-
1
-
-
0001198301
-
Lot sizing with random yields: A review
-
Yano CA and Lee HL (1995). Lot sizing with random yields: a review. Opns Res 43: 311-334.
-
(1995)
Opns Res
, vol.43
, pp. 311-334
-
-
Yano, C.A.1
Lee, H.L.2
-
2
-
-
0024032613
-
Periodic review production models with variable yield and uncertain demand
-
Gerchak Y, Vickson RG and Parlar M (1988). Periodic review production models with variable yield and uncertain demand. IIE Trans 20: 144-150.
-
(1988)
IIE Trans
, vol.20
, pp. 144-150
-
-
Gerchak, Y.1
Vickson, R.G.2
Parlar, M.3
-
3
-
-
0025456687
-
The structure of periodic review policies in the presence of random yield
-
Henig M and Gerchak Y (1990). The structure of periodic review policies in the presence of random yield. Opns Res 38: 634-643.
-
(1990)
Opns Res
, vol.38
, pp. 634-643
-
-
Henig, M.1
Gerchak, Y.2
-
4
-
-
0000455414
-
Periodic review production models with variable capacity, random yield and uncertain demand
-
Wang Y and Gerchak Y (1996). Periodic review production models with variable capacity, random yield and uncertain demand. Mngt Sci 42: 130-137.
-
(1996)
Mngt Sci
, vol.42
, pp. 130-137
-
-
Wang, Y.1
Gerchak, Y.2
-
5
-
-
0029342043
-
Analysis of a (Q, r, T) inventory policy with deterministic and random yields when future supply is uncertain
-
Parlar M and Perry D (1995). Analysis of a (Q, r, T) inventory policy with deterministic and random yields when future supply is uncertain. Eur J Opl Res 84: 431-443.
-
(1995)
Eur J Opl Res
, vol.84
, pp. 431-443
-
-
Parlar, M.1
Perry, D.2
-
6
-
-
84989675172
-
Algorithms and heuristics for variable-yield lot sizing
-
Mazzola JB, McCoy WF and Wagner HM (1987). Algorithms and heuristics for variable-yield lot sizing. Naval Res Logist 34: 67-86.
-
(1987)
Naval Res Logist
, vol.34
, pp. 67-86
-
-
Mazzola, J.B.1
McCoy, W.F.2
Wagner, H.M.3
-
7
-
-
3042541901
-
A dynamic inventory model with random replenishment quantities
-
Baker H and Ehrhardt R (1995). A dynamic inventory model with random replenishment quantities. Omega 23: 109-116.
-
(1995)
Omega
, vol.23
, pp. 109-116
-
-
Baker, H.1
Ehrhardt, R.2
-
8
-
-
0033310058
-
Myopic heuristics for the random yield problem
-
Bollapragada S and Morton TE (1999). Myopic heuristics for the random yield problem. Opns Res 47: 713-722.
-
(1999)
Opns Res
, vol.47
, pp. 713-722
-
-
Bollapragada, S.1
Morton, T.E.2
-
9
-
-
0023979032
-
Production control in multistage systems with variable yield losses
-
Lee HL and Yano CA (1988). Production control in multistage systems with variable yield losses. Opns Res 36: 269-278.
-
(1988)
Opns Res
, vol.36
, pp. 269-278
-
-
Lee, H.L.1
Yano, C.A.2
-
10
-
-
0029752323
-
Control limits for multi-stage manufacturing processes with binomial yield (single and multiple production runs)
-
Barad M and Braha D (1996). Control limits for multi-stage manufacturing processes with binomial yield (single and multiple production runs). J Opl Res Soc 47: 98-112.
-
(1996)
J Opl Res Soc
, vol.47
, pp. 98-112
-
-
Barad, M.1
Braha, D.2
-
11
-
-
0028396352
-
Lot sizing in assembly systems with random component yields
-
Gerchak Y, Wang Y and Yano CA (1994). Lot sizing in assembly systems with random component yields. IIE Trans 26: 19-24.
-
(1994)
IIE Trans
, vol.26
, pp. 19-24
-
-
Gerchak, Y.1
Wang, Y.2
Yano, C.A.3
-
12
-
-
3042545957
-
Supply management in assembly systems with random yield and random demand
-
Gurnani H, Akella R and Lehoczky J (2000). Supply management in assembly systems with random yield and random demand. IIE Trans 32: 701-714.
-
(2000)
IIE Trans
, vol.32
, pp. 701-714
-
-
Gurnani, H.1
Akella, R.2
Lehoczky, J.3
-
13
-
-
0022676316
-
Economic production cycles with imperfect production processes
-
Rosenblatt MJ and Lee HL (1986). Economic production cycles with imperfect production processes. IIE Trans 18: 48-54.
-
(1986)
IIE Trans
, vol.18
, pp. 48-54
-
-
Rosenblatt, M.J.1
Lee, H.L.2
-
14
-
-
0022613610
-
Optimal lot sizing, process quality improvement and setup cost reduction
-
Porteus EL (1986). Optimal lot sizing, process quality improvement and setup cost reduction. Opns Res 34: 137-144.
-
(1986)
Opns Res
, vol.34
, pp. 137-144
-
-
Porteus, E.L.1
-
15
-
-
0023412314
-
Simultaneous determination of production cycle and inspection schedules in a production system
-
Lee HL and Rosenblatt MJ (1987). Simultaneous determination of production cycle and inspection schedules in a production system. Mngt Sci 33: 1125-1136.
-
(1987)
Mngt Sci
, vol.33
, pp. 1125-1136
-
-
Lee, H.L.1
Rosenblatt, M.J.2
-
16
-
-
0000312965
-
The impact of inspection delay on process arid inspection lot sizing
-
Porteus EL (1990). The impact of inspection delay on process arid inspection lot sizing. Mngt Sci 36: 999-1007.
-
(1990)
Mngt Sci
, vol.36
, pp. 999-1007
-
-
Porteus, E.L.1
-
17
-
-
0026220964
-
Joint determination of production cycle and inspection intervals in a deteriorating production system
-
Lee JS and Park KS (1991). Joint determination of production cycle and inspection intervals in a deteriorating production system. J Opl Res Soc 42: 775-783.
-
(1991)
J Opl Res Soc
, vol.42
, pp. 775-783
-
-
Lee, J.S.1
Park, K.S.2
-
18
-
-
0031699435
-
An EMQ model with inpsections and random machine failures
-
Makis V and Fung J (1998). An EMQ model with inpsections and random machine failures. J Opl Res Soc 49: 66-76.
-
(1998)
J Opl Res Soc
, vol.49
, pp. 66-76
-
-
Makis, V.1
Fung, J.2
-
19
-
-
0026927270
-
Production batching with machine breakdowns and safety stocks
-
Groenevelt H, Pintelon L and Seidmann A (1992). Production batching with machine breakdowns and safety stocks. Opns Res 40: 959-971.
-
(1992)
Opns Res
, vol.40
, pp. 959-971
-
-
Groenevelt, H.1
Pintelon, L.2
Seidmann, A.3
-
20
-
-
0026454137
-
Production lot sizing with machine breakdowns
-
Groenevelt H, Pintelon L and Seidmann A (1992). Production lot sizing with machine breakdowns. Mngt Sci 38: 104-123.
-
(1992)
Mngt Sci
, vol.38
, pp. 104-123
-
-
Groenevelt, H.1
Pintelon, L.2
Seidmann, A.3
-
21
-
-
0032187128
-
Inventory management under random supply disruptions and partial backorders
-
Arreola-Risa A and DeCroix GA (1998). Inventory management under random supply disruptions and partial backorders. Naval Res Logist 45: 687-703.
-
(1998)
Naval Res Logist
, vol.45
, pp. 687-703
-
-
Arreola-Risa, A.1
DeCroix, G.A.2
-
22
-
-
0021519335
-
Production-inventory with equipment replacement - PIER
-
Venkatesan M (1984). Production-inventory with equipment replacement - PIER. Opns Res 32: 1286-1295.
-
(1984)
Opns Res
, vol.32
, pp. 1286-1295
-
-
Venkatesan, M.1
-
23
-
-
0008193301
-
Combined production and maintenance scheduling for a multiple-product, single-machine production system
-
Sloan TW and Shanthikumar JG (2000). Combined production and maintenance scheduling for a multiple-product, single-machine production system. Product Opns Mngt 9: 379-399.
-
(2000)
Product Opns Mngt
, vol.9
, pp. 379-399
-
-
Sloan, T.W.1
Shanthikumar, J.G.2
-
25
-
-
85190779781
-
On optimal replacement rules when changes of state are Markovian
-
Bellman R (ed). University of California Press: Berkeley, CA
-
Derman C (1963). On optimal replacement rules when changes of state are Markovian. In: Bellman R (ed), Mathematical Optimization Techniques. University of California Press: Berkeley, CA, pp 201-210.
-
(1963)
Mathematical Optimization Techniques
, pp. 201-210
-
-
Derman, C.1
|