메뉴 건너뛰기




Volumn 61, Issue 11, 2010, Pages 1654-1666

Multi-vendor integrated procurement-production system under shared transportation and just-in-time delivery system

Author keywords

inventory; just in time; lot size; procurement; purchasing; transportation

Indexed keywords

COST REDUCTION; INVENTORY CONTROL; MANUFACTURE; PURCHASING; TRANSPORTATION;

EID: 77957709870     PISSN: 01605682     EISSN: 14769360     Source Type: Journal    
DOI: 10.1057/jors.2009.115     Document Type: Article
Times cited : (53)

References (25)
  • 1
    • 0029273901 scopus 로고
    • Joint vendorbuyer policy in JIT manufacturing
    • Aderohunmu R, Mobolurin A and Bryson N (1995). Joint vendorbuyer policy in JIT manufacturing. J Opl Res Soc 46(3): 375-385.
    • (1995) J Opl Res Soc , vol.46 , Issue.3 , pp. 375-385
    • Aderohunmu, R.1    Mobolurin, A.2    Bryson, N.3
  • 2
    • 84985846646 scopus 로고
    • A joint economic lot size model for purchaser and vendor
    • Banerjee A (1986). A joint economic lot size model for purchaser and vendor. Decision Sci 17(2): 292-311.
    • (1986) Decision Sci , vol.17 , Issue.2 , pp. 292-311
    • Banerjee, A.1
  • 3
    • 3543067624 scopus 로고
    • An integrated JIT inventory model
    • Banerjee A and Kim SL (1995). An integrated JIT inventory model. Int J Oper Prod Mngt 15(9): 237-244.
    • (1995) Int J Oper Prod Mngt , vol.15 , Issue.9 , pp. 237-244
    • Banerjee, A.1    Kim, S.L.2
  • 4
    • 0026869895 scopus 로고
    • Economic manufacturing quantity in a just-in-time delivery system
    • Golhar DY and Sarker BR (1992). Economic manufacturing quantity in a just-in-time delivery system. Int J Prod Res 30(5): 961-972.
    • (1992) Int J Prod Res , vol.30 , Issue.5 , pp. 961-972
    • Golhar, D.Y.1    Sarker, B.R.2
  • 5
    • 0017416997 scopus 로고
    • An integrated inventory model for a single supplier single customer problem
    • Goyal SK (1976). An integrated inventory model for a single supplier single customer problem. Int J Prod Res 15(1): 107-111.
    • (1976) Int J Prod Res , vol.15 , Issue.1 , pp. 107-111
    • Goyal, S.K.1
  • 6
    • 0027116055 scopus 로고
    • Integrated procurement-production systems: A review
    • Goyal SK and Deshmukh SG (1992). Integrated procurement-production systems: a review. Eur J Opl Res 62(1): 1-10.
    • (1992) Eur J Opl Res , vol.62 , Issue.1 , pp. 1-10
    • Goyal, S.K.1    Deshmukh, S.G.2
  • 7
    • 0030783235 scopus 로고    scopus 로고
    • Integrated procurement-production system in a just-in-time environment-modeling and analysis
    • Goyal SK and Deshmukh SG (1997). Integrated procurement-production system in a just-in-time environment-modeling and analysis. Prod Plan Control 8(1): 31-36.
    • (1997) Prod Plan Control , vol.8 , Issue.1 , pp. 31-36
    • Goyal, S.K.1    Deshmukh, S.G.2
  • 8
    • 0036610166 scopus 로고    scopus 로고
    • An integrated vendor-buyer cooperative inventory model for items with imperfect quality
    • Huang C-K (2002). An integrated vendor-buyer cooperative inventory model for items with imperfect quality. Prod Plan Control 13(4): 355-361.
    • (2002) Prod Plan Control , vol.13 , Issue.4 , pp. 355-361
    • Huang, C.-K.1
  • 9
    • 0027666209 scopus 로고
    • An optimal batch size for a production system operating under a just-in-time delivery system
    • Jamal AMM and Sarker BR (1993). An optimal batch size for a production system operating under a just-in-time delivery system. Int J Prod Econ 32(3): 255-260.
    • (1993) Int J Prod Econ , vol.32 , Issue.3 , pp. 255-260
    • Jamal, A.M.M.1    Sarker, B.R.2
  • 10
    • 0000972493 scopus 로고
    • Common on 'a quantity discount pricing model to increase vendor profits'
    • Joglekar PN (1988). Common on 'A quantity discount pricing model to increase vendor profits'. Mngt Sci 34(11): 1391-1398.
    • (1988) Mngt Sci , vol.34 , Issue.11 , pp. 1391-1398
    • Joglekar, P.N.1
  • 11
    • 3543130792 scopus 로고    scopus 로고
    • Transition to just-in-time purchasing: Handling uncertain deliveries with vendor-purchaser cooperation
    • Kelle P and Miller PA (1998). Transition to just-in-time purchasing: Handling uncertain deliveries with vendor-purchaser cooperation. Int J Oper Prod Mngt 18(1): 53-65.
    • (1998) Int J Oper Prod Mngt , vol.18 , Issue.1 , pp. 53-65
    • Kelle, P.1    Miller, P.A.2
  • 12
    • 0037431669 scopus 로고    scopus 로고
    • Partnership and negotiation support by joint optimal ordering/setup policies for JIT
    • Kelle P, AL-Khateeb F and Miller PA (2003). Partnership and negotiation support by joint optimal ordering/setup policies for JIT. Int J Prod Econ 81-82(4): 431-441.
    • (2003) Int J Prod Econ , vol.81-82 , Issue.4 , pp. 431-441
    • Kelle, P.1    Al-Khateeb, F.2    Miller, P.A.3
  • 13
    • 34249935612 scopus 로고    scopus 로고
    • Coordinating ordering/shipment policy for buyer and supplier: Numerical and empirical analysis of influencing factors
    • Kelle P, Miller PA and Akbulut AY (2007). Coordinating ordering/shipment policy for buyer and supplier: numerical and empirical analysis of influencing factors. Int J Prod Econ 108(1): 100-110.
    • (2007) Int J Prod Econ , vol.108 , Issue.1 , pp. 100-110
    • Kelle, P.1    Miller, P.A.2    Akbulut, A.Y.3
  • 14
    • 0041862633 scopus 로고    scopus 로고
    • A JIT lot-splitting model for supply chain management: Enhancing buyer-supplier linkage
    • Kim SL and Ha D (2003). A JIT lot-splitting model for supply chain management: enhancing buyer-supplier linkage. Int J Prod Econ 86(1): 1-10.
    • (2003) Int J Prod Econ , vol.86 , Issue.1 , pp. 1-10
    • Kim, S.L.1    Ha, D.2
  • 15
    • 0002663868 scopus 로고    scopus 로고
    • The bullwhip effect in supply chains
    • Lee HL, Padmanabhan V and Whang S (1997). The bullwhip effect in supply chains. Sloan Mngt Rev 38(3): 93-102.
    • (1997) Sloan Mngt Rev , vol.38 , Issue.3 , pp. 93-102
    • Lee, H.L.1    Padmanabhan, V.2    Whang, S.3
  • 17
    • 34249930610 scopus 로고    scopus 로고
    • An integrated vendorbuyer inventory model with quality improvement and lead time reduction
    • Ouyang L-Y, Wu K-S and Ho C-H (2007). An integrated vendorbuyer inventory model with quality improvement and lead time reduction. Int J Prod Econ 108(1-2): 349-358.
    • (2007) Int J Prod Econ , vol.108 , Issue.1-2 , pp. 349-358
    • Ouyang, L.-Y.1    Wu, K.-S.2    Ho, C.-H.3
  • 18
    • 0037139670 scopus 로고    scopus 로고
    • A study of an integrated inventory with controllable lead time
    • Pan JC-H and Yang J-S (2002). A study of an integrated inventory with controllable lead time. Int J Prod Res 40(5): 1263-1273.
    • (2002) Int J Prod Res , vol.40 , Issue.5 , pp. 1263-1273
    • Pan, J.C.-H.1    Yang, J.-S.2
  • 19
    • 36248952068 scopus 로고    scopus 로고
    • Integrated inventory models with fuzzy annual demand and fuzzy production rate in a supply chain
    • Pan JC-H and Yang M-F (2006). Integrated inventory models with fuzzy annual demand and fuzzy production rate in a supply chain. Int J Prod Res 46(3): 753-770.
    • (2006) Int J Prod Res , vol.46 , Issue.3 , pp. 753-770
    • Pan, J.C.-H.1    Yang, M.-F.2
  • 20
    • 33947165157 scopus 로고    scopus 로고
    • Supply chain models for an assembly system with preprocessing of raw materials
    • Rahman MAA and Sarker BR (2007). Supply chain models for an assembly system with preprocessing of raw materials. Eur J Opl Res 181(3): 733-752.
    • (2007) Eur J Opl Res , vol.181 , Issue.3 , pp. 733-752
    • Rahman, M.A.A.1    Sarker, B.R.2
  • 21
    • 0031235185 scopus 로고    scopus 로고
    • The impact of just-in-time manufacturing and its infrastructure on manufacturing performance
    • Sakakibara S (1997). The impact of just-in-time manufacturing and its infrastructure on manufacturing performance. Mngt Sci 43(9): 1246-1257.
    • (1997) Mngt Sci , vol.43 , Issue.9 , pp. 1246-1257
    • Sakakibara, S.1
  • 22
    • 0037150276 scopus 로고    scopus 로고
    • Incorporating transportation costs into inventory replenishment decisions
    • Swenseth SR and Godfrey MR (2002). Incorporating transportation costs into inventory replenishment decisions. Int J Prod Econ 77(2): 113-130.
    • (2002) Int J Prod Econ , vol.77 , Issue.2 , pp. 113-130
    • Swenseth, S.R.1    Godfrey, M.R.2
  • 23
    • 32544454181 scopus 로고    scopus 로고
    • Optimal models for multi-stage supply chain system controlled by kanban under just-in-time philosophy
    • Wang S and Sarker BR (2006). Optimal models for multi-stage supply chain system controlled by kanban under just-in-time philosophy. Eur J Opl Res 172(1): 179-200.
    • (2006) Eur J Opl Res , vol.172 , Issue.1 , pp. 179-200
    • Wang, S.1    Sarker, B.R.2
  • 24
    • 0002427614 scopus 로고
    • The composition and scope of JIT
    • White R, Pearson J and Ruch W (1990). The composition and scope of JIT. Oper Mngt Rev 7(3&4): 9-18.
    • (1990) Oper Mngt Rev , vol.7 , Issue.3-4 , pp. 9-18
    • White, R.1    Pearson, J.2    Ruch, W.3
  • 25
    • 1342266030 scopus 로고    scopus 로고
    • Just-in-time purchasing: An integrated inventory model involving deterministic variable lead time and quality improvement investment
    • Yang J-S and Pan C-H (2004). Just-in-time purchasing: An integrated inventory model involving deterministic variable lead time and quality improvement investment. Int J Prod Res 42(5): 853-863.
    • (2004) Int J Prod Res , vol.42 , Issue.5 , pp. 853-863
    • Yang, J.-S.1    Pan, C.-H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.