-
1
-
-
0022768294
-
A survey of exact algorithms for the simple assembly line balancing problem
-
I. Baybars, A survey of exact algorithms for the simple assembly line balancing problem, Manage Sci 32 (8) (1986), 909-932.
-
(1986)
Manage Sci
, vol.32
, Issue.8
, pp. 909-932
-
-
Baybars, I.1
-
2
-
-
0013054874
-
A dynamic programming approach to stochastic assembly line balancing
-
R.L. Carraway, A dynamic programming approach to stochastic assembly line balancing, Manage Sci 35 (4) (1989), 459-471.
-
(1989)
Manage Sci
, vol.35
, Issue.4
, pp. 459-471
-
-
Carraway, R.L.1
-
3
-
-
0023852896
-
Wang scores EPIC success with circuit board assembly redesign
-
January
-
K. Cross, Wang scores EPIC success with circuit board assembly redesign, Ind Eng (January 1988), 52-56.
-
(1988)
Ind Eng
, pp. 52-56
-
-
Cross, K.1
-
4
-
-
0024641634
-
A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems
-
S. Ghosh and R.J. Gagnon, A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems, Int J Prod Res 27 (4) (1989), 637-670.
-
(1989)
Int J Prod Res
, vol.27
, Issue.4
, pp. 637-670
-
-
Ghosh, S.1
Gagnon, R.J.2
-
5
-
-
17144432659
-
Material handling: Key to assembly at Allen-Bradley
-
December
-
J. Gryga, Material handling: Key to assembly at Allen-Bradley, Mater Handling Eng 50 (13) (December 1995), 34-38.
-
(1995)
Mater Handling Eng
, vol.50
, Issue.13
, pp. 34-38
-
-
Gryga, J.1
-
6
-
-
0001474336
-
An algorithm for the line balancing problem
-
A.L. Gutjahr and G.L. Nemhauser, An algorithm for the line balancing problem, Manage Sci 11 (2) (1964), 308-315.
-
(1964)
Manage Sci
, vol.11
, Issue.2
, pp. 308-315
-
-
Gutjahr, A.L.1
Nemhauser, G.L.2
-
7
-
-
0024765174
-
Fast, effective algorithms for simple assembly line balancing problems
-
S.T. Hackman, M.J. Magazine, and T.S. Wee, Fast, effective algorithms for simple assembly line balancing problems, Oper Res 37 (6) (1989), 916-924.
-
(1989)
Oper Res
, vol.37
, Issue.6
, pp. 916-924
-
-
Hackman, S.T.1
Magazine, M.J.2
Wee, T.S.3
-
8
-
-
0000313704
-
Assembly-line balancing-dynamic programming with precedence constraints
-
M. Held, R.M. Karp, and R. Shareshian, Assembly-line balancing-dynamic programming with precedence constraints, Oper Res 11 (1963), 442-459.
-
(1963)
Oper Res
, vol.11
, pp. 442-459
-
-
Held, M.1
Karp, R.M.2
Shareshian, R.3
-
9
-
-
0022910386
-
Extensions of the dynamic programming method in the deterministic and stochastic assembly-line balancing problems
-
M.I. Henig, Extensions of the dynamic programming method in the deterministic and stochastic assembly-line balancing problems, Comput Oper Res 14 (4) (1986), 443-449.
-
(1986)
Comput Oper Res
, vol.14
, Issue.4
, pp. 443-449
-
-
Henig, M.I.1
-
10
-
-
0026487247
-
Eureka: A hybrid system for assembly line balancing
-
T.R. Hoffmann, Eureka: A hybrid system for assembly line balancing, Manage Sci 38 (1) (1992), 39-47.
-
(1992)
Manage Sci
, vol.38
, Issue.1
, pp. 39-47
-
-
Hoffmann, T.R.1
-
11
-
-
0023963644
-
Optimally balancing large assembly lines with fable
-
R.V. Johnson, Optimally balancing large assembly lines with fable, Manage Sci 34 (1) (1988), 240-253.
-
(1988)
Manage Sci
, vol.34
, Issue.1
, pp. 240-253
-
-
Johnson, R.V.1
-
12
-
-
0016964033
-
A preference order dynamic program for stochastic assembly line balancing
-
E.P. Kao, A preference order dynamic program for stochastic assembly line balancing, Manage Sci 22 (10) (1976), 1097-1104.
-
(1976)
Manage Sci
, vol.22
, Issue.10
, pp. 1097-1104
-
-
Kao, E.P.1
-
13
-
-
0020103084
-
On dynamic programming for assembly line balancing
-
E.P. Kao and M. Queyranne, On dynamic programming for assembly line balancing, Oper Res 30 (2) (1982), 375-390.
-
(1982)
Oper Res
, vol.30
, Issue.2
, pp. 375-390
-
-
Kao, E.P.1
Queyranne, M.2
-
14
-
-
0023311310
-
A study of work-time distributions on unpaced tasks
-
March
-
K. Knott and R.J. Sury, A study of work-time distributions on unpaced tasks, IIE Trans 19 (March 1987), 50-55.
-
(1987)
IIE Trans
, vol.19
, pp. 50-55
-
-
Knott, K.1
Sury, R.J.2
-
16
-
-
0013055270
-
A single-run optimization algorithm for stochastic assembly line balancing problems
-
J.J. Lyu, A single-run optimization algorithm for stochastic assembly line balancing problems, J Manuf Syst 16 (3) (1997), 204-210.
-
(1997)
J Manuf Syst
, vol.16
, Issue.3
, pp. 204-210
-
-
Lyu, J.J.1
-
17
-
-
0015483845
-
Production line balances for mixed-model lines
-
J.L. Macaskill, Production line balances for mixed-model lines, Manage Sci 19 (4) (1972), 423-433.
-
(1972)
Manage Sci
, vol.19
, Issue.4
, pp. 423-433
-
-
Macaskill, J.L.1
-
18
-
-
0002134614
-
Balancing U-lines in a multiple U-line facility
-
J. Miltenburg, Balancing U-lines in a multiple U-line facility, Eur J Oper Res 109 (1) (1998), 1-23.
-
(1998)
Eur J Oper Res
, vol.109
, Issue.1
, pp. 1-23
-
-
Miltenburg, J.1
-
19
-
-
0035906303
-
U-shaped production lines: A review of theory and practice
-
J. Miltenburg, U-shaped production lines: A review of theory and practice, Int J Prod Econ 70 (2001), 201-214.
-
(2001)
Int J Prod Econ
, vol.70
, pp. 201-214
-
-
Miltenburg, J.1
-
20
-
-
0028531312
-
The U-line balancing problem
-
J. Miltenburg and J. Wijngaard, The U-line balancing problem, Manage Sci 40 (10) (1994), 1378-1388.
-
(1994)
Manage Sci
, vol.40
, Issue.10
, pp. 1378-1388
-
-
Miltenburg, J.1
Wijngaard, J.2
-
21
-
-
0003449926
-
-
Industrial Engineering Press, Institute of Industrial Engineers, Norcross, GA
-
Y. Monden, Toyota production system (2nd edition), Industrial Engineering Press, Institute of Industrial Engineers, Norcross, GA, 1993.
-
(1993)
Toyota Production System (2nd Edition)
-
-
Monden, Y.1
-
22
-
-
0001207094
-
Analysis and optimization of a U-shaped production line
-
K. Nakade and K. Ohno, Analysis and optimization of a U-shaped production line, J Oper Res Soc Jpn 40(1) (1997), 90-104.
-
(1997)
J Oper Res Soc Jpn
, vol.40
, Issue.1
, pp. 90-104
-
-
Nakade, K.1
Ohno, K.2
-
23
-
-
0031379431
-
Stochastic analysis of a U-shaped production line with multiple workers
-
K. Nakade and K. Ohno, Stochastic analysis of a U-shaped production line with multiple workers, Comput Ind Eng 33 (3) (1997), 809-812.
-
(1997)
Comput Ind Eng
, vol.33
, Issue.3
, pp. 809-812
-
-
Nakade, K.1
Ohno, K.2
-
24
-
-
0032624742
-
An optimal worker allocation problem for a U-shaped production line
-
K. Nakade and K. Ohno, An optimal worker allocation problem for a U-shaped production line, Int J Prod Econ 60 (1999), 353-358.
-
(1999)
Int J Prod Econ
, vol.60
, pp. 353-358
-
-
Nakade, K.1
Ohno, K.2
-
26
-
-
0000166629
-
The complexity of counting cuts and of computing the probability that a graph is connected
-
J.S. Provan and M.O. Ball, The complexity of counting cuts and of computing the probability that a graph is connected, SIAM J Comput 12 (1983), 777-788.
-
(1983)
SIAM J Comput
, vol.12
, pp. 777-788
-
-
Provan, J.S.1
Ball, M.O.2
-
27
-
-
0017972181
-
Dynamic programming solution of sequencing problems with precedence constraints
-
L. Schrage and K.R. Baker, Dynamic programming solution of sequencing problems with precedence constraints, Oper Res 26 (3) (1978), 444-449.
-
(1978)
Oper Res
, vol.26
, Issue.3
, pp. 444-449
-
-
Schrage, L.1
Baker, K.R.2
-
29
-
-
0004114132
-
-
Productivity Press, Portland, OR
-
K. Sekine, One-piece flow, Productivity Press, Portland, OR, 1992.
-
(1992)
One-Piece Flow
-
-
Sekine, K.1
-
30
-
-
0022698734
-
A cost-based methodology for stochastic line balancing with intermittent line stoppages
-
F.N. Silverman and J.C. Carter, A cost-based methodology for stochastic line balancing with intermittent line stoppages, Manage Sci 32 (4) (1986), 455-463.
-
(1986)
Manage Sci
, vol.32
, Issue.4
, pp. 455-463
-
-
Silverman, F.N.1
Carter, J.C.2
-
31
-
-
0019610050
-
Analysis of a preference order assembly line problem
-
M. Sniedovich, Analysis of a preference order assembly line problem, Manage Sci 27 (9) (1981), 1067-1080.
-
(1981)
Manage Sci
, vol.27
, Issue.9
, pp. 1067-1080
-
-
Sniedovich, M.1
-
32
-
-
0032202723
-
Balancing just-in-time production units: The N U-line balancing problem
-
D. Sparling, Balancing Just-in-Time production units: The N U-line balancing problem, INFOR 36 (4) (1998), 215-237.
-
(1998)
INFOR
, vol.36
, Issue.4
, pp. 215-237
-
-
Sparling, D.1
-
33
-
-
0022699406
-
A comparative evaluation of heuristic line balancing techniques
-
F. Talbot, J. Patterson, and W. Gehrlein, A comparative evaluation of heuristic line balancing techniques, Manage Sci 32 (4) (1986), 430-454.
-
(1986)
Manage Sci
, vol.32
, Issue.4
, pp. 430-454
-
-
Talbot, F.1
Patterson, J.2
Gehrlein, W.3
-
34
-
-
0000566084
-
Mixed model line balancing with smoothed station assignments
-
N.T. Thomopolous, Mixed model line balancing with smoothed station assignments, Manage Sci 16 (9) (1970), 593-603.
-
(1970)
Manage Sci
, vol.16
, Issue.9
, pp. 593-603
-
-
Thomopolous, N.T.1
-
35
-
-
0032070937
-
Note: Optimal balancing of U-shaped assembly lines
-
T. Urban, Note: Optimal balancing of U-shaped assembly lines, Manage Sci 44 (5) (1998), 738-741.
-
(1998)
Manage Sci
, vol.44
, Issue.5
, pp. 738-741
-
-
Urban, T.1
|