Volumn 186, Issue 1, 2008, Pages 150-163

Economic production lot-sizing for an unreliable machine under imperfect age-based maintenance policy

Author keywords

Economic production quantity; Imperfect maintenance; Integrated models; Lot sizing; Preventive maintenance

Indexed keywords

AGING OF MATERIALS; ALGORITHMS; COST FUNCTIONS; DETERIORATION; ECONOMIC ANALYSIS; FAILURE ANALYSIS; NUMERICAL METHODS; OPTIMIZATION;

EID: 35348992049     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2007.01.035     Document Type: Article
Times cited : (73)

References (24)
  • 2
    • 0002362385 scopus 로고
    • Optimum preventive maintenance policies
    • Barlow R.E., and Hunter L.C. Optimum preventive maintenance policies. Operation Research 8 (1960) 90-100
    • (1960) Operation Research , vol.8 , pp. 90-100
    • Barlow, R.E.1    Hunter, L.C.2
  • 3
    • 0037061529 scopus 로고    scopus 로고
    • The economic production lot-sizing problem with imperfect production processes and imperfect maintenance
    • Ben-Daya M. The economic production lot-sizing problem with imperfect production processes and imperfect maintenance. International Journal of Production Economics 76 3 (2002) 257-264
    • (2002) International Journal of Production Economics , vol.76 , Issue.3 , pp. 257-264
    • Ben-Daya, M.1
  • 4
    • 35348996367 scopus 로고    scopus 로고
    • Ben-Daya, M., Khursheed, S.N., 2002. The Economic Production Lot-Sizing Problem with Deteriorating Manufacturing Processes and Preventive Maintenance. In: Proceedings IFRIM, Vaxjo, Sweden, 6-8th May.
  • 5
    • 0035546071 scopus 로고    scopus 로고
    • Optimal control of preventive maintenance schedule and safety stocks in an unreliable manufacturing environment
    • Dohi T., Okamura H., and Osaki S. Optimal control of preventive maintenance schedule and safety stocks in an unreliable manufacturing environment. International Journal of Production Economics 74 1-3 (2001) 147-155
    • (2001) International Journal of Production Economics , vol.74 , Issue.1-3 , pp. 147-155
    • Dohi, T.1    Okamura, H.2    Osaki, S.3
  • 6
    • 35348951363 scopus 로고    scopus 로고
    • El-Ferik, S., 2003. Optimal control for a failure prone manufacturing system under imperfect age-based maintenance. In: Second International Conference on Signals Systems Decision and Information Technology, Tunisia, 187-193.
  • 7
    • 33644620483 scopus 로고    scopus 로고
    • Age-based hybrid model for imperfect preventive maintenance
    • El-Ferik S., and Ben-Daya M. Age-based hybrid model for imperfect preventive maintenance. IIE Transactions Norcross 38 4 (2006) 365-375
    • (2006) IIE Transactions Norcross , vol.38 , Issue.4 , pp. 365-375
    • El-Ferik, S.1    Ben-Daya, M.2
  • 9
    • 0032096710 scopus 로고    scopus 로고
    • Production lot sizing problem with imperfect manufacturing processes: bounds and optimal solutions
    • Hariga M., and Ben Daya M. Production lot sizing problem with imperfect manufacturing processes: bounds and optimal solutions. Naval Research Logistics 45 (1998) 423-433
    • (1998) Naval Research Logistics , vol.45 , pp. 423-433
    • Hariga, M.1    Ben Daya, M.2
  • 10
    • 0033739305 scopus 로고    scopus 로고
    • Practices of preventive maintenance and replacement for engines: A case study
    • Lai K.K., Leung F.K.N., Tao B., and Wang S.Y. Practices of preventive maintenance and replacement for engines: A case study. European Journal of Operational Research 124 2 (2000) 294-306
    • (2000) European Journal of Operational Research , vol.124 , Issue.2 , pp. 294-306
    • Lai, K.K.1    Leung, F.K.N.2    Tao, B.3    Wang, S.Y.4
  • 11
    • 0023412314 scopus 로고
    • Simultaneous determination of production cycle and inspection schedules in a production system
    • Lee H.L., and Rosenblatt M.J. Simultaneous determination of production cycle and inspection schedules in a production system. Management Science 33 9 (1987) 1125-1132
    • (1987) Management Science , vol.33 , Issue.9 , pp. 1125-1132
    • Lee, H.L.1    Rosenblatt, M.J.2
  • 12
    • 0024914068 scopus 로고
    • A production and maintenance planning model with restoration cost dependent on detection delay
    • Lee H.L., and Rosenblatt M.J. A production and maintenance planning model with restoration cost dependent on detection delay. IIE Transactions 21 4 (1989) 368-375
    • (1989) IIE Transactions , vol.21 , Issue.4 , pp. 368-375
    • Lee, H.L.1    Rosenblatt, M.J.2
  • 14
    • 0002899872 scopus 로고
    • Optimal inspection schedule in the imperfect production system under general shift distribution
    • Lin T.M., Tseng S.T., and Liou M.J. Optimal inspection schedule in the imperfect production system under general shift distribution. Journal of the Chinese Institute of Industrial Engineers 8 2 (1991) 73-81
    • (1991) Journal of the Chinese Institute of Industrial Engineers , vol.8 , Issue.2 , pp. 73-81
    • Lin, T.M.1    Tseng, S.T.2    Liou, M.J.3
  • 16
    • 0035281197 scopus 로고    scopus 로고
    • Sequential imperfect preventive maintenance models with two categories of failure modes
    • Lin D., Zuo M.J., and Yam R.C.M. Sequential imperfect preventive maintenance models with two categories of failure modes. Naval Research Logistics 48 2 (2001) 172-183
    • (2001) Naval Research Logistics , vol.48 , Issue.2 , pp. 172-183
    • Lin, D.1    Zuo, M.J.2    Yam, R.C.M.3
  • 18
    • 0024054513 scopus 로고
    • Sequential imperfect preventive maintenance policies
    • Nakagawa T. Sequential imperfect preventive maintenance policies. IEEE Transactions on Reliability R-37 3 (1988) 295-298
    • (1988) IEEE Transactions on Reliability R-37 , vol.3 , pp. 295-298
    • Nakagawa, T.1
  • 19
    • 0019637027 scopus 로고
    • Optimal preventive maintenance policies for repairable systems
    • Nguyen D.G., and Murthy D.N.P. Optimal preventive maintenance policies for repairable systems. Operations Research 29 (1981) 1181-1194
    • (1981) Operations Research , vol.29 , pp. 1181-1194
    • Nguyen, D.G.1    Murthy, D.N.P.2
  • 21
    • 0022613610 scopus 로고
    • Optimal lot sizing, process quality improvement and setup cost reduction
    • Porteus E.L. Optimal lot sizing, process quality improvement and setup cost reduction. Operations Research 34 (1986) 137-144
    • (1986) Operations Research , vol.34 , pp. 137-144
    • Porteus, E.L.1
  • 22
    • 0022676316 scopus 로고
    • Economic production cycles with imperfect production process
    • Rosenblatt M.J., and Lee H.L. Economic production cycles with imperfect production process. IIE Transactions 18 (1986) 48-55
    • (1986) IIE Transactions , vol.18 , pp. 48-55
    • Rosenblatt, M.J.1    Lee, H.L.2
  • 23
    • 35348999335 scopus 로고    scopus 로고
    • Yano, C., 2006. Industrial Engineer; 38, 4; ABI/INFORM Global, 50.
  • 24
    • 33750521911 scopus 로고    scopus 로고
    • A sequential approach for gas turbine power plant preventative maintenance scheduling
    • Zhao Y., Volovoi V., Waters M., and Mavris D. A sequential approach for gas turbine power plant preventative maintenance scheduling. Transactions of the ASME 128 (2006) 796-805
    • (2006) Transactions of the ASME , vol.128 , pp. 796-805
    • Zhao, Y.1    Volovoi, V.2    Waters, M.3    Mavris, D.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.