-
4
-
-
0031673732
-
Applying genetic algorithms to the U-shaped assembly line balancing problem
-
Anchorage, AK
-
Ajenblit, D.A., Wainwright, R.L., 1998. Applying genetic algorithms to the U-shaped assembly line balancing problem. In: Proceedings of the 1998 IEEE International Conference on Evolutionary Computation, Anchorage, AK, pp. 96-101.
-
(1998)
Proceedings of the 1998 IEEE International Conference on Evolutionary Computation
, pp. 96-101
-
-
Ajenblit, D.A.1
Wainwright, R.L.2
-
6
-
-
0006030850
-
Ein exaktes Verfahren zur kostenorientierten Fließbandabstimmung
-
Springer Berlin
-
M. Amen Ein exaktes Verfahren zur kostenorientierten Fließbandabstimmung U. Zimmermann Operations Research Proceedings 1996 1997 Springer Berlin 224 229
-
(1997)
Operations Research Proceedings 1996
, pp. 224-229
-
-
Amen, M.1
Zimmermann, U.2
-
7
-
-
0033881924
-
An exact method for cost-oriented assembly line balancing
-
M. Amen An exact method for cost-oriented assembly line balancing International Journal of Production Economics 64 2000 187 195
-
(2000)
International Journal of Production Economics
, vol.64
, pp. 187-195
-
-
Amen, M.1
-
8
-
-
0034294050
-
Heuristic methods for cost-oriented assembly line balancing: A survey
-
M. Amen Heuristic methods for cost-oriented assembly line balancing: A survey International Journal of Production Economics 68 2000 1 14
-
(2000)
International Journal of Production Economics
, vol.68
, pp. 1-14
-
-
Amen, M.1
-
9
-
-
0035852818
-
Heuristic methods for cost-oriented assembly line balancing: A comparison on solution quality and computing time
-
M. Amen Heuristic methods for cost-oriented assembly line balancing: A comparison on solution quality and computing time International Journal of Production Economics 69 2001 255 264
-
(2001)
International Journal of Production Economics
, vol.69
, pp. 255-264
-
-
Amen, M.1
-
10
-
-
40849130689
-
COMSOAL: A computer method of sequencing operations for assembly lines
-
A.L. Arcus COMSOAL: A computer method of sequencing operations for assembly lines International Journal of Production Research 4 1966 259 277
-
(1966)
International Journal of Production Research
, vol.4
, pp. 259-277
-
-
Arcus, A.L.1
-
11
-
-
0031270224
-
A parallel station heuristic for the mixed-model production line balancing problem
-
R.G. Askin, and M. Zhou A parallel station heuristic for the mixed-model production line balancing problem International Journal of Production Research 35 1997 3095 3105
-
(1997)
International Journal of Production Research
, vol.35
, pp. 3095-3105
-
-
Askin, R.G.1
Zhou, M.2
-
13
-
-
0024673749
-
Assembly line balancing with parallel workstations and dead time
-
J.F. Bard Assembly line balancing with parallel workstations and dead time International Journal of Production Research 27 1989 1005 1018
-
(1989)
International Journal of Production Research
, vol.27
, pp. 1005-1018
-
-
Bard, J.F.1
-
16
-
-
0033707420
-
Local search heuristics for the assembly line balancing problem with incompatibilities between tasks
-
San Francisco, CA
-
Bautista, J., Suarez, R., Mateo, M., Companys, R., 2000. Local search heuristics for the assembly line balancing problem with incompatibilities between tasks. In: Proceedings of the 2000 IEEE International Conference on Robotics and Automation, San Francisco, CA, 2404-2409.
-
(2000)
Proceedings of the 2000 IEEE International Conference on Robotics and Automation
, pp. 2404-2409
-
-
Bautista, J.1
Suarez, R.2
Mateo, M.3
Companys, R.4
-
17
-
-
0022768294
-
A survey of exact algorithms for the simple assembly line balancing problem
-
I. Baybars A survey of exact algorithms for the simple assembly line balancing problem Management Science 32 1986 909 932
-
(1986)
Management Science
, vol.32
, pp. 909-932
-
-
Baybars, I.1
-
18
-
-
25144503076
-
Controlling mixed-model assembly lines in real-time by using distributed systems
-
this issue doi:10.1016/j.ejor.2004.07.035
-
Bock, S., Rosenberg, O., van Brackel, T., this issue. Controlling mixed-model assembly lines in real-time by using distributed systems, European Journal of Operational Research. doi:10.1016/j.ejor.2004.07.035.
-
European Journal of Operational Research
-
-
Bock, S.1
Rosenberg, O.2
Van Brackel, T.3
-
20
-
-
0032187351
-
A comparative study of performance measures for throughput of a mixed model assembly line in a JIT environment
-
J. Bukchin A comparative study of performance measures for throughput of a mixed model assembly line in a JIT environment International Journal of Production Research 36 1998 2669 2685
-
(1998)
International Journal of Production Research
, vol.36
, pp. 2669-2685
-
-
Bukchin, J.1
-
22
-
-
0037230929
-
A weighted approach for assembly line design with station paralleling and equipment selection
-
J. Bukchin, and J. Rubinovitz A weighted approach for assembly line design with station paralleling and equipment selection IIE Transactions 35 2002 573 585
-
(2002)
IIE Transactions
, vol.35
, pp. 573-585
-
-
Bukchin, J.1
Rubinovitz, J.2
-
23
-
-
0033750053
-
Design of flexible assembly line to minimize equipment cost
-
J. Bukchin, and M. Tzur Design of flexible assembly line to minimize equipment cost IIE Transactions 32 2000 585 598
-
(2000)
IIE Transactions
, vol.32
, pp. 585-598
-
-
Bukchin, J.1
Tzur, M.2
-
27
-
-
0016027179
-
Assembly line balancing with multiple Stations
-
G.M. Buxey Assembly line balancing with multiple Stations Management Science 20 1974 1010 1021
-
(1974)
Management Science
, vol.20
, pp. 1010-1021
-
-
Buxey, G.M.1
-
28
-
-
0016993042
-
Simulation studies of conveyor-paced assembly lines with buffer capacity
-
G.M. Buxey, and D. Sadjadi Simulation studies of conveyor-paced assembly lines with buffer capacity International Journal of Production Research 14 1976 607 624
-
(1976)
International Journal of Production Research
, vol.14
, pp. 607-624
-
-
Buxey, G.M.1
Sadjadi, D.2
-
29
-
-
0015603944
-
Production flow line system design - A review
-
G.M. Buxey, N.D. Slack, and R. Wild Production flow line system design - A review AIIE Transactions 5 1973 37 48
-
(1973)
AIIE Transactions
, vol.5
, pp. 37-48
-
-
Buxey, G.M.1
Slack, N.D.2
Wild, R.3
-
30
-
-
84946975124
-
Prediction of the efficiency of production systems without internal storage
-
J.A. Buzacott Prediction of the efficiency of production systems without internal storage International Journal of Production Research 6 1968 173 188
-
(1968)
International Journal of Production Research
, vol.6
, pp. 173-188
-
-
Buzacott, J.A.1
-
31
-
-
0025429668
-
Abandoning the moving assembly line: Models of human operators and job sequencing
-
J.A. Buzacott Abandoning the moving assembly line: Models of human operators and job sequencing International Journal of Production Research 28 1990 821 839
-
(1990)
International Journal of Production Research
, vol.28
, pp. 821-839
-
-
Buzacott, J.A.1
-
32
-
-
0035480374
-
Incorporating physical demand criteria into assembly line balancing
-
B.J. Carnahan, B.A. Norman, and M.S. Redfern Incorporating physical demand criteria into assembly line balancing IIE Transactions 33 2001 875 887
-
(2001)
IIE Transactions
, vol.33
, pp. 875-887
-
-
Carnahan, B.J.1
Norman, B.A.2
Redfern, M.S.3
-
33
-
-
0013054874
-
A dynamic programming approach to stochastic assembly line balancing
-
R.L. Carraway A dynamic programming approach to stochastic assembly line balancing Management Science 35 1989 459 471
-
(1989)
Management Science
, vol.35
, pp. 459-471
-
-
Carraway, R.L.1
-
34
-
-
48749137178
-
A cost-effective approach to stochastic line balancing with off-line repairs
-
J.C. Carter, and F.N. Silverman A cost-effective approach to stochastic line balancing with off-line repairs Journal of Operations Management 4 1984 145 157
-
(1984)
Journal of Operations Management
, vol.4
, pp. 145-157
-
-
Carter, J.C.1
Silverman, F.N.2
-
35
-
-
0024033958
-
Line balancing with task learning effects
-
A.K. Chakravarty Line balancing with task learning effects IIE Transactions 20 1988 186 193
-
(1988)
IIE Transactions
, vol.20
, pp. 186-193
-
-
Chakravarty, A.K.1
-
36
-
-
0022129886
-
Balancing mixed model lines with in-process inventories
-
A.K. Chakravarty, and A. Shtub Balancing mixed model lines with in-process inventories Management Science 31 1985 1161 1174
-
(1985)
Management Science
, vol.31
, pp. 1161-1174
-
-
Chakravarty, A.K.1
Shtub, A.2
-
37
-
-
0022440844
-
A cost minimization procedure for mixed model production lines with normally distributed task times
-
A.K. Chakravarty, and A. Shtub A cost minimization procedure for mixed model production lines with normally distributed task times European Journal of Operational Research 23 1986 25 36
-
(1986)
European Journal of Operational Research
, vol.23
, pp. 25-36
-
-
Chakravarty, A.K.1
Shtub, A.2
-
38
-
-
0022873494
-
Dynamic manning of long cycle assembly lines with learning effect
-
A.K. Chakravarty, and A. Shtub Dynamic manning of long cycle assembly lines with learning effect IIE Transactions 18 1986 392 397
-
(1986)
IIE Transactions
, vol.18
, pp. 392-397
-
-
Chakravarty, A.K.1
Shtub, A.2
-
39
-
-
33847001045
-
A hybrid heuristic for the stochastic U-line balancing problem
-
University of Tulsa, Oklahoma, USA
-
Chiang, W.-C., Urban, T.L., 2002. A hybrid heuristic for the stochastic U-line balancing problem, Working Paper, University of Tulsa, Oklahoma, USA.
-
(2002)
Working Paper
-
-
Chiang, W.-C.1
Urban, T.L.2
-
41
-
-
0027627041
-
Capacity smoothing and sequencing for mixed-model lines
-
M. Decker Capacity smoothing and sequencing for mixed-model lines International Journal of Production Economics 30-31 1993 31 42
-
(1993)
International Journal of Production Economics
, vol.30-31
, pp. 31-42
-
-
Decker, M.1
-
42
-
-
0024683477
-
Balancing cycle time and workstations
-
R.F Deckro Balancing cycle time and workstations IIE Transactions 21 1989 106 111
-
(1989)
IIE Transactions
, vol.21
, pp. 106-111
-
-
Deckro, R.F.1
-
46
-
-
25144507641
-
A heuristic approach for transfer lines balancing
-
University of Technology of Troyes, France
-
Dolgui, A., Finel, B., Guschinsky, N., Levin, G., Vernadat, F., 2002b. A heuristic approach for transfer lines balancing. Working Paper, University of Technology of Troyes, France.
-
(2002)
Working Paper
-
-
Dolgui, A.1
Finel, B.2
Guschinsky, N.3
Levin, G.4
Vernadat, F.5
-
47
-
-
0033284277
-
On problem of optimal design of transfer lines with parallel and sequential operations
-
Fuertes, J.M. (Ed.) Barcelona, Spain 1999
-
Dolgui, A., Guschinski, N., Levin, G., 1999. On problem of optimal design of transfer lines with parallel and sequential operations. In: Fuertes, J.M. (Ed.), Proceedings of the 7th IEEE International Conference on Emerging Technologies and Factory Automation, Barcelona, Spain, vol. 1, 1999, pp. 329-334.
-
(1999)
Proceedings of the 7th IEEE International Conference on Emerging Technologies and Factory Automation
, vol.1
, pp. 329-334
-
-
Dolgui, A.1
Guschinski, N.2
Levin, G.3
-
48
-
-
25144524152
-
Decomposition methods to optimize transfer line with parallel and sequential machining
-
Z. Binder, Management and control of production and logistics, Elsevier Amsterdam
-
A. Dolgui, N. Guschinsky, and G. Levin Decomposition methods to optimize transfer line with parallel and sequential machining Z. Binder Management and control of production and logistics Proceedings of the 2nd IFAC Conference, Grenoble, France, 2000 vol. 3 2001 Elsevier Amsterdam 983 988
-
(2001)
Proceedings of the 2nd IFAC Conference, Grenoble, France, 2000
, vol.3
, pp. 983-988
-
-
Dolgui, A.1
Guschinsky, N.2
Levin, G.3
-
49
-
-
0012789059
-
A mixed integer program for balancing of transfer line with grouped operations
-
Florida, USA, 2001
-
Dolgui, A., Guschinsky, N., Levin, G., 2001b. A mixed integer program for balancing of transfer line with grouped operations. In: Proceedings of the 28th International Conference on Computer and Industrial Engineering, Florida, USA, 2001, pp. 541-547.
-
(2001)
Proceedings of the 28th International Conference on Computer and Industrial Engineering
, pp. 541-547
-
-
Dolgui, A.1
Guschinsky, N.2
Levin, G.3
-
50
-
-
17444389512
-
Optimal design of a class of transfer lines with parallel operations
-
In: Groumpos, P.P., Tzes, A.A. (Eds.), Manufacturing, modeling, management and control Patras, Greece, 2000, Elsevier, Amsterdam
-
Dolgui, A., Guschinsky, N., Levin, G., Harrath, Y., 2001c. Optimal design of a class of transfer lines with parallel operations. In: Groumpos, P.P., Tzes, A.A. (Eds.), Manufacturing, modeling, management and control, A Proceedings volume from the IFAC Symposium, Patras, Greece, 2000, Elsevier, Amsterdam, pp. 36-41.
-
(2001)
A Proceedings Volume from the IFAC Symposium
, pp. 36-41
-
-
Dolgui, A.1
Guschinsky, N.2
Levin, G.3
Harrath, Y.4
-
52
-
-
85088743576
-
Optimal design of automated transfer lines with blocks of parallel operations
-
Camacho, E.F., Basanez, L., De la Puente, J.A. (Eds.) Barcelona, Spain, 2002, Elsevier, Amsterdam (on cd-rom)
-
Dolgui, A., Guschinsky, N., Levin, G., 2003. Optimal design of automated transfer lines with blocks of parallel operations. In: Camacho, E.F., Basanez, L., De la Puente, J.A. (Eds.), Proceedings of the 15th IFAC World Congress, Barcelona, Spain, 2002, Elsevier, Amsterdam (on cd-rom).
-
(2003)
Proceedings of the 15th IFAC World Congress
-
-
Dolgui, A.1
Guschinsky, N.2
Levin, G.3
-
53
-
-
0345815673
-
Antizipative Leistungsabstimmung bei moderner Variantenfließfertigung
-
W. Domschke, R. Klein, and A. Scholl Antizipative Leistungsabstimmung bei moderner Variantenfließfertigung Zeitschrift für Betriebswirtschaft 66 1996 1465 1490
-
(1996)
Zeitschrift für Betriebswirtschaft
, vol.66
, pp. 1465-1490
-
-
Domschke, W.1
Klein, R.2
Scholl, A.3
-
55
-
-
0032677007
-
Shortest route formulation of mixed-model assembly line balancing problem
-
E. Erel, and H. Gökcen Shortest route formulation of mixed-model assembly line balancing problem European Journal of Operational Research 116 1999 194 204
-
(1999)
European Journal of Operational Research
, vol.116
, pp. 194-204
-
-
Erel, E.1
Gökcen, H.2
-
57
-
-
0032117097
-
A survey of the assembly line balancing procedures
-
E. Erel, and S.C Sarin A survey of the assembly line balancing procedures Production Planning and Control 9 1998 414 434
-
(1998)
Production Planning and Control
, vol.9
, pp. 414-434
-
-
Erel, E.1
Sarin, S.C.2
-
58
-
-
25144439070
-
A grouping genetic algorithm for line balancing with resource dependent task times
-
University of Otago, Dunedin, New Zealand
-
Falkenauer, E., 1997. A grouping genetic algorithm for line balancing with resource dependent task times. In: Proceedings of the Fourth International Conference on Neural Information Processing 1997, University of Otago, Dunedin, New Zealand, pp. 464-468.
-
(1997)
Proceedings of the Fourth International Conference on Neural Information Processing 1997
, pp. 464-468
-
-
Falkenauer, E.1
-
59
-
-
25144499168
-
A decision support system for assembly line balancing
-
Middle East Technical University, Ankara, Turkey
-
Fidan, G., Kandiller, L., Oguztüzün, H., 2003. A decision support system for assembly line balancing, Working paper, Middle East Technical University, Ankara, Turkey.
-
(2003)
Working Paper
-
-
Fidan, G.1
Kandiller, L.2
Oguztüzün, H.3
-
61
-
-
0016971681
-
Scheduling parallel production lines with changeover costs: Practical application of a quadratic assignment/LP approach
-
A.M. Geoffrion, and G.W. Graves Scheduling parallel production lines with changeover costs: Practical application of a quadratic assignment/LP approach Operations Research 24 1976 595 610
-
(1976)
Operations Research
, vol.24
, pp. 595-610
-
-
Geoffrion, A.M.1
Graves, G.W.2
-
62
-
-
0024641634
-
A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems
-
S. Ghosh, and R.J. Gagnon A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems International Journal of Production Research 27 1989 637 670
-
(1989)
International Journal of Production Research
, vol.27
, pp. 637-670
-
-
Ghosh, S.1
Gagnon, R.J.2
-
63
-
-
0019016754
-
The relationship between job design, human behavior and system response
-
S. Globerson, and A. Tamir The relationship between job design, human behavior and system response International Journal of Production Research 18 1980 391 400
-
(1980)
International Journal of Production Research
, vol.18
, pp. 391-400
-
-
Globerson, S.1
Tamir, A.2
-
64
-
-
0032761669
-
A new line remedial policy for the paced lines with stochastic task times
-
H. Gökcen, and Ö.F. Baykoc A new line remedial policy for the paced lines with stochastic task times International Journal of Production Economics 58 1999 191 197
-
(1999)
International Journal of Production Economics
, vol.58
, pp. 191-197
-
-
Gökcen, H.1
Baykoc, Ö.F.2
-
65
-
-
0032043473
-
Binary integer formulation for mixed-model assembly line balancing problem
-
H. Gökcen, and E. Erel Binary integer formulation for mixed-model assembly line balancing problem Computers and Industrial Engineering 34 1998 451 461
-
(1998)
Computers and Industrial Engineering
, vol.34
, pp. 451-461
-
-
Gökcen, H.1
Erel, E.2
-
67
-
-
0020751825
-
An integer programming procedure for assembly system design problems
-
S.C. Graves, and B.W. Lamar An integer programming procedure for assembly system design problems Operations Research 31 1983 522 545
-
(1983)
Operations Research
, vol.31
, pp. 522-545
-
-
Graves, S.C.1
Lamar, B.W.2
-
68
-
-
25144466582
-
Taktabstimmung bei Fließarbeit mit dem Positionswert-Verfahren
-
K. Hautsch, H. John, and H. Schürgers Taktabstimmung bei Fließarbeit mit dem Positionswert-Verfahren REFA-Nachrichten 25 1972 451 464
-
(1972)
REFA-Nachrichten
, vol.25
, pp. 451-464
-
-
Hautsch, K.1
John, H.2
Schürgers, H.3
-
69
-
-
0000313704
-
Assembly line balancing - Dynamic programming with precedence constraints
-
M. Held, R.M. Karp, and R. Shareshian Assembly line balancing - Dynamic programming with precedence constraints Operations Research 11 1963 442 459
-
(1963)
Operations Research
, vol.11
, pp. 442-459
-
-
Held, M.1
Karp, R.M.2
Shareshian, R.3
-
70
-
-
0001108060
-
Assembly line balancing using the ranked positional weight technique
-
W.B. Helgeson, and D.P. Birnie Assembly line balancing using the ranked positional weight technique Journal of Industrial Engineering 12 1961 394 398
-
(1961)
Journal of Industrial Engineering
, vol.12
, pp. 394-398
-
-
Helgeson, W.B.1
Birnie, D.P.2
-
71
-
-
0022910386
-
Extensions of the dynamic programming method in the deterministic and stochastic assemblyline balancing problems
-
M.I. Henig Extensions of the dynamic programming method in the deterministic and stochastic assemblyline balancing problems Computers and Operations Research 13 1986 443 449
-
(1986)
Computers and Operations Research
, vol.13
, pp. 443-449
-
-
Henig, M.I.1
-
72
-
-
0026239015
-
The effect of machine breakdowns and interstage storage on the performance of production line systems
-
F.S. Hillier, and K.C. So The effect of machine breakdowns and interstage storage on the performance of production line systems International Journal of Production Research 29 1991 2043 2055
-
(1991)
International Journal of Production Research
, vol.29
, pp. 2043-2055
-
-
Hillier, F.S.1
So, K.C.2
-
73
-
-
0027574248
-
Some data for applying the bowl phenomenon to large production line systems
-
F.S. Hillier, and K.C. So Some data for applying the bowl phenomenon to large production line systems International Journal of Production Research 31 1993 811 822
-
(1993)
International Journal of Production Research
, vol.31
, pp. 811-822
-
-
Hillier, F.S.1
So, K.C.2
-
74
-
-
0027251210
-
Toward characterizing the optimal allocation of storage space in production line systems with variable processing times
-
F.S. Hillier, K.C. So, and R.W. Boling Toward characterizing the optimal allocation of storage space in production line systems with variable processing times Management Science 39 1993 126 133
-
(1993)
Management Science
, vol.39
, pp. 126-133
-
-
Hillier, F.S.1
So, K.C.2
Boling, R.W.3
-
75
-
-
0000030393
-
Assembly line balancing with a precedence matrix
-
T.R. Hoffmann Assembly line balancing with a precedence matrix Management Science 9 1963 551 562
-
(1963)
Management Science
, vol.9
, pp. 551-562
-
-
Hoffmann, T.R.1
-
78
-
-
0025498413
-
Unbalanced production line scheduling with partial job specialization
-
W.H. Iskander, and J. Chou Unbalanced production line scheduling with partial job specialization Naval Research Logistics 37 1990 789 805
-
(1990)
Naval Research Logistics
, vol.37
, pp. 789-805
-
-
Iskander, W.H.1
Chou, J.2
-
79
-
-
0020848902
-
A branch and bound algorithm for assembly line balancing problems with formulation irregularities
-
R.V. Johnson A branch and bound algorithm for assembly line balancing problems with formulation irregularities Management Science 29 1983 1309 1324
-
(1983)
Management Science
, vol.29
, pp. 1309-1324
-
-
Johnson, R.V.1
-
81
-
-
0016964033
-
A preference order dynamic program for stochastic assembly line balancing
-
E.P.C. Kao A preference order dynamic program for stochastic assembly line balancing Management Science 22 1976 1097 1104
-
(1976)
Management Science
, vol.22
, pp. 1097-1104
-
-
Kao, E.P.C.1
-
82
-
-
0018698137
-
Computational experience with a stochastic assembly line balancing algorithm
-
E.P.C. Kao Computational experience with a stochastic assembly line balancing algorithm Computers and Operations Research 6 1979 79 86
-
(1979)
Computers and Operations Research
, vol.6
, pp. 79-86
-
-
Kao, E.P.C.1
-
83
-
-
0020103084
-
On dynamic programming methods for assembly line balancing
-
E.P.C. Kao, and M. Queyranne On dynamic programming methods for assembly line balancing Operations Research 30 1982 375 390
-
(1982)
Operations Research
, vol.30
, pp. 375-390
-
-
Kao, E.P.C.1
Queyranne, M.2
-
84
-
-
0037508541
-
Assembly line balancing in a mixed-model sequencing environment with synchronous transfers
-
S. Karabati, and S. Sayin Assembly line balancing in a mixed-model sequencing environment with synchronous transfers European Journal of Operational Research 149 2003 417 429
-
(2003)
European Journal of Operational Research
, vol.149
, pp. 417-429
-
-
Karabati, S.1
Sayin, S.2
-
86
-
-
0029358711
-
A strong cutting plane algorithm for the robotic assembly line balancing problem
-
H. Kim, and S. Park A strong cutting plane algorithm for the robotic assembly line balancing problem International Journal of Production Research 33 1995 2311 2323
-
(1995)
International Journal of Production Research
, vol.33
, pp. 2311-2323
-
-
Kim, H.1
Park, S.2
-
87
-
-
0033993174
-
Two-sided assembly line balancing: A genetic algorithm approach
-
Y.K. Kim, Y. Kim, and Y.J. Kim Two-sided assembly line balancing: a genetic algorithm approach Production Planning and Control 11 2000 44 53
-
(2000)
Production Planning and Control
, vol.11
, pp. 44-53
-
-
Kim, Y.K.1
Kim, Y.2
Kim, Y.J.3
-
88
-
-
0000945761
-
A coevolutionary algorithm for balancing and sequencing in mixed model assembly lines
-
Y.K. Kim, J.Y. Kim, and Y. Kim A coevolutionary algorithm for balancing and sequencing in mixed model assembly lines Applied Intelligence 13 2000 247 258
-
(2000)
Applied Intelligence
, vol.13
, pp. 247-258
-
-
Kim, Y.K.1
Kim, J.Y.2
Kim, Y.3
-
89
-
-
25144469836
-
An endosymbiotic evolutionary algorithm for the integration of balancing and sequencing in mixed-model U-lines
-
this issue doi:10.1016/j.eor.2004.07.032
-
Kim, Y.K., Kim, J.Y., Kim, Y., this issue. An endosymbiotic evolutionary algorithm for the integration of balancing and sequencing in mixed-model U-lines. European Journal of Operational Research. doi:10.1016/j.eor.2004.07.032.
-
European Journal of Operational Research
-
-
Kim, Y.K.1
Kim, J.Y.2
Kim, Y.3
-
91
-
-
0015639656
-
A cost-oriented approach to stochastic line balancing
-
J.F. Kottas, and H.-S. Lau A cost-oriented approach to stochastic line balancing AIIE Transactions 5 1973 164 171
-
(1973)
AIIE Transactions
, vol.5
, pp. 164-171
-
-
Kottas, J.F.1
Lau, H.-S.2
-
92
-
-
0016962322
-
A total operating cost model for paced lines with stochastic task times
-
J.F. Kottas, and H.-S. Lau A total operating cost model for paced lines with stochastic task times AIIE Transactions 8 1976 234 240
-
(1976)
AIIE Transactions
, vol.8
, pp. 234-240
-
-
Kottas, J.F.1
Lau, H.-S.2
-
94
-
-
0023586184
-
An exploratory study on stopping a paced line when incompletions occur
-
H.-S. Lau, and A. Shtub An exploratory study on stopping a paced line when incompletions occur IIE Transactions 19 1987 463 467
-
(1987)
IIE Transactions
, vol.19
, pp. 463-467
-
-
Lau, H.-S.1
Shtub, A.2
-
95
-
-
0035399914
-
Two-sided assembly line balancing to maximize work relatedness and slackness
-
T.O. Lee, Y. Kim, and Y.K. Kim Two-sided assembly line balancing to maximize work relatedness and slackness Computers and Industrial Engineering 40 2001 273 292
-
(2001)
Computers and Industrial Engineering
, vol.40
, pp. 273-292
-
-
Lee, T.O.1
Kim, Y.2
Kim, Y.K.3
-
97
-
-
21544447635
-
Development of operator assignment schedules: A DSS approach
-
C.M. Lutz, K.R. Davis, and C.F. Turner Development of operator assignment schedules: A DSS approach OMEGA 22 1994 57 67
-
(1994)
OMEGA
, vol.22
, pp. 57-67
-
-
Lutz, C.M.1
Davis, K.R.2
Turner, C.F.3
-
98
-
-
0015483845
-
Production-line balances for mixed-model lines
-
J.L.C. Macaskill Production-line balances for mixed-model lines Management Science 19 1972 423 434
-
(1972)
Management Science
, vol.19
, pp. 423-434
-
-
MacAskill, J.L.C.1
-
99
-
-
0026238769
-
A multiple criteria decision making approach for the assembly line balancing problem
-
B. Malakooti A multiple criteria decision making approach for the assembly line balancing problem International Journal of Production Research 29 1991 1979 2001
-
(1991)
International Journal of Production Research
, vol.29
, pp. 1979-2001
-
-
Malakooti, B.1
-
100
-
-
0001340484
-
Assembly line balancing with buffers by multiple criteria optimization
-
B. Malakooti Assembly line balancing with buffers by multiple criteria optimization International Journal of Production Research 32 1994 2159 2178
-
(1994)
International Journal of Production Research
, vol.32
, pp. 2159-2178
-
-
Malakooti, B.1
-
101
-
-
0030241346
-
An expert system for solving multi-objective assembly line balancing problems
-
B. Malakooti, and A. Kumar An expert system for solving multi-objective assembly line balancing problems International Journal of Production Research 34 1996 2533 2552
-
(1996)
International Journal of Production Research
, vol.34
, pp. 2533-2552
-
-
Malakooti, B.1
Kumar, A.2
-
103
-
-
0031232825
-
A heuristic for solving mixed-model line balancing problems with stochastic task durations and parallel stations
-
P.R. McMullen, and G.V. Frazier A heuristic for solving mixed-model line balancing problems with stochastic task durations and parallel stations International Journal of Production Economics 51 1997 177 190
-
(1997)
International Journal of Production Economics
, vol.51
, pp. 177-190
-
-
McMullen, P.R.1
Frazier, G.V.2
-
104
-
-
0032188659
-
Using simulated annealing to solve a multiobjective assembly line balancing problem with parallel workstations
-
P.R. McMullen, and G.V. Frazier Using simulated annealing to solve a multiobjective assembly line balancing problem with parallel workstations International Journal of Production Research 36 1998 2717 2741
-
(1998)
International Journal of Production Research
, vol.36
, pp. 2717-2741
-
-
McMullen, P.R.1
Frazier, G.V.2
-
105
-
-
0038480082
-
Using ant techniques to solve the assembly line balancing problem
-
P.R. McMullen, and P. Tarasewich Using ant techniques to solve the assembly line balancing problem IIE Transactions 35 2003 605 617
-
(2003)
IIE Transactions
, vol.35
, pp. 605-617
-
-
McMullen, P.R.1
Tarasewich, P.2
-
112
-
-
0002569892
-
A heuristic method of assembly line balancing for assumptions of constant or variable work element times
-
C.L. Moodie, and H.H. Young A heuristic method of assembly line balancing for assumptions of constant or variable work element times Journal of Industrial Engineering 16 1965 23 29
-
(1965)
Journal of Industrial Engineering
, vol.16
, pp. 23-29
-
-
Moodie, C.L.1
Young, H.H.2
-
113
-
-
0031272027
-
Bounds and approximations for cycle times of a U-shaped production line
-
K. Nakade, K. Ohno, and J.G. Shanthikumar Bounds and approximations for cycle times of a U-shaped production line Operations Research Letters 21 1997 191 200
-
(1997)
Operations Research Letters
, vol.21
, pp. 191-200
-
-
Nakade, K.1
Ohno, K.2
Shanthikumar, J.G.3
-
116
-
-
0031122267
-
A heuristic for an assembly line balancing problem with incompatibility, range, and partial precedence constraints
-
K. Park, S. Park, and W. Kim A heuristic for an assembly line balancing problem with incompatibility, range, and partial precedence constraints Computers and Industrial Engineering 32 1997 321 332
-
(1997)
Computers and Industrial Engineering
, vol.32
, pp. 321-332
-
-
Park, K.1
Park, S.2
Kim, W.3
-
117
-
-
25144441275
-
Assembly line balancing with incompatibilities and bounded workstation loads
-
R. Pastor, and A. Corominas Assembly line balancing with incompatibilities and bounded workstation loads Ricerca Operativa 30 2000 23 45
-
(2000)
Ricerca Operativa
, vol.30
, pp. 23-45
-
-
Pastor, R.1
Corominas, A.2
-
118
-
-
0036902263
-
Tabu search algorithms for an industrial multi-product and multi-objective assembly line balancing problem, with reduction of the task dispersion
-
R. Pastor, C. Andres, A. Duran, and M. Perez Tabu search algorithms for an industrial multi-product and multi-objective assembly line balancing problem, with reduction of the task dispersion Journal of the Operational Research Society 53 2002 1317 1323
-
(2002)
Journal of the Operational Research Society
, vol.53
, pp. 1317-1323
-
-
Pastor, R.1
Andres, C.2
Duran, A.3
Perez, M.4
-
121
-
-
0031677329
-
Assembly system design: A branch and cut approach
-
A. Pinnoi, and W.E. Wilhelm Assembly system design: A branch and cut approach Management Science 44 1998 103 118
-
(1998)
Management Science
, vol.44
, pp. 103-118
-
-
Pinnoi, A.1
Wilhelm, W.E.2
-
124
-
-
0020781916
-
Assembly line balancing with processing alternatives: An application
-
P.A. Pinto, D.G. Dannenbring, and B.M. Khumawala Assembly line balancing with processing alternatives: an application Management Science 29 1983 817 830
-
(1983)
Management Science
, vol.29
, pp. 817-830
-
-
Pinto, P.A.1
Dannenbring, D.G.2
Khumawala, B.M.3
-
125
-
-
0000816262
-
Buffer allocation in unbalanced three-station serial lines
-
S.G. Powell Buffer allocation in unbalanced three-station serial lines International Journal of Production Research 32 1994 2201 2217
-
(1994)
International Journal of Production Research
, vol.32
, pp. 2201-2217
-
-
Powell, S.G.1
-
128
-
-
0019899326
-
A new method for assembly line balancing having stochastic work elements
-
A. Raouf, and C. Tsui A new method for assembly line balancing having stochastic work elements Computers and Industrial Engineering 6 1982 131 148
-
(1982)
Computers and Industrial Engineering
, vol.6
, pp. 131-148
-
-
Raouf, A.1
Tsui, C.2
-
129
-
-
0015660893
-
Balancing stochastic assembly lines
-
N.R. Reeve, and W.H. Thomas Balancing stochastic assembly lines AIIE Transactions 5 1973 223 229
-
(1973)
AIIE Transactions
, vol.5
, pp. 223-229
-
-
Reeve, N.R.1
Thomas, W.H.2
-
130
-
-
25144467503
-
Assembly line balancing and resource planning: What is done and what is still missing
-
Durban, South Africa, 2001
-
Rekiek, B., Delchambre, A., 2001. Assembly line balancing and resource planning: What is done and what is still missing. In: Proceedings of CARS and FOF, Durban, South Africa, 2001, pp. 86-93.
-
(2001)
Proceedings of CARS and FOF
, pp. 86-93
-
-
Rekiek, B.1
Delchambre, A.2
-
133
-
-
84960656106
-
On a multiproduct assembly line-balancing problem
-
S.D. Roberts, and C.D. Villa On a multiproduct assembly line-balancing problem AIIE Transactions 2 1970 361 364
-
(1970)
AIIE Transactions
, vol.2
, pp. 361-364
-
-
Roberts, S.D.1
Villa, C.D.2
-
135
-
-
0006102920
-
A comparison of heuristic algorithms for cost-oriented assembly line balancing
-
O. Rosenberg, and H. Ziegler A comparison of heuristic algorithms for cost-oriented assembly line balancing Zeitschrift für Operations Research 36 1992 477 495
-
(1992)
Zeitschrift für Operations Research
, vol.36
, pp. 477-495
-
-
Rosenberg, O.1
Ziegler, H.2
-
136
-
-
0022075822
-
Designing a production line to maximize profit
-
M.J. Rosenblatt, and R.C. Carlson Designing a production line to maximize profit IIE Transactions 17 1985 117 121
-
(1985)
IIE Transactions
, vol.17
, pp. 117-121
-
-
Rosenblatt, M.J.1
Carlson, R.C.2
-
137
-
-
0027148640
-
RALB - A heuristic algorithm for design and balancing of robotic assembly lines
-
J. Rubinovitz, and J. Bukchin RALB - A heuristic algorithm for design and balancing of robotic assembly lines Annals of the CIRP 42 1993 497 500
-
(1993)
Annals of the CIRP
, vol.42
, pp. 497-500
-
-
Rubinovitz, J.1
Bukchin, J.2
-
138
-
-
0025462434
-
Development of cost model for the single-model stochastic assembly line balancing problem
-
S.C. Sarin, and E. Erel Development of cost model for the single-model stochastic assembly line balancing problem International Journal of Production Research 28 1990 1305 1316
-
(1990)
International Journal of Production Research
, vol.28
, pp. 1305-1316
-
-
Sarin, S.C.1
Erel, E.2
-
139
-
-
0013064892
-
A methodology for solving single-model, stochastic assembly line balancing problem
-
S.C. Sarin, E. Erel, and E.M. Dar-El A methodology for solving single-model, stochastic assembly line balancing problem Omega 27 1999 525 535
-
(1999)
Omega
, vol.27
, pp. 525-535
-
-
Sarin, S.C.1
Erel, E.2
Dar-El, E.M.3
-
142
-
-
25144484909
-
A note on An exact method for cost-oriented assembly line balancing
-
University of Jena
-
Scholl, A., Becker, C., 2003. A note on An exact method for cost-oriented assembly line balancing. Jenaer Schriften zur Wirtschaftswissenschaft 22/2003, University of Jena.
-
(2003)
Jenaer Schriften zur Wirtschaftswissenschaft
, vol.22
, Issue.2003
-
-
Scholl, A.1
Becker, C.2
-
143
-
-
25144482035
-
State-of-the-art exact and heuristic solution procedures for simple assembly line balancing
-
this issue doi:10.1016/j.ejor.2004.07.022
-
Scholl, A., Becker, C., this issue. State-of-the-art exact and heuristic solution procedures for simple assembly line balancing, European Journal of Operations Research. doi:10.1016/j.ejor.2004.07.022.
-
European Journal of Operations Research
-
-
Scholl, A.1
Becker, C.2
-
144
-
-
0001193704
-
SALOME: A bidirectional branch and bound procedure for assembly line balancing
-
A. Scholl, and R. Klein SALOME: A bidirectional branch and bound procedure for assembly line balancing INFORMS Journal on Computing 9 1997 319 334
-
(1997)
INFORMS Journal on Computing
, vol.9
, pp. 319-334
-
-
Scholl, A.1
Klein, R.2
-
146
-
-
0032305338
-
Pattern based vocabulary building for effectively sequencing mixed model assembly lines
-
A. Scholl, R. Klein, and W. Domschke Pattern based vocabulary building for effectively sequencing mixed model assembly lines Journal of Heuristics 4 1998 359 381
-
(1998)
Journal of Heuristics
, vol.4
, pp. 359-381
-
-
Scholl, A.1
Klein, R.2
Domschke, W.3
-
147
-
-
0017972181
-
Dynamic programming solution of sequencing problems with precedence constraints
-
L. Schrage, and K.R. Baker Dynamic programming solution of sequencing problems with precedence constraints Operations Research 26 1978 444 449
-
(1978)
Operations Research
, vol.26
, pp. 444-449
-
-
Schrage, L.1
Baker, K.R.2
-
148
-
-
0021392913
-
The effect of incompletion cost on line balancing with multiple manning of work stations
-
A. Shtub The effect of incompletion cost on line balancing with multiple manning of work stations International Journal of Production Research 22 1984 235 245
-
(1984)
International Journal of Production Research
, vol.22
, pp. 235-245
-
-
Shtub, A.1
-
150
-
-
0022698734
-
A cost-based methodology for stochastic line balancing with intermittent line stoppages
-
F.N. Silverman, and J.C. Carter A cost-based methodology for stochastic line balancing with intermittent line stoppages Management Science 32 1986 455 463
-
(1986)
Management Science
, vol.32
, pp. 455-463
-
-
Silverman, F.N.1
Carter, J.C.2
-
151
-
-
0019610050
-
Analysis of a preference order assembly line problem
-
M. Sniedovich Analysis of a preference order assembly line problem Management Science 27 1981 1067 1080
-
(1981)
Management Science
, vol.27
, pp. 1067-1080
-
-
Sniedovich, M.1
-
152
-
-
25144442374
-
Stability analysis of optimal balance for assembly line with fixed cycle time
-
this issue doi:10.1016/j.ejor.2004.07.028
-
Sotskov, Y., Dolgui, A., Portmann, M.-C., this issue. Stability analysis of optimal balance for assembly line with fixed cycle time. European Journal of Operational Research. doi:10.1016/j.ejor.2004.07.028.
-
European Journal of Operational Research
-
-
Sotskov, Y.1
Dolgui, A.2
Portmann, M.-C.3
-
153
-
-
0032202723
-
Balancing JIT production units: The N U-line balancing problem
-
D. Sparling Balancing JIT production units: The N U-line balancing problem Information Systems and Operational Research 36 1998 215 237
-
(1998)
Information Systems and Operational Research
, vol.36
, pp. 215-237
-
-
Sparling, D.1
-
155
-
-
0016961319
-
Deterministic equivalents for stochastic assembly line balancing
-
G.P. Sphicas, and F.N. Silverman Deterministic equivalents for stochastic assembly line balancing AIIE Transactions 8 1976 280 282
-
(1976)
AIIE Transactions
, vol.8
, pp. 280-282
-
-
Sphicas, G.P.1
Silverman, F.N.2
-
157
-
-
0020816110
-
Reliability and optimization considerations in a conveyor-paced assembly line system
-
A. Suhail Reliability and optimization considerations in a conveyor-paced assembly line system International Journal of Production Research 21 1983 627 640
-
(1983)
International Journal of Production Research
, vol.21
, pp. 627-640
-
-
Suhail, A.1
-
158
-
-
30244535639
-
Evaluating mixed-model assembly line sequencing heuristics for just-in-time production systems
-
R.T. Sumichrast, and R.S. Russell Evaluating mixed-model assembly line sequencing heuristics for just-in-time production systems Journal of Operations Management 9 1990 371 390
-
(1990)
Journal of Operations Management
, vol.9
, pp. 371-390
-
-
Sumichrast, R.T.1
Russell, R.S.2
-
159
-
-
0026624344
-
A comparative analysis of sequencing procedures for mixedmodel assembly lines in a just-in-time production system
-
R.T. Sumichrast, R.S. Russell, and B.W. Taylor A comparative analysis of sequencing procedures for mixedmodel assembly lines in a just-in-time production system International Journal of Production Research 30 1992 199 214
-
(1992)
International Journal of Production Research
, vol.30
, pp. 199-214
-
-
Sumichrast, R.T.1
Russell, R.S.2
Taylor, B.W.3
-
162
-
-
0000566084
-
Mixed model line balancing with smoothed station assignments
-
N.T. Thomopoulos Mixed model line balancing with smoothed station assignments Management Science 16 1970 593 603
-
(1970)
Management Science
, vol.16
, pp. 593-603
-
-
Thomopoulos, N.T.1
-
165
-
-
25144472327
-
An optimal piecewise-linear optimization of the U-line balancing problem with stochastic task times
-
this issue doi:10.1016/j.ejor.2004.07.027
-
Urban, T.L., Chiang, W.-C., this issue. An optimal piecewise-linear optimization of the U-line balancing problem with stochastic task times. European Journal of Operational Research. doi:10.1016/j.ejor.2004.07.027.
-
European Journal of Operational Research
-
-
Urban, T.L.1
Chiang, W.-C.2
-
167
-
-
0037091985
-
A two-stage heuristic method for balancing mixed-model assembly lines with parallel workstations
-
P.M. Vilarinho, and A.S. Simaria A two-stage heuristic method for balancing mixed-model assembly lines with parallel workstations International Journal of Production Research 40 2002 1405 1420
-
(2002)
International Journal of Production Research
, vol.40
, pp. 1405-1420
-
-
Vilarinho, P.M.1
Simaria, A.S.2
-
168
-
-
25144521321
-
Comparative analyses of fixed and removable item mixed model assembly lines
-
F. Wang, and R.C. Wilson Comparative analyses of fixed and removable item mixed model assembly lines IIE Transactions 18 1986 313 317
-
(1986)
IIE Transactions
, vol.18
, pp. 313-317
-
-
Wang, F.1
Wilson, R.C.2
-
169
-
-
0020116655
-
Assembly line balancing as generalized bin packing
-
T.S. Wee, and M.J. Magazine Assembly line balancing as generalized bin packing Operations Research Letters 1/2 1982 56 58
-
(1982)
Operations Research Letters
, vol.1-2
, pp. 56-58
-
-
Wee, T.S.1
Magazine, M.J.2
-
170
-
-
0022441646
-
Formulation of a problem involving assembly lines with multiple manning of work stations
-
J.M. Wilson Formulation of a problem involving assembly lines with multiple manning of work stations International Journal of Production Research 24 1986 59 63
-
(1986)
International Journal of Production Research
, vol.24
, pp. 59-63
-
-
Wilson, J.M.1
-
171
-
-
0000544268
-
Survey, development, and application of algorithms for sequencing paced assembly lines
-
C.A. Yano, and A. Bolat Survey, development, and application of algorithms for sequencing paced assembly lines Journal of Manufacturing and Operations Management 2 1989 172 198
-
(1989)
Journal of Manufacturing and Operations Management
, vol.2
, pp. 172-198
-
-
Yano, C.A.1
Bolat, A.2
|