-
1
-
-
78650130562
-
A MIP-based local search method for the railway rescheduling problem
-
R. Acuna-Agost, P. Michelon, D. Feillet, and, S. Gueye, A MIP-based local search method for the railway rescheduling problem, Networks 57 (2011), 69-86.
-
(2011)
Networks
, vol.57
, pp. 69-86
-
-
Acuna-Agost, R.1
Michelon, P.2
Feillet, D.3
Gueye, S.4
-
2
-
-
79957466386
-
Solution of the train platforming problem
-
A. Caprara, L. Galli, and, P. Toth, Solution of the train platforming problem, Transp Sci 45 (2011), 246-257.
-
(2011)
Transp Sci
, vol.45
, pp. 246-257
-
-
Caprara, A.1
Galli, L.2
Toth, P.3
-
3
-
-
84859708458
-
-
Ph.D. Thesis, TRAIL Thesis Seriess T2010/14, the Netherlands TRAIL Research School, Netherlands
-
F. Corman, "Rail-time railway traffic management: Dispatching in complex, large and busy railway networks," Ph.D. Thesis, TRAIL Thesis Seriess T2010/14, the Netherlands TRAIL Research School, Netherlands, 2010.
-
(2010)
Rail-time Railway Traffic Management: Dispatching in Complex, Large and Busy Railway Networks
-
-
Corman, F.1
-
4
-
-
71549158818
-
A tabu search algorithm for rerouting trains during rail operations
-
F. Corman, A. D'Ariano, D. Pacciarelli, and, M. Pranzo, A tabu search algorithm for rerouting trains during rail operations, Transp Res Part B 44 (2010), 175-192.
-
(2010)
Transp Res Part B
, vol.44
, pp. 175-192
-
-
Corman, F.1
D'Ariano, A.2
Pacciarelli, D.3
Pranzo, M.4
-
5
-
-
34249982545
-
A branch and bound algorithm for scheduling trains in a railway network
-
A. D'Ariano, D. Pacciarelli, and, M. Pranzo, A branch and bound algorithm for scheduling trains in a railway network, Eur J Oper Res 183 (2007), 643-657.
-
(2007)
Eur J Oper Res
, vol.183
, pp. 643-657
-
-
D'Ariano, A.1
Pacciarelli, D.2
Pranzo, M.3
-
6
-
-
84887117774
-
Movement planner algorithm design for dispatching on multi-track territories
-
F. Fischer, B. Grimm, and, T. Klug, "Movement planner algorithm design for dispatching on multi-track territories," 2012 RAS Problem Solving Competition Report. Available at: http://www.informs.org/Community/RAS/ Problem-Solving-Competition/2012-RAS-Problem-Solving-Competition, 2012.
-
(2012)
2012 RAS Problem Solving Competition Report
-
-
Fischer, F.1
Grimm, B.2
Klug, T.3
-
7
-
-
79951897217
-
Modeling network transition constraints with hypergraphs
-
S. Harrod, Modeling network transition constraints with hypergraphs, Transp Sci 45 (2011), 81-97.
-
(2011)
Transp Sci
, vol.45
, pp. 81-97
-
-
Harrod, S.1
-
8
-
-
84881452667
-
Integrated surface and departure management at airports by optimization
-
Hammamet
-
D. Kjenstad, C. Mannino, P. Schittekat, and, M. Smedsrud, "Integrated surface and departure management at airports by optimization," IEEE Xplore Digital Library, 5th International Conference on Modeling, Simulation and Applied Optimization (ICMSAO), Hammamet, 2013, pp. 1-5.
-
(2013)
IEEE Xplore Digital Library, 5th International Conference on Modeling, Simulation and Applied Optimization (ICMSAO)
, pp. 1-5
-
-
Kjenstad, D.1
Mannino, C.2
Schittekat, P.3
Smedsrud, M.4
-
9
-
-
84879726563
-
The track formulation for the train dispatching problem
-
L. Lamorgese, and, C. Mannino, The track formulation for the train dispatching problem, Elec Note Discrete Math 41 (2013), 559-566.
-
(2013)
Elec Note Discrete Math
, vol.41
, pp. 559-566
-
-
Lamorgese, L.1
Mannino, C.2
-
10
-
-
69949109733
-
Real-time traffic control in metro stations
-
C. Mannino, and, A. Mascis, Real-time traffic control in metro stations, Oper Res 57 (2009), 1026-1039.
-
(2009)
Oper Res
, vol.57
, pp. 1026-1039
-
-
Mannino, C.1
Mascis, A.2
-
11
-
-
4444334393
-
A rollout metaheuristic for job shop scheduling problems
-
C. Meloni, D. Pacciarelli, and, M. Pranzo, A rollout metaheuristic for job shop scheduling problems, Ann Oper Res 131 (2004), 215-235.
-
(2004)
Ann Oper Res
, vol.131
, pp. 215-235
-
-
Meloni, C.1
Pacciarelli, D.2
Pranzo, M.3
-
12
-
-
84887037462
-
Semi-automatic train traffic control in the new Swiss Lötschberg base tunnel
-
Available at: www.systransis.ch/fileadmin/2006-Paper-MM.pdf.
-
M. Montigel, Semi-automatic train traffic control in the new Swiss Lötschberg base tunnel, IRSA-Apect (2006). Available at: www.systransis.ch/fileadmin/2006-Paper-MM.pdf.
-
(2006)
IRSA-Apect
-
-
Montigel, M.1
-
13
-
-
84887121549
-
-
2012 RAS Problem Solving Competition. Available at: http://www.informs. org/Community/RAS/Problem-Solving-Competition/2012-RAS-Problem-Solving- Competition.
-
2012 RAS Problem Solving Competition
-
-
-
14
-
-
79951934396
-
-
Tech Rep Sabanci Univerisity, Turkey.
-
G. Sahin, R.K. Ahuja, and, C.B. Cunha, Integer programming based approaches for the train dispatching problem, Tech Rep Sabanci Univerisity, Turkey, 2010.
-
(2010)
Integer Programming Based Approaches for the Train Dispatching Problem
-
-
Sahin, G.1
Ahuja, R.K.2
Cunha, C.B.3
-
16
-
-
84887045342
-
-
C. Yan, and, L. Yangy, "Mixed-integer programming based approaches for the movement planner problem: Model, heuristics and decomposition," 2012 RAS Problem Solving Competition Report. Available at: http://www.informs. org/Community/RAS/Problem-Solving-Competition/2012-RAS-Problem-Solving- Competition, 2012.
-
(2012)
Mixed-integer Programming Based Approaches for the Movement Planner Problem: Model, Heuristics and Decomposition," 2012 RAS Problem Solving Competition Report
-
-
Yan, C.1
Yangy, L.2
|