메뉴 건너뛰기




Volumn 48, Issue 1 SPEC. ISS., 2005, Pages 55-68

A cost/benefit model for investments in inventory and preventive maintenance in an imperfect production system

Author keywords

Delay cost; Inventory; Proportion of defective; Service level; Stockout

Indexed keywords

COST BENEFIT ANALYSIS; COSTS; MAINTENANCE; MATHEMATICAL MODELS; PRODUCTION; QUADRATIC PROGRAMMING;

EID: 10844259870     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cie.2004.07.008     Document Type: Article
Times cited : (40)

References (17)
  • 1
    • 0034309424 scopus 로고    scopus 로고
    • Optimal determination of quality level, selling quantity and purchasing price for intermediate firms
    • Chen, C. K. (2000). Optimal determination of quality level, selling quantity and purchasing price for intermediate firms. Production Planning and Control, 11(1), 706-712.
    • (2000) Production Planning and Control , vol.11 , Issue.1 , pp. 706-712
    • Chen, C.K.1
  • 2
    • 0034309369 scopus 로고    scopus 로고
    • Coordinating replenishments in a supply chain with quality control considerations
    • Cheung, K. L., & Leung, K. F. (2000). Coordinating replenishments in a supply chain with quality control considerations. Production Planning and Control, 11(1), 697-705.
    • (2000) Production Planning and Control , vol.11 , Issue.1 , pp. 697-705
    • Cheung, K.L.1    Leung, K.F.2
  • 6
    • 10844292101 scopus 로고
    • Optimal investment and lot-sizing policies for improved productivity and quality
    • Gunasekaran, A. (1995). Optimal investment and lot-sizing policies for improved productivity and quality. International Journal of Production Research, 33, 261-278.
    • (1995) International Journal of Production Research , vol.33 , pp. 261-278
    • Gunasekaran, A.1
  • 8
    • 0035470201 scopus 로고    scopus 로고
    • Production lot sizing with the reworking of imperfect quality items produced
    • Hayek, P. A., & Salameh, M. K. (2001). Production lot sizing with the reworking of imperfect quality items produced. Production Planning and Control, 12(6), 584-590.
    • (2001) Production Planning and Control , vol.12 , Issue.6 , pp. 584-590
    • Hayek, P.A.1    Salameh, M.K.2
  • 9
    • 0032642482 scopus 로고    scopus 로고
    • Component commonality in a multiple-period inventory model with service level constraints
    • Hillier, M. S. (1999). Component commonality in a multiple-period inventory model with service level constraints. International Journal of Production Research, 37(12), 2665-2683.
    • (1999) International Journal of Production Research , vol.37 , Issue.12 , pp. 2665-2683
    • Hillier, M.S.1
  • 10
    • 0031237390 scopus 로고    scopus 로고
    • Optimal batch size and investment in multistage production systems with scrap
    • Lee, H. H., Chandra, M. J., & Deleveaux, V. J. (1997). Optimal batch size and investment in multistage production systems with scrap. Production Planning and Control, 8(6), 586-596.
    • (1997) Production Planning and Control , vol.8 , Issue.6 , pp. 586-596
    • Lee, H.H.1    Chandra, M.J.2    Deleveaux, V.J.3
  • 11
    • 0031152514 scopus 로고    scopus 로고
    • Multi-item setup-reduction investment-allocation problem with continuous investment-cost functions
    • Leschke, J. P., & Weiss, E. N. (1997). Multi-item setup-reduction investment-allocation problem with continuous investment-cost functions. Management Science, 43, 890-894.
    • (1997) Management Science , vol.43 , pp. 890-894
    • Leschke, J.P.1    Weiss, E.N.2
  • 12
    • 0032183178 scopus 로고    scopus 로고
    • A note on the effect of inventory costs on product quality levels
    • Mehrez, O. K. A. (1998). A note on the effect of inventory costs on product quality levels. Production Planning and Control, 9(6), 580-584.
    • (1998) Production Planning and Control , vol.9 , Issue.6 , pp. 580-584
    • Mehrez, O.K.A.1
  • 13
    • 0022613610 scopus 로고
    • Optimal lot sizing, process quality improvement and setup cost reduction
    • Porteus, E. L. (1986). Optimal lot sizing, process quality improvement and setup cost reduction. Operations Research, 34, 137-144.
    • (1986) Operations Research , vol.34 , pp. 137-144
    • Porteus, E.L.1
  • 14
    • 34250129599 scopus 로고
    • NLQPL: A FORTRAN-subroutine solving constrained nonlinear programming problems
    • Schittowski, K. (1985). NLQPL: a FORTRAN-subroutine solving constrained nonlinear programming problems. Operations Research, 5, 485-500.
    • (1985) Operations Research , vol.5 , pp. 485-500
    • Schittowski, K.1
  • 15
    • 0037138029 scopus 로고    scopus 로고
    • Two-stage make-to-order remanufacturing with service-level constraints
    • Souza, G. C., & Ketzenberg, M. E. (2002). Two-stage make-to-order remanufacturing with service-level constraints. International Journal of Production Research, 40(2), 477-493.
    • (2002) International Journal of Production Research , vol.40 , Issue.2 , pp. 477-493
    • Souza, G.C.1    Ketzenberg, M.E.2
  • 16
    • 0035497186 scopus 로고    scopus 로고
    • A partial backordering approach to inventory control
    • Zeng, A. Z. (2001). A partial backordering approach to inventory control. Production Planning and Control, 12(7), 660-668.
    • (2001) Production Planning and Control , vol.12 , Issue.7 , pp. 660-668
    • Zeng, A.Z.1
  • 17
    • 0032785526 scopus 로고    scopus 로고
    • The performance of two popular service measures on management effectiveness in inventory control
    • Zeng, A. Z., & Hayya, J. C. (2002). The performance of two popular service measures on management effectiveness in inventory control. International Journal of Production Economics, 58, 147-158.
    • (2002) International Journal of Production Economics , vol.58 , pp. 147-158
    • Zeng, A.Z.1    Hayya, J.C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.