-
1
-
-
3242721026
-
EBQ for a multistage production system considering rework
-
Chakrabarty S., Rao N.V. EBQ for a multistage production system considering rework. Opsearch. 25:(2):1988;75-88.
-
(1988)
Opsearch
, vol.25
, Issue.2
, pp. 75-88
-
-
Chakrabarty, S.1
Rao, N.V.2
-
4
-
-
0035470201
-
Production lot sizing with the reworking of imperfect quality item produced
-
Hayek P.A., Salameh M.K. Production lot sizing with the reworking of imperfect quality item produced. Production Planning and Control. 12:(6):2001;584-590.
-
(2001)
Production Planning and Control
, vol.12
, Issue.6
, pp. 584-590
-
-
Hayek, P.A.1
Salameh, M.K.2
-
5
-
-
0001012373
-
Lot sizing to reduce capacity utilization in production process with defective items, process corrections, and rework
-
Lee H.L. Lot sizing to reduce capacity utilization in production process with defective items, process corrections, and rework. Management Science. 38:(9):1992;1314-1328.
-
(1992)
Management Science
, vol.38
, Issue.9
, pp. 1314-1328
-
-
Lee, H.L.1
-
6
-
-
0031237390
-
Optimal batch size and investment in multistage production systems with scrap
-
Lee H.-H., Chandra M.J., Deleveaux V.J. Optimal batch size and investment in multistage production systems with scrap. Production Planning and Control. 8:(6):1997;586-596.
-
(1997)
Production Planning and Control
, vol.8
, Issue.6
, pp. 586-596
-
-
Lee, H.-H.1
Chandra, M.J.2
Deleveaux, V.J.3
-
7
-
-
0022676316
-
Economic production cycles with imperfect production processes
-
Lee H.L., Rosenblatt M.J. Economic production cycles with imperfect production processes. IIE Transactions. 18:(1):1986;48-55.
-
(1986)
IIE Transactions
, vol.18
, Issue.1
, pp. 48-55
-
-
Lee, H.L.1
Rosenblatt, M.J.2
-
8
-
-
0042091890
-
Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs
-
Liu J.J., Yang P. Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs. European Journal of Operational Research. 91:(3):1996;517-527.
-
(1996)
European Journal of Operational Research
, vol.91
, Issue.3
, pp. 517-527
-
-
Liu, J.J.1
Yang, P.2
-
9
-
-
0002198641
-
Optimal control of production and remanufacturing in a simple recovery model with linear cost functions
-
Minner S., Kleber R. Optimal control of production and remanufacturing in a simple recovery model with linear cost functions. OR Spektrum. 23:(1):2001;3-24.
-
(2001)
OR Spektrum
, vol.23
, Issue.1
, pp. 3-24
-
-
Minner, S.1
Kleber, R.2
-
11
-
-
0035815837
-
The reverse Wagner/Whitin model with variable manufacturing and remanufacturing cost
-
Richter K., Weber J. The reverse Wagner/Whitin model with variable manufacturing and remanufacturing cost. International Journal of Production Economics. 71:(1-3):2001;447-456.
-
(2001)
International Journal of Production Economics
, vol.71
, Issue.1-3
, pp. 447-456
-
-
Richter, K.1
Weber, J.2
-
12
-
-
0019083768
-
Optimal inventory policies when stockouts result from defective product
-
Shih W. Optimal inventory policies when stockouts result from defective product. International Journal of Production Research. 18:(6):1980;677-686.
-
(1980)
International Journal of Production Research
, vol.18
, Issue.6
, pp. 677-686
-
-
Shih, W.1
-
13
-
-
0036722111
-
On the non-optimality of the average cost approach for inventory models with remanufacturing
-
Teunter R., van der Laan E. On the non-optimality of the average cost approach for inventory models with remanufacturing. International Journal of Production Research. 79:(1):2002;67-73.
-
(2002)
International Journal of Production Research
, vol.79
, Issue.1
, pp. 67-73
-
-
Teunter, R.1
Van Der Laan, E.2
|