-
1
-
-
34548668647
-
Integrated inventory and inspection policies for stochastic demand
-
Ben-Daya, M., and S. Noman. 2008. "Integrated inventory and inspection policies for stochastic demand." European Journal of Operational Research 185 (1): 159-169.
-
(2008)
European Journal of Operational Research
, vol.185
, Issue.1
, pp. 159-169
-
-
Ben-Daya, M.1
Noman, S.2
-
2
-
-
27444445374
-
Integrated inventory control and inspection policies with deterministic demand
-
Ben-Daya, M., S. Noman, and M. Hariga. 2006. "Integrated inventory control and inspection policies with deterministic demand." Computers & Operations Research 33 (6): 1625-1638.
-
(2006)
Computers & Operations Research
, vol.33
, Issue.6
, pp. 1625-1638
-
-
Ben-Daya, M.1
Noman, S.2
Hariga, M.3
-
3
-
-
0004271456
-
-
Upper Saddle River, NJ: Pearson Prentice Hall
-
Besterfield, D. H. 2009. Quality control. Upper Saddle River, NJ: Pearson Prentice Hall.
-
(2009)
Quality Control
-
-
Besterfield, D.H.1
-
4
-
-
0024037430
-
Optimality of zero-inventory policies for unreliable manufacturing systems
-
Bielecki, T., and P. Kumar. 1988. "Optimality of zero-inventory policies for unreliable manufacturing systems." Operations Research 36: 532-541.
-
(1988)
Operations Research
, vol.36
, pp. 532-541
-
-
Bielecki, T.1
Kumar, P.2
-
5
-
-
84870295031
-
Optimal production control policy in unreliable batch processing manufacturing systems with transportation delay
-
Bouslah, B., A. Gharbi, R. Pellerin, and A. Hajji. 2013. "Optimal production control policy in unreliable batch processing manufacturing systems with transportation delay." International Journal of Production Research 51 (1): 264-280.
-
(2013)
International Journal of Production Research
, vol.51
, Issue.1
, pp. 264-280
-
-
Bouslah, B.1
Gharbi, A.2
Pellerin, R.3
Hajji, A.4
-
6
-
-
46149086146
-
Production lot sising with process deterioration and machine breakdown under inspection schedule
-
Chakraborty, T., B. Giri, and K. Chaudhuri. 2009. "Production lot sising with process deterioration and machine breakdown under inspection schedule." Omega 37 (2): 257-271.
-
(2009)
Omega
, vol.37
, Issue.2
, pp. 257-271
-
-
Chakraborty, T.1
Giri, B.2
Chaudhuri, K.3
-
7
-
-
33846655633
-
Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
-
Chiu, S. W., S. L. Wang, and Y. S. P. Chiu. 2007. "Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns." European Journal of Operational Research 180 (2): 664-676.
-
(2007)
European Journal of Operational Research
, vol.180
, Issue.2
, pp. 664-676
-
-
Chiu, S.W.1
Wang, S.L.2
Chiu, Y.S.P.3
-
8
-
-
0037954442
-
Approximations to production lot sizing with machine breakdowns
-
Chung, K. J. 2003. "Approximations to production lot sizing with machine breakdowns." Computers & Operations Research 30 (10): 1499-1507.
-
(2003)
Computers & Operations Research
, vol.30
, Issue.10
, pp. 1499-1507
-
-
Chung, K.J.1
-
9
-
-
0037375114
-
An optimal production run time with imperfect production processes and allowable shortages
-
Chung, K. J., and K. L. Hou. 2003. "An optimal production run time with imperfect production processes and allowable shortages." Computers & Operations Research 30 (4): 483-490.
-
(2003)
Computers & Operations Research
, vol.30
, Issue.4
, pp. 483-490
-
-
Chung, K.J.1
Hou, K.L.2
-
10
-
-
33644631966
-
Cost minimising single sampling plans with AIQL and AOQL constraints
-
Ercan, S. S., M. Z. Hassan, and A. Taulananda. 1974. "Cost minimising single sampling plans with AIQL and AOQL constraints." Management Science 20 (7): 1112-1121.
-
(1974)
Management Science
, vol.20
, Issue.7
, pp. 1112-1121
-
-
Ercan, S.S.1
Hassan, M.Z.2
Taulananda, A.3
-
11
-
-
0036722127
-
Design of economically optimal acceptance sampling plans with inspection error
-
Ferrell, W. G., and A. Chhoker. 2002. "Design of economically optimal acceptance sampling plans with inspection error." Computers & Operations Research 29 (10): 1283-1300.
-
(2002)
Computers & Operations Research
, vol.29
, Issue.10
, pp. 1283-1300
-
-
Ferrell, W.G.1
Chhoker, A.2
-
12
-
-
34249770616
-
Optimisation via simulation: A review
-
Fu, M. C. 1994. "Optimisation via simulation: A review." Annals of Operations Research 53 (1): 199-247.
-
(1994)
Annals of Operations Research
, vol.53
, Issue.1
, pp. 199-247
-
-
Fu, M.C.1
-
13
-
-
0033737583
-
Production and preventive maintenance rates control for a manufacturing system: An experimental design approach
-
Gharbi, A., and J. Kenne. 2000. "Production and preventive maintenance rates control for a manufacturing system: an experimental design approach." International Journal of Production Economics 65 (3): 275-287.
-
(2000)
International Journal of Production Economics
, vol.65
, Issue.3
, pp. 275-287
-
-
Gharbi, A.1
Kenne, J.2
-
14
-
-
0026927270
-
Production batching with machine breakdowns and safety stocks
-
Groenevelt, H., L. Pintelon, and A. Seidmann. 1992a. "Production batching with machine breakdowns and safety stocks." Operations Research 40 (5): 959-971.
-
(1992)
Operations Research
, vol.40
, Issue.5
, pp. 959-971
-
-
Groenevelt, H.1
Pintelon, L.2
Seidmann, A.3
-
15
-
-
0026454137
-
Production lot sizing with machine breakdowns
-
Groenevelt, H., L. Pintelon, and A. Seidmann. 1992b. "Production lot sizing with machine breakdowns." Management Science 38 (1): 104-123.
-
(1992)
Management Science
, vol.38
, Issue.1
, pp. 104-123
-
-
Groenevelt, H.1
Pintelon, L.2
Seidmann, A.3
-
16
-
-
0021230603
-
Optimisation in simulation experiments using response surface methodology
-
Hossein Safisadeh, M., and B. M. Thornton. 1984. "Optimisation in simulation experiments using response surface methodology." Computers & Industrial Engineering 8 (1): 11-27.
-
(1984)
Computers & Industrial Engineering
, vol.8
, Issue.1
, pp. 11-27
-
-
Hossein Safisadeh, M.1
Thornton, B.M.2
-
17
-
-
0242269872
-
Designing production systems for quality: Research opportunities from an automotive industry perspective
-
Inman, R. R., D. E. Blumenfeld, N. Huang, and J. Li. 2003. "Designing production systems for quality: research opportunities from an automotive industry perspective." International Journal of Production Research 41 (9): 1953-1971.
-
(2003)
International Journal of Production Research
, vol.41
, Issue.9
, pp. 1953-1971
-
-
Inman, R.R.1
Blumenfeld, D.E.2
Huang, N.3
Li, J.4
-
18
-
-
0032761507
-
An optimal production run length in deteriorating production processes
-
Kim, C. H., and Y. Hong. 1999. "An optimal production run length in deteriorating production processes." International Journal of Production Economics 58 (2): 183-189.
-
(1999)
International Journal of Production Economics
, vol.58
, Issue.2
, pp. 183-189
-
-
Kim, C.H.1
Hong, Y.2
-
19
-
-
0031232875
-
An extended optimal lot sising model with an unreliable machine
-
Kim, C. H., Y. Hong, and S. Y. Kim. 1997. "An extended optimal lot sising model with an unreliable machine." Production Planning & Control 8 (6): 577-585.
-
(1997)
Production Planning & Control
, vol.8
, Issue.6
, pp. 577-585
-
-
Kim, C.H.1
Hong, Y.2
Kim, S.Y.3
-
20
-
-
74449083649
-
A comparative study of pull control mechanisms for unreliable homogenous transfer lines
-
Lavoie, P., A. Gharbi, and J. P. Kenné. 2010. "A comparative study of pull control mechanisms for unreliable homogenous transfer lines." International Journal of Production Economics 124 (1): 241-251.
-
(2010)
International Journal of Production Economics
, vol.124
, Issue.1
, pp. 241-251
-
-
Lavoie, P.1
Gharbi, A.2
Kenné, J.P.3
-
21
-
-
36248994722
-
Production control and combined discrete/continuous simulation modeling in failureprone transfer lines
-
Lavoie, P., J. P. Kenné, and A. Gharbi. 2007. "Production control and combined discrete/continuous simulation modeling in failureprone transfer lines." International Journal of Production Research 45 (24): 5667-5685.
-
(2007)
International Journal of Production Research
, vol.45
, Issue.24
, pp. 5667-5685
-
-
Lavoie, P.1
Kenné, J.P.2
Gharbi, A.3
-
22
-
-
0023412314
-
Simultaneous determination of production cycle and inspection schedules in a production systems
-
Lee, H. L., and M. J. Rosenblatt. 1987. "Simultaneous determination of production cycle and inspection schedules in a production systems." Management Science 33 (9): 1125-1136.
-
(1987)
Management Science
, vol.33
, Issue.9
, pp. 1125-1136
-
-
Lee, H.L.1
Rosenblatt, M.J.2
-
23
-
-
56749174474
-
An analytical approach for performance evaluation and optimisation of a two-stage production-distribution system
-
Li, J., A. Sava, and X. Xie. 2009. "An analytical approach for performance evaluation and optimisation of a two-stage production-distribution system." International Journal of Production Research 47 (2): 403-414.
-
(2009)
International Journal of Production Research
, vol.47
, Issue.2
, pp. 403-414
-
-
Li, J.1
Sava, A.2
Xie, X.3
-
24
-
-
56249098653
-
Optimal economic production quantity policy for imperfect process with imperfect repair and maintenance
-
Liao, G. L., Y. H. Chen, and S. H. Sheu. 2009. "Optimal economic production quantity policy for imperfect process with imperfect repair and maintenance." European Journal of Operational Research 195 (2): 348-357.
-
(2009)
European Journal of Operational Research
, vol.195
, Issue.2
, pp. 348-357
-
-
Liao, G.L.1
Chen, Y.H.2
Sheu, S.H.3
-
26
-
-
0016973525
-
A Bayesian algorithm for determining optimal single sample acceptance plans for product attributes
-
Moskowitz, H., and W. L. Berry. 1976. "A Bayesian algorithm for determining optimal single sample acceptance plans for product attributes." Management Science 22 (11): 1238-1250.
-
(1976)
Management Science
, vol.22
, Issue.11
, pp. 1238-1250
-
-
Moskowitz, H.1
Berry, W.L.2
-
27
-
-
0018544524
-
An algorithm for selecting an optimal acceptance plan in quality control and auditing
-
Moskowitz, H., A. Ravindran, and J. M. Patton. 1979. "An algorithm for selecting an optimal acceptance plan in quality control and auditing." International Journal of Production Research 17 (6): 581-594.
-
(1979)
International Journal of Production Research
, vol.17
, Issue.6
, pp. 581-594
-
-
Moskowitz, H.1
Ravindran, A.2
Patton, J.M.3
-
28
-
-
38749093302
-
Simulation-based optimisation of a single-stage failure-prone manufacturing system with transportation delay
-
Mourani, I., S. Hennequin, and X. Xie. 2008. "Simulation-based optimisation of a single-stage failure-prone manufacturing system with transportation delay." International Journal of Production Economics 112 (1): 26-36.
-
(2008)
International Journal of Production Economics
, vol.112
, Issue.1
, pp. 26-36
-
-
Mourani, I.1
Hennequin, S.2
Xie, X.3
-
30
-
-
0024067268
-
Joint determination of optimal inventory and quality control policy
-
Peters, M. H., H. Schneider, and K. Tang. 1988. "Joint determination of optimal inventory and quality control policy." Management Science 34 (8): 991-1004.
-
(1988)
Management Science
, vol.34
, Issue.8
, pp. 991-1004
-
-
Peters, M.H.1
Schneider, H.2
Tang, K.3
-
31
-
-
0022613610
-
Optimal lot sizing, process quality improvement and setup cost reduction
-
Porteus, E. L. 1986. "Optimal lot sizing, process quality improvement and setup cost reduction." Operations Research 34 (1): 137-144.
-
(1986)
Operations Research
, vol.34
, Issue.1
, pp. 137-144
-
-
Porteus, E.L.1
-
32
-
-
0031648198
-
A generalised economic model for joint determination of production run, inspection schedule and control chart design
-
Rahim, M., and M. Ben-Daya. 1998. "A generalised economic model for joint determination of production run, inspection schedule and control chart design." International Journal of Production Research 36 (1): 277-289.
-
(1998)
International Journal of Production Research
, vol.36
, Issue.1
, pp. 277-289
-
-
Rahim, M.1
Ben-Daya, M.2
-
33
-
-
0022889080
-
Nonlinear integer goal programming models for acceptance sampling
-
Ravindran, A., W. S. Shin, J. L. Arthur, and H. Moskowitz. 1986. "Nonlinear integer goal programming models for acceptance sampling." Computers & Operations Research 13 (5): 611-622.
-
(1986)
Computers & Operations Research
, vol.13
, Issue.5
, pp. 611-622
-
-
Ravindran, A.1
Shin, W.S.2
Arthur, J.L.3
Moskowitz, H.4
-
34
-
-
0022676316
-
Economic production cycles with imperfect production processes
-
Rosenblatt, M. J., and H. L. Lee. 1986. "Economic production cycles with imperfect production processes." IIE Transactions 18 (1): 48-55.
-
(1986)
IIE Transactions
, vol.18
, Issue.1
, pp. 48-55
-
-
Rosenblatt, M.J.1
Lee, H.L.2
-
35
-
-
0033874992
-
Economic production quantity model for items with imperfect quality
-
Salameh, M., and M. Jaber. 2000. "Economic production quantity model for items with imperfect quality." International Journal of Production Economics 64 (1): 59-64.
-
(2000)
International Journal of Production Economics
, vol.64
, Issue.1
, pp. 59-64
-
-
Salameh, M.1
Jaber, M.2
|