메뉴 건너뛰기




Volumn 8, Issue 2, 2007, Pages 208-222

Conflict resolution and train speed coordination for solving real-time timetable perturbations

Author keywords

Blocking time; Rail traffic control; Train scheduling; Variable speed model

Indexed keywords

COMPUTATION THEORY; ITERATIVE METHODS; LOCOMOTIVES; OPTICAL RESOLVING POWER; PERTURBATION TECHNIQUES; REAL TIME CONTROL; SPEED CONTROL;

EID: 34249889301     PISSN: 15249050     EISSN: None     Source Type: Journal    
DOI: 10.1109/TITS.2006.888605     Document Type: Article
Times cited : (215)

References (26)
  • 1
    • 0011074380 scopus 로고
    • Properties of expected costs and performance measures in stochastic models of scheduled transport
    • M. Carey and A. Kwiecinski, "Properties of expected costs and performance measures in stochastic models of scheduled transport," Eur. J. Oper. Res., vol. 83, no. 1, pp. 182-199, 1995.
    • (1995) Eur. J. Oper. Res , vol.83 , Issue.1 , pp. 182-199
    • Carey, M.1    Kwiecinski, A.2
  • 2
    • 33644679955 scopus 로고    scopus 로고
    • Reliability and heterogeneity of railway services
    • Jul
    • J. C. M. Vromans, R. Dekker, and L. G. Kroon, "Reliability and heterogeneity of railway services," Eur. J. Oper. Res., vol. 172, no. 2, pp. 647-665, Jul. 2006.
    • (2006) Eur. J. Oper. Res , vol.172 , Issue.2 , pp. 647-665
    • Vromans, J.C.M.1    Dekker, R.2    Kroon, L.G.3
  • 4
    • 0031097820 scopus 로고    scopus 로고
    • Optimal traffic control at railway junctions
    • Mar
    • T. K. Ho, J. P. Norton, and C. Goodman, "Optimal traffic control at railway junctions," Proc. Inst. Electr. Eng., vol. 144, no. 2, pp. 140-148, Mar. 1997.
    • (1997) Proc. Inst. Electr. Eng , vol.144 , Issue.2 , pp. 140-148
    • Ho, T.K.1    Norton, J.P.2    Goodman, C.3
  • 5
    • 0032884348 scopus 로고    scopus 로고
    • Railway traffic control and train scheduling based on inter-train conflict management
    • Sep
    • I. Şahin, "Railway traffic control and train scheduling based on inter-train conflict management," Transp. Res. - Part B, vol. 33, no. 7, pp. 511-534, Sep. 1999.
    • (1999) Transp. Res. - Part B , vol.33 , Issue.7 , pp. 511-534
    • Şahin, I.1
  • 6
    • 0039258445 scopus 로고    scopus 로고
    • On-line timetable re-scheduling in regional train services
    • Aug
    • B. Adenso-Díaz, M. O. González, and P. González- Torre, "On-line timetable re-scheduling in regional train services," Transp. Res. - Part B, vol. 33, no. 6, pp. 387-398, Aug. 1999.
    • (1999) Transp. Res. - Part B , vol.33 , Issue.6 , pp. 387-398
    • Adenso-Díaz, B.1    González, M.O.2    González- Torre, P.3
  • 7
    • 0142156064 scopus 로고    scopus 로고
    • Scheduling trains on a railway network using a discrete event model of railway traffic
    • M. J. Dorfman and J. Medanic, "Scheduling trains on a railway network using a discrete event model of railway traffic," Transp. Res. - Part B, vol. 38, no. 1, pp. 81-98, 2004.
    • (2004) Transp. Res. - Part B , vol.38 , Issue.1 , pp. 81-98
    • Dorfman, M.J.1    Medanic, J.2
  • 8
    • 4644239719 scopus 로고    scopus 로고
    • Reducing delays by means of computer-aided 'on-the-spot' rescheduling
    • J. Allan, C. A. Brebbia, R. J. Hill, G. Sciutto, and S. Sone, Eds. Southampton, U.K, WIT Press
    • J. Jacobs, "Reducing delays by means of computer-aided 'on-the-spot' rescheduling," in Computers in Railways IX, J. Allan, C. A. Brebbia, R. J. Hill, G. Sciutto, and S. Sone, Eds. Southampton, U.K.: WIT Press, 2004, pp. 603-612.
    • (2004) Computers in Railways IX , pp. 603-612
    • Jacobs, J.1
  • 9
    • 33845266135 scopus 로고    scopus 로고
    • N-tracked railway traffic re-scheduling during disturbances
    • Mar
    • J. Törnquist and J. A. Persson, "N-tracked railway traffic re-scheduling during disturbances," Transp. Res. - Part B., vol. 41, no. 3, pp. 342-362, Mar. 2007.
    • (2007) Transp. Res. - Part B , vol.41 , Issue.3 , pp. 342-362
    • Törnquist, J.1    Persson, J.A.2
  • 10
    • 0032203702 scopus 로고    scopus 로고
    • A survey of optimization models for train routing and scheduling
    • J. F. Cordeau, P. Toth, and D. Vigo, "A survey of optimization models for train routing and scheduling," Transp. Sci., vol. 32, no. 4, pp. 380-404, 1998.
    • (1998) Transp. Sci , vol.32 , Issue.4 , pp. 380-404
    • Cordeau, J.F.1    Toth, P.2    Vigo, D.3
  • 11
    • 34249863930 scopus 로고    scopus 로고
    • A. Mascis, D. Pacciarelli, and M. Pranzo, Models and algorithms for traffic management of rail networks, Dipartimento di Informatica e Automazione, Univ. Roma Tre, Rome, Italy, Tech. Rep. DIA-74-2002, 2002.
    • A. Mascis, D. Pacciarelli, and M. Pranzo, "Models and algorithms for traffic management of rail networks," Dipartimento di Informatica e Automazione, Univ. Roma Tre, Rome, Italy, Tech. Rep. DIA-74-2002, 2002.
  • 12
    • 4644296430 scopus 로고    scopus 로고
    • The european project combine 2 to improve knowledge on future rail traffic management systems
    • J. Allan, C. A. Brebbia, R. J. Hill, G. Sciutto, and S. Sone, Eds. Southampton, U.K, WIT Press
    • M. Giannettoni and S. Savio, "The european project combine 2 to improve knowledge on future rail traffic management systems," in Computers in Railways IX, J. Allan, C. A. Brebbia, R. J. Hill, G. Sciutto, and S. Sone, Eds. Southampton, U.K.: WIT Press, 2004, pp. 695-704.
    • (2004) Computers in Railways IX , pp. 695-704
    • Giannettoni, M.1    Savio, S.2
  • 13
    • 0002175846 scopus 로고
    • Optimal pacing of trains in freight railroads: Model formulation and solution
    • Jan/Feb
    • D. Kraay, P. T. Harker, and B. Chen, "Optimal pacing of trains in freight railroads: Model formulation and solution," Oper. Res., vol. 39, no. 1, pp. 82-99, Jan/Feb. 1991.
    • (1991) Oper. Res , vol.39 , Issue.1 , pp. 82-99
    • Kraay, D.1    Harker, P.T.2    Chen, B.3
  • 14
    • 0042545904 scopus 로고    scopus 로고
    • Modelling the number and location of sidings on a single line railway
    • A. Higgins, E. Kozan, and L. Ferreira, "Modelling the number and location of sidings on a single line railway," Comput. Oper. Res., vol. 24, no. 3, pp. 209-220, 1997.
    • (1997) Comput. Oper. Res , vol.24 , Issue.3 , pp. 209-220
    • Higgins, A.1    Kozan, E.2    Ferreira, L.3
  • 15
    • 4544322159 scopus 로고    scopus 로고
    • Tnv-prepare: Analysis of Dutch railway operations based on train detection data
    • J. Allan, C. A. Brebbia, R. J. Hill, G. Sciutto, and S. Sone, Eds. Southampton, U.K, WIT Press
    • R. Goverde and I. Hansen, "Tnv-prepare: Analysis of Dutch railway operations based on train detection data," in Computers in Railways VII, J. Allan, C. A. Brebbia, R. J. Hill, G. Sciutto, and S. Sone, Eds. Southampton, U.K.: WIT Press, 2000, pp. 779-788.
    • (2000) Computers in Railways VII , pp. 779-788
    • Goverde, R.1    Hansen, I.2
  • 17
    • 79961102935 scopus 로고    scopus 로고
    • Energy-efficient train control in suburban railways: Experiences gained from onboard tests of a driver assistance system
    • I. Hansen, F. Dekking, R. Goverde, B. Heidergott, and L. Meester, Eds, Delft, The Netherlands, CD-ROM
    • T. Albrecht, "Energy-efficient train control in suburban railways: Experiences gained from onboard tests of a driver assistance system," in Proc. 1st Int. Semin. Railway Oper. Model. and Anal. (RailDelft), I. Hansen, F. Dekking, R. Goverde, B. Heidergott, and L. Meester, Eds., Delft, The Netherlands, 2005, CD-ROM.
    • (2005) Proc. 1st Int. Semin. Railway Oper. Model. and Anal. (RailDelft)
    • Albrecht, T.1
  • 18
    • 0037121475 scopus 로고    scopus 로고
    • Job shop scheduling with blocking and no-wait constraints
    • Dec
    • A. Mascis and D. Pacciarelli, "Job shop scheduling with blocking and no-wait constraints," Eur. J. Oper. Res., vol. 143, no. 3, pp. 498-517, Dec. 2002.
    • (2002) Eur. J. Oper. Res , vol.143 , Issue.3 , pp. 498-517
    • Mascis, A.1    Pacciarelli, D.2
  • 19
    • 34249878539 scopus 로고    scopus 로고
    • J. Pachl, Railway Operation and Control. Mountlake Terrace, WA: VTD Rail, 2002.
    • J. Pachl, Railway Operation and Control. Mountlake Terrace, WA: VTD Rail, 2002.
  • 20
    • 4644238419 scopus 로고    scopus 로고
    • Increase of capacity through optimized timetabling
    • J. Allan, C. A. Brebbia, R. J. Hill, G. Sciutto, and S. Sone, Eds. Southampton, U.K, WIT Press
    • I. A. Hansen, "Increase of capacity through optimized timetabling," in Computers in Railways IX, J. Allan, C. A. Brebbia, R. J. Hill, G. Sciutto, and S. Sone, Eds. Southampton, U.K.: WIT Press, 2004, pp. 529-538.
    • (2004) Computers in Railways IX , pp. 529-538
    • Hansen, I.A.1
  • 23
    • 34249982545 scopus 로고    scopus 로고
    • A branch and bound algorithm for scheduling trains in a railway network
    • to appear
    • A. D'Ariano, D. Pacciarelli, and M. Pranzo, "A branch and bound algorithm for scheduling trains in a railway network," Eur. J. Oper. Res. to appear.
    • Eur. J. Oper. Res
    • D'Ariano, A.1    Pacciarelli, D.2    Pranzo, M.3
  • 24
  • 25
    • 34249870901 scopus 로고    scopus 로고
    • R. Hemelrijk, J. Kruijer, and D. K. de Vries, Schiphol tunnel 2007. Description of the situation, Holland Railconsult, Utrecht, The Netherlands, Tech. Rep. V&V/ 2003-022, 2003.
    • R. Hemelrijk, J. Kruijer, and D. K. de Vries, "Schiphol tunnel 2007. Description of the situation," Holland Railconsult, Utrecht, The Netherlands, Tech. Rep. V&V/ 2003-022, 2003.
  • 26
    • 34249886085 scopus 로고    scopus 로고
    • Conflict resolution and train speed co-ordination for solving timetable perturbations
    • L Hansen, F. Dekking, R. Goverde, B. Heidergott, and L. Meester, Eds, Delft, The Netherlands, CD-ROM
    • A. D'Ariano and M. Pranzo, "Conflict resolution and train speed co-ordination for solving timetable perturbations," in Pmc. 1st Int. Semin. Railway Oper. Model, and Anal. (RailDelft), L Hansen, F. Dekking, R. Goverde, B. Heidergott, and L. Meester, Eds., Delft, The Netherlands, 2005, CD-ROM.
    • (2005) Pmc. 1st Int. Semin. Railway Oper. Model, and Anal. (RailDelft)
    • D'Ariano, A.1    Pranzo, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.