-
1
-
-
34247842514
-
What quantity to make at once. The library for factory management
-
A.W. Shaw, Chicago
-
Harris F.W. What quantity to make at once. The library for factory management. Operation and Costs vol. 5 (1915), A.W. Shaw, Chicago 47-52
-
(1915)
Operation and Costs
, vol.5
, pp. 47-52
-
-
Harris, F.W.1
-
4
-
-
0142090745
-
Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging
-
Chiu Y.P. Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging. Engineering Optimization 35 (2003) 427-437
-
(2003)
Engineering Optimization
, vol.35
, pp. 427-437
-
-
Chiu, Y.P.1
-
5
-
-
0035470201
-
Production lot sizing with the reworking of imperfect quality items produced
-
Hayek P.A., and Salameh M.K. Production lot sizing with the reworking of imperfect quality items produced. Production Planning & Control 12 (2001) 584-590
-
(2001)
Production Planning & Control
, vol.12
, pp. 584-590
-
-
Hayek, P.A.1
Salameh, M.K.2
-
7
-
-
0023412314
-
Simultaneous determination of production cycle and inspection schedules in a production system
-
Lee H.L., and Rosenblatt M.J. Simultaneous determination of production cycle and inspection schedules in a production system. Management Science 33 (1987) 1125-1136
-
(1987)
Management Science
, vol.33
, pp. 1125-1136
-
-
Lee, H.L.1
Rosenblatt, M.J.2
-
8
-
-
0022676316
-
Economic production cycles with imperfect production processes
-
Rosenblatt M.J., and Lee H.L. Economic production cycles with imperfect production processes. IIE Transactions 18 (1986) 48-55
-
(1986)
IIE Transactions
, vol.18
, pp. 48-55
-
-
Rosenblatt, M.J.1
Lee, H.L.2
-
10
-
-
0025399639
-
Joint lot sizing and inspection policy in an EOQ model with random yield
-
Zhang X., and Gerchak Y. Joint lot sizing and inspection policy in an EOQ model with random yield. IIE Transactions 22 (1990) 41-47
-
(1990)
IIE Transactions
, vol.22
, pp. 41-47
-
-
Zhang, X.1
Gerchak, Y.2
-
11
-
-
0026116409
-
An economic order quantity model with demand-dependent unit production cost and imperfect production processes
-
Cheng T.C.E. An economic order quantity model with demand-dependent unit production cost and imperfect production processes. IIE Transactions 23 (1991) 23-28
-
(1991)
IIE Transactions
, vol.23
, pp. 23-28
-
-
Cheng, T.C.E.1
-
12
-
-
0030835106
-
Bounds for production lot sizing with machine breakdown
-
Chung K.J. Bounds for production lot sizing with machine breakdown. Computers & Industrial Engineering 32 (1997) 139-144
-
(1997)
Computers & Industrial Engineering
, vol.32
, pp. 139-144
-
-
Chung, K.J.1
-
13
-
-
0034999406
-
Probabilistic service level guarantees in make-to-stock manufacturing systems
-
Bertsimas D., and Paschalidis I.C. Probabilistic service level guarantees in make-to-stock manufacturing systems. Operations Research 49 (2001) 119-136
-
(2001)
Operations Research
, vol.49
, pp. 119-136
-
-
Bertsimas, D.1
Paschalidis, I.C.2
-
15
-
-
0022076008
-
Approximations for a lost-sales production/inventory control model with service level constraints
-
de Kok A.G. Approximations for a lost-sales production/inventory control model with service level constraints. Management Science 31 (1985) 729-737
-
(1985)
Management Science
, vol.31
, pp. 729-737
-
-
de Kok, A.G.1
-
16
-
-
0024662560
-
Optimal service levels in multi-item inventory systems
-
Kelle P. Optimal service levels in multi-item inventory systems. Engineering Costs and Production Economics 15 (1989) 375-379
-
(1989)
Engineering Costs and Production Economics
, vol.15
, pp. 375-379
-
-
Kelle, P.1
-
17
-
-
0006038152
-
A comparison of production scheduling policies on costs, service level, and schedule changes
-
Metters R., and Vargas V. A comparison of production scheduling policies on costs, service level, and schedule changes. Production and Operations Management 8 (1999) 76-91
-
(1999)
Production and Operations Management
, vol.8
, pp. 76-91
-
-
Metters, R.1
Vargas, V.2
-
19
-
-
0031232606
-
Mixture inventory model involving variable lead time with a service level constraint
-
Ouyang L.-Y., and Wu K.-S. Mixture inventory model involving variable lead time with a service level constraint. Computers & Operations Research 24 (1997) 875-882
-
(1997)
Computers & Operations Research
, vol.24
, pp. 875-882
-
-
Ouyang, L.-Y.1
Wu, K.-S.2
-
20
-
-
8744223416
-
The effects of the random defective rate and the imperfect rework process on the economic production quantity model
-
Chiu S.W., Gong D.C., and Wee H.M. The effects of the random defective rate and the imperfect rework process on the economic production quantity model. Japan Journal of Industrial and Applied Mathematics 21 (2004) 375-389
-
(2004)
Japan Journal of Industrial and Applied Mathematics
, vol.21
, pp. 375-389
-
-
Chiu, S.W.1
Gong, D.C.2
Wee, H.M.3
|