-
1
-
-
33748691351
-
Railway timetable stability analysis using maxplus system theory
-
R. M. Goverde, "Railway timetable stability analysis using maxplus system theory, " Transportation Research Part B: Methodological, vol. 41, no. 2, pp. 179-201, 2007.
-
(2007)
Transportation Research Part B: Methodological
, vol.41
, Issue.2
, pp. 179-201
-
-
Goverde, R.M.1
-
3
-
-
18944406568
-
A model for the delay management problem based on mixed-integer- programming
-
A. Schöbel, "A model for the delay management problem based on mixed-integer-programming, " Electr. Notes Theor. Comput. Sci., vol. 50, no. 1, pp. 1-10, 2001.
-
(2001)
Electr. Notes Theor. Comput. Sci.
, vol.50
, Issue.1
, pp. 1-10
-
-
Schöbel, A.1
-
4
-
-
33845266135
-
N-tracked railway traffic re-scheduling during disturbances
-
March
-
J. Törnquist and J. A. Persson, "N-tracked railway traffic re-scheduling during disturbances, " Transportation Research Part B: Methodological, vol. 41, no. 3, pp. 342-362, March 2007.
-
(2007)
Transportation Research Part B: Methodological
, vol.41
, Issue.3
, pp. 342-362
-
-
Törnquist, J.1
Persson, J.A.2
-
6
-
-
0035479598
-
Towards a (max, +) control theory for public transportationnetworks
-
Oct.
-
B. Heidergott and R. d. Vries, "Towards a (max, +) control theory for public transportationnetworks, " Discrete Event Dynamic Systems, vol. 11, no. 4, pp. 371-398, Oct. 2001.
-
(2001)
Discrete Event Dynamic Systems
, vol.11
, Issue.4
, pp. 371-398
-
-
Heidergott, B.1
Vries, R.D.2
-
8
-
-
84866750317
-
A permutation-based algorithm to optimally reschedule trains in a railway traffic network
-
T. J. van den Boom, N. Weiss, W. Leune, R. M. Goverde, and B. D. Schutter, "A permutation-based algorithm to optimally reschedule trains in a railway traffic network, " in IFAC World Congress, 2011.
-
(2011)
IFAC World Congress
-
-
Van Den Boom, T.J.1
Weiss, N.2
Leune, W.3
Goverde, R.M.4
Schutter, B.D.5
-
10
-
-
84893340440
-
Capturing stochastic variations of train event times and process times with goodness-of-fit tests
-
J. Yuan, "Capturing stochastic variations of train event times and process times with goodness-of-fit tests, " Delft University of Technology, Tech. Rep., 2007.
-
(2007)
Delft University of Technology, Tech. Rep.
-
-
Yuan, J.1
-
12
-
-
84903602606
-
Noncommercial software for mixedinteger linear programming
-
J. Karlof, Ed. CRC Press
-
J. T. Linderoth and T. Ralphs, "Noncommercial software for mixedinteger linear programming, " in Integer Programming: Theory and Practice, J. Karlof, Ed. CRC Press, 2005.
-
(2005)
Integer Programming: Theory and Practice
-
-
Linderoth, J.T.1
Ralphs, T.2
-
15
-
-
0028550919
-
Parallel branch and bound algorithms: Survey and synthesis
-
B. Gendron and T. G. Crainic, "Parallel branch and bound algorithms: Survey and synthesis, " Operations Research, vol. 42, pp. 1042-1066, 1994.
-
(1994)
Operations Research
, vol.42
, pp. 1042-1066
-
-
Gendron, B.1
Crainic, T.G.2
-
16
-
-
79959392003
-
A feasibility pump heuristic for general mixed-integer problems
-
L. Bertacco, M. Fischetti, and A. Lodi, "A feasibility pump heuristic for general mixed-integer problems, " University of Padova, Italy, Tech. Rep. Technical Report OR-05-5, 2005.
-
(2005)
University of Padova, Italy, Tech. Rep. Technical Report OR-05-5
-
-
Bertacco, L.1
Fischetti, M.2
Lodi, A.3
|