메뉴 건너뛰기




Volumn 35, Issue 7, 2011, Pages 3596-3610

A multi-objective production smoothing model with compressible operating times

Author keywords

Available time; Compressible operating time; Multi objective; Multi period; Multi product; Production smoothing

Indexed keywords

AVAILABLE TIME; MULTI OBJECTIVE; MULTI-PERIOD; MULTI-PRODUCTS; OPERATING TIME; PRODUCTION SMOOTHING;

EID: 79953222174     PISSN: 0307904X     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.apm.2011.01.038     Document Type: Article
Times cited : (22)

References (54)
  • 2
    • 0011718181 scopus 로고    scopus 로고
    • Finished goods management for JIT production: new models for analysis
    • Ehrhardt R. Finished goods management for JIT production: new models for analysis. Int. J. Comput. Integr. Manuf. 1998, 11:217-225.
    • (1998) Int. J. Comput. Integr. Manuf. , vol.11 , pp. 217-225
    • Ehrhardt, R.1
  • 3
    • 79953209788 scopus 로고    scopus 로고
    • A multi-objective approach for production smoothing problem, in: Proceedings of the Second International Conference of Iranian Operations Research Society, Iran
    • M.B. Aryanezhad, M. Karimi-Nasab, A multi-objective approach for production smoothing problem, in: Proceedings of the Second International Conference of Iranian Operations Research Society, Iran, 2009, pp. 315-319.
    • (2009) , pp. 315-319
    • Aryanezhad, M.B.1    Karimi-Nasab, M.2
  • 4
    • 0025434989 scopus 로고
    • Disaggregating aggregate production plans to smooth workload variation
    • Azoza M.A., Bonney M.C. Disaggregating aggregate production plans to smooth workload variation. Eng. Costs Prod. Econ. 1990, 19:125-131.
    • (1990) Eng. Costs Prod. Econ. , vol.19 , pp. 125-131
    • Azoza, M.A.1    Bonney, M.C.2
  • 5
    • 34547397316 scopus 로고    scopus 로고
    • Analysis and solution to the single-level batch production smoothing problem
    • Yavuz M., Tufekci S. Analysis and solution to the single-level batch production smoothing problem. Int. J. Prod. Res. 2007, 45:3893-3916.
    • (2007) Int. J. Prod. Res. , vol.45 , pp. 3893-3916
    • Yavuz, M.1    Tufekci, S.2
  • 6
    • 34547246295 scopus 로고    scopus 로고
    • Production smoothing in just-in-time manufacturing systems: a review of the models and solution approaches
    • Yavuz M., Akcali E. Production smoothing in just-in-time manufacturing systems: a review of the models and solution approaches. Int. J. Prod. Res. 2007, 45:3579-3597.
    • (2007) Int. J. Prod. Res. , vol.45 , pp. 3579-3597
    • Yavuz, M.1    Akcali, E.2
  • 7
    • 33745164902 scopus 로고    scopus 로고
    • Optimizing production smoothing decisions via batch selection for mixed-model just-in-time manufacturing systems with arbitrary setup and processing times
    • Yavuz M., Akcali E., Tufekci S. Optimizing production smoothing decisions via batch selection for mixed-model just-in-time manufacturing systems with arbitrary setup and processing times. Int. J. Prod. Res. 2006, 44:3061-3081.
    • (2006) Int. J. Prod. Res. , vol.44 , pp. 3061-3081
    • Yavuz, M.1    Akcali, E.2    Tufekci, S.3
  • 8
    • 33745839897 scopus 로고    scopus 로고
    • A bounded dynamic programming solution to the batching problem in mixed-model just-in-time manufacturing systems
    • Yavuz M., Tufekci S. A bounded dynamic programming solution to the batching problem in mixed-model just-in-time manufacturing systems. Int. J. Prod. Econ. 2006, 103:841-862.
    • (2006) Int. J. Prod. Econ. , vol.103 , pp. 841-862
    • Yavuz, M.1    Tufekci, S.2
  • 9
    • 0027148257 scopus 로고
    • Production planning and control in a JIT environment
    • Sengupta S., Davis R.P., Ferrell W.G. Production planning and control in a JIT environment. Appl. Math. Model. 1993, 17:41-46.
    • (1993) Appl. Math. Model. , vol.17 , pp. 41-46
    • Sengupta, S.1    Davis, R.P.2    Ferrell, W.G.3
  • 10
    • 34249950138 scopus 로고    scopus 로고
    • An empirical analysis of just-in-time production in Japanese manufacturing companies
    • Matsui Y. An empirical analysis of just-in-time production in Japanese manufacturing companies. Int. J. Prod. Econ. 2007, 108:153-164.
    • (2007) Int. J. Prod. Econ. , vol.108 , pp. 153-164
    • Matsui, Y.1
  • 11
    • 3242676894 scopus 로고    scopus 로고
    • Production smoothing in the Japanese vehicle industry
    • Mollick A.V. Production smoothing in the Japanese vehicle industry. Int. J. Prod. Econ. 2004, 91:63-74.
    • (2004) Int. J. Prod. Econ. , vol.91 , pp. 63-74
    • Mollick, A.V.1
  • 12
    • 0030412014 scopus 로고    scopus 로고
    • Integrating material coordination and capacity load smoothing in multi-product multi-phase production systems
    • Bertrand J.W.M., Van-Oijen H.P.G. Integrating material coordination and capacity load smoothing in multi-product multi-phase production systems. Int. J. Prod. Econ. 1996, 46-47:1-12.
    • (1996) Int. J. Prod. Econ. , pp. 1-12
    • Bertrand, J.W.M.1    Van-Oijen, H.P.G.2
  • 15
    • 0035973393 scopus 로고    scopus 로고
    • A Kohonen self-organizing map approach to addressing a multiple objective, mixed-model JIT sequencing problem
    • McMullen P.R. A Kohonen self-organizing map approach to addressing a multiple objective, mixed-model JIT sequencing problem. Int. J. Prod. Econ. 2001, 72:59-71.
    • (2001) Int. J. Prod. Econ. , vol.72 , pp. 59-71
    • McMullen, P.R.1
  • 16
    • 33846451096 scopus 로고    scopus 로고
    • Multi-objective single machine scheduling with nontraditional requirements
    • Haral U., Chen R.W., Ferrell W.G., Kurz M.B. Multi-objective single machine scheduling with nontraditional requirements. Int. J. Prod. Econ. 2007, 106:574-584.
    • (2007) Int. J. Prod. Econ. , vol.106 , pp. 574-584
    • Haral, U.1    Chen, R.W.2    Ferrell, W.G.3    Kurz, M.B.4
  • 17
    • 67349091412 scopus 로고    scopus 로고
    • Mutual benefits of two multicriteria analysis methodologies: a case study for batch plant design
    • Azzaro-Pantel C., Zarate P. Mutual benefits of two multicriteria analysis methodologies: a case study for batch plant design. Eng. Appl. Artif. Intell. 2009, 22:546-556.
    • (2009) Eng. Appl. Artif. Intell. , vol.22 , pp. 546-556
    • Azzaro-Pantel, C.1    Zarate, P.2
  • 18
    • 67749116576 scopus 로고    scopus 로고
    • Bi-objective optimization algorithms for joint production and maintenance scheduling: application to the parallel machine problem
    • Berrichi A., Amodeo L., Yalaoui F., Châtelet E., Mezghiche M. Bi-objective optimization algorithms for joint production and maintenance scheduling: application to the parallel machine problem. J. Intell. Manuf. 2009, 20:389-400.
    • (2009) J. Intell. Manuf. , vol.20 , pp. 389-400
    • Berrichi, A.1    Amodeo, L.2    Yalaoui, F.3    Châtelet, E.4    Mezghiche, M.5
  • 19
    • 61849139542 scopus 로고    scopus 로고
    • A new multi-objective optimization method for master production scheduling problems based on genetic algorithm
    • Soares M.M., Vieira G.E. A new multi-objective optimization method for master production scheduling problems based on genetic algorithm. Int. J. Adv. Manuf. Technol. 2009, 41:549-567.
    • (2009) Int. J. Adv. Manuf. Technol. , vol.41 , pp. 549-567
    • Soares, M.M.1    Vieira, G.E.2
  • 20
    • 55849099283 scopus 로고    scopus 로고
    • Computation of a multi-objective production planning model with probabilistic constraints
    • Sahoo N.P., Biswal M.P. Computation of a multi-objective production planning model with probabilistic constraints. Int. J. Comput. Math. 2009, 86:185-198.
    • (2009) Int. J. Comput. Math. , vol.86 , pp. 185-198
    • Sahoo, N.P.1    Biswal, M.P.2
  • 21
    • 55649106405 scopus 로고    scopus 로고
    • Multi-objective integrated optimization research on preventive maintenance planning and production scheduling for a single machine
    • Yulan J., Zuhua J., Wenrui H. Multi-objective integrated optimization research on preventive maintenance planning and production scheduling for a single machine. Int. J. Adv. Manuf. Technol. 2008, 39:954-964.
    • (2008) Int. J. Adv. Manuf. Technol. , vol.39 , pp. 954-964
    • Yulan, J.1    Zuhua, J.2    Wenrui, H.3
  • 22
    • 61449161211 scopus 로고    scopus 로고
    • A comparison of simple heuristics for multi-product dynamic demand lot-sizing with limited warehouse capacity
    • Minner S. A comparison of simple heuristics for multi-product dynamic demand lot-sizing with limited warehouse capacity. Int. J. Prod. Econ. 2009, 118:305-310.
    • (2009) Int. J. Prod. Econ. , vol.118 , pp. 305-310
    • Minner, S.1
  • 23
    • 61449148566 scopus 로고    scopus 로고
    • Lot sizing with learning, forgetting and entropy cost
    • Jaber M.Y., Bonney M., Moualek I. Lot sizing with learning, forgetting and entropy cost. Int. J. Prod. Econ. 2009, 118:19-25.
    • (2009) Int. J. Prod. Econ. , vol.118 , pp. 19-25
    • Jaber, M.Y.1    Bonney, M.2    Moualek, I.3
  • 24
    • 34247278104 scopus 로고    scopus 로고
    • An economic lot-size model with partial backlogging hinging on waiting time and shortage period
    • San-Jose L.A., Sicilia J., Garcia-Laguna J. An economic lot-size model with partial backlogging hinging on waiting time and shortage period. Appl. Math. Model. 2007, 31:2149-2159.
    • (2007) Appl. Math. Model. , vol.31 , pp. 2149-2159
    • San-Jose, L.A.1    Sicilia, J.2    Garcia-Laguna, J.3
  • 25
    • 37349049252 scopus 로고    scopus 로고
    • Scheduling on a single machine with family setups to minimize total tardiness
    • Schaller J. Scheduling on a single machine with family setups to minimize total tardiness. Int. J. Prod. Econ. 2007, 105:329-344.
    • (2007) Int. J. Prod. Econ. , vol.105 , pp. 329-344
    • Schaller, J.1
  • 26
    • 44949145426 scopus 로고    scopus 로고
    • Multi-objective inventory planning using MOPSO and TOPSIS
    • Tsou C.S. Multi-objective inventory planning using MOPSO and TOPSIS. Expert Syst. Appl. 2008, 35:136-142.
    • (2008) Expert Syst. Appl. , vol.35 , pp. 136-142
    • Tsou, C.S.1
  • 27
    • 40649107395 scopus 로고    scopus 로고
    • Single machine scheduling problems with a learning effect
    • Wu C.C., Lee W.C. Single machine scheduling problems with a learning effect. Appl. Math. Model. 2008, 32:1191-1197.
    • (2008) Appl. Math. Model. , vol.32 , pp. 1191-1197
    • Wu, C.C.1    Lee, W.C.2
  • 28
    • 61449139202 scopus 로고    scopus 로고
    • An efficient MIP model for the capacitated lot-sizing and scheduling problem with sequence-dependent setups
    • Kovacs A., Brown K.N., Tarim S.A. An efficient MIP model for the capacitated lot-sizing and scheduling problem with sequence-dependent setups. Int. J. Prod. Econ. 2009, 118:282-291.
    • (2009) Int. J. Prod. Econ. , vol.118 , pp. 282-291
    • Kovacs, A.1    Brown, K.N.2    Tarim, S.A.3
  • 29
    • 50249122486 scopus 로고    scopus 로고
    • Fuzzy multi-objective production/distribution planning decisions with multi-product and multi-time period in a supply chain
    • Liang T.F. Fuzzy multi-objective production/distribution planning decisions with multi-product and multi-time period in a supply chain. Comput. Indust. Eng. 2008, 55:676-694.
    • (2008) Comput. Indust. Eng. , vol.55 , pp. 676-694
    • Liang, T.F.1
  • 30
    • 4043173297 scopus 로고    scopus 로고
    • A finite horizon lot-sizing problem with time-varying deterministic demand and waiting-time-dependent partial backlogging
    • Zhou Y.W., Lau H.S., Yang S.L. A finite horizon lot-sizing problem with time-varying deterministic demand and waiting-time-dependent partial backlogging. Int. J. Prod. Econ. 2004, 91:109-119.
    • (2004) Int. J. Prod. Econ. , vol.91 , pp. 109-119
    • Zhou, Y.W.1    Lau, H.S.2    Yang, S.L.3
  • 31
    • 34249979295 scopus 로고    scopus 로고
    • A seasonal demand inventory model with variable lead time and resource constraints
    • Chen K.K., Chang C.T. A seasonal demand inventory model with variable lead time and resource constraints. Appl. Math. Model. 2007, 31:2433-2445.
    • (2007) Appl. Math. Model. , vol.31 , pp. 2433-2445
    • Chen, K.K.1    Chang, C.T.2
  • 32
    • 24144438260 scopus 로고    scopus 로고
    • Deterministic economic production quantity models with time-varying demand and cost
    • Teng J.T., Ouyang L.Y., Chang C.T. Deterministic economic production quantity models with time-varying demand and cost. Appl. Math. Model. 2005, 29:987-1003.
    • (2005) Appl. Math. Model. , vol.29 , pp. 987-1003
    • Teng, J.T.1    Ouyang, L.Y.2    Chang, C.T.3
  • 33
    • 43949102416 scopus 로고    scopus 로고
    • A partial replenishment model for an inventory with constant demand
    • Choi S.K., Lim K.E., Lee E.Y. A partial replenishment model for an inventory with constant demand. Appl. Math. Model. 2008, 32:1790-1796.
    • (2008) Appl. Math. Model. , vol.32 , pp. 1790-1796
    • Choi, S.K.1    Lim, K.E.2    Lee, E.Y.3
  • 34
    • 0035815808 scopus 로고    scopus 로고
    • Multiproduct lot sizing for finite production rate
    • Bylka S., Rempala R. Multiproduct lot sizing for finite production rate. Int. J. Prod. Econ. 2001, 71:305-315.
    • (2001) Int. J. Prod. Econ. , vol.71 , pp. 305-315
    • Bylka, S.1    Rempala, R.2
  • 35
    • 1642335464 scopus 로고    scopus 로고
    • MIP-based heuristics for capacitated lot sizing problems
    • Merce C., Fontan G. MIP-based heuristics for capacitated lot sizing problems. Int. J. Prod. Econ. 2003, 85:97-111.
    • (2003) Int. J. Prod. Econ. , vol.85 , pp. 97-111
    • Merce, C.1    Fontan, G.2
  • 36
    • 0035852851 scopus 로고    scopus 로고
    • Common due date assignment for scheduling on a single machine with jointly reducible processing times
    • Biskup D., Jahnke H. Common due date assignment for scheduling on a single machine with jointly reducible processing times. Int. J. Prod. Econ. 2001, 69:317-322.
    • (2001) Int. J. Prod. Econ. , vol.69 , pp. 317-322
    • Biskup, D.1    Jahnke, H.2
  • 37
    • 22044438294 scopus 로고    scopus 로고
    • Optimization of continuous-time production planning using hybrid genetic algorithms-simulated annealing
    • Ganesh K., Punniyamoorthy M. Optimization of continuous-time production planning using hybrid genetic algorithms-simulated annealing. Int. J. Adv. Manuf. Technol. 2005, 26:148-154.
    • (2005) Int. J. Adv. Manuf. Technol. , vol.26 , pp. 148-154
    • Ganesh, K.1    Punniyamoorthy, M.2
  • 38
    • 34848904864 scopus 로고    scopus 로고
    • A new variable reduction technique for convex integer quadratic programs
    • Hua Z., Zhang B., Xu X. A new variable reduction technique for convex integer quadratic programs. Appl. Math. Model. 2008, 32:224-231.
    • (2008) Appl. Math. Model. , vol.32 , pp. 224-231
    • Hua, Z.1    Zhang, B.2    Xu, X.3
  • 39
    • 1342328090 scopus 로고    scopus 로고
    • Simulated annealing in lot sizing problems
    • Tang O. Simulated annealing in lot sizing problems. Int. J. Prod. Econ. 2004, 88:173-181.
    • (2004) Int. J. Prod. Econ. , vol.88 , pp. 173-181
    • Tang, O.1
  • 42
    • 35748949865 scopus 로고    scopus 로고
    • Extensions of TOPSIS for large scale multi-objective non-linear programming problems with block angular structure
    • Abo-Sinna M.A., Amer A.H., Ibrahim A.S. Extensions of TOPSIS for large scale multi-objective non-linear programming problems with block angular structure. Appl. Math. Model. 2008, 32:292-302.
    • (2008) Appl. Math. Model. , vol.32 , pp. 292-302
    • Abo-Sinna, M.A.1    Amer, A.H.2    Ibrahim, A.S.3
  • 44
    • 70449378452 scopus 로고    scopus 로고
    • Multi-objective model of mixed continuous/batch plants planning problem and its particle swarm optimization algorithm
    • Xu X., Dai X., Hao P., Wang W. Multi-objective model of mixed continuous/batch plants planning problem and its particle swarm optimization algorithm. Control Decis. Conf. 2009, 17:2521-2526.
    • (2009) Control Decis. Conf. , vol.17 , pp. 2521-2526
    • Xu, X.1    Dai, X.2    Hao, P.3    Wang, W.4
  • 45
    • 70449134141 scopus 로고    scopus 로고
    • Multi-objective ACO for integrated scheduling of machines and material handling equipment in flexible manufacturing systems, in: Fifth Annual IEEE Conference on Automation Science and Engineering, Bangalore, India, August
    • T.W. Yung, S.G. Ponnambalam, M. Yogeswaran, Multi-objective ACO for integrated scheduling of machines and material handling equipment in flexible manufacturing systems, in: Fifth Annual IEEE Conference on Automation Science and Engineering, Bangalore, India, August 2009, pp. 22-25.
    • (2009) , pp. 22-25
    • Yung, T.W.1    Ponnambalam, S.G.2    Yogeswaran, M.3
  • 46
    • 34247237157 scopus 로고    scopus 로고
    • Integration of process planning and production scheduling based on a hybrid PSO and SA algorithm, in: Proceedings of the 2006 IEEE International Conference on Mechatronics and Automation, Luoyang, China, June
    • F. Zhao, A. Zhu, Z. Ren, Y. Yang, Integration of process planning and production scheduling based on a hybrid PSO and SA algorithm, in: Proceedings of the 2006 IEEE International Conference on Mechatronics and Automation, Luoyang, China, June 2006, pp. 25-28.
    • (2006) , pp. 25-28
    • Zhao, F.1    Zhu, A.2    Ren, Z.3    Yang, Y.4
  • 48
    • 58249131873 scopus 로고    scopus 로고
    • A modified method for constructing efficient solutions structure of MOLP
    • Foroughi A.A., Jafari Y. A modified method for constructing efficient solutions structure of MOLP. Appl. Math. Model. 2009, 33:2403-2410.
    • (2009) Appl. Math. Model. , vol.33 , pp. 2403-2410
    • Foroughi, A.A.1    Jafari, Y.2
  • 49
    • 33644599297 scopus 로고    scopus 로고
    • An effective genetic algorithm approach to large scale mixed integer programming problems
    • Hua Z., Huang F. An effective genetic algorithm approach to large scale mixed integer programming problems. Appl. Math. Comput. 2006, 174:897-909.
    • (2006) Appl. Math. Comput. , vol.174 , pp. 897-909
    • Hua, Z.1    Huang, F.2
  • 51
    • 0037116765 scopus 로고    scopus 로고
    • Genetic local search for multi-objective combinatorial optimization
    • Jaszkiewicz A. Genetic local search for multi-objective combinatorial optimization. Eur. J. Oper. Res. 2002, 137:50-71.
    • (2002) Eur. J. Oper. Res. , vol.137 , pp. 50-71
    • Jaszkiewicz, A.1
  • 52
    • 39149091016 scopus 로고    scopus 로고
    • Stability achievement scalarization function for multi-objective nonlinear programming problems
    • Kassem M.A.E. Stability achievement scalarization function for multi-objective nonlinear programming problems. Appl. Math. Model. 2008, 32:1044-1055.
    • (2008) Appl. Math. Model. , vol.32 , pp. 1044-1055
    • Kassem, M.A.E.1
  • 53
    • 41549151558 scopus 로고    scopus 로고
    • Finding preferred subsets of Pareto optimal solutions
    • Kao G.K., Jacobson S.H. Finding preferred subsets of Pareto optimal solutions. Comput. Optim. Appl. 2008, 40:73-95.
    • (2008) Comput. Optim. Appl. , vol.40 , pp. 73-95
    • Kao, G.K.1    Jacobson, S.H.2
  • 54
    • 33645763013 scopus 로고    scopus 로고
    • Parallelization of population-based multi-objective metaheuristics: an empirical study
    • Banos R., Gil C., Paechter B., Ortega J. Parallelization of population-based multi-objective metaheuristics: an empirical study. Appl. Math. Model. 2006, 30:578-592.
    • (2006) Appl. Math. Model. , vol.30 , pp. 578-592
    • Banos, R.1    Gil, C.2    Paechter, B.3    Ortega, J.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.