메뉴 건너뛰기




Volumn 175, Issue 3, 2006, Pages 1767-1781

The stochastic U-line balancing problem: A heuristic procedure

Author keywords

Facilities planning and design; Heuristics; Line balancing

Indexed keywords

ALGORITHMS; COMPUTATIONAL COMPLEXITY; HEURISTIC METHODS; MATHEMATICAL MODELS; NUMERICAL ANALYSIS; PROBLEM SOLVING; RANDOM PROCESSES;

EID: 33748934553     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2004.10.031     Document Type: Article
Times cited : (77)

References (42)
  • 2
    • 0031673732 scopus 로고    scopus 로고
    • Ajenblit, D.A., Wainwright, R.L., 1998. Applying genetic algorithms to the U-shaped assembly line problem. In: Proceedings of the 1998 IEEE International Conference on Evolutionary Computation, Anchorage, AK, pp. 96-101.
  • 3
    • 0031270224 scopus 로고    scopus 로고
    • A parallel station heuristic for the mixed-model production line balancing problem
    • Askin R.G., and Zhou M. A parallel station heuristic for the mixed-model production line balancing problem. International Journal of Production Research 35 11 (1997) 3095-3105
    • (1997) International Journal of Production Research , vol.35 , Issue.11 , pp. 3095-3105
    • Askin, R.G.1    Zhou, M.2
  • 5
    • 0035460936 scopus 로고    scopus 로고
    • Performance of bucket brigades when work is stochastic
    • Bartholdi J.J., Eisenstein D.D., and Foley R.D. Performance of bucket brigades when work is stochastic. Operations Research 49 5 (2001) 710-719
    • (2001) Operations Research , vol.49 , Issue.5 , pp. 710-719
    • Bartholdi, J.J.1    Eisenstein, D.D.2    Foley, R.D.3
  • 6
    • 0022768294 scopus 로고
    • A survey of exact algorithms for the simple assembly line balancing problem
    • Baybars I. A survey of exact algorithms for the simple assembly line balancing problem. Management Science 32 8 (1986) 909-932
    • (1986) Management Science , vol.32 , Issue.8 , pp. 909-932
    • Baybars, I.1
  • 7
    • 25144450992 scopus 로고    scopus 로고
    • A survey on problems and methods in generalized assembly line balancing
    • Becker C., and Scholl A. A survey on problems and methods in generalized assembly line balancing. European Journal of Operational Research 168 3 (2006) 32-53
    • (2006) European Journal of Operational Research , vol.168 , Issue.3 , pp. 32-53
    • Becker, C.1    Scholl, A.2
  • 9
    • 0013054874 scopus 로고
    • A dynamic programming approach to stochastic assembly line balancing
    • Carraway R.L. A dynamic programming approach to stochastic assembly line balancing. Management Science 35 4 (1989) 459-470
    • (1989) Management Science , vol.35 , Issue.4 , pp. 459-470
    • Carraway, R.L.1
  • 10
    • 0347711882 scopus 로고    scopus 로고
    • A comparison of U-line and straight-line performances under stochastic task times
    • Chand S., and Zeng T. A comparison of U-line and straight-line performances under stochastic task times. Manufacturing and Service Operations Management 3 2 (2001) 138-150
    • (2001) Manufacturing and Service Operations Management , vol.3 , Issue.2 , pp. 138-150
    • Chand, S.1    Zeng, T.2
  • 11
    • 0032361515 scopus 로고    scopus 로고
    • The application of a tabu search metaheuristic to the assembly line balancing problem
    • Chiang W.-C. The application of a tabu search metaheuristic to the assembly line balancing problem. Annals of Operations Research 77 (1998) 209-227
    • (1998) Annals of Operations Research , vol.77 , pp. 209-227
    • Chiang, W.-C.1
  • 12
    • 0033751802 scopus 로고    scopus 로고
    • A worker-based approach for modeling variability in task completion times
    • Doerr K.H., and Arreola-Risa A. A worker-based approach for modeling variability in task completion times. IIE Transactions 32 7 (2000) 625-636
    • (2000) IIE Transactions , vol.32 , Issue.7 , pp. 625-636
    • Doerr, K.H.1    Arreola-Risa, A.2
  • 13
    • 0033886239 scopus 로고    scopus 로고
    • Synchronous unpaced flow lines with worker differences and overtime cost
    • Doerr K.H., Klastorin T.D., and Magazine M.J. Synchronous unpaced flow lines with worker differences and overtime cost. Management Science 46 3 (2000) 421-435
    • (2000) Management Science , vol.46 , Issue.3 , pp. 421-435
    • Doerr, K.H.1    Klastorin, T.D.2    Magazine, M.J.3
  • 15
  • 18
    • 6544245177 scopus 로고    scopus 로고
    • A study of the effect of time variations for assembly line balancing in the clothing industry
    • Hui C.L.P., and Ng S.F.F. A study of the effect of time variations for assembly line balancing in the clothing industry. International Journal of Clothing Science and Technology 11 4 (1999) 181-188
    • (1999) International Journal of Clothing Science and Technology , vol.11 , Issue.4 , pp. 181-188
    • Hui, C.L.P.1    Ng, S.F.F.2
  • 19
    • 0000804223 scopus 로고
    • A computing procedure for a line balancing problem
    • Jackson J.R. A computing procedure for a line balancing problem. Management Science 2 3 (1956) 261-272
    • (1956) Management Science , vol.2 , Issue.3 , pp. 261-272
    • Jackson, J.R.1
  • 20
    • 0003037529 scopus 로고
    • Reducibility among combinatorial problems
    • Miller R.E., and Thatcher J.W. (Eds), Plenum Press, New York
    • Karp R.M. Reducibility among combinatorial problems. In: Miller R.E., and Thatcher J.W. (Eds). Complexity of Computer Computations (1972), Plenum Press, New York 85-103
    • (1972) Complexity of Computer Computations , pp. 85-103
    • Karp, R.M.1
  • 21
    • 0742323768 scopus 로고    scopus 로고
    • Reconfiguring a remanufacturing line at Visteon, Mexico
    • Kekre S., Rao U.S., Swaminathan J.M., and Zhang J. Reconfiguring a remanufacturing line at Visteon, Mexico. Interfaces 33 6 (2003) 30-43
    • (2003) Interfaces , vol.33 , Issue.6 , pp. 30-43
    • Kekre, S.1    Rao, U.S.2    Swaminathan, J.M.3    Zhang, J.4
  • 22
    • 0015639656 scopus 로고
    • A cost-oriented approach to stochastic line balancing
    • Kottas J.F., and Lau H.-S. A cost-oriented approach to stochastic line balancing. AIIE Transactions 5 2 (1973) 164-171
    • (1973) AIIE Transactions , vol.5 , Issue.2 , pp. 164-171
    • Kottas, J.F.1    Lau, H.-S.2
  • 23
    • 84990609518 scopus 로고
    • Assembly line balancing using genetic algorithms with heuristic-generated initial populations and multiple evaluation criteria
    • Leu Y.-Y., Matheson L.A., and Rees L.P. Assembly line balancing using genetic algorithms with heuristic-generated initial populations and multiple evaluation criteria. Decision Sciences 25 4 (1994) 581-606
    • (1994) Decision Sciences , vol.25 , Issue.4 , pp. 581-606
    • Leu, Y.-Y.1    Matheson, L.A.2    Rees, L.P.3
  • 24
    • 0031232825 scopus 로고    scopus 로고
    • A heuristic for solving mixed-model line balancing problems with stochastic task durations and parallel stations
    • McMullen P.R., and Frazier G.V. A heuristic for solving mixed-model line balancing problems with stochastic task durations and parallel stations. International Journal of Production Economics 51 3 (1997) 177-190
    • (1997) International Journal of Production Economics , vol.51 , Issue.3 , pp. 177-190
    • McMullen, P.R.1    Frazier, G.V.2
  • 25
    • 0032188659 scopus 로고    scopus 로고
    • Using simulated annealing to solve a multiobjective assembly line balancing problem with parallel workstations
    • McMullen P.R., and Frazier G.V. Using simulated annealing to solve a multiobjective assembly line balancing problem with parallel workstations. International Journal of Production Research 36 10 (1998) 2717-2741
    • (1998) International Journal of Production Research , vol.36 , Issue.10 , pp. 2717-2741
    • McMullen, P.R.1    Frazier, G.V.2
  • 26
    • 0028531312 scopus 로고
    • The U-line line balancing problem
    • Miltenburg G.J., and Wijngaard J. The U-line line balancing problem. Management Science 40 10 (1994) 1378-1388
    • (1994) Management Science , vol.40 , Issue.10 , pp. 1378-1388
    • Miltenburg, G.J.1    Wijngaard, J.2
  • 27
    • 0003449926 scopus 로고
    • Industrial Engineering and Management Press, Norcross, GA
    • Monden Y. Toyota Production System (1983), Industrial Engineering and Management Press, Norcross, GA
    • (1983) Toyota Production System
    • Monden, Y.1
  • 28
    • 0002569892 scopus 로고
    • A heuristic method of assembly line balancing for assumptions of constant or variable work element times
    • Moodie C.L., and Young H.H. A heuristic method of assembly line balancing for assumptions of constant or variable work element times. Journal of Industrial Engineering 16 1 (1965) 23-29
    • (1965) Journal of Industrial Engineering , vol.16 , Issue.1 , pp. 23-29
    • Moodie, C.L.1    Young, H.H.2
  • 30
    • 0014725357 scopus 로고
    • Assembly line balancing with variable element times
    • Ramsing K., and Downing R. Assembly line balancing with variable element times. Industrial Engineering 2 1 (1970) 41-43
    • (1970) Industrial Engineering , vol.2 , Issue.1 , pp. 41-43
    • Ramsing, K.1    Downing, R.2
  • 31
    • 0015660893 scopus 로고
    • Balancing stochastic assembly lines
    • Reeve N.R., and Thomas W.H. Balancing stochastic assembly lines. AIIE Transactions 5 3 (1973) 223-229
    • (1973) AIIE Transactions , vol.5 , Issue.3 , pp. 223-229
    • Reeve, N.R.1    Thomas, W.H.2
  • 33
    • 0018672309 scopus 로고
    • Assembly line balancing and the application of computer techniques
    • Schofield N.A. Assembly line balancing and the application of computer techniques. Computers and Industrial Engineering 3 1 (1979) 53-69
    • (1979) Computers and Industrial Engineering , vol.3 , Issue.1 , pp. 53-69
    • Schofield, N.A.1
  • 35
    • 0004114132 scopus 로고
    • Productivity Press, Portland, OR
    • Sekine K. One-Piece Flow (1992), Productivity Press, Portland, OR
    • (1992) One-Piece Flow
    • Sekine, K.1
  • 36
    • 0022698734 scopus 로고
    • A cost-based methodology for stochastic line balancing with intermittent line stoppages
    • Silverman F.N., and Carter J.C. A cost-based methodology for stochastic line balancing with intermittent line stoppages. Management Science 32 4 (1986) 455-463
    • (1986) Management Science , vol.32 , Issue.4 , pp. 455-463
    • Silverman, F.N.1    Carter, J.C.2
  • 37
    • 0000423498 scopus 로고
    • Stochastic assembly line balancing using simulated annealing
    • Suresh G., and Sahu S. Stochastic assembly line balancing using simulated annealing. International Journal of Production Research 32 8 (1994) 1801-1810
    • (1994) International Journal of Production Research , vol.32 , Issue.8 , pp. 1801-1810
    • Suresh, G.1    Sahu, S.2
  • 38
    • 0022699406 scopus 로고
    • A comparative evaluation of heuristic line balancing techniques
    • Talbot F.B., Patterson J.H., and Gehrlein W.V. A comparative evaluation of heuristic line balancing techniques. Management Science 32 4 (1986) 430-454
    • (1986) Management Science , vol.32 , Issue.4 , pp. 430-454
    • Talbot, F.B.1    Patterson, J.H.2    Gehrlein, W.V.3
  • 39
    • 0032070937 scopus 로고    scopus 로고
    • Optimal balancing of U-shaped assembly lines
    • Urban T.L. Optimal balancing of U-shaped assembly lines. Management Science 44 5 (1998) 738-741
    • (1998) Management Science , vol.44 , Issue.5 , pp. 738-741
    • Urban, T.L.1
  • 40
    • 25144472327 scopus 로고    scopus 로고
    • An optimal piecewise-linear program for the U-line balancing problem with stochastic task times
    • Urban T.L., and Chiang W.-C. An optimal piecewise-linear program for the U-line balancing problem with stochastic task times. European Journal of Operational Research 168 3 (2006) 109-120
    • (2006) European Journal of Operational Research , vol.168 , Issue.3 , pp. 109-120
    • Urban, T.L.1    Chiang, W.-C.2
  • 41
    • 0037091985 scopus 로고    scopus 로고
    • A two-stage heuristic method for balancing mixed-model assembly lines with parallel workstations
    • Vilarinho P.M., and Simaria A.S. A two-stage heuristic method for balancing mixed-model assembly lines with parallel workstations. International Journal of Production Research 40 6 (2002) 1405-1420
    • (2002) International Journal of Production Research , vol.40 , Issue.6 , pp. 1405-1420
    • Vilarinho, P.M.1    Simaria, A.S.2
  • 42
    • 0023108688 scopus 로고
    • On the normality of operation times in small-lot assembly systems: A technical note
    • Wilhelm W.E. On the normality of operation times in small-lot assembly systems: A technical note. International Journal of Production Research 25 1 (1987) 145-149
    • (1987) International Journal of Production Research , vol.25 , Issue.1 , pp. 145-149
    • Wilhelm, W.E.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.