메뉴 건너뛰기




Volumn 54, Issue 1-4, 2011, Pages 271-285

Balancing of stochastic U-type assembly lines: An imperialist competitive algorithm

Author keywords

Imperialist competitive algorithm; Stochastic U type assembly line balancing problems; Taguchi method

Indexed keywords

ALGORITHM EFFICIENCY; ASSEMBLY LINE; ASSEMBLY LINE BALANCING PROBLEMS; COMPETITIVE ALGORITHMS; COMPLETION PROBABILITY; COMPUTATIONAL RESULTS; CYCLE TIME; EVOLUTION PROCESS; HYBRID ALGORITHMS; HYBRID EVOLUTIONARY ALGORITHM; IDLE TIME; META HEURISTICS; NATURAL PROCESS; NP-HARD; OPTIMAL SOLUTIONS; SEQUENCING OPERATIONS; SIGNIFICANT IMPACTS; STOCHASTIC U-TYPE ASSEMBLY LINE BALANCING PROBLEMS; TASK ASSIGNMENT; U-SHAPED; U-TYPE ASSEMBLY LINE; WORK STATION;

EID: 79955672885     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-010-2937-3     Document Type: Article
Times cited : (71)

References (63)
  • 1
    • 0031122267 scopus 로고    scopus 로고
    • A heuristic for an assembly line balancing problem with incompatibility, range, and partial precedence constraints
    • PII S0360835296003014
    • Park K, Park S, Kim W (1997) A heuristic for an assembly line balancing problem with incompatibility, range, and partial precedence constraints. Comput Ind Eng 32:321-332 (Pubitemid 127406315)
    • (1997) Computers and Industrial Engineering , vol.32 , Issue.2 , pp. 321-332
    • Park, K.1    Park, S.2    Kim, W.3
  • 2
    • 25144466582 scopus 로고
    • Taktabstimmung bei FlieXarbeit mit dem Positionswert-Verfahren
    • Hautsch K, John H, Schürgers H (1972) Taktabstimmung bei FlieXarbeit mit dem Positionswert-Verfahren. REFA Nachrichten 25:451-464
    • (1972) REFA Nachrichten , vol.25 , pp. 451-464
    • Hautsch, K.1    John, H.2    Schürgers, H.3
  • 3
    • 3042688706 scopus 로고    scopus 로고
    • Balancing assembly lines: An industrial case study
    • Lapierre SD, Ruiz AB (2004) Balancing assembly lines: An industrial case study. J Oper Res Soc 55:589-597
    • (2004) J Oper Res Soc , vol.55 , pp. 589-597
    • Lapierre, S.D.1    Ruiz, A.B.2
  • 4
    • 0026238769 scopus 로고
    • Multiple criteria decision making approach for the assembly line balancing problem
    • Malakooti B (1991) Amultiple criteria decision making approach for the assembly line balancing problem. Int J Prod Res 29:1979-2001 (Pubitemid 21693199)
    • (1991) International Journal of Production Research , vol.29 , Issue.10 , pp. 1979-2001
    • Malakooti, B.1
  • 5
    • 34249995941 scopus 로고    scopus 로고
    • A classification of assembly line balancing problems
    • DOI 10.1016/j.ejor.2006.10.010, PII S0377221706010435
    • Boysen N, Fliedner M, Scholl A (2007) A classification of assembly line balancing problems. Eur J Oper Res 183:674-693 (Pubitemid 46891133)
    • (2007) European Journal of Operational Research , vol.183 , Issue.2 , pp. 674-693
    • Boysen, N.1    Fliedner, M.2    Scholl, A.3
  • 6
    • 25144472327 scopus 로고    scopus 로고
    • An optimal piecewise-linear program for the U-line balancing problem with stochastic task times
    • Urban TL, Chiang WC (2006) An optimal piecewise-linear program for the U-line balancing problem with stochastic task times. Eur J Operation Res 168(3):109-120
    • (2006) Eur J Operation Res , vol.168 , Issue.3 , pp. 109-120
    • Urban, T.L.1    Chiang, W.C.2
  • 7
    • 33846998345 scopus 로고    scopus 로고
    • Stochastic U-line balancing using genetic algorithms
    • Baykasoglu A, Özbakir L (2007) Stochastic U-line balancing using genetic algorithms. Int J Adv Manuf Technol 32(1):139-147
    • (2007) Int J Adv Manuf Technol , vol.32 , Issue.1 , pp. 139-147
    • Baykasoglu, A.1    Özbakir, L.2
  • 8
    • 33748934553 scopus 로고    scopus 로고
    • The stochastic U-line balancing problem: A heuristic procedure
    • DOI 10.1016/j.ejor.2004.10.031, PII S0377221705004753
    • Chiang WC, Urban TL (2006) The stochastic U-line balancing problem: A heuristic procedure. Eur J Oper Res 175(3):1767-1781 (Pubitemid 44436754)
    • (2006) European Journal of Operational Research , vol.175 , Issue.3 , pp. 1767-1781
    • Chiang, W.-C.1    Urban, T.L.2
  • 10
    • 0003449926 scopus 로고
    • Industrial Engineering and Management, Norcross
    • Monden Y (1983) Toyota production system. Industrial Engineering and Management, Norcross
    • (1983) Toyota Production System
    • Monden, Y.1
  • 12
    • 0033101693 scopus 로고    scopus 로고
    • ULINO: Optimally balancing U-shaped JIT assembly lines
    • Scholl A, Klein R (1999) ULINO: Optimally balancing U-shaped JIT assembly lines. Int J Prod Res 37(4):721-736
    • (1999) Int J Prod Res , vol.37 , Issue.4 , pp. 721-736
    • Scholl, A.1    Klein, R.2
  • 13
    • 0022768294 scopus 로고
    • SURVEY OF EXACT ALGORITHMS FOR THE SIMPLE ASSEMBLY LINE BALANCING PROBLEM.
    • Baybars I (1986) A survey of exact algorithms for the simple line balancing problem. Manage Sci 32:909-932 (Pubitemid 16612186)
    • (1986) Management Science , vol.32 , Issue.8 , pp. 909-932
    • Baybars Ilker1
  • 14
    • 0032117097 scopus 로고    scopus 로고
    • A survey of the assembly line balancing procedures
    • Erel E, Sarin SC (1998) A survey of the assembly line balancing procedures. Prod Plann Control 9:414-434 (Pubitemid 128624333)
    • (1998) Production Planning and Control , vol.9 , Issue.5 , pp. 414-434
    • Erel, E.1    Sarin, S.C.2
  • 15
    • 0024641634 scopus 로고
    • A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems
    • Ghosh S, Gagnon RJ (1989) A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems. Int J Prod Res 27:637-670
    • (1989) Int J Prod Res , vol.27 , pp. 637-670
    • Ghosh, S.1    Gagnon, R.J.2
  • 16
    • 25144482035 scopus 로고    scopus 로고
    • State-of-the-art exact and heuristic solution procedures for simple assembly line balancing
    • DOI 10.1016/j.ejor.2004.07.022, PII S0377221704004795, Balancing Assembly and Transfer Lines
    • Scholl A, Becker C (2006) State-of-the-art exact and heuristic solution procedures for simple assembly line balancing. Eur J Oper Res 168:666-693 (Pubitemid 41336586)
    • (2006) European Journal of Operational Research , vol.168 , Issue.3 , pp. 666-693
    • Scholl, A.1    Becker, C.2
  • 17
    • 0028531312 scopus 로고
    • The U-line line balancing problem
    • Miltenburg J, Wijngaard J (1994) The U-line line balancing problem. Manage Sci 40(10):1378-1388
    • (1994) Manage Sci , vol.40 , Issue.10 , pp. 1378-1388
    • Miltenburg, J.1    Wijngaard, J.2
  • 19
    • 0032070937 scopus 로고    scopus 로고
    • Optimal balancing of U-shaped assembly lines
    • Urban T (1998) Optimal balancing of U-shaped assembly lines. Manage Sci 44(5):738-741
    • (1998) Manage Sci , vol.44 , Issue.5 , pp. 738-741
    • Urban, T.1
  • 22
    • 0002134614 scopus 로고    scopus 로고
    • Balancing U-lines in a multiple U-line facility
    • PII S0377221797001690
    • Miltenburg J (1998) Balancing U-lines in a multiple U-line facility. Eur J Oper Res 109:1-23 (Pubitemid 128393226)
    • (1998) European Journal of Operational Research , vol.109 , Issue.1 , pp. 1-23
    • Miltenburg, J.1
  • 23
    • 0032202723 scopus 로고    scopus 로고
    • Balancing Just-In-Time production units: The N U-line balancing problem
    • Sparling D (1998) Balancing JIT production units: The N U-line balancing problem. Inf Syst Oper Res 36:215-237 (Pubitemid 128645106)
    • (1998) INFOR , vol.36 , Issue.4 , pp. 215-237
    • Sparling, D.1
  • 24
    • 0000945761 scopus 로고    scopus 로고
    • A coevolutionary algorithm for balancing and sequencing in mixed model assembly lines
    • Kim YK, Kim JY, Kim Y (2000) A coevolutionary algorithm for balancing and sequencing in mixed model assembly lines. Appl Intell 13:247-258
    • (2000) Appl Intell , vol.13 , pp. 247-258
    • Kim, Y.K.1    Kim, J.Y.2    Kim, Y.3
  • 26
    • 1642482577 scopus 로고    scopus 로고
    • Development of heuristics to reduce model imbalance for the mixed model, U-shaped assembly line
    • Visich JK, Diaz-Saiz J, Khumawala BM (2002) Development of heuristics to reduce model imbalance for the mixed model, U-shaped assembly line. Proc Annu Meet Decis Sci Inst 2002:1786-1791
    • (2002) Proc Annu Meet Decis Sci Inst , vol.2002 , pp. 1786-1791
    • Visich, J.K.1    Diaz-Saiz, J.2    Khumawala, B.M.3
  • 28
    • 33846576096 scopus 로고    scopus 로고
    • Balancing and sequencing mixed-model just-in-time U-lines with multiple objectives
    • DOI 10.1016/j.amc.2006.05.185, PII S0096300306007314
    • Kara Y, Özcan U, Peker A (2007) Balancing and sequencing mixed-model just-in-time U-lines with multiple objectives. Appl Math Comput 184(2):566-588 (Pubitemid 46176114)
    • (2007) Applied Mathematics and Computation , vol.184 , Issue.2 , pp. 566-588
    • Kara, Y.1    Ozcan, U.2    Peker, A.3
  • 29
    • 0032624742 scopus 로고    scopus 로고
    • An optimal worker allocation problem for a U-shaped production line
    • Nakade K, Ohno K (1999) An optimal worker allocation problem for a U-shaped production line. Int J Prod Econ 60(1):353-358
    • (1999) Int J Prod Econ , vol.60 , Issue.1 , pp. 353-358
    • Nakade, K.1    Ohno, K.2
  • 30
    • 0034688394 scopus 로고    scopus 로고
    • The effect of breakdowns on U-shaped production lines
    • DOI 10.1080/002075400189455
    • Miltenburg J (2000) The effect of breakdowns on U-shaped production lines. Int J Prod Res 38:353-364 (Pubitemid 35395480)
    • (2000) International Journal of Production Research , vol.38 , Issue.2 , pp. 353-364
    • Miltenburg, J.1
  • 31
    • 0035311608 scopus 로고    scopus 로고
    • One-piece flow manufacturing on U-shaped production lines: A tutorial
    • DOI 10.1023/A:1007642522626
    • Miltenburg J (2001) One-piece flow manufacturing on U-shaped production lines: A tutorial. IIE Trans 33:303-321 (Pubitemid 32272434)
    • (2001) IIE Transactions (Institute of Industrial Engineers) , vol.33 , Issue.4 , pp. 303-321
    • Miltenburg, J.1
  • 32
    • 0037332862 scopus 로고    scopus 로고
    • Separate and carousel type allocations of workers in a U-shaped production line
    • DOI 10.1016/S0377-2217(02)00157-1, PII S0377221702001571
    • Nakade K, Ohno K (2003) Separate and carousel type allocations of workers in a U-shaped production line. Eur J Oper Res 145:403-424 (Pubitemid 35411986)
    • (2003) European Journal of Operational Research , vol.145 , Issue.2 , pp. 403-424
    • Nakade, K.1    Ohno, K.2
  • 33
    • 0242401874 scopus 로고    scopus 로고
    • U-OPT: An analysis of exact U-shaped line balancing procedures
    • Aase GR, Schniederjans MJ, Olson JR (2003) U-OPT: An analysis of exact U-shaped line balancing procedures. Int J Prod Res 41 (17):4185-4210
    • (2003) Int J Prod Res , vol.41 , Issue.17 , pp. 4185-4210
    • Aase, G.R.1    Schniederjans, M.J.2    Olson, J.R.3
  • 34
    • 1642587683 scopus 로고    scopus 로고
    • U-shaped assembly line layouts and their impact on labor productivity: An experimental study
    • Aase GR, Olson JR, Schniederjans MJ (2004) U-shaped assembly line layouts and their impact on labor productivity: An experimental study. Eur J Oper Res 156:698-711
    • (2004) Eur J Oper Res , vol.156 , pp. 698-711
    • Aase, G.R.1    Olson, J.R.2    Schniederjans, M.J.3
  • 36
    • 13444306204 scopus 로고    scopus 로고
    • A shortest route formulation of simple U-type assembly line balancing problem
    • DOI 10.1016/j.apm.2004.10.003, PII S0307904X04001441
    • Gökçen H, Agpak K, Gencer C, Kizilkaya E (2005) A shortest route formulation of simple U-type assembly line balancing problem. Appl Math Model 29:373-380 (Pubitemid 40205319)
    • (2005) Applied Mathematical Modelling , vol.29 , Issue.4 , pp. 373-380
    • Gokcen, H.1    Agpak, K.2    Gencer, C.3    Kizilkaya, E.4
  • 37
    • 28244475042 scopus 로고    scopus 로고
    • A goal programming approach to simple U-line balancing problem
    • DOI 10.1016/j.ejor.2004.09.021, PII S0377221704006460
    • Gökçen H, Agpak K (2006) A goal programming approach to simple U-line balancing problem. Eur J Oper Res 171:577-585 (Pubitemid 41706215)
    • (2006) European Journal of Operational Research , vol.171 , Issue.2 , pp. 577-585
    • Gokcen, H.1    Agpak, K.2
  • 38
    • 33645509107 scopus 로고    scopus 로고
    • Multi-rule multi-objective simulated annealing algorithmfor straight and Utype assembly line balancing problems
    • Baykasoglu A (2006)Multi-rule multi-objective simulated annealing algorithmfor straight and Utype assembly line balancing problems. J Intell Manuf 17:217-232
    • (2006) J Intell Manuf , vol.17 , pp. 217-232
    • Baykasoglu, A.1
  • 39
    • 46649115541 scopus 로고    scopus 로고
    • U-shaped assembly line balancing problem with genetic algorithm
    • Hwang RK, Katayama H, Gen M (2007) U-shaped assembly line balancing problem with genetic algorithm. Int J Prod Res 46 (16):3797-3822
    • (2007) Int J Prod Res , vol.46 , Issue.16 , pp. 3797-3822
    • Hwang, R.K.1    Katayama, H.2    Gen, M.3
  • 40
    • 25144450992 scopus 로고    scopus 로고
    • A survey on problems and methods in generalized assembly line balancing
    • DOI 10.1016/j.ejor.2004.07.023, PII S0377221704004801, Balancing Assembly and Transfer Lines
    • Becker C, Scholl A (2006) A survey on problems and methods in generalized assembly line balancing. Eur J Oper Res 168(3):694-715 (Pubitemid 41336587)
    • (2006) European Journal of Operational Research , vol.168 , Issue.3 , pp. 694-715
    • Becker, C.1    Scholl, A.2
  • 41
    • 38949169513 scopus 로고    scopus 로고
    • A fuzzy goal programming model for the simple U-line balancing problem with multiple objectives
    • DOI 10.1080/03052150701651642, PII 790494261
    • Toklu B, Özcan U (2008) A fuzzy goal programming model for the simple U-line balancing problem with multiple objectives. Eng Optim 40(3):191-204 (Pubitemid 351230571)
    • (2008) Engineering Optimization , vol.40 , Issue.3 , pp. 191-204
    • Toklu, B.1    Ozcan, U.2
  • 42
    • 34548399728 scopus 로고    scopus 로고
    • A versatile algorithm for assembly line balancing
    • DOI 10.1016/j.ejor.2006.11.006, PII S0377221706011362
    • Boysen N, Fliedner M (2008) A versatile algorithm for assembly line balancing. Eur J Oper Res 184:39-56 (Pubitemid 47368917)
    • (2008) European Journal of Operational Research , vol.184 , Issue.1 , pp. 39-56
    • Boysen, N.1    Fliedner, M.2
  • 43
    • 50149094661 scopus 로고    scopus 로고
    • Simple and U-type assembly line balancing problems with a learning effect
    • Toksari MD, Isleyen SK, Guner E, Baykoc OF (2008) Simple and U-type assembly line balancing problems with a learning effect. Appl Math Model 32(12):2954-2961
    • (2008) Appl Math Model , vol.32 , Issue.12 , pp. 2954-2961
    • Toksari, M.D.1    Isleyen, S.K.2    Guner, E.3    Baykoc, O.F.4
  • 44
    • 58549088684 scopus 로고    scopus 로고
    • A new hybrid improvement heuristic approach to simple straight and U-type assembly line balancing problems
    • Özcan U, Toklu B (2008) A new hybrid improvement heuristic approach to simple straight and U-type assembly line balancing problems. J Intell Manuf 20(1):123-136
    • (2008) J Intell Manuf , vol.20 , Issue.1 , pp. 123-136
    • Özcan, U.1    Toklu, B.2
  • 45
    • 67651163455 scopus 로고    scopus 로고
    • Ant colony optimization for the single model U-type assembly line balancing problem
    • Sabuncuoglu I, Erel E, Alp A (2009) Ant colony optimization for the single model U-type assembly line balancing problem. Int J Prod Econ 120(2):287-300
    • (2009) Int J Prod Econ , vol.120 , Issue.2 , pp. 287-300
    • Sabuncuoglu, I.1    Erel, E.2    Alp, A.3
  • 46
    • 62149085883 scopus 로고    scopus 로고
    • Simple and U-type assembly line balancing by using an ant colony based algorithm
    • Baykasoglu A, Dereli T (2009) Simple and U-type assembly line balancing by using an ant colony based algorithm. Math Comput Appl 14(1):1-12
    • (2009) Math Comput Appl , vol.14 , Issue.1 , pp. 1-12
    • Baykasoglu, A.1    Dereli, T.2
  • 47
    • 70449632610 scopus 로고    scopus 로고
    • A multi-decision genetic approach for workload balancing of mixed-model U-shaped assembly line systems
    • Hwang R, Katayama H (2009) A multi-decision genetic approach for workload balancing of mixed-model U-shaped assembly line systems. Int J Prod Res 47(14):3797-3822
    • (2009) Int J Prod Res , vol.47 , Issue.14 , pp. 3797-3822
    • Hwang, R.1    Katayama, H.2
  • 48
    • 70449672626 scopus 로고    scopus 로고
    • Meeting demand variation using flexible U-shaped assembly lines
    • Simaria AS, Zanella M, de Sá M, Vilarinho PM (2009) Meeting demand variation using flexible U-shaped assembly lines. Int J Prod Res 47(14):3937-3955
    • (2009) Int J Prod Res , vol.47 , Issue.14 , pp. 3937-3955
    • Simaria, A.S.1    Zanella, M.2    De Sá, M.3    Vilarinho, P.M.4
  • 50
    • 0347711882 scopus 로고    scopus 로고
    • A Comparison of U-Line and Straight-Line Performances under Stochastic Task Times
    • Chand S, Zeng T (2001) A comparison of U-line and straightline performances under stochastic task times. Manuf Serv Oper Manage 3(2):138-150 (Pubitemid 33666625)
    • (2001) Manufacturing and Service Operations Management , vol.3 , Issue.2 , pp. 138-150
    • Chand, S.1    Zeng, T.2
  • 51
    • 2342467327 scopus 로고    scopus 로고
    • A heuristic for single model U-line assembly line balancing with stochastic task time
    • Agpak K, Gökçen H, Saray N, Özel S (2002) A heuristic for single model U-line assembly line balancing with stochastic task time. J Fac Eng Arch Gazi Univ 17(4):115-124
    • (2002) J Fac Eng Arch Gazi Univ , vol.17 , Issue.4 , pp. 115-124
    • Agpak, K.1    Gökçen, H.2    Saray, N.3    Özel, S.4
  • 53
    • 0037316822 scopus 로고    scopus 로고
    • The stochastic U-line balancing problem
    • Guerriero F, Miltenburg J (2003) The stochastic U-line balancing problem. Nav Res Logist 50(1):31-57
    • (2003) Nav Res Logist , vol.50 , Issue.1 , pp. 31-57
    • Guerriero, F.1    Miltenburg, J.2
  • 55
    • 40849130689 scopus 로고
    • COMSOAL: A computer method of sequencing operations for assembly lines
    • Arcus AL (1966) COMSOAL: A computer method of sequencing operations for assembly lines. Intell J Prod Res 4(4):259-277
    • (1966) Intell J Prod Res , vol.4 , Issue.4 , pp. 259-277
    • Arcus, A.L.1
  • 56
    • 78149290542 scopus 로고    scopus 로고
    • Imperialist competitive algorithm: An algorithm for optimization inspired by imperialistic competition
    • Singapore
    • Atashpaz-Gargari E, Lucas C (2007) Imperialist competitive algorithm: An algorithm for optimization inspired by imperialistic competition. IEEE Congress on Evolutionary Computation, Singapore
    • (2007) IEEE Congress on Evolutionary Computation
    • Atashpaz-Gargari, E.1    Lucas, C.2
  • 58
    • 0013054874 scopus 로고
    • A dynamic programming approach to stochastic assembly line balancing
    • Carraway RL (1989) A dynamic programming approach to stochastic assembly line balancing. Manage Sci 35(4):459-470
    • (1989) Manage Sci , vol.35 , Issue.4 , pp. 459-470
    • Carraway, R.L.1
  • 61
    • 36049016444 scopus 로고    scopus 로고
    • Improved immune algorithmfor global numerical optimization and job-shop scheduling problems
    • Tsai JT, Ho WH, Liu TK, Chou JH (2007) Improved immune algorithmfor global numerical optimization and job-shop scheduling problems. Appl Math Comput 194:406-424
    • (2007) Appl Math Comput , vol.194 , pp. 406-424
    • Tsai, J.T.1    Ho, W.H.2    Liu, T.K.3    Chou, J.H.4
  • 62
    • 33244484571 scopus 로고    scopus 로고
    • Incorporating robustness into Genetic Algorithm search of stochastic simulation outputs
    • DOI 10.1016/j.simpat.2005.05.001, PII S1569190X05000687
    • Al-Aomar R (2006) Incorporating robustness into genetic algorithm search of stochastic simulation outputs. Simul Model Pract Theory 14:201-223 (Pubitemid 43277668)
    • (2006) Simulation Modelling Practice and Theory , vol.14 , Issue.3 , pp. 201-223
    • Al-Aomar, R.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.