-
1
-
-
0031169483
-
A simple approximation of the EMQ model with Poisson machine failures
-
N.E. Abboud A simple approximation of the EMQ model with Poisson machine failures Production Planning & Control 8 1997 385 397 (Pubitemid 127647930)
-
(1997)
Production Planning and Control
, vol.8
, Issue.4
, pp. 385-397
-
-
Abboud, N.E.1
-
2
-
-
0035247534
-
Discrete-time Markov production-inventory model with machine breakdowns
-
DOI 10.1016/S0360-8352(00)00070-X
-
N.E. Abboud A discrete-time Markov production-inventory model with machine breakdowns Computers & Industrial Engineering 39 2001 95 107 (Pubitemid 32263383)
-
(2001)
Computers and Industrial Engineering
, vol.39
, Issue.1-2
, pp. 95-107
-
-
Abboud, N.E.1
-
3
-
-
77950237103
-
Producer's replenishment policy for an EPQ model with rework and machine failure taking place in backorder reloading time
-
K. Chen, Y.P. Chiu, and C. Ting Producer's replenishment policy for an EPQ model with rework and machine failure taking place in backorder reloading time WSEAS Transactions on Mathematics 9 2010 223 233
-
(2010)
WSEAS Transactions on Mathematics
, vol.9
, pp. 223-233
-
-
Chen, K.1
Chiu, Y.P.2
Ting, C.3
-
4
-
-
77950947159
-
Economic production quantity model with backordering, rework and machine failure taking place in stock piling time
-
F.-T. Cheng, H.-H. Chang, and S.W. Chiu Economic production quantity model with backordering, rework and machine failure taking place in stock piling time WSEAS Transactions on Information Science and Applications 7 2010 463 473
-
(2010)
WSEAS Transactions on Information Science and Applications
, vol.7
, pp. 463-473
-
-
Cheng, F.-T.1
Chang, H.-H.2
Chiu, S.W.3
-
5
-
-
70350622445
-
Robust planning in optimization for production system subject to random machine breakdown and failure in rework
-
S.W. Chiu Robust planning in optimization for production system subject to random machine breakdown and failure in rework Computers and Operations Research 37 2010 899 908
-
(2010)
Computers and Operations Research
, vol.37
, pp. 899-908
-
-
Chiu, S.W.1
-
6
-
-
33846655633
-
Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
-
DOI 10.1016/j.ejor.2006.05.005, PII S0377221706003353
-
S.W. Chiu, S.-L. Wang, and Y.-S.P. Chiu Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns European Journal of Operational Research 180 2007 664 676 (Pubitemid 46199072)
-
(2007)
European Journal of Operational Research
, vol.180
, Issue.2
, pp. 664-676
-
-
Chiu, S.W.1
Wang, S.-L.2
Chiu, Y.-S.P.3
-
7
-
-
72949118882
-
Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown
-
Y.-S.P. Chiu, K.K. Chen, F.T. Cheng, and M.F. Wu Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown Computers and Mathematics with Applications 59 2010 919 932
-
(2010)
Computers and Mathematics with Applications
, vol.59
, pp. 919-932
-
-
Chiu, Y.-S.P.1
Chen, K.K.2
Cheng, F.T.3
Wu, M.F.4
-
8
-
-
79952618361
-
Mathematical modeling for solving manufacturing run time problem with defective rate and random machine breakdown
-
Y.-S.P. Chiu, H.-D. Lin, and H.-H. Chang Mathematical modeling for solving manufacturing run time problem with defective rate and random machine breakdown Computers & Industrial Engineering 60 2011 576 584
-
(2011)
Computers & Industrial Engineering
, vol.60
, pp. 576-584
-
-
Chiu, Y.-S.P.1
Lin, H.-D.2
Chang, H.-H.3
-
9
-
-
0030835106
-
Bounds for production lot sizing with machine breakdowns
-
K.J. Chung Bounds for production lot sizing with machine breakdowns Computers & Industrial Engineering 32 1997 139 144
-
(1997)
Computers & Industrial Engineering
, vol.32
, pp. 139-144
-
-
Chung, K.J.1
-
10
-
-
0037954442
-
Approximations to production lot sizing with machine breakdowns
-
K.J. Chung Approximations to production lot sizing with machine breakdowns Computers & Operations Research 30 2003 1499 1507
-
(2003)
Computers & Operations Research
, vol.30
, pp. 1499-1507
-
-
Chung, K.J.1
-
11
-
-
17644387571
-
Exact formulation of stochastic EMQ model for an unreliable production system
-
DOI 10.1057/palgrave.jors.2601840
-
B.C. Giri, and T. Dohi Exact formulation of stochastic EMQ model for an unreliable production system Journal of the Operational Research Society 56 2005 563 575 (Pubitemid 40567542)
-
(2005)
Journal of the Operational Research Society
, vol.56
, Issue.5
, pp. 563-575
-
-
Giri, B.C.1
Dohi, T.2
-
15
-
-
0031141332
-
An extended EMQ model for a failure prone machine with general lifetime distribution
-
PII S0925527397000133
-
C.H. Kim, and Y. Hong An extended EMQ model for a failure prone machine with general lifetime distribution International Journal of Production Economics 49 1997 215 223 (Pubitemid 127412309)
-
(1997)
International Journal of Production Economics
, vol.49
, Issue.3
, pp. 215-223
-
-
Kim, C.H..1
Hong, Y.2
-
17
-
-
23144434063
-
A dynamic lot sizing model with exponential machine breakdowns
-
PII S0377221796001361
-
H. Kuhn A dynamic lot sizing model with exponential machine breakdowns European Journal of Operational Research 100 1997 514 536 (Pubitemid 127392374)
-
(1997)
European Journal of Operational Research
, vol.100
, Issue.3
, pp. 514-536
-
-
Kuhn, H.1
-
18
-
-
0033891787
-
Production lot sizing in failure prone two-stage serial systems
-
DOI 10.1016/S0377-2217(99)00089-2
-
S.D. Lee, and J.M. Rung Production lot sizing in failure prone two-state serial systems European Journal of Operational Research 123 2000 42 60 (Pubitemid 30575851)
-
(2000)
European Journal of Operational Research
, vol.123
, Issue.1
, pp. 42-60
-
-
Lee, S.D.1
Rung, J.M.2
-
19
-
-
78651284941
-
Economic production quantity model for randomly failing production process with minimal repair and imperfect maintenance
-
G.-L. Liao, and S.-H. Sheu Economic production quantity model for randomly failing production process with minimal repair and imperfect maintenance International Journal of Production Economics 130 2011 118 124
-
(2011)
International Journal of Production Economics
, vol.130
, pp. 118-124
-
-
Liao, G.-L.1
Sheu, S.-H.2
-
20
-
-
33645033021
-
On a production-inventory system of deteriorating items subject to random machine breakdowns with a fixed repair time
-
G.C. Lin, and D.C. Gong On a production-inventory system of deteriorating items subject to random machine breakdowns with a fixed repair time Mathematical and Computer Modeling 43 2006 920 932
-
(2006)
Mathematical and Computer Modeling
, vol.43
, pp. 920-932
-
-
Lin, G.C.1
Gong, D.C.2
-
21
-
-
0032764917
-
Analysis of a production-inventory system with machine breakdowns and shutdowns
-
DOI 10.1016/S0305-0548(98)00040-9, PII S0305054898000409
-
B. Liu, and J. Cao Analysis of a production-inventory system with machine breakdowns and shutdowns Computers & Operations Research 26 1999 73 91 (Pubitemid 29346488)
-
(1999)
Computers and Operations Research
, vol.26
, Issue.1
, pp. 73-91
-
-
Liu, B.1
Cao, J.2
-
22
-
-
0031273569
-
Analysis of a production/inventory system subject to random disruptions
-
K. Moinzadeh, and P. Aggarwal Analysis of a production/inventory system subject to random disruptions Management Science 43 1997 1577 1588 (Pubitemid 127606213)
-
(1997)
Management Science
, vol.43
, Issue.11
, pp. 1577-1588
-
-
Moinzadeh, K.1
Aggarwal, P.2
-
23
-
-
0024945301
-
Analysis of a production-inventory system with unreliable production facility
-
DOI 10.1016/0167-6377(89)90020-5
-
M.J.M. Posner, and M. Berge Analysis of a production-inventory system with unreliable production facility Operations Research Letter 8 1989 339 345 (Pubitemid 20667542)
-
(1989)
Operations Research Letters
, vol.8
, Issue.6
, pp. 339-345
-
-
Posner, M.J.M.1
Berg, M.2
-
24
-
-
79952909315
-
Optimal lot sizing with scrap and random breakdown occurring in backorder replenishing period
-
C.K. Ting, Y.-S.P. Chiu, and C.C.H. Chan Optimal lot sizing with scrap and random breakdown occurring in backorder replenishing period Mathematical & Computational Applications 16 2011 329 339
-
(2011)
Mathematical & Computational Applications
, vol.16
, pp. 329-339
-
-
Ting, C.K.1
Chiu, Y.-S.P.2
Chan, C.C.H.3
-
25
-
-
3543089582
-
Optimization of the lot size and the time to replacement in a production system subject to random failure
-
Tse, E.; Makis, V. (1994). Optimization of the lot size and the time to replacement in a production system subject to random failure. In Proceedings of the third international conference on automation technology (Vol. 4, pp. 163-169).
-
(1994)
Proceedings of the Third International Conference on Automation Technology
, vol.4
, pp. 163-169
-
-
Tse, E.1
Makis, V.2
-
26
-
-
69249218859
-
Optimal management of the machine repair problem with working vacation: Newton's method
-
K.H. Wang, W.L. Chen, and D.Y. Yang Optimal management of the machine repair problem with working vacation: Newton's method Journal of Computational and Applied Mathematics 233 2009 449 458
-
(2009)
Journal of Computational and Applied Mathematics
, vol.233
, pp. 449-458
-
-
Wang, K.H.1
Chen, W.L.2
Yang, D.Y.3
-
27
-
-
77949522602
-
Economic Production Quantity (EPQ) deteriorating inventory model with machine breakdown and stochastic repair time
-
Widyadana, G. A.; Wee, H. M. (2009). Economic Production Quantity (EPQ) deteriorating inventory model with machine breakdown and stochastic repair time. In IEEE international conference (pp. 548-552).
-
(2009)
IEEE International Conference
, pp. 548-552
-
-
Widyadana, G.A.1
Wee, H.M.2
-
28
-
-
0018544506
-
Response time distribution of the m/m/m/n queueing model
-
J.W. Wong Response time distribution of the M/M/m/N queueing model Operations Research 27 1979 1196 1202 (Pubitemid 10443313)
-
(1979)
Operations Research
, vol.27
, Issue.6
, pp. 1196-1202
-
-
Wong, J.W.1
|