메뉴 건너뛰기




Volumn 26, Issue 4, 2014, Pages 466-489

Susceptibility of optimal train schedules to stochastic disturbances of process times

Author keywords

Delay minimization; Railway traffic optimization; Simulation; Uncertainty

Indexed keywords

BRANCH AND BOUND METHOD; RAILROAD TRANSPORTATION; RAILROADS; RANDOM PROCESSES; SCHEDULING; SENSITIVITY ANALYSIS;

EID: 84912051240     PISSN: 19366582     EISSN: 19366590     Source Type: Journal    
DOI: 10.1007/s10696-013-9172-9     Document Type: Article
Times cited : (60)

References (39)
  • 1
    • 0141712989 scopus 로고    scopus 로고
    • Robust optimization—methodology and applications
    • Ben-Tal A, Nemirovski A (2002) Robust optimization—methodology and applications. Math Program 92(3):453–480
    • (2002) Math Program , vol.92 , Issue.3 , pp. 453-480
    • Ben-Tal, A.1    Nemirovski, A.2
  • 2
    • 49949092507 scopus 로고    scopus 로고
    • Decision support tools for customer-oriented dispatching
    • Biederbick C, Suhl L (2007) Decision support tools for customer-oriented dispatching. Lecture notes in computer science, vol 4359. pp 171–183
    • (2007) Lecture notes in computer science, vol , vol.4359 , pp. 171-183
    • Biederbick, C.1    Suhl, L.2
  • 3
    • 0032885173 scopus 로고    scopus 로고
    • Ex ante heuristic measures of schedule reliability
    • Carey M (1999) Ex ante heuristic measures of schedule reliability. Transp Res Part B Methodol 33(7):473–494
    • (1999) Transp Res Part B Methodol , vol.33 , Issue.7 , pp. 473-494
    • Carey, M.1
  • 4
    • 0034396319 scopus 로고    scopus 로고
    • Testing schedule performance and reliability for train stations
    • Carey M, Carville S (2000) Testing schedule performance and reliability for train stations. J Oper Res Soc 51(6):666–682
    • (2000) J Oper Res Soc , vol.51 , Issue.6 , pp. 666-682
    • Carey, M.1    Carville, S.2
  • 7
    • 84912037896 scopus 로고    scopus 로고
    • Dispatching and coordination in multi-area railway traffic management. Tech. Rep. 2011-190, Dip. Inform. Autom
    • Corman F, D’Ariano A, Pacciarelli D, Pranzo M (2011a) Dispatching and coordination in multi-area railway traffic management. Tech. Rep. 2011-190, Dip. Inform. Autom. Roma Tre University
    • (2011) Roma Tre University
    • Corman, F.1    D’Ariano, A.2    Pacciarelli, D.3    Pranzo, M.4
  • 8
    • 79958004969 scopus 로고    scopus 로고
    • Effectiveness of dynamic reordering and rerouting of trains in a complicated and densely occupied station area
    • Corman F, D’Ariano A, Pranzo M, Hansen I (2011b) Effectiveness of dynamic reordering and rerouting of trains in a complicated and densely occupied station area. Transp Plan Technol 34(4):341–362
    • (2011) Transp Plan Technol , vol.34 , Issue.4 , pp. 341-362
    • Corman, F.1    D’Ariano, A.2    Pranzo, M.3    Hansen, I.4
  • 12
    • 70449635732 scopus 로고    scopus 로고
    • Modeling reordering and local rerouting strategies to solve train conflicts during rail operations
    • D’Ariano A, Corman C, Pacciarelli D, Pranzo M (2008) Modeling reordering and local rerouting strategies to solve train conflicts during rail operations. Transp Sci 42(4):405–419
    • (2008) Transportation Science , vol.42 , Issue.4 , pp. 405-419
    • D’Ariano, A.1    Corman, C.2    Pacciarelli, D.3    Pranzo, M.4
  • 13
    • 59749089450 scopus 로고    scopus 로고
    • An advanced real-time train dispatching system for minimizing the propagation of delays in a dispatching area under severe disturbances
    • D’Ariano A, Pranzo M (2009) an advanced real-time train dispatching system for minimizing the propagation of delays in a dispatching area under severe disturbances. Netw Spat Econ 9(1):63–84
    • (2009) Netw Spat Econ , vol.9 , Issue.1 , pp. 63-84
    • D’Ariano, A.1    Pranzo, M.2
  • 16
    • 70449640336 scopus 로고    scopus 로고
    • Fast approaches to improve the robustness of a railway timetable
    • Fischetti M, Salvagnin D, Zanette A (2009) Fast approaches to improve the robustness of a railway timetable. Transp Sci 43(3):321–335
    • (2009) Transp Sci , vol.43 , Issue.3 , pp. 321-335
    • Fischetti, M.1    Salvagnin, D.2    Zanette, A.3
  • 17
    • 51849167530 scopus 로고    scopus 로고
    • To wait or not to wait? the bicriteria delay management problem in public transportation
    • Ginkel A, Schöbel A (2007) To wait or not to wait? the bicriteria delay management problem in public transportation. Transp Sci 41(4):527–538
    • (2007) Transp Sci , vol.41 , Issue.4 , pp. 527-538
    • Ginkel, A.1    Schöbel, A.2
  • 21
    • 78650137333 scopus 로고    scopus 로고
    • A note on the online nature of the railway delay management problem
    • Kliewer N, Suhl L (2011) A note on the online nature of the railway delay management problem. Networks 57(1):28–37
    • (2011) Networks , vol.57 , Issue.1 , pp. 28-37
    • Kliewer, N.1    Suhl, L.2
  • 22
    • 84912037634 scopus 로고    scopus 로고
    • A framework for dynamic rescheduling problems. Tech. Rep. 2012–01, Dip. Ingegneria dell’Informazione
    • Larsen R, Pranzo M (2012) A framework for dynamic rescheduling problems. Tech. Rep. 2012–01, Dip. Ingegneria dell’Informazione. University of Siena
    • (2012) University of Siena
    • Larsen, R.1    Pranzo, M.2
  • 23
    • 77956336205 scopus 로고    scopus 로고
    • The concept of recoverable robustness, linear programming recovery, and railway applications
    • Liebchen C, Lübbecke M, Möhring R, Stiller S (2009) The concept of recoverable robustness, linear programming recovery, and railway applications. Lecture notes in computer science, vol 5868. pp 1–27
    • (2009) Lecture notes in computer science , vol.5868 , pp. 1-27
    • Liebchen, C.1    Lübbecke, M.2    Möhring, R.3    Stiller, S.4
  • 25
    • 79960086387 scopus 로고    scopus 로고
    • Railway track allocation: models and methods
    • Lusby R, Larsen J, Ehrgott M, Ryan D (2011) Railway track allocation: models and methods. OR Spectr 33(4):843–883
    • (2011) OR Spectr , vol.33 , Issue.4 , pp. 843-883
    • Lusby, R.1    Larsen, J.2    Ehrgott, M.3    Ryan, D.4
  • 26
    • 79959808568 scopus 로고    scopus 로고
    • Robust single-track train dispatching model under a dynamic and stochastic environment: a scenario-based rolling horizon solution approach
    • Meng L, Zhou X (2011) Robust single-track train dispatching model under a dynamic and stochastic environment: a scenario-based rolling horizon solution approach. Transp Res Part B Methodol 45(7):1080–1102
    • (2011) Transp Res Part B Methodol , vol.45 , Issue.7 , pp. 1080-1102
    • Meng, L.1    Zhou, X.2
  • 28
    • 68249099005 scopus 로고    scopus 로고
    • A survey of dynamic scheduling in manufacturing systems
    • Ouelhadj D, Petrovic S (2009) A survey of dynamic scheduling in manufacturing systems. J Sched 12(4):417–431
    • (2009) J Sched , vol.12 , Issue.4 , pp. 417-431
    • Ouelhadj, D.1    Petrovic, S.2
  • 29
    • 21144451206 scopus 로고    scopus 로고
    • A new class of greedy heuristics for job shop scheduling problems
    • Pranzo M, Meloni C, Pacciarelli D (2003) A new class of greedy heuristics for job shop scheduling problems. Lecture notes in computer science, vol 2647. pp 223–236
    • (2003) Lecture notes in computer science , vol.2647 , pp. 223-236
    • Pranzo, M.1    Meloni, C.2    Pacciarelli, D.3
  • 31
    • 52149086561 scopus 로고    scopus 로고
    • Robustness in railway transportation scheduling. In: Proceedings of the world congress on intelligent control and automation (WCICA)
    • Salido M, Barber F, Ingolotti L (2008) Robustness in railway transportation scheduling. In: Proceedings of the world congress on intelligent control and automation (WCICA), pp 2833–2837
    • (2008) pp 2833–2837
    • Salido, M.1    Barber, F.2    Ingolotti, L.3
  • 32
    • 77955639714 scopus 로고    scopus 로고
    • To wait or not to wait and who goes first? Delay management with priority decisions
    • Schachtebeck M, Schöbel A (2010) To wait or not to wait and who goes first? Delay management with priority decisions. Transp Sci 44(3):307–321
    • (2010) Transp Sci , vol.44 , Issue.3 , pp. 307-321
    • Schachtebeck, M.1    Schöbel, A.2
  • 33
    • 77956299895 scopus 로고    scopus 로고
    • A bicriteria approach for robust timetabling
    • Schöbel A, Kratz A (2009) A bicriteria approach for robust timetabling. Lecture notes in computer science, vol 5868. pp 119–144
    • (2009) Lecture notes in computer science , vol.5868 , pp. 119-144
    • Schöbel, A.1    Kratz, A.2
  • 34
    • 84857788279 scopus 로고    scopus 로고
    • Robust train timetabling problem: mathematical model and branch and bound algorithm
    • Shafia M, Pourseyed Aghaee M, Sadjadi S, Jamili A (2012) Robust train timetabling problem: mathematical model and branch and bound algorithm. IEEE Trans Intell Transp Syst 13(1):307–317
    • (2012) IEEE Trans Intell Transp Syst , vol.13 , Issue.1 , pp. 307-317
    • Shafia, M.1    Pourseyed Aghaee, M.2    Sadjadi, S.3    Jamili, A.4
  • 37
    • 33646079626 scopus 로고    scopus 로고
    • Developing railway timetables which guarantee a better service
    • Vansteenwegen P, Van Oudheusden D (2006) Developing railway timetables which guarantee a better service. Eur J Oper Res 173(1):337–350
    • (2006) Eur J Oper Res , vol.173 , Issue.1 , pp. 337-350
    • Vansteenwegen, P.1    Van Oudheusden, D.2
  • 38
    • 37749047801 scopus 로고    scopus 로고
    • Stochastic modelling of train delays and delay propagation in stations
    • Delft, The Netherlands:
    • Yuan J (2006) Stochastic modelling of train delays and delay propagation in stations. TRAIL thesis series T2006/6, Delft, The Netherlands
    • (2006) TRAIL thesis series T2006/6
    • Yuan, J.1
  • 39
    • 33748706761 scopus 로고    scopus 로고
    • Optimizing capacity utilization of stations by estimating knock-on train delays
    • Yuan J, Hansen IA (2007) Optimizing capacity utilization of stations by estimating knock-on train delays. Transp Res Part B 41(2):202–217
    • (2007) Transp Res Part B , vol.41 , Issue.2 , pp. 202-217
    • Yuan, J.1    Hansen, I.A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.