메뉴 건너뛰기




Volumn 55, Issue 8, 2004, Pages 902-909

Optimal production policy with shelf life including shortages

Author keywords

Inventory; Optimization; Production

Indexed keywords

COMPUTATIONAL METHODS; CONSTRAINT THEORY; COSTS; INDUSTRIAL MANAGEMENT; INVENTORY CONTROL; OPTIMIZATION; PRODUCTION ENGINEERING; PUBLIC POLICY; SCHEDULING;

EID: 3242776106     PISSN: 01605682     EISSN: None     Source Type: Journal    
DOI: 10.1057/palgrave.jors.2601760     Document Type: Article
Times cited : (39)

References (9)
  • 1
    • 0017931081 scopus 로고
    • The economic lot scheduling problem (ELSP): Review and extensions
    • Elmaghraby SE (1978). The economic lot scheduling problem (ELSP): review and extensions. Mngt Sci 24: 587-598.
    • (1978) Mngt Sci , vol.24 , pp. 587-598
    • Elmaghraby, S.E.1
  • 2
    • 0023994979 scopus 로고
    • The economic lot scheduling problem: A simple approach
    • Larraneta J and Onieva L (1988). The economic lot scheduling problem: a simple approach. J Opl Res Soc 39: 373-379.
    • (1988) J Opl Res Soc , vol.39 , pp. 373-379
    • Larraneta, J.1    Onieva, L.2
  • 3
    • 0023168047 scopus 로고
    • Common cycle scheduling: A successful application
    • Ware N and Keown B (1987). Common cycle scheduling: a successful application. Prod Invent Mngt 28: 16-22.
    • (1987) Prod Invent Mngt , vol.28 , pp. 16-22
    • Ware, N.1    Keown, B.2
  • 4
    • 0024881398 scopus 로고
    • Shelf life consideration in a family production context
    • Silver EA (1989). Shelf life consideration in a family production context. Int J Prod Res 27: 2021-2026.
    • (1989) Int J Prod Res , vol.27 , pp. 2021-2026
    • Silver, E.A.1
  • 5
    • 0027641509 scopus 로고
    • Effect of production cost on shelf life
    • Sarker BR and Babu PS (1993). Effect of production cost on shelf life. Int J Prod Res 31: 1865-1872.
    • (1993) Int J Prod Res , vol.31 , pp. 1865-1872
    • Sarker, B.R.1    Babu, P.S.2
  • 6
    • 0035837945 scopus 로고    scopus 로고
    • Manufacturing batch size and ordering policy for products with shelf lives
    • Chowdhury MR and Sarker BR (2001). Manufacturing batch size and ordering policy for products with shelf lives. Int J Prod Res 39: 1405-1426.
    • (2001) Int J Prod Res , vol.39 , pp. 1405-1426
    • Chowdhury, M.R.1    Sarker, B.R.2
  • 7
    • 0025243881 scopus 로고
    • Deliberately slowing down output in a family production context
    • Silver EA (1990). Deliberately slowing down output in a family production context. Int J Prod Res 28: 17-27.
    • (1990) Int J Prod Res , vol.28 , pp. 17-27
    • Silver, E.A.1
  • 8
    • 0001450111 scopus 로고
    • Dealing with a shelf life constraint in cyclic scheduling by adjusting both cycle time and production rate
    • Silver EA (1995). Dealing with a shelf life constraint in cyclic scheduling by adjusting both cycle time and production rate. Int J Prod Res 33: 623-629.
    • (1995) Int J Prod Res , vol.33 , pp. 623-629
    • Silver, E.A.1
  • 9
    • 0031168341 scopus 로고    scopus 로고
    • Optimal cycle time and production rate in a family production context with shelf life considerations
    • Viswanathan S and Goyal SK (1997). Optimal cycle time and production rate in a family production context with shelf life considerations. Int J Prod Res 35: 1703-1711.
    • (1997) Int J Prod Res , vol.35 , pp. 1703-1711
    • Viswanathan, S.1    Goyal, S.K.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.