메뉴 건너뛰기




Volumn 126, Issue 2, 2000, Pages 371-385

Input control in a batch production system with lead times, due dates and random yields

Author keywords

[No Author keywords available]

Indexed keywords

COST EFFECTIVENESS; DYNAMIC PROGRAMMING; OPTIMAL CONTROL SYSTEMS; SCHEDULING; THEOREM PROVING;

EID: 0034675399     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0377-2217(99)00295-7     Document Type: Article
Times cited : (26)

References (21)
  • 1
    • 0029752323 scopus 로고    scopus 로고
    • Control limits for multi-stage manufacturing process with binomial yield single and multiple production runs
    • Barad, M., Braha, D., 1996. Control limits for multi-stage manufacturing process with binomial yield single and multiple production runs. Journal of the Operational Research Society 47, 98-112.
    • (1996) Journal of the Operational Research Society , vol.47 , pp. 98-112
    • Barad, M.1    Braha, D.2
  • 2
    • 0017468319 scopus 로고
    • Optimal reject allowance with constant marginal production efficiency
    • Beja, A., 1977. Optimal reject allowance with constant marginal production efficiency. Naval Research Logistics Quarterly 24, 21-33.
    • (1977) Naval Research Logistics Quarterly , vol.24 , pp. 21-33
    • Beja, A.1
  • 3
    • 84989726438 scopus 로고
    • Supply chain management in assembly systems
    • Chu, C., Proth, J.M., Xie, X., 1993. Supply chain management in assembly systems. Naval Research Logistics 40, 933-950.
    • (1993) Naval Research Logistics , vol.40 , pp. 933-950
    • Chu, C.1    Proth, J.M.2    Xie, X.3
  • 4
    • 0028396352 scopus 로고
    • Lot sizing in assembly systems with random component yields
    • Gerchak, Y., Wang, Y., Yano, C.A., 1994. Lot sizing in assembly systems with random component yields. IIE Transactions 26, 19-24.
    • (1994) IIE Transactions , vol.26 , pp. 19-24
    • Gerchak, Y.1    Wang, Y.2    Yano, C.A.3
  • 5
    • 0025516724 scopus 로고
    • Multiple lot sizing with random common-cause yield and rigid demand
    • Grosfeld-Nir, A., Gerchak, Y., 1990. Multiple lot sizing with random common-cause yield and rigid demand. Operations Research Letters 9, 383-388.
    • (1990) Operations Research Letters , vol.9 , pp. 383-388
    • Grosfeld-Nir, A.1    Gerchak, Y.2
  • 6
    • 0030218604 scopus 로고    scopus 로고
    • Production to order with random yields: Single-stage multiple lot sizing
    • Grosfeld-Nir, A., Gerchak, Y., 1996. Production to order with random yields: single-stage multiple lot sizing. IIE Transactions 28, 669-676.
    • (1996) IIE Transactions , vol.28 , pp. 669-676
    • Grosfeld-Nir, A.1    Gerchak, Y.2
  • 8
    • 0005913019 scopus 로고
    • A single bottleneck system with binomial yield and rigid demand
    • Grosfeld-Nir, A., Ronen, B., 1993. A single bottleneck system with binomial yield and rigid demand. Management Science 39, 650-653.
    • (1993) Management Science , vol.39 , pp. 650-653
    • Grosfeld-Nir, A.1    Ronen, B.2
  • 9
    • 0030285543 scopus 로고    scopus 로고
    • Optimal order policies in assembly systems with random demand and random supplier delivery
    • Gurnani, H., Akella, R., Lehoczky, J., 1996. Optimal order policies in assembly systems with random demand and random supplier delivery. IIE Transactions 28, 865-878.
    • (1996) IIE Transactions , vol.28 , pp. 865-878
    • Gurnani, H.1    Akella, R.2    Lehoczky, J.3
  • 10
    • 0025456687 scopus 로고
    • The structure of periodic review policies in the presence of variable yield
    • Henig, M., Gerchak, Y., 1990. The structure of periodic review policies in the presence of variable yield. Operations Research 38, 634-643.
    • (1990) Operations Research , vol.38 , pp. 634-643
    • Henig, M.1    Gerchak, Y.2
  • 11
    • 0041907478 scopus 로고
    • Markovian decision models for reject allowance problems
    • Klein, M., 1966. Markovian decision models for reject allowance problems. Management Science 12, 349-358.
    • (1966) Management Science , vol.12 , pp. 349-358
    • Klein, M.1
  • 12
    • 0023979032 scopus 로고
    • Production control for multi-stage systems with variable yield losses
    • Lee, H.L., Yano, C.A., 1988. Production control for multi-stage systems with variable yield losses. Operations Research 36, 269-278.
    • (1988) Operations Research , vol.36 , pp. 269-278
    • Lee, H.L.1    Yano, C.A.2
  • 13
    • 0031249189 scopus 로고    scopus 로고
    • Supply management for cost minimization in assembly systems with random component yield times
    • Proth, J.M., Mauroy, G., Wardi, Y., Chu, C., Xie, X.L., 1997. Supply management for cost minimization in assembly systems with random component yield times. Journal of Intelligent Manufacturing 8, 385-403.
    • (1997) Journal of Intelligent Manufacturing , vol.8 , pp. 385-403
    • Proth, J.M.1    Mauroy, G.2    Wardi, Y.3    Chu, C.4    Xie, X.L.5
  • 14
    • 0004267646 scopus 로고
    • Princeton University Press, Princeton, NJ
    • Rockafellar R.T., 1970. Convex Analysis. Princeton University Press, Princeton, NJ.
    • (1970) Convex Analysis
    • Rockafellar, R.T.1
  • 15
    • 0025396652 scopus 로고
    • A wafer design problem in semiconductor manufacturing for reliable customer service
    • Singh, M.R., Abraham, C.T., Akella, R., 1990. A wafer design problem in semiconductor manufacturing for reliable customer service. IEEE Transactions on CHMT 13, 103-108.
    • (1990) IEEE Transactions on CHMT , vol.13 , pp. 103-108
    • Singh, M.R.1    Abraham, C.T.2    Akella, R.3
  • 16
    • 0022681090 scopus 로고
    • A heuristic for multiple lot sizing for an order under variable yield
    • Sepehri, M., Silver, E.A., New, C., 1986. A heuristic for multiple lot sizing for an order under variable yield. IIE Transactions 18, 63-69.
    • (1986) IIE Transactions , vol.18 , pp. 63-69
    • Sepehri, M.1    Silver, E.A.2    New, C.3
  • 17
    • 0000455414 scopus 로고    scopus 로고
    • Periodic review production models with variable capacity, random yield, and uncertain demand
    • Wang, Y., Gerchak, Y., 1996. Periodic review production models with variable capacity, random yield, and uncertain demand. Management Science 42, 130-137.
    • (1996) Management Science , vol.42 , pp. 130-137
    • Wang, Y.1    Gerchak, Y.2
  • 18
    • 0001068236 scopus 로고
    • Random yield, rework and scrap in multi-stage batch manufacturing environments
    • Wein, A.S., 1992. Random yield, rework and scrap in multi-stage batch manufacturing environments. Operations Research 40, 551-563.
    • (1992) Operations Research , vol.40 , pp. 551-563
    • Wein, A.S.1
  • 19
    • 0005548957 scopus 로고
    • Dynamic programming and systems of uncertain duration
    • White, D.J., 1965. Dynamic programming and systems of uncertain duration. Management Science 12, 37-67.
    • (1965) Management Science , vol.12 , pp. 37-67
    • White, D.J.1
  • 20
    • 0001198301 scopus 로고
    • Lot sizing with random yields a review
    • H.L.
    • Yano, C.A., Lee, 1995. H.L. Lot sizing with random yields a review. Operations Research 43, 311-334.
    • (1995) Operations Research , vol.43 , pp. 311-334
    • Yano, C.A.1    Lee2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.