.41 , Issue.3 , pp. 249-266
    • Törnquist, J.1
  • 26
    • 33845266135 scopus 로고    scopus 로고
    • N-tracked railway traffic re-scheduling during disturbances
    • Törnquist J., Persson J. N-tracked railway traffic re-scheduling during disturbances. Transportation Research Part B 2007, 41(3):342-362.
    • (2007) Transportation Research Part B , vol.41 , Issue.3 , pp. 342-362
    • Törnquist, J.1    Persson, J.2
  • 27
    • 4744370447 scopus 로고    scopus 로고
    • Improved heuristics for the early tardy scheduling problem with no idle time
    • Valente J., Alves R. Improved heuristics for the early tardy scheduling problem with no idle time. Computers & Operations Research 2005, 32(3):557-569.
    • (2005) Computers & Operations Research , vol.32 , Issue.3 , pp. 557-569
    • Valente, J.1    Alves, R.2
  • 28
    • 0026158109 scopus 로고
    • Algorithms for a class of single machine weighted tardiness and earliness scheduling problems
    • Yano C., Kim Y. Algorithms for a class of single machine weighted tardiness and earliness scheduling problems. European Journal of Operational Research 1991, 52(2):167-178.
    • (1991) European Journal of Operational Research , vol.52 , Issue.2 , pp. 167-178
    • Yano, C.1    Kim, Y.2
  • 29
    • 13544267417 scopus 로고    scopus 로고
    • Bicriteria train scheduling for high-speed passenger railroad planning applications
    • Zhou X., Zhong M. Bicriteria train scheduling for high-speed passenger railroad planning applications. European Journal of Operational Research 2005, 167(3):752-771.
    • (2005) European Journal of Operational Research , vol.167 , Issue.3 , pp. 752-771
    • Zhou, X.1    Zhong, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.