메뉴 건너뛰기




Volumn 63, Issue 4, 2012, Pages 864-874

Combining a maintenance center M/M/c/m queue into the economic production quantity model with stochastic machine breakdowns and repair

Author keywords

Economic Production Quantity (EPQ) model; Maintenance; Optimum production cycle; Queuing system

Indexed keywords

BREAK DOWN; BROKEN DOWN; DEMAND RATES; DIRECT SEARCH METHODS; ECONOMIC PRODUCTION QUANTITY; ECONOMIC PRODUCTION QUANTITY MODELS; IDENTICAL MACHINES; OPTIMAL PRODUCTION; OPTIMUM NUMBER; PRODUCTION CYCLE; PRODUCTION RATES; PRODUCTION SYSTEM; QUEUING SYSTEMS; STEEPEST DESCENT; STOCHASTIC MACHINE BREAKDOWN; WAITING-TIME;

EID: 84868200621     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cie.2012.05.008     Document Type: Article
Times cited : (13)

References (28)
  • 1
    • 0031169483 scopus 로고    scopus 로고
    • A simple approximation of the EMQ model with Poisson machine failures
    • N.E. Abboud A simple approximation of the EMQ model with Poisson machine failures Production Planning & Control 8 1997 385 397 (Pubitemid 127647930)
    • (1997) Production Planning and Control , vol.8 , Issue.4 , pp. 385-397
    • Abboud, N.E.1
  • 2
    • 0035247534 scopus 로고    scopus 로고
    • Discrete-time Markov production-inventory model with machine breakdowns
    • DOI 10.1016/S0360-8352(00)00070-X
    • N.E. Abboud A discrete-time Markov production-inventory model with machine breakdowns Computers & Industrial Engineering 39 2001 95 107 (Pubitemid 32263383)
    • (2001) Computers and Industrial Engineering , vol.39 , Issue.1-2 , pp. 95-107
    • Abboud, N.E.1
  • 3
    • 77950237103 scopus 로고    scopus 로고
    • Producer's replenishment policy for an EPQ model with rework and machine failure taking place in backorder reloading time
    • K. Chen, Y.P. Chiu, and C. Ting Producer's replenishment policy for an EPQ model with rework and machine failure taking place in backorder reloading time WSEAS Transactions on Mathematics 9 2010 223 233
    • (2010) WSEAS Transactions on Mathematics , vol.9 , pp. 223-233
    • Chen, K.1    Chiu, Y.P.2    Ting, C.3
  • 4
    • 77950947159 scopus 로고    scopus 로고
    • Economic production quantity model with backordering, rework and machine failure taking place in stock piling time
    • F.-T. Cheng, H.-H. Chang, and S.W. Chiu Economic production quantity model with backordering, rework and machine failure taking place in stock piling time WSEAS Transactions on Information Science and Applications 7 2010 463 473
    • (2010) WSEAS Transactions on Information Science and Applications , vol.7 , pp. 463-473
    • Cheng, F.-T.1    Chang, H.-H.2    Chiu, S.W.3
  • 5
    • 70350622445 scopus 로고    scopus 로고
    • Robust planning in optimization for production system subject to random machine breakdown and failure in rework
    • S.W. Chiu Robust planning in optimization for production system subject to random machine breakdown and failure in rework Computers and Operations Research 37 2010 899 908
    • (2010) Computers and Operations Research , vol.37 , pp. 899-908
    • Chiu, S.W.1
  • 6
    • 33846655633 scopus 로고    scopus 로고
    • Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
    • DOI 10.1016/j.ejor.2006.05.005, PII S0377221706003353
    • S.W. Chiu, S.-L. Wang, and Y.-S.P. Chiu Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns European Journal of Operational Research 180 2007 664 676 (Pubitemid 46199072)
    • (2007) European Journal of Operational Research , vol.180 , Issue.2 , pp. 664-676
    • Chiu, S.W.1    Wang, S.-L.2    Chiu, Y.-S.P.3
  • 7
    • 72949118882 scopus 로고    scopus 로고
    • Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown
    • Y.-S.P. Chiu, K.K. Chen, F.T. Cheng, and M.F. Wu Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown Computers and Mathematics with Applications 59 2010 919 932
    • (2010) Computers and Mathematics with Applications , vol.59 , pp. 919-932
    • Chiu, Y.-S.P.1    Chen, K.K.2    Cheng, F.T.3    Wu, M.F.4
  • 8
    • 79952618361 scopus 로고    scopus 로고
    • Mathematical modeling for solving manufacturing run time problem with defective rate and random machine breakdown
    • Y.-S.P. Chiu, H.-D. Lin, and H.-H. Chang Mathematical modeling for solving manufacturing run time problem with defective rate and random machine breakdown Computers & Industrial Engineering 60 2011 576 584
    • (2011) Computers & Industrial Engineering , vol.60 , pp. 576-584
    • Chiu, Y.-S.P.1    Lin, H.-D.2    Chang, H.-H.3
  • 9
    • 0030835106 scopus 로고    scopus 로고
    • Bounds for production lot sizing with machine breakdowns
    • K.J. Chung Bounds for production lot sizing with machine breakdowns Computers & Industrial Engineering 32 1997 139 144
    • (1997) Computers & Industrial Engineering , vol.32 , pp. 139-144
    • Chung, K.J.1
  • 10
    • 0037954442 scopus 로고    scopus 로고
    • Approximations to production lot sizing with machine breakdowns
    • K.J. Chung Approximations to production lot sizing with machine breakdowns Computers & Operations Research 30 2003 1499 1507
    • (2003) Computers & Operations Research , vol.30 , pp. 1499-1507
    • Chung, K.J.1
  • 11
    • 17644387571 scopus 로고    scopus 로고
    • Exact formulation of stochastic EMQ model for an unreliable production system
    • DOI 10.1057/palgrave.jors.2601840
    • B.C. Giri, and T. Dohi Exact formulation of stochastic EMQ model for an unreliable production system Journal of the Operational Research Society 56 2005 563 575 (Pubitemid 40567542)
    • (2005) Journal of the Operational Research Society , vol.56 , Issue.5 , pp. 563-575
    • Giri, B.C.1    Dohi, T.2
  • 13
    • 0026927270 scopus 로고
    • Production batching with machine breakdowns and safety stocks
    • H. Groenvelt, L. Pintelon, and A. Seidmann Production batching with machine breakdowns and safety stocks Operations Research 40 1992 959 971 (Pubitemid 23581842)
    • (1992) Operations Research , vol.40 , Issue.5 , pp. 959-971
    • Groenevelt Harry1    Pintelon Liliane2    Seidmann Abraham3
  • 15
    • 0031141332 scopus 로고    scopus 로고
    • An extended EMQ model for a failure prone machine with general lifetime distribution
    • PII S0925527397000133
    • C.H. Kim, and Y. Hong An extended EMQ model for a failure prone machine with general lifetime distribution International Journal of Production Economics 49 1997 215 223 (Pubitemid 127412309)
    • (1997) International Journal of Production Economics , vol.49 , Issue.3 , pp. 215-223
    • Kim, C.H..1    Hong, Y.2
  • 17
    • 23144434063 scopus 로고    scopus 로고
    • A dynamic lot sizing model with exponential machine breakdowns
    • PII S0377221796001361
    • H. Kuhn A dynamic lot sizing model with exponential machine breakdowns European Journal of Operational Research 100 1997 514 536 (Pubitemid 127392374)
    • (1997) European Journal of Operational Research , vol.100 , Issue.3 , pp. 514-536
    • Kuhn, H.1
  • 18
    • 0033891787 scopus 로고    scopus 로고
    • Production lot sizing in failure prone two-stage serial systems
    • DOI 10.1016/S0377-2217(99)00089-2
    • S.D. Lee, and J.M. Rung Production lot sizing in failure prone two-state serial systems European Journal of Operational Research 123 2000 42 60 (Pubitemid 30575851)
    • (2000) European Journal of Operational Research , vol.123 , Issue.1 , pp. 42-60
    • Lee, S.D.1    Rung, J.M.2
  • 19
    • 78651284941 scopus 로고    scopus 로고
    • Economic production quantity model for randomly failing production process with minimal repair and imperfect maintenance
    • G.-L. Liao, and S.-H. Sheu Economic production quantity model for randomly failing production process with minimal repair and imperfect maintenance International Journal of Production Economics 130 2011 118 124
    • (2011) International Journal of Production Economics , vol.130 , pp. 118-124
    • Liao, G.-L.1    Sheu, S.-H.2
  • 20
    • 33645033021 scopus 로고    scopus 로고
    • On a production-inventory system of deteriorating items subject to random machine breakdowns with a fixed repair time
    • G.C. Lin, and D.C. Gong On a production-inventory system of deteriorating items subject to random machine breakdowns with a fixed repair time Mathematical and Computer Modeling 43 2006 920 932
    • (2006) Mathematical and Computer Modeling , vol.43 , pp. 920-932
    • Lin, G.C.1    Gong, D.C.2
  • 21
    • 0032764917 scopus 로고    scopus 로고
    • Analysis of a production-inventory system with machine breakdowns and shutdowns
    • DOI 10.1016/S0305-0548(98)00040-9, PII S0305054898000409
    • B. Liu, and J. Cao Analysis of a production-inventory system with machine breakdowns and shutdowns Computers & Operations Research 26 1999 73 91 (Pubitemid 29346488)
    • (1999) Computers and Operations Research , vol.26 , Issue.1 , pp. 73-91
    • Liu, B.1    Cao, J.2
  • 22
    • 0031273569 scopus 로고    scopus 로고
    • Analysis of a production/inventory system subject to random disruptions
    • K. Moinzadeh, and P. Aggarwal Analysis of a production/inventory system subject to random disruptions Management Science 43 1997 1577 1588 (Pubitemid 127606213)
    • (1997) Management Science , vol.43 , Issue.11 , pp. 1577-1588
    • Moinzadeh, K.1    Aggarwal, P.2
  • 23
    • 0024945301 scopus 로고
    • Analysis of a production-inventory system with unreliable production facility
    • DOI 10.1016/0167-6377(89)90020-5
    • M.J.M. Posner, and M. Berge Analysis of a production-inventory system with unreliable production facility Operations Research Letter 8 1989 339 345 (Pubitemid 20667542)
    • (1989) Operations Research Letters , vol.8 , Issue.6 , pp. 339-345
    • Posner, M.J.M.1    Berg, M.2
  • 24
    • 79952909315 scopus 로고    scopus 로고
    • Optimal lot sizing with scrap and random breakdown occurring in backorder replenishing period
    • C.K. Ting, Y.-S.P. Chiu, and C.C.H. Chan Optimal lot sizing with scrap and random breakdown occurring in backorder replenishing period Mathematical & Computational Applications 16 2011 329 339
    • (2011) Mathematical & Computational Applications , vol.16 , pp. 329-339
    • Ting, C.K.1    Chiu, Y.-S.P.2    Chan, C.C.H.3
  • 25
    • 3543089582 scopus 로고
    • Optimization of the lot size and the time to replacement in a production system subject to random failure
    • Tse, E.; Makis, V. (1994). Optimization of the lot size and the time to replacement in a production system subject to random failure. In Proceedings of the third international conference on automation technology (Vol. 4, pp. 163-169).
    • (1994) Proceedings of the Third International Conference on Automation Technology , vol.4 , pp. 163-169
    • Tse, E.1    Makis, V.2
  • 26
    • 69249218859 scopus 로고    scopus 로고
    • Optimal management of the machine repair problem with working vacation: Newton's method
    • K.H. Wang, W.L. Chen, and D.Y. Yang Optimal management of the machine repair problem with working vacation: Newton's method Journal of Computational and Applied Mathematics 233 2009 449 458
    • (2009) Journal of Computational and Applied Mathematics , vol.233 , pp. 449-458
    • Wang, K.H.1    Chen, W.L.2    Yang, D.Y.3
  • 27
    • 77949522602 scopus 로고    scopus 로고
    • Economic Production Quantity (EPQ) deteriorating inventory model with machine breakdown and stochastic repair time
    • Widyadana, G. A.; Wee, H. M. (2009). Economic Production Quantity (EPQ) deteriorating inventory model with machine breakdown and stochastic repair time. In IEEE international conference (pp. 548-552).
    • (2009) IEEE International Conference , pp. 548-552
    • Widyadana, G.A.1    Wee, H.M.2
  • 28
    • 0018544506 scopus 로고
    • Response time distribution of the m/m/m/n queueing model
    • J.W. Wong Response time distribution of the M/M/m/N queueing model Operations Research 27 1979 1196 1202 (Pubitemid 10443313)
    • (1979) Operations Research , vol.27 , Issue.6 , pp. 1196-1202
    • Wong, J.W.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.