메뉴 건너뛰기




Volumn 180, Issue 3, 2007, Pages 1098-1115

A chance-constrained approach to stochastic line balancing problem

Author keywords

Production; U line balancing

Indexed keywords

COMPUTATIONAL METHODS; CONSTRAINT THEORY; INTEGER PROGRAMMING; MATHEMATICAL MODELS; PROBLEM SOLVING;

EID: 33847014539     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2006.04.042     Document Type: Article
Times cited : (99)

References (25)
  • 1
    • 0022768294 scopus 로고
    • A survey of exact algorithms for the simple assembly line balancing problem
    • Baybars I. A survey of exact algorithms for the simple assembly line balancing problem. Management Science 32 (1986) 909-932
    • (1986) Management Science , vol.32 , pp. 909-932
    • Baybars, I.1
  • 2
    • 0024641634 scopus 로고
    • A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems
    • Ghosh S., and Gagnon J. A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems. International Journal of Production Research 27 (1989) 637-670
    • (1989) International Journal of Production Research , vol.27 , pp. 637-670
    • Ghosh, S.1    Gagnon, J.2
  • 3
    • 0032117097 scopus 로고    scopus 로고
    • A survey of the assembly line balancing procedures
    • Erel E., and Sarin S.C. A survey of the assembly line balancing procedures. Production Planning and Control 9 (1998) 414-434
    • (1998) Production Planning and Control , vol.9 , pp. 414-434
    • Erel, E.1    Sarin, S.C.2
  • 6
    • 0032070937 scopus 로고    scopus 로고
    • Note: Optimal balancing of U-shaped assembly lines
    • Urban T.L. Note: Optimal balancing of U-shaped assembly lines. Management Science 44 (1998) 738-741
    • (1998) Management Science , vol.44 , pp. 738-741
    • Urban, T.L.1
  • 8
    • 0031272027 scopus 로고    scopus 로고
    • Bounds and approximations for cycle times of a U-shaped production line
    • Ohno K., Nakade K., and Shantikumar J.G. Bounds and approximations for cycle times of a U-shaped production line. Operations Research Letters 21 (1997) 191-200
    • (1997) Operations Research Letters , vol.21 , pp. 191-200
    • Ohno, K.1    Nakade, K.2    Shantikumar, J.G.3
  • 12
    • 0002569892 scopus 로고
    • A heuristic method of assembly line balancing for assumptions of constant or variable work element times
    • Moodie C.L., and Young H.H. A heuristic method of assembly line balancing for assumptions of constant or variable work element times. Journal of Industrial Engineering 16 (1965) 23-29
    • (1965) Journal of Industrial Engineering , vol.16 , pp. 23-29
    • Moodie, C.L.1    Young, H.H.2
  • 13
    • 0015639656 scopus 로고
    • A cost oriented approach to stochastic line balancing
    • Kottas J.F., and Lau H.S. A cost oriented approach to stochastic line balancing. AIIE Transactions 5 (1973) 164-171
    • (1973) AIIE Transactions , vol.5 , pp. 164-171
    • Kottas, J.F.1    Lau, H.S.2
  • 14
    • 0016962322 scopus 로고
    • A total operating cost model for paced lines with stochastic task times
    • Kottas J.F., and Lau H.S. A total operating cost model for paced lines with stochastic task times. AIIE Transactions 8 (1976) 234-240
    • (1976) AIIE Transactions , vol.8 , pp. 234-240
    • Kottas, J.F.1    Lau, H.S.2
  • 16
    • 0000423498 scopus 로고
    • Stochastic assembly line balancing using simulated annealing
    • Suresh G., and Sahu S. Stochastic assembly line balancing using simulated annealing. International Journal of Production Research 32 (1994) 1801-1810
    • (1994) International Journal of Production Research , vol.32 , pp. 1801-1810
    • Suresh, G.1    Sahu, S.2
  • 17
    • 0025603598 scopus 로고
    • An efficient heuristic for solving stochastic assembly line balancing problems
    • Shin D. An efficient heuristic for solving stochastic assembly line balancing problems. Computers and Industrial Engineering 18 (1990) 285-295
    • (1990) Computers and Industrial Engineering , vol.18 , pp. 285-295
    • Shin, D.1
  • 18
    • 0023586184 scopus 로고
    • An exploratory study on stopping a paced line when incompletions occur
    • Lau H., and Shtub A. An exploratory study on stopping a paced line when incompletions occur. IIE Transactions 19 (1987) 463-467
    • (1987) IIE Transactions , vol.19 , pp. 463-467
    • Lau, H.1    Shtub, A.2
  • 22
    • 0002431201 scopus 로고
    • Deterministic equivalents for optimizing and satisficing under chance constraints
    • Charnes A., and Cooper W.W. Deterministic equivalents for optimizing and satisficing under chance constraints. Operations Research 11 (1963) 18-39
    • (1963) Operations Research , vol.11 , pp. 18-39
    • Charnes, A.1    Cooper, W.W.2
  • 23
    • 25144472327 scopus 로고    scopus 로고
    • An optimal piece-wise linear program for the U-line balancing problem with stochastic task times
    • Urban T.L., and Chiang W. An optimal piece-wise linear program for the U-line balancing problem with stochastic task times. European Journal of Operational Research 168 (2006) 771-782
    • (2006) European Journal of Operational Research , vol.168 , pp. 771-782
    • Urban, T.L.1    Chiang, W.2
  • 24
    • 0000804223 scopus 로고
    • A computing procedure for a line balancing problem
    • Jackson J.R. A computing procedure for a line balancing problem. Management Science 2 (1956) 261-272
    • (1956) Management Science , vol.2 , pp. 261-272
    • Jackson, J.R.1
  • 25
    • 28244475042 scopus 로고    scopus 로고
    • A goal programming approach to simple U-line balancing problem
    • Gokcen H., and Agpak K. A goal programming approach to simple U-line balancing problem. European Journal of Operational Research 171 (2006) 577-585
    • (2006) European Journal of Operational Research , vol.171 , pp. 577-585
    • Gokcen, H.1    Agpak, K.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.