메뉴 건너뛰기




Volumn 64, Issue 1, 2013, Pages 469-481

Modelling disruptions and resolving conflicts optimally in a railway schedule

Author keywords

Conflicts; Disruption; Mixed integer linear programming; Optimal resolution; Single track railway

Indexed keywords

COMPUTATIONAL COMPLEXITY; INTEGER PROGRAMMING; RAILROAD TRANSPORTATION; RAILROADS; SCHEDULING; TRANSPORTATION;

EID: 84881612519     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cie.2012.08.004     Document Type: Article
Times cited : (81)

References (37)
  • 1
    • 59749084340 scopus 로고    scopus 로고
    • The influence of anticipating train driving on the dispatching process in railway conflict situations
    • Albrecht, T. (2009). The influence of anticipating train driving on the dispatching process in railway conflict situations. Networks and Spatial Economics, 9(1), 85-101.
    • (2009) Networks and Spatial Economics , vol.9 , Issue.1 , pp. 85-101
    • Albrecht, T.1
  • 2
    • 58549112367 scopus 로고    scopus 로고
    • A hybrid model of fuzzy and AHP for handling public assessments on transportation projects
    • Arslan, T. (2009). A hybrid model of fuzzy and AHP for handling public assessments on transportation projects. Transportation, 36(1), 97-112.
    • (2009) Transportation , vol.36 , Issue.1 , pp. 97-112
    • Arslan, T.1
  • 3
    • 0019230108 scopus 로고
    • Models for rail transportation
    • Assad, A. (1980). Models for rail transportation. Transportation Research Part B, 14, 205-220.
    • (1980) Transportation Research Part B , vol.14 , pp. 205-220
    • Assad, A.1
  • 4
    • 77955925115 scopus 로고    scopus 로고
    • Rescheduling in passenger railways: The rolling stock rebalancing problem
    • Budai, G., Maroti, G., Dekker, R., Huisman, D., & Kroon, L. (2009). Rescheduling in passenger railways: The rolling stock rebalancing problem. Journal of Scheduling. http://dx.doi.org/10.1007/s10951-009-0133-9.
    • (2009) Journal of Scheduling
    • Budai, G.1    Maroti, G.2    Dekker, R.3    Huisman, D.4    Kroon, L.5
  • 5
    • 0028436769 scopus 로고
    • A fast heuristic for the train scheduling problem
    • Cai, X., & Goh, C. (1994). A fast heuristic for the train scheduling problem. Computers and Operations Research, 21(5), 499-510.
    • (1994) Computers and Operations Research , vol.21 , Issue.5 , pp. 499-510
    • Cai, X.1    Goh, C.2
  • 7
    • 18844459422 scopus 로고    scopus 로고
    • From timetabling to train regulation - A new train operation model
    • DOI 10.1016/j.infsof.2004.10.008, PII S0950584904001612
    • Chang, S., & Chung, Y.-C. (2005). From timetabling to train regulation-a new train operation model. Information and Software Technology, 47(9), 575-585. (Pubitemid 40682533)
    • (2005) Information and Software Technology , vol.47 , Issue.9 , pp. 575-585
    • Chang, S.-C.1    Chung, Y.-C.2
  • 8
    • 0032050958 scopus 로고    scopus 로고
    • Hybrid simulation for resolving resource conflicts in train traffic rescheduling
    • PII S0166361597000717
    • Cheng, Y. (1998). Hybrid simulation for resolving resource conflicts in train traffic rescheduling. Computers in Industry, 35, 233-246. (Pubitemid 128416426)
    • (1998) Computers in Industry , vol.35 , Issue.3 , pp. 233-246
    • Cheng, Y.1
  • 9
    • 84881616589 scopus 로고    scopus 로고
    • A constraint-Based interactive train rescheduling tool
    • Principles and Practice of Constraint Programming - CP96
    • Chiu, C. K., Chou, C. M., Lee, J. H. M., Leung, H. F., & Leung, Y. W. (1996). A constraintbased interactive train rescheduling tool. In Principles and practice of constraint programming (Vol. 1118, pp. 104-118). doi: 10.1007/3-540-61551-269. (Pubitemid 126117697)
    • (1996) Lecture Notes in Computer Science , Issue.1118 , pp. 104-118
    • Chiu, C.K.1    Chou, C.M.2    Lee, J.H.M.3    Leung, H.F.4    Leung, Y.W.5
  • 10
    • 0032203702 scopus 로고    scopus 로고
    • A survey of optimization models for train routing and scheduling
    • Cordeau, J. F., Toth, P., & Vigo, D. (1998). A survey of optimization models for train routing and scheduling. Transportation Science, 32, 380-404. (Pubitemid 128608925)
    • (1998) Transportation Science , vol.32 , Issue.4 , pp. 380-404
    • Cordeau, J.-F.1    Toth, P.2    Vigo, D.3
  • 12
    • 24344486096 scopus 로고    scopus 로고
    • An analysis of agent-based approaches to transport logistics
    • DOI 10.1016/j.trc.2005.07.002, PII S0968090X05000318, Agents in Traffic and Transportation: Exploring Autonomy in Logistics, Management, Simulations, and Cooperative Driving
    • Davidsson, P., Henesey, L., Ramstedt, L., Tornquist, J., & Wernstedt, F. (2005). An analysis of agent-based approaches to transport logistics. Transportation Research Part C, 13, 255-271. (Pubitemid 41258425)
    • (2005) Transportation Research Part C: Emerging Technologies , vol.13 , Issue.4 , pp. 255-271
    • Davidsson, P.1    Henesey, L.2    Ramstedt, L.3    Tornquist, J.4    Wernstedt, F.5
  • 14
    • 0142156064 scopus 로고    scopus 로고
    • Scheduling trains on a railway network using a discrete event model of railway traffic
    • DOI 10.1016/S0191-2615(03)00006-7
    • Dorfman, M. J., & Medanic, J. (2004). Scheduling trains on a railway network using a discrete event model of railway traffic. Transportation Research Part B, 38, 81-98. (Pubitemid 37312603)
    • (2004) Transportation Research Part B: Methodological , vol.38 , Issue.1 , pp. 81-98
    • Dorfman, M.J.1    Medanic, J.2
  • 19
    • 0035119102 scopus 로고    scopus 로고
    • Railway junction traffic control by heuristic methods
    • DOI 10.1049/ip-epa:20010028
    • Ho, T. K., Yeung, & T. H. (2001). Railway junction traffic control by heuristic methods. In IEE Proceedings - Electrical Power Applications (Vol. 148, pp. 77-84). (Pubitemid 32191056)
    • (2001) IEE Proceedings: Electric Power Applications , vol.148 , Issue.1 , pp. 77-84
    • Ho, T.K.1    Yeung, T.H.2
  • 20
    • 78650149342 scopus 로고    scopus 로고
    • Operations research in passenger railway transportation
    • Research Institute of Management (ERIM), Rotterdam School of Management
    • Huisman, D., Kroon, L. G., Lentink, R. M., & Vromans, M. J. C. M. (2005). Operations research in passenger railway transportation. In Technical report. Erasmus Research Institute of Management (ERIM), Rotterdam School of Management.
    • (2005) Technical Report. Erasmus
    • Huisman, D.1    Kroon, L.G.2    Lentink, R.M.3    Vromans, M.J.C.M.4
  • 23
    • 70349864211 scopus 로고    scopus 로고
    • Delay resistant timetabling
    • Liebchen, C., & Stiller, S. (2009). Delay resistant timetabling. Public Transport, 1(1), 55-72.
    • (2009) Public Transport , vol.1 , Issue.1 , pp. 55-72
    • Liebchen, C.1    Stiller, S.2
  • 26
    • 78650114915 scopus 로고    scopus 로고
    • Describing and evaluating train services on the swiss railway network from a new perspective
    • Monte Verita, Ascona
    • Mahadevan, V. (2007). Describing and evaluating train services on the swiss railway network from a new perspective. In 7th (STRC) Swiss Transport Research Conference. Monte Verita, Ascona.
    • (2007) 7th (STRC) Swiss Transport Research Conference
    • Mahadevan, V.1
  • 28
    • 84881610983 scopus 로고    scopus 로고
    • Automatic conflict detection and advanced decision support for optimal usage of railway infrastructure prototyping and test results
    • Makkinga, F., & Metselaar, S. (1998). Automatic conflict detection and advanced decision support for optimal usage of railway infrastructure prototyping and test results. Computers in railways - VI, 37.
    • (1998) Computers in Railways - VI , pp. 37
    • Makkinga, F.1    Metselaar, S.2
  • 30
    • 79952909371 scopus 로고    scopus 로고
    • Integrating line planning, timetabling, and vehicle scheduling: A customer-oriented heuristic
    • Michaelis, M., & Schobel, A. (2009). Integrating line planning, timetabling, and vehicle scheduling: A customer-oriented heuristic. Public Transport, 1(3).
    • (2009) Public Transport , vol.1 , pp. 3
    • Michaelis, M.1    Schobel, A.2
  • 31
    • 0032884348 scopus 로고    scopus 로고
    • Railway traffic control and train scheduling based on inter-train conflict management
    • DOI 10.1016/S0191-2615(99)00004-1
    • Sahin, I. (1999). Railway traffic control and train scheduling based on inter-train conflict management. Transportation Research Part B, 1(33), 511-534. (Pubitemid 29424947)
    • (1999) Transportation Research Part B: Methodological , vol.33 , Issue.7 , pp. 511-534
    • Sahin, I.1
  • 32
    • 78649431753 scopus 로고    scopus 로고
    • Computer based decision support for railway traffic scheduling and dispatching: A review of models and algorithms, management objectives and limitations in planning horizon
    • Tornquist, J. (2005). Computer based decision support for railway traffic scheduling and dispatching: A review of models and algorithms, management objectives and limitations in planning horizon. In 5th Workshop on algorithmic methods and models for optimization of railways - ATMOST 2005. http://drops.dagstuhl.de/ opus/volltexte/2006/659/.
    • (2005) 5th Workshop on Algorithmic Methods and Models for Optimization of Railways - ATMOST 2005
    • Tornquist, J.1
  • 33
    • 36448977879 scopus 로고    scopus 로고
    • Railway traffic disturbance management-An experimental analysis of disturbance complexity, management objectives and limitations in planning horizon
    • DOI 10.1016/j.tra.2006.05.003, PII S0965856406000577
    • Tornquist, J. (2007). Railway traffic disturbance management - An experimental analysis of disturbance complexity, management objectives and limitations in planning horizon. Transportation Research Part A, 41, 249-266. (Pubitemid 44824829)
    • (2007) Transportation Research Part A: Policy and Practice , vol.41 , Issue.3 , pp. 249-266
    • Tornquist, J.1
  • 34
    • 33845266135 scopus 로고    scopus 로고
    • N-tracked railway traffic re-scheduling during disturbances
    • DOI 10.1016/j.trb.2006.06.001, PII S0191261506000749
    • Tornquist, J., & Persson, J. A. (2007). N-tracked railway traffic re-scheduling during disturbances. Transportation Research Part B, 41(3), 342-362. (Pubitemid 44858115)
    • (2007) Transportation Research Part B: Methodological , vol.41 , Issue.3 , pp. 342-362
    • Tornquist, J.1    Persson, J.A.2
  • 35
    • 10644237939 scopus 로고    scopus 로고
    • Simultaneous disruption recovery of a train timetable and crew roster in real time
    • Walker, C. G., Snowdon, J. N., & Ryan, D. M. (2005). Simultaneous disruption recovery of a train timetable and crew roster in real time. Computers and Operations Research, 32, 2077-2094.
    • (2005) Computers and Operations Research , Issue.32 , pp. 2077-2094
    • Walker, C.G.1    Snowdon, J.N.2    Ryan, D.M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.