메뉴 건너뛰기




Volumn 52, Issue 8, 2014, Pages 2388-2421

Developing approximate algorithms for EPQ problem with process compressibility and random error in production/inspection

Author keywords

Approximate algorithm; Imperfect production; Inspection; Process compressibility; Rework

Indexed keywords

APPROXIMATION ALGORITHMS; INSPECTION; POLYNOMIAL APPROXIMATION;

EID: 84896393103     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2013.866286     Document Type: Article
Times cited : (29)

References (107)
  • 2
    • 62949125040 scopus 로고    scopus 로고
    • Gem: A novel evolutionary optimization method with improved neighborhood search
    • Ahrari, A., M. Shariat-Panahi, and A. A. Atai. 2009. "GEM: A Novel Evolutionary Optimization Method with Improved Neighborhood Search." Applied Mathematics and Computation 210: 376-386
    • (2009) Applied Mathematics and Computation , vol.210 , pp. 376-386
    • Ahrari, A.1    Shariat-Panahi, M.2    Atai, A.A.3
  • 3
    • 84875747214 scopus 로고    scopus 로고
    • Integrated production planning and order acceptance under uncertainty: A robust optimization approach
    • doi:http://dx.doi.org/10.1016/j.ejor.2013.02.010
    • Aouam, T., and N. Brahimi. 2013. "Integrated Production Planning and Order Acceptance under Uncertainty: A Robust Optimization Approach." European Journal of Operational Research. doi:http://dx.doi.org/10.1016/j.ejor. 2013.02.010
    • (2013) European Journal of Operational Research
    • Aouam, T.1    Brahimi, N.2
  • 4
    • 84868553213 scopus 로고    scopus 로고
    • Joint optimisation of maintenance and production policies considering random demand and variable production rate
    • Ayed, S., D. Sofiene, and R. Nidhal. 2012. "Joint Optimisation of Maintenance and Production Policies Considering Random Demand and Variable Production Rate." International Journal of Production Research 50: 6870-6885
    • (2012) International Journal of Production Research , vol.50 , pp. 6870-6885
    • Ayed, S.1    Sofiene, D.2    Nidhal, R.3
  • 6
    • 0242333836 scopus 로고    scopus 로고
    • Optimal lot-sizing, quality improvement and inspection errors for multistage production systems
    • Ben-Daya, M., and A. Rahim. 2003. "Optimal Lot-sizing, Quality Improvement and Inspection Errors for Multistage Production Systems." International Journal of Production Research 41: 65-79
    • (2003) International Journal of Production Research , vol.41 , pp. 65-79
    • Ben-Daya, M.1    Rahim, A.2
  • 7
    • 84902662242 scopus 로고    scopus 로고
    • Joint production and quality control of unreliable batch manufacturing systems with rectifying inspection
    • doi:http://dx.doi.org/10.1080/00207543.2012.746481
    • Bouslah, B., A. Gharbi, and R. Pellerin. 2012. "Joint Production and Quality Control of Unreliable Batch Manufacturing Systems with Rectifying Inspection." International Journal of Production Research. doi:http://dx.doi.org/10.1080/00207543.2012.746481
    • (2012) International Journal of Production Research
    • Bouslah, B.1    Gharbi, A.2    Pellerin, R.3
  • 10
    • 69749123862 scopus 로고    scopus 로고
    • Observation on: Economic production quantity model for items with imperfect quality'
    • Cárdenas-Barrón, L. E. 2000. "Observation on: 'Economic Production Quantity Model for Items with Imperfect Quality'." International Journal of Production Economics 67: 201
    • (2000) International Journal of Production Economics , vol.67 , pp. 201
    • Cárdenas-Barrón, L.E.1
  • 11
    • 34447260758 scopus 로고    scopus 로고
    • On optimal manufacturing batch size with rework process at single-stage production system
    • Cárdenas-Barrón, L. E. 2007. "On Optimal Manufacturing Batch Size with Rework Process at Single-stage Production System." Computers & Industrial Engineering 53: 196-198
    • (2007) Computers & Industrial Engineering , vol.53 , pp. 196-198
    • Cárdenas-Barrón, L.E.1
  • 12
    • 55649099841 scopus 로고    scopus 로고
    • Optimal manufacturing batch size with rework in a single-stage production system-A simple derivation
    • Cárdenas-Barrón, L. E. 2008. "Optimal Manufacturing Batch Size with Rework in a Single-Stage Production System-A Simple Derivation." Computers & Industrial Engineering 55: 758-765
    • (2008) Computers & Industrial Engineering , vol.55 , pp. 758-765
    • Cárdenas-Barrón, L.E.1
  • 13
    • 69649103599 scopus 로고    scopus 로고
    • Economic production quantity with rework process at a single-stage manufacturing system with planned backorders
    • Cárdenas-Barrón, L. E. 2009a. "Economic Production Quantity with Rework Process at a Single-stage Manufacturing System with Planned Backorders." Computers & Industrial Engineering 57: 1105-1113
    • (2009) Computers & Industrial Engineering , vol.57 , pp. 1105-1113
    • Cárdenas-Barrón, L.E.1
  • 14
    • 58849151362 scopus 로고    scopus 로고
    • On optimal batch sizing in a multi-stage production system with rework consideration
    • Cárdenas-Barrón, L. E. 2009b. "On Optimal Batch Sizing in a Multi-stage Production System with Rework Consideration." European Journal of Operational Research 196: 1238-1244
    • (2009) European Journal of Operational Research , vol.196 , pp. 1238-1244
    • Cárdenas-Barrón, L.E.1
  • 16
    • 77957709870 scopus 로고    scopus 로고
    • Multi-vendor integrated procurement-production system under shared transportation and just-in-Time delivery system
    • Chen, Z. X., and B. R. Sarker. 2010. "Multi-vendor Integrated Procurement-production System under Shared Transportation and Just-in-Time Delivery System." Journal of the Operational Research Society 61: 1654-1666
    • (2010) Journal of the Operational Research Society , vol.61 , pp. 1654-1666
    • Chen, Z.X.1    Sarker, B.R.2
  • 17
    • 0029494896 scopus 로고
    • An approximation to the continuous review inventory model with perishable items and lead times
    • Chiu, H. N. 1995. "An Approximation to the Continuous Review Inventory Model with Perishable Items and Lead times." European Journal of Operational Research 87: 93-108
    • (1995) European Journal of Operational Research , vol.87 , pp. 93-108
    • Chiu, H.N.1
  • 18
    • 38349058125 scopus 로고    scopus 로고
    • Production lot size problem with failure in repair and backlogging derived without derivatives
    • Chiu, S. W. 2008. "Production Lot Size Problem with Failure in Repair and Backlogging Derived without Derivatives." European Journal of Operational Research 188: 610-615
    • (2008) European Journal of Operational Research , vol.188 , pp. 610-615
    • Chiu, S.W.1
  • 19
    • 34247863936 scopus 로고    scopus 로고
    • Optimal production lot sizing with rework, scrap rate, and service level constraint
    • Chiu, S. W., C. K. Ting, and Y. S. P. Chiu. 2007. "Optimal Production Lot Sizing with Rework, Scrap Rate, and Service Level Constraint." Mathematical and Computer Modelling 46: 535-549
    • (2007) Mathematical and Computer Modelling , vol.46 , pp. 535-549
    • Chiu, S.W.1    Ting, C.K.2    Chiu, Y.S.P.3
  • 20
    • 33846655633 scopus 로고    scopus 로고
    • Determining the optimal run time for epq model with scrap, rework, and stochastic breakdowns
    • Chiu, S. W., S. L. Wang, and Y. S. P. Chiu. 2007. "Determining the Optimal Run Time for EPQ Model with Scrap, Rework, and Stochastic Breakdowns." European Journal of Operational Research 180: 664-676
    • (2007) European Journal of Operational Research , vol.180 , pp. 664-676
    • Chiu, S.W.1    Wang, S.L.2    Chiu, Y.S.P.3
  • 21
    • 72949118882 scopus 로고    scopus 로고
    • Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown
    • Chiu, Y. S. P., K. K. Chen, F. T. Cheng, and M. F. Wu. 2010. "Optimization of the Finite Production Rate Model with Scrap, Rework and Stochastic Machine Breakdown." Computers and Mathematics with Applications 59: 919-932
    • (2010) Computers and Mathematics with Applications , vol.59 , pp. 919-932
    • Chiu, Y.S.P.1    Chen, K.K.2    Cheng, F.T.3    Wu, M.F.4
  • 22
    • 0034668369 scopus 로고    scopus 로고
    • An integrated material flow system approach for determining the economic production quantity (epq
    • doi:10.1080/002075400422761
    • Choi, S., and J. S. Noble. 2000. "An Integrated Material Flow System Approach for Determining the Economic Production Quantity (EPQ)." International Journal of Production Research 38 (15): 3485-3511. doi:10.1080/002075400422761
    • (2000) International Journal of Production Research , vol.38 , Issue.15 , pp. 3485-3511
    • Choi, S.1    Noble, J.S.2
  • 23
    • 59049103474 scopus 로고    scopus 로고
    • A two-warehouse inventory model with imperfect quality production processes
    • Chung, K. J., C. C. Her, and S. D. Lin. 2009. "A Two-warehouse Inventory Model with Imperfect Quality Production Processes." Computers & Industrial Engineering 56: 193-197
    • (2009) Computers & Industrial Engineering , vol.56 , pp. 193-197
    • Chung, K.J.1    Her, C.C.2    Lin, S.D.3
  • 24
    • 78649843827 scopus 로고    scopus 로고
    • Economic production quantity model for deteriorating inventory with random machine unavailability and shortage
    • Chung, C. J., G. A. Widyadana, and H. M. Wee. 2011. "Economic Production Quantity Model for Deteriorating Inventory with Random Machine Unavailability and Shortage." International Journal of Production Research 49: 883-902
    • (2011) International Journal of Production Research , vol.49 , pp. 883-902
    • Chung, C.J.1    Widyadana, G.A.2    Wee, H.M.3
  • 25
    • 84855759342 scopus 로고    scopus 로고
    • Development of joint maintenance and production strategies in a subcontracting environment
    • Dahane, M., S. Dellagi, C. Clementz, and N. Rezg. 2011. "Development of Joint Maintenance and Production Strategies in a Subcontracting Environment." International Journal of Production Research 49: 6937-6961
    • (2011) International Journal of Production Research , vol.49 , pp. 6937-6961
    • Dahane, M.1    Dellagi, S.2    Clementz, C.3    Rezg, N.4
  • 26
    • 0030193969 scopus 로고    scopus 로고
    • Production strategies for a stochastic lot-sizing problem with constant capacity
    • Dellaert, N. P., and M. T. Melo. 1996. "Production Strategies for a Stochastic Lot-sizing Problem with Constant Capacity." European Journal of Operational Research 92: 281-301
    • (1996) European Journal of Operational Research , vol.92 , pp. 281-301
    • Dellaert, N.P.1    Melo, M.T.2
  • 27
    • 62549096849 scopus 로고    scopus 로고
    • Fuzzy periodic review system with fuzzy random variable demand
    • Dey, O., and D. Chakraborty. 2009. "Fuzzy Periodic Review System with Fuzzy Random Variable Demand." European Journal of Operational Research 198: 113-120
    • (2009) European Journal of Operational Research , vol.198 , pp. 113-120
    • Dey, O.1    Chakraborty, D.2
  • 28
    • 35348992049 scopus 로고    scopus 로고
    • Economic production lot-sizing for an unreliable machine under imperfect age-based maintenance policy
    • El-Ferik, S. 2008. "Economic Production Lot-sizing for an Unreliable Machine under Imperfect Age-based Maintenance Policy." European Journal of Operational Research 186: 150-163
    • (2008) European Journal of Operational Research , vol.186 , pp. 150-163
    • El-Ferik, S.1
  • 29
    • 33646476572 scopus 로고    scopus 로고
    • The value of setup cost reduction and process improvement for the economic production quantity model with defects
    • Freimer, M., D. Thomas, and J. Tyworth. 2006. "The Value of Setup Cost Reduction and Process Improvement for the Economic Production Quantity Model with Defects." European Journal of Operational Research 173: 241-251
    • (2006) European Journal of Operational Research , vol.173 , pp. 241-251
    • Freimer, M.1    Thomas, D.2    Tyworth, J.3
  • 30
    • 73449100750 scopus 로고    scopus 로고
    • Economic design of an inventory policy for non-instantaneous deteriorating items under permissible delay in payments
    • Geetha, K. V., and R. Uthayakumar. 2010. "Economic Design of an Inventory Policy for Non-instantaneous Deteriorating Items under Permissible Delay in Payments." Journal of Computational and Applied Mathematics 233: 2492-2505
    • (2010) Journal of Computational and Applied Mathematics , vol.233 , pp. 2492-2505
    • Geetha, K.V.1    Uthayakumar, R.2
  • 31
    • 80053003983 scopus 로고    scopus 로고
    • Production rate control of an unreliable manufacturing cell with adjustable capacity
    • Gharbi, A., A. Hajji, and K. Dhouib. 2011. "Production Rate Control of an Unreliable Manufacturing Cell with Adjustable Capacity." International Journal of Production Research 49: 6539-6557
    • (2011) International Journal of Production Research , vol.49 , pp. 6539-6557
    • Gharbi, A.1    Hajji, A.2    Dhouib, K.3
  • 32
    • 17644387571 scopus 로고    scopus 로고
    • Exact formulation of stochastic emq model for an unreliable production system
    • Giri, B. C., and T. Dohi. 2005. "Exact Formulation of Stochastic EMQ Model for an Unreliable Production System." Journal of the Operational Research Society 56: 563-575
    • (2005) Journal of the Operational Research Society , vol.56 , pp. 563-575
    • Giri, B.C.1    Dohi, T.2
  • 33
    • 84859951755 scopus 로고    scopus 로고
    • Supply chain model for a deteriorating product with time-varying demand and production rate
    • Giri, B. C., and T. Maiti. 2012. "Supply Chain Model for a Deteriorating Product with Time-varying Demand and Production Rate." Journal of the Operational Research Society 63: 665-673
    • (2012) Journal of the Operational Research Society , vol.63 , pp. 665-673
    • Giri, B.C.1    Maiti, T.2
  • 34
    • 0036568439 scopus 로고    scopus 로고
    • Note on: Economic production quantity model for items with imperfect quality-A practical approach
    • Goyal, S. K., and L. E. Cárdenas-Barrón. 2002. "Note on: Economic Production Quantity Model for Items with Imperfect Quality-A Practical Approach." International Journal of Production Economics 77: 85-87
    • (2002) International Journal of Production Economics , vol.77 , pp. 85-87
    • Goyal, S.K.1    Cárdenas-Barrón, L.E.2
  • 35
    • 77957719013 scopus 로고    scopus 로고
    • Stochastic lot-sizing problem with inventory-bounds and constant order-capacities
    • Guan, Y., and T. Liu. 2010. "Stochastic Lot-sizing Problem with Inventory-bounds and Constant Order-capacities." European Journal of Operational Research 207: 1398-1409
    • (2010) European Journal of Operational Research , vol.207 , pp. 1398-1409
    • Guan, Y.1    Liu, T.2
  • 37
    • 0037448815 scopus 로고    scopus 로고
    • The finite multiple lot sizing problem with interrupted geometric yield and holding costs
    • Guu, S. M., and A. X. Zhang. 2003. "The Finite Multiple Lot Sizing Problem with Interrupted Geometric Yield and Holding Costs." European Journal of Operational Research 145: 635-644
    • (2003) European Journal of Operational Research , vol.145 , pp. 635-644
    • Guu, S.M.1    Zhang, A.X.2
  • 38
    • 34247257749 scopus 로고    scopus 로고
    • Continuous functions minimization by dynamic random search technique
    • Hamzaçebi, C., and F. Kutay. 2007. "Continuous Functions Minimization by Dynamic Random Search Technique." Applied Mathematical Modelling 31: 2189-2198
    • (2007) Applied Mathematical Modelling , vol.31 , pp. 2189-2198
    • Hamzaçebi, C.1    Kutay, F.2
  • 40
    • 0035470201 scopus 로고    scopus 로고
    • Production lot sizing with the reworking of imperfect quality items produced
    • Hayek, P. A., and M. K. Salameh. 2001. "Production Lot Sizing with the Reworking of Imperfect Quality Items Produced." Production Planning and Control 12: 584-590
    • (2001) Production Planning and Control , vol.12 , pp. 584-590
    • Hayek, P.A.1    Salameh, M.K.2
  • 41
    • 70449523678 scopus 로고    scopus 로고
    • An optimal production-inventory model for deteriorating items with multiple-market demand
    • He, Y., S. Y. Wang, and K. K. Lai. 2010. "An Optimal Production-inventory Model for Deteriorating Items with Multiple-market Demand." European Journal of Operational Research 203: 593-600
    • (2010) European Journal of Operational Research , vol.203 , pp. 593-600
    • He, Y.1    Wang, S.Y.2    Lai, K.K.3
  • 42
    • 84861796333 scopus 로고    scopus 로고
    • A polynomial time algorithm to solve the single-item capacitated lot sizing problem with minimum order quantities and concave costs
    • Hellion, B., F. Mangione, and B. Penz. 2012. "A Polynomial Time Algorithm to Solve the Single-item Capacitated Lot Sizing Problem with Minimum Order Quantities and Concave Costs." European Journal of Operational Research 222: 10-16
    • (2012) European Journal of Operational Research , vol.222 , pp. 10-16
    • Hellion, B.1    Mangione, F.2    Penz, B.3
  • 44
    • 14944342757 scopus 로고    scopus 로고
    • Optimal production run length for deteriorating production system with a two-state continuous-Time markovian processes under allowable shortages
    • Hou, K. L. 2005. "Optimal Production Run Length for Deteriorating Production System with a Two-state Continuous-Time Markovian Processes under Allowable Shortages." Journal of the Operational Research Society 56: 346-350
    • (2005) Journal of the Operational Research Society , vol.56 , pp. 346-350
    • Hou, K.L.1
  • 45
    • 70350566005 scopus 로고    scopus 로고
    • Quality investment and inspection policy in a supplier-manufacturer supply chain
    • Hsieh, C. C., and Y. T. Liu. 2010. "Quality Investment and Inspection Policy in a Supplier-Manufacturer Supply Chain." European Journal of Operational Research 202: 717-729
    • (2010) European Journal of Operational Research , vol.202 , pp. 717-729
    • Hsieh, C.C.1    Liu, Y.T.2
  • 46
    • 78549278380 scopus 로고    scopus 로고
    • An inventory model with generalized type demand, deterioration and backorder rates
    • Hung, K. C. 2011. "An Inventory Model with Generalized Type Demand, Deterioration and Backorder Rates." European Journal of Operational Research 208: 239-242
    • (2011) European Journal of Operational Research , vol.208 , pp. 239-242
    • Hung, K.C.1
  • 48
    • 33751189169 scopus 로고    scopus 로고
    • Lot sizing for an imperfect production process with quality corrective interruptions and improvements, and reduction in setups
    • Jaber, M. Y. 2006. "Lot Sizing for an Imperfect Production Process with Quality Corrective Interruptions and Improvements, and Reduction in Setups." Computers & Industrial Engineering 51: 781-790
    • (2006) Computers & Industrial Engineering , vol.51 , pp. 781-790
    • Jaber, M.Y.1
  • 49
    • 43049122113 scopus 로고    scopus 로고
    • Lower bounds for randomized direct search with isotropic sampling
    • Jägersküpper, J. 2008. "Lower Bounds for Randomized Direct Search with Isotropic Sampling." Operations Research Letters 36: 327-332
    • (2008) Operations Research Letters , vol.36 , pp. 327-332
    • Jägersküpper, J.1
  • 50
    • 3242701287 scopus 로고    scopus 로고
    • Optimal manufacturing batch size with rework process at a single-stage production system
    • Jamal, A. M. M., B. R. Sarker, and S. Mondal. 2004. "Optimal Manufacturing Batch Size with Rework Process at a Single-stage Production System." Computers & Industrial Engineering 47: 77-89
    • (2004) Computers & Industrial Engineering , vol.47 , pp. 77-89
    • Jamal, A.M.M.1    Sarker, B.R.2    Mondal, S.3
  • 51
  • 52
    • 18844396823 scopus 로고    scopus 로고
    • Random search optimization approach for highly multi-modal nonlinear problems
    • Jeżowski, J., R. Bochenek, and G. Ziomek. 2005. "Random Search Optimization Approach for Highly Multi-modal Nonlinear Problems." Advances in Engineering Software 36: 504-517
    • (2005) Advances in Engineering Software , vol.36 , pp. 504-517
    • Jezowski, J.1    Bochenek, R.2    Ziomek, G.3
  • 53
    • 79953222174 scopus 로고    scopus 로고
    • A multi-objective production smoothing model with compressible operating times
    • Karimi-Nasab, M., and M. B. Aryanezhad. 2011. "A Multi-objective Production Smoothing Model with Compressible Operating times." Applied Mathematical Modelling 35: 3596-3610
    • (2011) Applied Mathematical Modelling , vol.35 , pp. 3596-3610
    • Karimi-Nasab, M.1    Aryanezhad, M.B.2
  • 54
    • 84868681939 scopus 로고    scopus 로고
    • Multi-objective production scheduling with controllable processing times and sequence-dependent setups for deteriorating items
    • doi:10.1080/00207543.2011.649800
    • Karimi-Nasab, M., and S. M. T. Fatemi Ghomi 2012. "Multi-objective Production Scheduling with Controllable Processing times and Sequence-dependent Setups for Deteriorating Items." International Journal of Production Research. doi:10.1080/00207543.2011.649800
    • (2012) International Journal of Production Research
    • Karimi-Nasab, M.1    Fatemi Ghomi, S.M.T.2
  • 55
    • 84855786910 scopus 로고    scopus 로고
    • A random search heuristic for a multi-objective production planning
    • Karimi-Nasab, M., and I. Konstantaras. 2012. "A Random Search Heuristic for a Multi-objective Production Planning." Computers & Industrial Engineering 62: 479-490
    • (2012) Computers & Industrial Engineering , vol.62 , pp. 479-490
    • Karimi-Nasab, M.1    Konstantaras, I.2
  • 56
    • 84872900363 scopus 로고    scopus 로고
    • An inventory control model with stochastic review interval and special sale offer
    • Karimi-Nasab, M., and I. Konstantaras. 2013. "An Inventory Control Model with Stochastic Review Interval and Special Sale Offer." European Journal of Operational Research 227: 81-87
    • (2013) European Journal of Operational Research , vol.227 , pp. 81-87
    • Karimi-Nasab, M.1    Konstantaras, I.2
  • 57
    • 74449083819 scopus 로고    scopus 로고
    • Economic order quantity model for items with imperfect quality with learning in inspection
    • Khan, M., M. Y. Jaber, and M. I. M. Wahab. 2010. "Economic Order Quantity Model for Items with Imperfect Quality with Learning in Inspection." International Journal of Production Economics 124: 87-96
    • (2010) International Journal of Production Economics , vol.124 , pp. 87-96
    • Khan, M.1    Jaber, M.Y.2    Wahab, M.I.M.3
  • 58
    • 70350716434 scopus 로고    scopus 로고
    • Lot sizing for a single product recovery system with variable setup numbers
    • Konstantaras, I., and K. Skouri. 2010. "Lot Sizing for a Single Product Recovery System with Variable Setup Numbers." European Journal of Operational Research 203: 326-335
    • (2010) European Journal of Operational Research , vol.203 , pp. 326-335
    • Konstantaras, I.1    Skouri, K.2
  • 59
    • 84875434810 scopus 로고    scopus 로고
    • Optimal control of an inventory-production system with state-dependent random yield
    • Kutzner, S. C., and G. P. Kiesmüller. 2013. "Optimal Control of an Inventory-production System with State-dependent Random Yield." European Journal of Operational Research 227: 444-452
    • (2013) European Journal of Operational Research , vol.227 , pp. 444-452
    • Kutzner, S.C.1    Kiesmüller, G.P.2
  • 60
    • 0030288024 scopus 로고    scopus 로고
    • A general approximation for the single product lot sizing model with queueing delays
    • Lambrecht, M. R., and N. J. Vandaele. 1996. "A General Approximation for the Single Product Lot Sizing Model with Queueing Delays." European Journal of Operational Research 95: 73-88
    • (1996) European Journal of Operational Research , vol.95 , pp. 73-88
    • Lambrecht, M.R.1    Vandaele, N.J.2
  • 61
    • 10844259870 scopus 로고    scopus 로고
    • A cost/benefit model for investments in inventory and preventive maintenance in an imperfect production system
    • Lee, H. H. 2005. "A Cost/Benefit Model for Investments in Inventory and Preventive Maintenance in an Imperfect Production System." Computers & Industrial Engineering 48: 55-68
    • (2005) Computers & Industrial Engineering , vol.48 , pp. 55-68
    • Lee, H.H.1
  • 62
    • 84885618110 scopus 로고    scopus 로고
    • Joint production and shipment lot sizing for a delivery price-based production facility
    • Lee, S. D., and Y. C. Fu. 2013. "Joint Production and Shipment Lot Sizing for a Delivery Price-based Production Facility." International Journal of Production Research 51: 6152-6162
    • (2013) International Journal of Production Research , vol.51 , pp. 6152-6162
    • Lee, S.D.1    Fu, Y.C.2
  • 63
    • 0036498691 scopus 로고    scopus 로고
    • Adaptive random search in quasi-monte carlo methods for global optimization
    • Lei, G. 2002. "Adaptive Random Search in Quasi-Monte Carlo Methods for Global Optimization." Computers and Mathematics with Applications 43: 747-754
    • (2002) Computers and Mathematics with Applications , vol.43 , pp. 747-754
    • Lei, G.1
  • 65
    • 56249098653 scopus 로고    scopus 로고
    • Optimal economic production quantity policy for imperfect process with imperfect repair and maintenance
    • Liao, G. L., Y. H. Chen, and S. H. Sheu. 2009. "Optimal Economic Production Quantity Policy for Imperfect Process with Imperfect Repair and Maintenance." European Journal of Operational Research 195: 348-357
    • (2009) European Journal of Operational Research , vol.195 , pp. 348-357
    • Liao, G.L.1    Chen, Y.H.2    Sheu, S.H.3
  • 66
    • 0032991947 scopus 로고    scopus 로고
    • Integrated production-inventory models with imperfect production processes and a limited capacity for raw materials
    • Lin, C. S. 1999. "Integrated Production-Inventory Models with Imperfect Production Processes and a Limited Capacity for Raw Materials." Mathematical and Computer Modelling 29: 81-89
    • (1999) Mathematical and Computer Modelling , vol.29 , pp. 81-89
    • Lin, C.S.1
  • 67
    • 30344488182 scopus 로고    scopus 로고
    • Economic lot sizing for an imperfect production system subject to random breakdowns
    • Lin, G. C., and D. E. Kroll. 2006. "Economic Lot Sizing for an Imperfect Production System Subject to Random Breakdowns." Engineering Optimization 38: 73-92
    • (2006) Engineering Optimization , vol.38 , pp. 73-92
    • Lin, G.C.1    Kroll, D.E.2
  • 68
    • 0037380652 scopus 로고    scopus 로고
    • Integrated production-inventory models for imperfect production processes under inspection schedules
    • Lin, C. S., C. H. Chen, and D. E. Kroll. 2003. "Integrated Production-Inventory Models for Imperfect Production Processes under Inspection Schedules." Computers & Industrial Engineering 44: 633-650
    • (2003) Computers & Industrial Engineering , vol.44 , pp. 633-650
    • Lin, C.S.1    Chen, C.H.2    Kroll, D.E.3
  • 69
    • 0042091890 scopus 로고    scopus 로고
    • Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs
    • Liu, J. J., and P. Yang. 1996. "Optimal Lot-sizing in an Imperfect Production System with Homogeneous Reworkable Jobs." European Journal of Operational Research 91: 517-527
    • (1996) European Journal of Operational Research , vol.91 , pp. 517-527
    • Liu, J.J.1    Yang, P.2
  • 72
  • 73
    • 41749121496 scopus 로고    scopus 로고
    • A note on a production control model for a facility with limited storage capacity in a random environment
    • Mohebbi, E. 2008. "A Note on a Production Control Model for a Facility with Limited Storage Capacity in a Random Environment." European Journal of Operational Research 190: 562-570
    • (2008) European Journal of Operational Research , vol.190 , pp. 562-570
    • Mohebbi, E.1
  • 74
    • 84855776210 scopus 로고    scopus 로고
    • A hybrid adaptive large neighborhood search heuristic for lot-sizing with setup times
    • Muller, L. F., S. Spoorendonk, and D. Pisinger. 2012. "A Hybrid Adaptive Large Neighborhood Search Heuristic for Lot-sizing with Setup times." European Journal of Operational Research 218: 614-623
    • (2012) European Journal of Operational Research , vol.218 , pp. 614-623
    • Muller, L.F.1    Spoorendonk, S.2    Pisinger, D.3
  • 75
    • 77951115374 scopus 로고    scopus 로고
    • Manufacturing lot-sizing, procurement and delivery schedules over a finite planning horizon
    • Mungan, D., J. Yu, and B. R. Sarker. 2010. "Manufacturing Lot-sizing, Procurement and Delivery Schedules over a Finite Planning Horizon." International Journal of Production Research 48: 3619-3636
    • (2010) International Journal of Production Research , vol.48 , pp. 3619-3636
    • Mungan, D.1    Yu, J.2    Sarker, B.R.3
  • 76
    • 70449526679 scopus 로고    scopus 로고
    • Efficient and effective heuristics for the coordinated capacitated lot-size problem
    • Narayanan, A., and P. Robinson. 2010. "Efficient and Effective Heuristics for the Coordinated Capacitated Lot-size Problem." European Journal of Operational Research 203: 583-592
    • (2010) European Journal of Operational Research , vol.203 , pp. 583-592
    • Narayanan, A.1    Robinson, P.2
  • 77
    • 84860577697 scopus 로고    scopus 로고
    • An economic production quantity model with random yield subject to process compressibility
    • Noorollahi, E., M. Karimi-Nasab, and M. B. Aryanezhad. 2012. "An Economic Production Quantity Model with Random Yield Subject to Process Compressibility." Mathematical and Computer Modelling 56: 80-96
    • (2012) Mathematical and Computer Modelling , vol.56 , pp. 80-96
    • Noorollahi, E.1    Karimi-Nasab, M.2    Aryanezhad, M.B.3
  • 78
    • 79952698290 scopus 로고    scopus 로고
    • Service level robustness in stochastic production planning under random machine breakdowns
    • Nourelfath, M. 2011. "Service Level Robustness in Stochastic Production Planning under Random Machine Breakdowns." European Journal of Operational Research 212: 81-88
    • (2011) European Journal of Operational Research , vol.212 , pp. 81-88
    • Nourelfath, M.1
  • 79
    • 34249311990 scopus 로고    scopus 로고
    • An optimal batch size for an imperfect production system with quality assurance and rework
    • Ojha, D., B. R. Sarker, and P. Biswas. 2007. "An Optimal Batch Size for an Imperfect Production System with Quality Assurance and Rework." International Journal of Production Research 45: 3191-3214
    • (2007) International Journal of Production Research , vol.45 , pp. 3191-3214
    • Ojha, D.1    Sarker, B.R.2    Biswas, P.3
  • 80
    • 79952192401 scopus 로고    scopus 로고
    • An o(t3) algorithm for the capacitated lot sizing problem with minimum order quantities
    • Okhrin, I., and K. Richter. 2011. "An O(T3) Algorithm for the Capacitated Lot Sizing Problem with Minimum Order Quantities." European Journal of Operational Research 211: 507-514
    • (2011) European Journal of Operational Research , vol.211 , pp. 507-514
    • Okhrin, I.1    Richter, K.2
  • 81
    • 84868549757 scopus 로고    scopus 로고
    • An integrated epq model based on a control chart for an imperfect production process
    • Pan, E., Y. Jin, S. Wang, and T. Cang. 2012. "An Integrated EPQ Model Based on a Control Chart for an Imperfect Production Process." International Journal of Production Research 50: 6999-7011
    • (2012) International Journal of Production Research , vol.50 , pp. 6999-7011
    • Pan, E.1    Jin, Y.2    Wang, S.3    Cang, T.4
  • 82
    • 79959728208 scopus 로고    scopus 로고
    • A survey of deterministic models for the eoq and epq with partial backordering
    • Pentico, D. W., and M. J. Drake. 2011. "A Survey of Deterministic Models for the EOQ and EPQ with Partial Backordering." European Journal of Operational Research 214: 179-198
    • (2011) European Journal of Operational Research , vol.214 , pp. 179-198
    • Pentico, D.W.1    Drake, M.J.2
  • 84
    • 77957717985 scopus 로고    scopus 로고
    • Convergence guarantees for generalized adaptive stochastic search methods for continuous global optimization
    • Regis, R. G. 2010. "Convergence Guarantees for Generalized Adaptive Stochastic Search Methods for Continuous Global Optimization." European Journal of Operational Research 207: 1187-1202
    • (2010) European Journal of Operational Research , vol.207 , pp. 1187-1202
    • Regis, R.G.1
  • 85
    • 59349105235 scopus 로고    scopus 로고
    • A production-inventory model with remanufacturing for defective and usable items in fuzzy-environment
    • Roy, A., K. Maity, S. Kar, and M. Maiti. 2009. "A Production-Inventory Model with Remanufacturing for Defective and Usable Items in Fuzzy-environment." Computers & Industrial Engineering 56: 87-96
    • (2009) Computers & Industrial Engineering , vol.56 , pp. 87-96
    • Roy, A.1    Maity, K.2    Kar, S.3    Maiti, M.4
  • 86
    • 84868200621 scopus 로고    scopus 로고
    • Combining a maintenance center m/m/c/ m queue into the economic production quantity model with stochastic machine breakdowns and repair
    • Sabri-Laghaie, K., M. Mansouri, A. Motaghedi-Larijani, and S. G. R. Jalali-Naini. 2012. "Combining a Maintenance Center M/M/C/ M Queue into the Economic Production Quantity Model with Stochastic Machine Breakdowns and Repair." Computers & Industrial Engineering 63: 864-874
    • (2012) Computers & Industrial Engineering , vol.63 , pp. 864-874
    • Sabri-Laghaie, K.1    Mansouri, M.2    Motaghedi-Larijani, A.3    Jalali-Naini, S.G.R.4
  • 88
    • 70249126214 scopus 로고    scopus 로고
    • An economic production lot size model in an imperfect production system
    • Sana, S. S. 2010. "An Economic Production Lot Size Model in an Imperfect Production System." European Journal of Operational Research 201: 158-170
    • (2010) European Journal of Operational Research , vol.201 , pp. 158-170
    • Sana, S.S.1
  • 89
    • 34548565651 scopus 로고    scopus 로고
    • Optimal batch sizing in a multi-stage production system with rework consideration
    • Sarker, B. R., A. M. M. Jamal, and S. Mondal. 2008. "Optimal Batch Sizing in a Multi-stage Production System with Rework Consideration." European Journal of Operational Research 184: 915-929
    • (2008) European Journal of Operational Research , vol.184 , pp. 915-929
    • Sarker, B.R.1    Jamal, A.M.M.2    Mondal, S.3
  • 90
    • 3242776106 scopus 로고    scopus 로고
    • Optimal production policy with shelf life including shortages
    • Sharma, S. 2004. "Optimal Production Policy with Shelf Life including Shortages." Journal of the Operational Research Society 55: 902-909
    • (2004) Journal of the Operational Research Society , vol.55 , pp. 902-909
    • Sharma, S.1
  • 91
  • 92
    • 3042555850 scopus 로고    scopus 로고
    • A periodic review production and maintenance model with random demand, deteriorating equipment, and binomial yield
    • Sloan, T. 2004. "A Periodic Review Production and Maintenance Model with Random Demand, Deteriorating Equipment, and Binomial Yield." Journal of the Operational Research Society 55: 647-656
    • (2004) Journal of the Operational Research Society , vol.55 , pp. 647-656
    • Sloan, T.1
  • 93
    • 80052267733 scopus 로고    scopus 로고
    • An efficient computational method for a stochastic dynamic lot-sizing problem under service-level constraints
    • Tarim, S. A., M. K. Dogru, U. Özen, and R. Rossi. 2011. "An Efficient Computational Method for a Stochastic Dynamic Lot-sizing Problem under Service-level Constraints." European Journal of Operational Research 215: 563-571
    • (2011) European Journal of Operational Research , vol.215 , pp. 563-571
    • Tarim, S.A.1    Dogru, M.K.2    Özen, U.3    Rossi, R.4
  • 94
    • 79954592850 scopus 로고    scopus 로고
    • Dynamic uncapacitated lot sizing with random demand under a fillrate constraint
    • Tempelmeier, H., and S. Herpers. 2011. "Dynamic Uncapacitated Lot Sizing with Random Demand under a Fillrate Constraint." European Journal of Operational Research 212: 497-507
    • (2011) European Journal of Operational Research , vol.212 , pp. 497-507
    • Tempelmeier, H.1    Herpers, S.2
  • 96
    • 84870297303 scopus 로고    scopus 로고
    • Designing and computing optimal policies on a production model for non-instantaneous deteriorating items with shortages
    • Valliathal, M., and R. Uthayakumar. 2013. "Designing and Computing Optimal Policies on a Production Model for Non-instantaneous Deteriorating Items with Shortages." International Journal of Production Research 51: 215-229
    • (2013) International Journal of Production Research , vol.51 , pp. 215-229
    • Valliathal, M.1    Uthayakumar, R.2
  • 97
    • 72049085795 scopus 로고    scopus 로고
    • Economic order quantity model for items with imperfect quality, different holding costs, and learning effects: A note
    • Wahab, M. I. M., and M. Y. Jaber. 2010. "Economic Order Quantity Model for Items with Imperfect Quality, Different Holding Costs, and Learning Effects: A Note." Computers & Industrial Engineering 58: 186-190
    • (2010) Computers & Industrial Engineering , vol.58 , pp. 186-190
    • Wahab, M.I.M.1    Jaber, M.Y.2
  • 98
    • 0034675399 scopus 로고    scopus 로고
    • Input control in a batch production system with lead times, due dates and Random Yields
    • Wang, Y., and Y. Gerchak. 2000. "Input Control in a Batch Production System with Lead times, Due Dates and Random Yields." European Journal of Operational Research 126: 371-385
    • (2000) European Journal of Operational Research , vol.126 , pp. 371-385
    • Wang, Y.1    Gerchak, Y.2
  • 99
    • 33644620677 scopus 로고    scopus 로고
    • Optimal production time and number of maintenance actions for an imperfect production system under equal-interval maintenance policy
    • Wang, C. H., R. H. Yeh, and P. Wu. 2006. "Optimal Production Time and Number of Maintenance Actions for an Imperfect Production System under Equal-interval Maintenance Policy." Journal of the Operational Research Society 57: 262-270
    • (2006) Journal of the Operational Research Society , vol.57 , pp. 262-270
    • Wang, C.H.1    Yeh, R.H.2    Wu, P.3
  • 100
    • 84862649934 scopus 로고    scopus 로고
    • Economic production quantity models for deteriorating items with rework and stochastic preventive maintenance time
    • Wee, H. M., and G. A. Widyadana. 2012. "Economic Production Quantity Models for Deteriorating Items with Rework and Stochastic Preventive Maintenance Time." International Journal of Production Research 50: 2940-2952
    • (2012) International Journal of Production Research , vol.50 , pp. 2940-2952
    • Wee, H.M.1    Widyadana, G.A.2
  • 101
    • 84871343647 scopus 로고    scopus 로고
    • A production quantity model for imperfect quality items with shortage and screening constraint
    • Wee, H. M., W. T. Wang, and P. C. Yang. 2013. "A Production Quantity Model for Imperfect Quality Items with Shortage and Screening Constraint." International Journal of Production Research 51: 1869-1884
    • (2013) International Journal of Production Research , vol.51 , pp. 1869-1884
    • Wee, H.M.1    Wang, W.T.2    Yang, P.C.3
  • 103
    • 79959695223 scopus 로고    scopus 로고
    • An optimization framework for solving capacitated multi-level lot-sizing problems with backlogging
    • Wu, T., L. Shi, J. Geunes, and K. Akartunali. 2011. "An Optimization Framework for Solving Capacitated Multi-level Lot-sizing Problems with Backlogging." European Journal of Operational Research 214: 428-441
    • (2011) European Journal of Operational Research , vol.214 , pp. 428-441
    • Wu, T.1    Shi, L.2    Geunes, J.3    Akartunali, K.4
  • 104
    • 84894037411 scopus 로고    scopus 로고
    • Joint production and maintenance planning with machine deterioration and Random Yield
    • doi:http://dx.doi.org/10.1080/00207543.2013.843037
    • Xiang, Y., C. R. Cassady, T. Jin, and C. W. Zhang. 2013. "Joint Production and Maintenance Planning with Machine Deterioration and Random Yield." International Journal of Production Research. doi:http://dx.doi. org/10.1080/00207543.2013.843037
    • (2013) International Journal of Production Research
    • Xiang, Y.1    Cassady, C.R.2    Jin, T.3    Zhang, C.W.4
  • 105
    • 79551495187 scopus 로고    scopus 로고
    • Optimal inventory policy with supply uncertainty and demand cancellation
    • Yeo, W. M., and X. M. Yuan. 2011. "Optimal Inventory Policy with Supply Uncertainty and Demand Cancellation." European Journal of Operational Research 211: 26-34
    • (2011) European Journal of Operational Research , vol.211 , pp. 26-34
    • Yeo, W.M.1    Yuan, X.M.2
  • 106
    • 69349091956 scopus 로고    scopus 로고
    • Economic production quantity model with imperfect-quality items, two-way imperfect inspection and sales return
    • Yoo, S. H., D. Kim, and M. S. Park. 2009. "Economic Production Quantity Model with Imperfect-quality Items, Two-way Imperfect Inspection and Sales Return." International Journal of Production Economics 121: 255-265
    • (2009) International Journal of Production Economics , vol.121 , pp. 255-265
    • Yoo, S.H.1    Kim, D.2    Park, M.S.3
  • 107
    • 80051736230 scopus 로고    scopus 로고
    • Optimal integrated maintenance/production policy for randomly failing systems with variable failure rate
    • Zied, H., D. Sofiene, and R. Nidhal. 2011. "Optimal Integrated Maintenance/Production Policy for Randomly failing Systems with Variable Failure Rate." International Journal of Production Research 49: 5695-5712
    • (2011) International Journal of Production Research , vol.49 , pp. 5695-5712
    • Zied, H.1    Sofiene, D.2    Nidhal, R.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.