메뉴 건너뛰기




Volumn 46, Issue 3-4, 2007, Pages 535-549

Optimal production lot sizing with rework, scrap rate, and service level constraint

Author keywords

Inventory model; Production lot size; Random defective rate; Rework; Service level constraint

Indexed keywords

CONSTRAINT THEORY; COST EFFECTIVENESS; MATHEMATICAL MODELS; OPTIMAL SYSTEMS; OPTIMIZATION; SUPPLY CHAIN MANAGEMENT;

EID: 34247863936     PISSN: 08957177     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.mcm.2006.11.031     Document Type: Article
Times cited : (84)

References (24)
  • 1
    • 34247842514 scopus 로고
    • What quantity to make at once. The library for factory management
    • A.W. Shaw, Chicago
    • Harris F.W. What quantity to make at once. The library for factory management. Operation and Costs vol. 5 (1915), A.W. Shaw, Chicago 47-52
    • (1915) Operation and Costs , vol.5 , pp. 47-52
    • Harris, F.W.1
  • 4
    • 0142090745 scopus 로고    scopus 로고
    • Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging
    • Chiu Y.P. Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging. Engineering Optimization 35 (2003) 427-437
    • (2003) Engineering Optimization , vol.35 , pp. 427-437
    • Chiu, Y.P.1
  • 5
    • 0035470201 scopus 로고    scopus 로고
    • Production lot sizing with the reworking of imperfect quality items produced
    • Hayek P.A., and Salameh M.K. Production lot sizing with the reworking of imperfect quality items produced. Production Planning & Control 12 (2001) 584-590
    • (2001) Production Planning & Control , vol.12 , pp. 584-590
    • Hayek, P.A.1    Salameh, M.K.2
  • 7
    • 0023412314 scopus 로고
    • Simultaneous determination of production cycle and inspection schedules in a production system
    • Lee H.L., and Rosenblatt M.J. Simultaneous determination of production cycle and inspection schedules in a production system. Management Science 33 (1987) 1125-1136
    • (1987) Management Science , vol.33 , pp. 1125-1136
    • Lee, H.L.1    Rosenblatt, M.J.2
  • 8
    • 0022676316 scopus 로고
    • Economic production cycles with imperfect production processes
    • Rosenblatt M.J., and Lee H.L. Economic production cycles with imperfect production processes. IIE Transactions 18 (1986) 48-55
    • (1986) IIE Transactions , vol.18 , pp. 48-55
    • Rosenblatt, M.J.1    Lee, H.L.2
  • 9
    • 0026454137 scopus 로고
    • Production lot sizing with machine breakdowns
    • Groenevelt H., Pintelon L., and Seidmann A. Production lot sizing with machine breakdowns. Management Science 38 1 (1992) 104-120
    • (1992) Management Science , vol.38 , Issue.1 , pp. 104-120
    • Groenevelt, H.1    Pintelon, L.2    Seidmann, A.3
  • 10
    • 0025399639 scopus 로고
    • Joint lot sizing and inspection policy in an EOQ model with random yield
    • Zhang X., and Gerchak Y. Joint lot sizing and inspection policy in an EOQ model with random yield. IIE Transactions 22 (1990) 41-47
    • (1990) IIE Transactions , vol.22 , pp. 41-47
    • Zhang, X.1    Gerchak, Y.2
  • 11
    • 0026116409 scopus 로고
    • An economic order quantity model with demand-dependent unit production cost and imperfect production processes
    • Cheng T.C.E. An economic order quantity model with demand-dependent unit production cost and imperfect production processes. IIE Transactions 23 (1991) 23-28
    • (1991) IIE Transactions , vol.23 , pp. 23-28
    • Cheng, T.C.E.1
  • 12
    • 0030835106 scopus 로고    scopus 로고
    • Bounds for production lot sizing with machine breakdown
    • Chung K.J. Bounds for production lot sizing with machine breakdown. Computers & Industrial Engineering 32 (1997) 139-144
    • (1997) Computers & Industrial Engineering , vol.32 , pp. 139-144
    • Chung, K.J.1
  • 13
    • 0034999406 scopus 로고    scopus 로고
    • Probabilistic service level guarantees in make-to-stock manufacturing systems
    • Bertsimas D., and Paschalidis I.C. Probabilistic service level guarantees in make-to-stock manufacturing systems. Operations Research 49 (2001) 119-136
    • (2001) Operations Research , vol.49 , pp. 119-136
    • Bertsimas, D.1    Paschalidis, I.C.2
  • 14
    • 0035480433 scopus 로고    scopus 로고
    • Inventory models with minimal service level constraints
    • Chen F.Y., and Krass D. Inventory models with minimal service level constraints. European Journal of Operational Research 134 (2001) 120-140
    • (2001) European Journal of Operational Research , vol.134 , pp. 120-140
    • Chen, F.Y.1    Krass, D.2
  • 15
    • 0022076008 scopus 로고
    • Approximations for a lost-sales production/inventory control model with service level constraints
    • de Kok A.G. Approximations for a lost-sales production/inventory control model with service level constraints. Management Science 31 (1985) 729-737
    • (1985) Management Science , vol.31 , pp. 729-737
    • de Kok, A.G.1
  • 16
    • 0024662560 scopus 로고
    • Optimal service levels in multi-item inventory systems
    • Kelle P. Optimal service levels in multi-item inventory systems. Engineering Costs and Production Economics 15 (1989) 375-379
    • (1989) Engineering Costs and Production Economics , vol.15 , pp. 375-379
    • Kelle, P.1
  • 17
    • 0006038152 scopus 로고    scopus 로고
    • A comparison of production scheduling policies on costs, service level, and schedule changes
    • Metters R., and Vargas V. A comparison of production scheduling policies on costs, service level, and schedule changes. Production and Operations Management 8 (1999) 76-91
    • (1999) Production and Operations Management , vol.8 , pp. 76-91
    • Metters, R.1    Vargas, V.2
  • 19
    • 0031232606 scopus 로고    scopus 로고
    • Mixture inventory model involving variable lead time with a service level constraint
    • Ouyang L.-Y., and Wu K.-S. Mixture inventory model involving variable lead time with a service level constraint. Computers & Operations Research 24 (1997) 875-882
    • (1997) Computers & Operations Research , vol.24 , pp. 875-882
    • Ouyang, L.-Y.1    Wu, K.-S.2
  • 20
    • 8744223416 scopus 로고    scopus 로고
    • The effects of the random defective rate and the imperfect rework process on the economic production quantity model
    • Chiu S.W., Gong D.C., and Wee H.M. The effects of the random defective rate and the imperfect rework process on the economic production quantity model. Japan Journal of Industrial and Applied Mathematics 21 (2004) 375-389
    • (2004) Japan Journal of Industrial and Applied Mathematics , vol.21 , pp. 375-389
    • Chiu, S.W.1    Gong, D.C.2    Wee, H.M.3
  • 24
    • 0031146058 scopus 로고    scopus 로고
    • Easily implementable inventory control policies
    • Hopp W.J., Spearman M.L., and Zhang R.Q. Easily implementable inventory control policies. Operations Research 45 (1997) 327-340
    • (1997) Operations Research , vol.45 , pp. 327-340
    • Hopp, W.J.1    Spearman, M.L.2    Zhang, R.Q.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.