메뉴 건너뛰기




Volumn 55, Issue 6, 2004, Pages 647-656

A periodic review production and maintenance model with random demand, deteriorating equipment, and binomial yield

Author keywords

Inventory; Maintenance; Production; Quality; Scheduling

Indexed keywords

COSTS; DECISION MAKING; EQUIPMENT TESTING; INTEGRATED CIRCUITS; INVENTORY CONTROL; MARKOV PROCESSES; MATHEMATICAL MODELS; PRODUCT DESIGN; PRODUCTION ENGINEERING; SCHEDULING;

EID: 3042555850     PISSN: 01605682     EISSN: None     Source Type: Journal    
DOI: 10.1057/palgrave.jors.2601725     Document Type: Review
Times cited : (50)

References (27)
  • 1
    • 0001198301 scopus 로고
    • Lot sizing with random yields: A review
    • Yano CA and Lee HL (1995). Lot sizing with random yields: a review. Opns Res 43: 311-334.
    • (1995) Opns Res , vol.43 , pp. 311-334
    • Yano, C.A.1    Lee, H.L.2
  • 2
    • 0024032613 scopus 로고
    • Periodic review production models with variable yield and uncertain demand
    • Gerchak Y, Vickson RG and Parlar M (1988). Periodic review production models with variable yield and uncertain demand. IIE Trans 20: 144-150.
    • (1988) IIE Trans , vol.20 , pp. 144-150
    • Gerchak, Y.1    Vickson, R.G.2    Parlar, M.3
  • 3
    • 0025456687 scopus 로고
    • The structure of periodic review policies in the presence of random yield
    • Henig M and Gerchak Y (1990). The structure of periodic review policies in the presence of random yield. Opns Res 38: 634-643.
    • (1990) Opns Res , vol.38 , pp. 634-643
    • Henig, M.1    Gerchak, Y.2
  • 4
    • 0000455414 scopus 로고    scopus 로고
    • Periodic review production models with variable capacity, random yield and uncertain demand
    • Wang Y and Gerchak Y (1996). Periodic review production models with variable capacity, random yield and uncertain demand. Mngt Sci 42: 130-137.
    • (1996) Mngt Sci , vol.42 , pp. 130-137
    • Wang, Y.1    Gerchak, Y.2
  • 5
    • 0029342043 scopus 로고
    • Analysis of a (Q, r, T) inventory policy with deterministic and random yields when future supply is uncertain
    • Parlar M and Perry D (1995). Analysis of a (Q, r, T) inventory policy with deterministic and random yields when future supply is uncertain. Eur J Opl Res 84: 431-443.
    • (1995) Eur J Opl Res , vol.84 , pp. 431-443
    • Parlar, M.1    Perry, D.2
  • 6
    • 84989675172 scopus 로고
    • Algorithms and heuristics for variable-yield lot sizing
    • Mazzola JB, McCoy WF and Wagner HM (1987). Algorithms and heuristics for variable-yield lot sizing. Naval Res Logist 34: 67-86.
    • (1987) Naval Res Logist , vol.34 , pp. 67-86
    • Mazzola, J.B.1    McCoy, W.F.2    Wagner, H.M.3
  • 7
    • 3042541901 scopus 로고
    • A dynamic inventory model with random replenishment quantities
    • Baker H and Ehrhardt R (1995). A dynamic inventory model with random replenishment quantities. Omega 23: 109-116.
    • (1995) Omega , vol.23 , pp. 109-116
    • Baker, H.1    Ehrhardt, R.2
  • 8
    • 0033310058 scopus 로고    scopus 로고
    • Myopic heuristics for the random yield problem
    • Bollapragada S and Morton TE (1999). Myopic heuristics for the random yield problem. Opns Res 47: 713-722.
    • (1999) Opns Res , vol.47 , pp. 713-722
    • Bollapragada, S.1    Morton, T.E.2
  • 9
    • 0023979032 scopus 로고
    • Production control in multistage systems with variable yield losses
    • Lee HL and Yano CA (1988). Production control in multistage systems with variable yield losses. Opns Res 36: 269-278.
    • (1988) Opns Res , vol.36 , pp. 269-278
    • Lee, H.L.1    Yano, C.A.2
  • 10
    • 0029752323 scopus 로고    scopus 로고
    • Control limits for multi-stage manufacturing processes with binomial yield (single and multiple production runs)
    • Barad M and Braha D (1996). Control limits for multi-stage manufacturing processes with binomial yield (single and multiple production runs). J Opl Res Soc 47: 98-112.
    • (1996) J Opl Res Soc , vol.47 , pp. 98-112
    • Barad, M.1    Braha, D.2
  • 11
    • 0028396352 scopus 로고
    • Lot sizing in assembly systems with random component yields
    • Gerchak Y, Wang Y and Yano CA (1994). Lot sizing in assembly systems with random component yields. IIE Trans 26: 19-24.
    • (1994) IIE Trans , vol.26 , pp. 19-24
    • Gerchak, Y.1    Wang, Y.2    Yano, C.A.3
  • 12
    • 3042545957 scopus 로고    scopus 로고
    • Supply management in assembly systems with random yield and random demand
    • Gurnani H, Akella R and Lehoczky J (2000). Supply management in assembly systems with random yield and random demand. IIE Trans 32: 701-714.
    • (2000) IIE Trans , vol.32 , pp. 701-714
    • Gurnani, H.1    Akella, R.2    Lehoczky, J.3
  • 13
    • 0022676316 scopus 로고
    • Economic production cycles with imperfect production processes
    • Rosenblatt MJ and Lee HL (1986). Economic production cycles with imperfect production processes. IIE Trans 18: 48-54.
    • (1986) IIE Trans , vol.18 , pp. 48-54
    • Rosenblatt, M.J.1    Lee, H.L.2
  • 14
    • 0022613610 scopus 로고
    • Optimal lot sizing, process quality improvement and setup cost reduction
    • Porteus EL (1986). Optimal lot sizing, process quality improvement and setup cost reduction. Opns Res 34: 137-144.
    • (1986) Opns Res , vol.34 , pp. 137-144
    • Porteus, E.L.1
  • 15
    • 0023412314 scopus 로고
    • Simultaneous determination of production cycle and inspection schedules in a production system
    • Lee HL and Rosenblatt MJ (1987). Simultaneous determination of production cycle and inspection schedules in a production system. Mngt Sci 33: 1125-1136.
    • (1987) Mngt Sci , vol.33 , pp. 1125-1136
    • Lee, H.L.1    Rosenblatt, M.J.2
  • 16
    • 0000312965 scopus 로고
    • The impact of inspection delay on process arid inspection lot sizing
    • Porteus EL (1990). The impact of inspection delay on process arid inspection lot sizing. Mngt Sci 36: 999-1007.
    • (1990) Mngt Sci , vol.36 , pp. 999-1007
    • Porteus, E.L.1
  • 17
    • 0026220964 scopus 로고
    • Joint determination of production cycle and inspection intervals in a deteriorating production system
    • Lee JS and Park KS (1991). Joint determination of production cycle and inspection intervals in a deteriorating production system. J Opl Res Soc 42: 775-783.
    • (1991) J Opl Res Soc , vol.42 , pp. 775-783
    • Lee, J.S.1    Park, K.S.2
  • 18
    • 0031699435 scopus 로고    scopus 로고
    • An EMQ model with inpsections and random machine failures
    • Makis V and Fung J (1998). An EMQ model with inpsections and random machine failures. J Opl Res Soc 49: 66-76.
    • (1998) J Opl Res Soc , vol.49 , pp. 66-76
    • Makis, V.1    Fung, J.2
  • 19
    • 0026927270 scopus 로고
    • Production batching with machine breakdowns and safety stocks
    • Groenevelt H, Pintelon L and Seidmann A (1992). Production batching with machine breakdowns and safety stocks. Opns Res 40: 959-971.
    • (1992) Opns Res , vol.40 , pp. 959-971
    • Groenevelt, H.1    Pintelon, L.2    Seidmann, A.3
  • 20
    • 0026454137 scopus 로고
    • Production lot sizing with machine breakdowns
    • Groenevelt H, Pintelon L and Seidmann A (1992). Production lot sizing with machine breakdowns. Mngt Sci 38: 104-123.
    • (1992) Mngt Sci , vol.38 , pp. 104-123
    • Groenevelt, H.1    Pintelon, L.2    Seidmann, A.3
  • 21
    • 0032187128 scopus 로고    scopus 로고
    • Inventory management under random supply disruptions and partial backorders
    • Arreola-Risa A and DeCroix GA (1998). Inventory management under random supply disruptions and partial backorders. Naval Res Logist 45: 687-703.
    • (1998) Naval Res Logist , vol.45 , pp. 687-703
    • Arreola-Risa, A.1    DeCroix, G.A.2
  • 22
    • 0021519335 scopus 로고
    • Production-inventory with equipment replacement - PIER
    • Venkatesan M (1984). Production-inventory with equipment replacement - PIER. Opns Res 32: 1286-1295.
    • (1984) Opns Res , vol.32 , pp. 1286-1295
    • Venkatesan, M.1
  • 23
    • 0008193301 scopus 로고    scopus 로고
    • Combined production and maintenance scheduling for a multiple-product, single-machine production system
    • Sloan TW and Shanthikumar JG (2000). Combined production and maintenance scheduling for a multiple-product, single-machine production system. Product Opns Mngt 9: 379-399.
    • (2000) Product Opns Mngt , vol.9 , pp. 379-399
    • Sloan, T.W.1    Shanthikumar, J.G.2
  • 25
    • 85190779781 scopus 로고
    • On optimal replacement rules when changes of state are Markovian
    • Bellman R (ed). University of California Press: Berkeley, CA
    • Derman C (1963). On optimal replacement rules when changes of state are Markovian. In: Bellman R (ed), Mathematical Optimization Techniques. University of California Press: Berkeley, CA, pp 201-210.
    • (1963) Mathematical Optimization Techniques , pp. 201-210
    • Derman, C.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.