메뉴 건너뛰기




Volumn 50, Issue 1, 2003, Pages 31-57

The stochastic U-line balancing problem

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; ASSEMBLY; FABRICATION; JUST IN TIME PRODUCTION; PROBLEM SOLVING; QUALITY CONTROL; RECURSIVE FUNCTIONS; VISIBILITY;

EID: 0037316822     PISSN: 0894069X     EISSN: None     Source Type: Journal    
DOI: 10.1002/nav.10043     Document Type: Article
Times cited : (64)

References (35)
  • 1
    • 0022768294 scopus 로고
    • A survey of exact algorithms for the simple assembly line balancing problem
    • I. Baybars, A survey of exact algorithms for the simple assembly line balancing problem, Manage Sci 32 (8) (1986), 909-932.
    • (1986) Manage Sci , vol.32 , Issue.8 , pp. 909-932
    • Baybars, I.1
  • 2
    • 0013054874 scopus 로고
    • A dynamic programming approach to stochastic assembly line balancing
    • R.L. Carraway, A dynamic programming approach to stochastic assembly line balancing, Manage Sci 35 (4) (1989), 459-471.
    • (1989) Manage Sci , vol.35 , Issue.4 , pp. 459-471
    • Carraway, R.L.1
  • 3
    • 0023852896 scopus 로고
    • Wang scores EPIC success with circuit board assembly redesign
    • January
    • K. Cross, Wang scores EPIC success with circuit board assembly redesign, Ind Eng (January 1988), 52-56.
    • (1988) Ind Eng , pp. 52-56
    • Cross, K.1
  • 4
    • 0024641634 scopus 로고
    • A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems
    • S. Ghosh and R.J. Gagnon, A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems, Int J Prod Res 27 (4) (1989), 637-670.
    • (1989) Int J Prod Res , vol.27 , Issue.4 , pp. 637-670
    • Ghosh, S.1    Gagnon, R.J.2
  • 5
    • 17144432659 scopus 로고
    • Material handling: Key to assembly at Allen-Bradley
    • December
    • J. Gryga, Material handling: Key to assembly at Allen-Bradley, Mater Handling Eng 50 (13) (December 1995), 34-38.
    • (1995) Mater Handling Eng , vol.50 , Issue.13 , pp. 34-38
    • Gryga, J.1
  • 6
    • 0001474336 scopus 로고
    • An algorithm for the line balancing problem
    • A.L. Gutjahr and G.L. Nemhauser, An algorithm for the line balancing problem, Manage Sci 11 (2) (1964), 308-315.
    • (1964) Manage Sci , vol.11 , Issue.2 , pp. 308-315
    • Gutjahr, A.L.1    Nemhauser, G.L.2
  • 7
    • 0024765174 scopus 로고
    • Fast, effective algorithms for simple assembly line balancing problems
    • S.T. Hackman, M.J. Magazine, and T.S. Wee, Fast, effective algorithms for simple assembly line balancing problems, Oper Res 37 (6) (1989), 916-924.
    • (1989) Oper Res , vol.37 , Issue.6 , pp. 916-924
    • Hackman, S.T.1    Magazine, M.J.2    Wee, T.S.3
  • 8
    • 0000313704 scopus 로고
    • Assembly-line balancing-dynamic programming with precedence constraints
    • M. Held, R.M. Karp, and R. Shareshian, Assembly-line balancing-dynamic programming with precedence constraints, Oper Res 11 (1963), 442-459.
    • (1963) Oper Res , vol.11 , pp. 442-459
    • Held, M.1    Karp, R.M.2    Shareshian, R.3
  • 9
    • 0022910386 scopus 로고
    • Extensions of the dynamic programming method in the deterministic and stochastic assembly-line balancing problems
    • M.I. Henig, Extensions of the dynamic programming method in the deterministic and stochastic assembly-line balancing problems, Comput Oper Res 14 (4) (1986), 443-449.
    • (1986) Comput Oper Res , vol.14 , Issue.4 , pp. 443-449
    • Henig, M.I.1
  • 10
    • 0026487247 scopus 로고
    • Eureka: A hybrid system for assembly line balancing
    • T.R. Hoffmann, Eureka: A hybrid system for assembly line balancing, Manage Sci 38 (1) (1992), 39-47.
    • (1992) Manage Sci , vol.38 , Issue.1 , pp. 39-47
    • Hoffmann, T.R.1
  • 11
    • 0023963644 scopus 로고
    • Optimally balancing large assembly lines with fable
    • R.V. Johnson, Optimally balancing large assembly lines with fable, Manage Sci 34 (1) (1988), 240-253.
    • (1988) Manage Sci , vol.34 , Issue.1 , pp. 240-253
    • Johnson, R.V.1
  • 12
    • 0016964033 scopus 로고
    • A preference order dynamic program for stochastic assembly line balancing
    • E.P. Kao, A preference order dynamic program for stochastic assembly line balancing, Manage Sci 22 (10) (1976), 1097-1104.
    • (1976) Manage Sci , vol.22 , Issue.10 , pp. 1097-1104
    • Kao, E.P.1
  • 13
    • 0020103084 scopus 로고
    • On dynamic programming for assembly line balancing
    • E.P. Kao and M. Queyranne, On dynamic programming for assembly line balancing, Oper Res 30 (2) (1982), 375-390.
    • (1982) Oper Res , vol.30 , Issue.2 , pp. 375-390
    • Kao, E.P.1    Queyranne, M.2
  • 14
    • 0023311310 scopus 로고
    • A study of work-time distributions on unpaced tasks
    • March
    • K. Knott and R.J. Sury, A study of work-time distributions on unpaced tasks, IIE Trans 19 (March 1987), 50-55.
    • (1987) IIE Trans , vol.19 , pp. 50-55
    • Knott, K.1    Sury, R.J.2
  • 16
    • 0013055270 scopus 로고    scopus 로고
    • A single-run optimization algorithm for stochastic assembly line balancing problems
    • J.J. Lyu, A single-run optimization algorithm for stochastic assembly line balancing problems, J Manuf Syst 16 (3) (1997), 204-210.
    • (1997) J Manuf Syst , vol.16 , Issue.3 , pp. 204-210
    • Lyu, J.J.1
  • 17
    • 0015483845 scopus 로고
    • Production line balances for mixed-model lines
    • J.L. Macaskill, Production line balances for mixed-model lines, Manage Sci 19 (4) (1972), 423-433.
    • (1972) Manage Sci , vol.19 , Issue.4 , pp. 423-433
    • Macaskill, J.L.1
  • 18
    • 0002134614 scopus 로고    scopus 로고
    • Balancing U-lines in a multiple U-line facility
    • J. Miltenburg, Balancing U-lines in a multiple U-line facility, Eur J Oper Res 109 (1) (1998), 1-23.
    • (1998) Eur J Oper Res , vol.109 , Issue.1 , pp. 1-23
    • Miltenburg, J.1
  • 19
    • 0035906303 scopus 로고    scopus 로고
    • U-shaped production lines: A review of theory and practice
    • J. Miltenburg, U-shaped production lines: A review of theory and practice, Int J Prod Econ 70 (2001), 201-214.
    • (2001) Int J Prod Econ , vol.70 , pp. 201-214
    • Miltenburg, J.1
  • 20
    • 0028531312 scopus 로고
    • The U-line balancing problem
    • J. Miltenburg and J. Wijngaard, The U-line balancing problem, Manage Sci 40 (10) (1994), 1378-1388.
    • (1994) Manage Sci , vol.40 , Issue.10 , pp. 1378-1388
    • Miltenburg, J.1    Wijngaard, J.2
  • 21
    • 0003449926 scopus 로고
    • Industrial Engineering Press, Institute of Industrial Engineers, Norcross, GA
    • Y. Monden, Toyota production system (2nd edition), Industrial Engineering Press, Institute of Industrial Engineers, Norcross, GA, 1993.
    • (1993) Toyota Production System (2nd Edition)
    • Monden, Y.1
  • 22
    • 0001207094 scopus 로고    scopus 로고
    • Analysis and optimization of a U-shaped production line
    • K. Nakade and K. Ohno, Analysis and optimization of a U-shaped production line, J Oper Res Soc Jpn 40(1) (1997), 90-104.
    • (1997) J Oper Res Soc Jpn , vol.40 , Issue.1 , pp. 90-104
    • Nakade, K.1    Ohno, K.2
  • 23
    • 0031379431 scopus 로고    scopus 로고
    • Stochastic analysis of a U-shaped production line with multiple workers
    • K. Nakade and K. Ohno, Stochastic analysis of a U-shaped production line with multiple workers, Comput Ind Eng 33 (3) (1997), 809-812.
    • (1997) Comput Ind Eng , vol.33 , Issue.3 , pp. 809-812
    • Nakade, K.1    Ohno, K.2
  • 24
    • 0032624742 scopus 로고    scopus 로고
    • An optimal worker allocation problem for a U-shaped production line
    • K. Nakade and K. Ohno, An optimal worker allocation problem for a U-shaped production line, Int J Prod Econ 60 (1999), 353-358.
    • (1999) Int J Prod Econ , vol.60 , pp. 353-358
    • Nakade, K.1    Ohno, K.2
  • 26
    • 0000166629 scopus 로고
    • The complexity of counting cuts and of computing the probability that a graph is connected
    • J.S. Provan and M.O. Ball, The complexity of counting cuts and of computing the probability that a graph is connected, SIAM J Comput 12 (1983), 777-788.
    • (1983) SIAM J Comput , vol.12 , pp. 777-788
    • Provan, J.S.1    Ball, M.O.2
  • 27
    • 0017972181 scopus 로고
    • Dynamic programming solution of sequencing problems with precedence constraints
    • L. Schrage and K.R. Baker, Dynamic programming solution of sequencing problems with precedence constraints, Oper Res 26 (3) (1978), 444-449.
    • (1978) Oper Res , vol.26 , Issue.3 , pp. 444-449
    • Schrage, L.1    Baker, K.R.2
  • 29
    • 0004114132 scopus 로고
    • Productivity Press, Portland, OR
    • K. Sekine, One-piece flow, Productivity Press, Portland, OR, 1992.
    • (1992) One-Piece Flow
    • Sekine, K.1
  • 30
    • 0022698734 scopus 로고
    • A cost-based methodology for stochastic line balancing with intermittent line stoppages
    • F.N. Silverman and J.C. Carter, A cost-based methodology for stochastic line balancing with intermittent line stoppages, Manage Sci 32 (4) (1986), 455-463.
    • (1986) Manage Sci , vol.32 , Issue.4 , pp. 455-463
    • Silverman, F.N.1    Carter, J.C.2
  • 31
    • 0019610050 scopus 로고
    • Analysis of a preference order assembly line problem
    • M. Sniedovich, Analysis of a preference order assembly line problem, Manage Sci 27 (9) (1981), 1067-1080.
    • (1981) Manage Sci , vol.27 , Issue.9 , pp. 1067-1080
    • Sniedovich, M.1
  • 32
    • 0032202723 scopus 로고    scopus 로고
    • Balancing just-in-time production units: The N U-line balancing problem
    • D. Sparling, Balancing Just-in-Time production units: The N U-line balancing problem, INFOR 36 (4) (1998), 215-237.
    • (1998) INFOR , vol.36 , Issue.4 , pp. 215-237
    • Sparling, D.1
  • 33
    • 0022699406 scopus 로고
    • A comparative evaluation of heuristic line balancing techniques
    • F. Talbot, J. Patterson, and W. Gehrlein, A comparative evaluation of heuristic line balancing techniques, Manage Sci 32 (4) (1986), 430-454.
    • (1986) Manage Sci , vol.32 , Issue.4 , pp. 430-454
    • Talbot, F.1    Patterson, J.2    Gehrlein, W.3
  • 34
    • 0000566084 scopus 로고
    • Mixed model line balancing with smoothed station assignments
    • N.T. Thomopolous, Mixed model line balancing with smoothed station assignments, Manage Sci 16 (9) (1970), 593-603.
    • (1970) Manage Sci , vol.16 , Issue.9 , pp. 593-603
    • Thomopolous, N.T.1
  • 35
    • 0032070937 scopus 로고    scopus 로고
    • Note: Optimal balancing of U-shaped assembly lines
    • T. Urban, Note: Optimal balancing of U-shaped assembly lines, Manage Sci 44 (5) (1998), 738-741.
    • (1998) Manage Sci , vol.44 , Issue.5 , pp. 738-741
    • Urban, T.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.