-
1
-
-
0022667867
-
Optimal control of production rate in a failure prone manufacturing system
-
Akella, R., and Kumar, P.R. (1986), "Optimal control of production rate in a failure prone manufacturing system", IEEE Transactions on Automatic Control 31, 116-126.
-
(1986)
IEEE Transactions on Automatic Control
, vol.31
, pp. 116-126
-
-
Akella, R.1
Kumar, P.R.2
-
2
-
-
0024037430
-
Optimality of zero-inventory policies for unreliable manufacturing systems
-
Bielecki, T., and Kumar, P.R. (1988), "Optimality of zero-inventory policies for unreliable manufacturing systems", Operations Research 36, 532-541.
-
(1988)
Operations Research
, vol.36
, pp. 532-541
-
-
Bielecki, T.1
Kumar, P.R.2
-
3
-
-
0041907478
-
Markovian decision models for reject allowance problems
-
Klein, M. (1966), "Markovian decision models for reject allowance problems", Management Science 12, 349-358.
-
(1966)
Management Science
, vol.12
, pp. 349-358
-
-
Klein, M.1
-
4
-
-
0022676316
-
Economic production cycles with imperfect production processes
-
Lee, H.L., and Rosenblatt, M.J. (1986), "Economic production cycles with imperfect production processes", IIE Transactions 18, 48-55.
-
(1986)
IIE Transactions
, vol.18
, pp. 48-55
-
-
Lee, H.L.1
Rosenblatt, M.J.2
-
5
-
-
0023979032
-
Production control in multistage systems with variable yield losses
-
Lee, H.L., and Yano, C.A. (1988), "Production control in multistage systems with variable yield losses", Operations Research 36, 269-278.
-
(1988)
Operations Research
, vol.36
, pp. 269-278
-
-
Lee, H.L.1
Yano, C.A.2
-
6
-
-
0005536597
-
The optimum reject allowance problem
-
Levitan, R.E. (1960), "The optimum reject allowance problem", Management Science 6, 172-186.
-
(1960)
Management Science
, vol.6
, pp. 172-186
-
-
Levitan, R.E.1
-
7
-
-
0023978351
-
Dynamic scheduling and routing for flexible manufacturing systems that have unreliable machines
-
Maimon, O.Z., and Gershwin, S.B. (1988), "Dynamic scheduling and routing for flexible manufacturing systems that have unreliable machines", Operations Research 36, 279-292.
-
(1988)
Operations Research
, vol.36
, pp. 279-292
-
-
Maimon, O.Z.1
Gershwin, S.B.2
-
8
-
-
0001342394
-
MRP with high uncertain yield losses
-
New, C., and Mapes, T. (1984), "MRP with high uncertain yield losses," Journal of Operations Management 4, 315-330.
-
(1984)
Journal of Operations Management
, vol.4
, pp. 315-330
-
-
New, C.1
Mapes, T.2
-
9
-
-
0022613610
-
Optimal lot sizing, process quality improvement, and setup cost reduction
-
Porteus, R.L. (1986), "Optimal lot sizing, process quality improvement, and setup cost reduction", Operations Research 34, 137-144.
-
(1986)
Operations Research
, vol.34
, pp. 137-144
-
-
Porteus, R.L.1
-
10
-
-
0024048635
-
Optimal production control of a manufacturing system with multiple machine states
-
Sharifnia, A. (1988), "Optimal production control of a manufacturing system with multiple machine states", IEEE Transactions on Automatic Control 33, 620-625.
-
(1988)
IEEE Transactions on Automatic Control
, vol.33
, pp. 620-625
-
-
Sharifnia, A.1
-
11
-
-
0042408670
-
Bayes Markovian decision models for a multi-period reject allowance problem
-
White, L.S. (1967), "Bayes Markovian decision models for a multi-period reject allowance problem", Operations Research 15, 857-865.
-
(1967)
Operations Research
, vol.15
, pp. 857-865
-
-
White, L.S.1
|