|
Volumn 196, Issue 3, 2009, Pages 1238-1244
|
On optimal batch sizing in a multi-stage production system with rework consideration
|
Author keywords
Defective products; EPQ inventory models; Multi stage production system; Rework process
|
Indexed keywords
DISTRIBUTION OF GOODS;
INDUSTRIAL RESEARCH;
INVENTORY CONTROL;
OPTIMAL SYSTEMS;
PRODUCTION ENGINEERING;
ADDITIONAL COSTS;
BATCH SIZINGS;
CLOSED FORMS;
DEFECTIVE PRODUCTS;
EPQ INVENTORY MODELS;
INVENTORY COSTS;
INVENTORY POLICIES;
MATHEMATICAL EXPRESSIONS;
MULTI-STAGE MANUFACTURING SYSTEMS;
MULTI-STAGE PRODUCTION SYSTEM;
NOT GIVENS;
NUMERICAL EXAMPLES;
OPTIMAL SOLUTIONS;
REWORK PROCESS;
OPTIMIZATION;
|
EID: 58849151362
PISSN: 03772217
EISSN: None
Source Type: Journal
DOI: 10.1016/j.ejor.2008.04.015 Document Type: Article |
Times cited : (73)
|
References (4)
|