Volumn 184, Issue 3, 2008, Pages 915-929

Optimal batch sizing in a multi-stage production system with rework consideration

Author keywords

Manufacturing batches; Multiple cycle policy; Multiple stages; Rework; Sensitivity analysis

Indexed keywords

COSTS; NONLINEAR PROGRAMMING; PARAMETER ESTIMATION; PROCESS PLANNING; PRODUCT DEVELOPMENT; SENSITIVITY ANALYSIS;

EID: 34548565651     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2006.12.005     Document Type: Article
Times cited : (138)

References (27)
  • 3
    • 3242721026 scopus 로고
    • EBQ for a multistage production system considering rework
    • Chakraborty S., and Rao N.V. EBQ for a multistage production system considering rework. Opsearch 25 2 (1988) 75-88
    • (1988) Opsearch , vol.25 , Issue.2 , pp. 75-88
    • Chakraborty, S.1    Rao, N.V.2
  • 4
    • 0033874529 scopus 로고    scopus 로고
    • Performance evaluation and design of a CONWIP system with inspections
    • Duri C., Frein Y., and Lee H.S. Performance evaluation and design of a CONWIP system with inspections. International Journal of Production Economics 64 1-3 (2000) 219-229
    • (2000) International Journal of Production Economics , vol.64 , Issue.1-3 , pp. 219-229
    • Duri, C.1    Frein, Y.2    Lee, H.S.3
  • 7
    • 0017984961 scopus 로고
    • Economic batch quantity in a multistage production system
    • Goyal S.K. Economic batch quantity in a multistage production system. International Journal of Production Research 16 4 (1978) 267-273
    • (1978) International Journal of Production Research , vol.16 , Issue.4 , pp. 267-273
    • Goyal, S.K.1
  • 11
    • 0032124177 scopus 로고    scopus 로고
    • Economic design of screening procedures when the rejected items are reprocessed
    • Hong S.H., Kim S.B., Kwon H.M., and Lee M.K. Economic design of screening procedures when the rejected items are reprocessed. European Journal of Operational Research 108 1 (1998) 65-73
    • (1998) European Journal of Operational Research , vol.108 , Issue.1 , pp. 65-73
    • Hong, S.H.1    Kim, S.B.2    Kwon, H.M.3    Lee, M.K.4
  • 12
    • 0037464632 scopus 로고    scopus 로고
    • Lot sizing with learning and forgetting in set-ups and in product quality
    • Jaber M.Y., and Bonney M. Lot sizing with learning and forgetting in set-ups and in product quality. International Journal of Production Economics 83 1 (2003) 95-111
    • (2003) International Journal of Production Economics , vol.83 , Issue.1 , pp. 95-111
    • Jaber, M.Y.1    Bonney, M.2
  • 13
    • 0032761507 scopus 로고    scopus 로고
    • An optimal Production run length in deteriorating production process
    • Kim C.H., and Hong Y.S. An optimal Production run length in deteriorating production process. International Journal of Production Economics 58 2 (1999) 183-189
    • (1999) International Journal of Production Economics , vol.58 , Issue.2 , pp. 183-189
    • Kim, C.H.1    Hong, Y.S.2
  • 14
    • 0018479533 scopus 로고
    • Optimization of single-item multistage stochastic production-inventory systems
    • Kumar U., and Vrat P. Optimization of single-item multistage stochastic production-inventory systems. Journal of Operational Research Society 30 6 (1979) 547-553
    • (1979) Journal of Operational Research Society , vol.30 , Issue.6 , pp. 547-553
    • Kumar, U.1    Vrat, P.2
  • 15
    • 0001012373 scopus 로고
    • Lot sizing to reduce capacity utilization in production process with defective items, process corrections, and rework
    • Lee H.L. Lot sizing to reduce capacity utilization in production process with defective items, process corrections, and rework. Management Science 38 (1992) 1314-1328
    • (1992) Management Science , vol.38 , pp. 1314-1328
    • Lee, H.L.1
  • 16
    • 0022676316 scopus 로고
    • Economic production cycles with imperfect production processes
    • Lee H.L., and Rosenblatt M.J. Economic production cycles with imperfect production processes. IIE Transactions 18 (1986) 48-55
    • (1986) IIE Transactions , vol.18 , pp. 48-55
    • Lee, H.L.1    Rosenblatt, M.J.2
  • 17
    • 0031237390 scopus 로고    scopus 로고
    • Optimal batch size and investment in multistage production systems with scrap
    • Lee H.H., Chandra M.J., and Deleveaux V.J. Optimal batch size and investment in multistage production systems with scrap. Production Planning and Control 8 6 (1997) 586-596
    • (1997) Production Planning and Control , vol.8 , Issue.6 , pp. 586-596
    • Lee, H.H.1    Chandra, M.J.2    Deleveaux, V.J.3
  • 18
    • 0000752798 scopus 로고
    • Investing in reduced setups in the EOQ model
    • Porteus E.L. Investing in reduced setups in the EOQ model. Management Science 31 (1985) 998-1010
    • (1985) Management Science , vol.31 , pp. 998-1010
    • Porteus, E.L.1
  • 19
    • 0022613610 scopus 로고
    • Optimal lot sizing, process quality improvement and setup cost reduction
    • Porteus E.L. Optimal lot sizing, process quality improvement and setup cost reduction. Operations Research 34 (1986) 137-144
    • (1986) Operations Research , vol.34 , pp. 137-144
    • Porteus, E.L.1
  • 20
    • 0033874992 scopus 로고    scopus 로고
    • Economic production quantity model for items with imperfect quality
    • Salameh M.K., and Jaber M.Y. Economic production quantity model for items with imperfect quality. International Journal of Production Economics 64 1-3 (2000) 59-64
    • (2000) International Journal of Production Economics , vol.64 , Issue.1-3 , pp. 59-64
    • Salameh, M.K.1    Jaber, M.Y.2
  • 21
    • 0031145351 scopus 로고    scopus 로고
    • Manufacturing setup cost reduction under variable lead times and finite opportunities for investment
    • Sarker B.R., and Coates E.R. Manufacturing setup cost reduction under variable lead times and finite opportunities for investment. International Journal of Production Economics 49 (1997) 237-247
    • (1997) International Journal of Production Economics , vol.49 , pp. 237-247
    • Sarker, B.R.1    Coates, E.R.2
  • 22
    • 0029290859 scopus 로고
    • Optimal operating policy for a bottleneck with random rework
    • So K.C., and Tang C.S. Optimal operating policy for a bottleneck with random rework. Management Science 41 4 (1995) 620-636
    • (1995) Management Science , vol.41 , Issue.4 , pp. 620-636
    • So, K.C.1    Tang, C.S.2
  • 24
    • 0022769141 scopus 로고
    • Continuous quality production and machine maintenance
    • Tapiero C.S. Continuous quality production and machine maintenance. Naval Research Logistics Quarterly 33 3 (1986) 489-499
    • (1986) Naval Research Logistics Quarterly , vol.33 , Issue.3 , pp. 489-499
    • Tapiero, C.S.1
  • 25
    • 0024064273 scopus 로고
    • An integrated production-inventory model with reprocessing and inspection
    • Tay G.K., and Ballou D.P. An integrated production-inventory model with reprocessing and inspection. International Journal of Production Research 26 8 (1988) 1299-1315
    • (1988) International Journal of Production Research , vol.26 , Issue.8 , pp. 1299-1315
    • Tay, G.K.1    Ballou, D.P.2
  • 26
    • 1342332973 scopus 로고    scopus 로고
    • Lot sizing for a single stage single product production system with rework of perishable production defectives
    • Teunter R.H., and Flapper S.D.P. Lot sizing for a single stage single product production system with rework of perishable production defectives. OR Spectrum 25 1 (2003) 85-96
    • (2003) OR Spectrum , vol.25 , Issue.1 , pp. 85-96
    • Teunter, R.H.1    Flapper, S.D.P.2
  • 27
    • 0001068236 scopus 로고
    • Random yield, rework and scrap in a multi-stage batch manufacturing environment
    • Wein A.S. Random yield, rework and scrap in a multi-stage batch manufacturing environment. Operations Research 40 3 (1992) 551-563
    • (1992) Operations Research , vol.40 , Issue.3 , pp. 551-563
    • Wein, A.S.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.